FLNG mixed refrigerant recovery storage and composition adjustment device
By designing complex pipeline connection devices in FLNG, the recycling and component adjustment of mixed refrigerant is achieved, and the problems of mixed refrigerant losses and space occupation caused by incomplete recycling of mixed refrigerant and component adjustment methods in FLNG are solved, thereby reducing the problem of mixed refrigerant losses and space occupancy caused by incomplete recycling of mixed refrigerant and component adjustment methods in FLNG. Operating costs and energy consumption are improved, and component adjustment accuracy and speed are improved.
Patent Information
- Application Number
- CN202110170868.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-02-08
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2041-02-08
AI Technical Summary
The mixed refrigerant recovery in FLNG is incomplete and the component adjustment method results in the loss of mixed refrigerant and large space occupancy, which increases operating costs.
A device including a compressor, a cooler, a gas-liquid separator, a multi-stream heat exchanger and a distillation tower was designed, and complex circuits were formed through pipeline connections to realize the recovery of mixed refrigerant and component adjustment. The compressor and multi-stream heat exchanger perform light and heavy components separation and boost storage, and precisely fractionate the components through the distillation column.
It realizes efficient recycling and component adjustment of mixed refrigerant, reduces storage tank volume, reduces operating costs and energy consumption, and improves the accuracy and speed of component adjustment.
Smart Images

Figure CN112815624B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to a refrigerant recovery storage and component adjustment device, in particular to a FLNG mixed refrigerant recovery storage and component adjustment device, belonging to the field of marine engineering and new energy technology. Background Art
[0002] FLNG is a new type of floating production, storage and unloading device that integrates the production, storage, loading and unloading and transportation of offshore liquefied natural gas. It is used in the exploitation of offshore gas fields and has the characteristics of low investment cost, short construction period, low development risk, easy migration and high safety. It has attracted much attention in recent years. FLNG usually uses a mixed refrigerant refrigeration process to condense natural gas into LNG. The mixed refrigerant is generally composed of light components such as nitrogen and methane and heavy components such as ethane, ethylene, propane, propylene, butane and pentane. The mixed refrigerant circulation system is a closed circulation system. During normal operation, only a small amount of replenishment is required, but the mixed refrigerant in the system needs to be recovered and stored before shutdown for maintenance.
[0003] Natural gas liquefaction equipment on land usually discharges mixed refrigerant directly into mixed refrigerant storage tanks, which results in incomplete recovery of mixed refrigerant and requires a large mixed refrigerant storage tank volume, which is not suitable for FLNG, which has extremely high space requirements.
[0004] At the same time, in actual production, the components of the mixed refrigerant need to be adjusted according to the components of the natural gas intake. Most existing devices operate by discharging part of the mixed refrigerant and then adding a single component, resulting in the loss of the mixed refrigerant and increasing operating costs. Summary of the invention
[0005] The technical problem to be solved by the present invention is to realize the recovery and storage of mixed refrigerant on FLNG and to adjust the components of the mixed refrigerant according to production needs.
[0006] In order to solve the above technical problems, the mixed refrigerant recovery, storage and component adjustment device of FLNG of the present scheme includes a compressor, wherein the inlet of the compressor is connected to the first mixed refrigerant separation tank in the mixed refrigerant circulation system through a pipeline, the outlet of the compressor is connected to the cooler through a pipeline, the cooler is connected to the gas-liquid separator through a pipeline, the liquid phase port of the gas-liquid separator is connected to the first storage tank through a pipeline, the gas phase port of the gas-liquid separator is connected to the first loop in the multi-stream heat exchanger through a pipeline, the first loop is connected to the feed port in the middle of the separation tower through a pipeline, the gas phase port of the gas-liquid separator is connected to the second loop in the multi-stream heat exchanger through a second pipeline, the second loop is connected to the condenser at the top of the separation tower through a pipeline, the condenser is connected to the third loop in the multi-stream heat exchanger through a pipeline, and the third loop is connected to the compressor inlet through a pipeline; the top of the separation tower is connected to the fourth loop in the multi-stream heat exchanger through a pipeline, and the fourth loop is connected to the mixed refrigerant compressor inlet separation tank in the mixed refrigerant circulation system through a pipeline; the bottom of the separation tower is connected to the second storage tank through a pipeline.
[0007] In the above technical solution, the liquid phase port of the gas-liquid separator is connected to the second mixed refrigerant separation tank in the mixed refrigerant circulation system through a pipeline.
[0008] In the above technical solution, the fourth loop is connected to the outside through a pipeline.
[0009] In the above technical solution, the liquid phase port of the gas-liquid separator is connected to the feed port in the middle of the separation tower through a pipeline, the compressor outlet is connected to the reboiler at the bottom of the separation tower through a pipeline, and the reboiler is connected to the gas-liquid separator through a pipeline.
[0010] In the above technical solution, the bottom of the separation tower is connected to the third mixed refrigerant separation tank in the mixed refrigerant circulation system through a pipeline.
[0011] In the above technical solution, the first storage tank and the second storage tank are connected by a pipeline.
[0012] In the above technical solution, each section of the pipeline is provided with a valve.
[0013] In the above technical solution, the compressor is a screw compressor, a reciprocating compressor or a diaphragm compressor.
[0014] In the above technical solution, the multi-stream heat exchanger is a PCHE heat exchanger or a plate-fin heat exchanger.
[0015] The mixed refrigerant recovery, storage and component adjustment device of FLNG of this scheme has the following advantages.
[0016] 1. When recycling mixed refrigerant, the light and heavy components are separated, and only the heavy components that cannot be self-sufficient and have higher value are stored. At the same time, the mixed refrigerant is pressurized and stored, which greatly reduces the volume of the mixed refrigerant storage tank and reduces space occupancy.
[0017] 2. When recovering the mixed refrigerant, light components are used for replacement to recover the heavy components to the maximum extent, thus reducing the loss of heavy components of the mixed refrigerant and reducing operating costs.
[0018] 3. When adjusting the mixed refrigerant, use a distillation tower to accurately distill out the components that need to be adjusted, adjust the components more accurately, and at the same time achieve no loss of heavy components, reducing the replenishment cost of the mixed refrigerant.
[0019] 4. Use distillation to accurately separate the mixed refrigerant components, and the mixed refrigerant components can be adjusted more quickly, which can quickly and effectively reduce the energy consumption of the mixed refrigerant circulation system and reduce production costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 This is a schematic diagram of the overall structure of an implementation method of a mixed refrigerant recovery, storage and component adjustment device for FLNG. DETAILED DESCRIPTION
[0021] See also Figure 1 , a mixed refrigerant recovery, storage and component adjustment device, includes a compressor 1, the compressor inlet is connected to the first mixed refrigerant separation tank in the mixed refrigerant circulation system 8 through a pipeline equipped with a twelfth valve V12, the compressor outlet is connected to the cooler 2 through a pipeline, and the cooler 2 is connected to the gas-liquid separator 3 through a pipeline.
[0022] The liquid phase port of the gas-liquid separator is connected to the first storage tank 5 through a pipeline equipped with a fourth valve V4 and a ninth valve V9; the liquid phase port of the gas-liquid separator is connected to the second mixed refrigerant separation tank in the mixed refrigerant circulation system 8 through a pipeline equipped with a sixth valve V6; the liquid phase port of the gas-liquid separator is connected to the middle feed port of the separation tower 4 through a pipeline equipped with a fourteenth valve V14.
[0023] The gas phase port of the gas-liquid separator is connected to the first loop in the multi-stream heat exchanger 7 through a pipeline equipped with the seventeenth valve V17, and the first loop is connected to the middle feed port of the separation tower 4 through a pipeline equipped with the fifteenth valve V15; the gas phase port of the gas-liquid separator is connected to the second loop in the multi-stream heat exchanger 7 through a pipeline equipped with the sixteenth valve V16, and the second loop is connected to the top condenser 41 of the separation tower through a pipeline equipped with the third valve V3, and the condenser 41 is connected to the third loop in the multi-stream heat exchanger 7 through a pipeline, and the third loop is connected to the compressor inlet through a pipeline.
[0024] The top of the separation tower is connected to the fourth loop in the multi-stream heat exchanger 7 through a pipeline equipped with a fifth valve V5, and the fourth loop is connected to the mixed refrigerant compressor inlet separation tank in the mixed refrigerant circulation system 8 through a pipeline equipped with a second valve V2, and the fourth loop is connected to the outside through a pipeline equipped with a first valve V1.
[0025] The compressor outlet is connected to the reboiler 42 at the bottom of the separation tower through a pipeline equipped with a thirteenth valve V13, and the reboiler 42 is connected to the gas-liquid separator 3 through a pipeline.
[0026] The bottom of the separation tower is connected to the third mixed refrigerant separation tank in the mixed refrigerant circulation system 8 through a pipeline equipped with a seventh valve V7; the bottom of the separation tower is connected to the second storage tank 6 through a pipeline equipped with an eighth valve V8 and an eleventh valve V11; the pipeline between the eighth valve V8 and the eleventh valve V11 and the pipeline between the fourth valve V4 and the ninth valve V9 are connected through a pipeline equipped with a tenth valve V10.
[0027] The first storage tank 5 and the second storage tank 6 can respectively recover the heavy components in the mixed refrigerant separated by the gas-liquid separator 3 and the separation tower 4, and the components of the heavy components separated by the two are different. The first storage tank 5 and the second storage tank 6 are connected by the tenth valve V10 to realize the switching between the two tanks.
[0028] Recycling mixed refrigerant working mode:
[0029] When the mixed refrigerant circulation system 8 stops, open the twelfth valve V12, start the compressor 1, compress the mixed refrigerant, cool it to room temperature through the cooler 2, and then send it to the gas-liquid separator 3, send the separated liquid phase to the first storage tank 5, and divide the separated gas phase into two parts and send them to the first loop and the second loop in the multi-stream heat exchanger 7, input into the condenser 41 through the second loop for throttling and cooling, and then return to the third loop in the multi-stream heat exchanger 7, return to the compressor 1 inlet after reheating, cool through the first loop and then enter the separation tower 4, the light component is discharged from the top of the tower and enters the fourth loop in the multi-stream heat exchanger 7, and returns to the mixed refrigerant circulation system 8 after reheating. The liquid phase discharged from the bottom of the separation tower 4 is sent to the second storage tank 6.
[0030] By adjusting the ratio of the two gas phases entering the multi-stream heat exchanger 7, the temperature of the multi-stream heat exchanger outlet is adjusted within the range of -30~-150℃ and gradually decreased. At the same time, the pressure at the top of the separation tower is controlled within the range of 4.5MpaG~2.5MpaG and gradually decreased. The heavy components isopentane or butane, propane or propylene, and ethylene in the mixed refrigerant are gradually separated and sent to the second storage tank 6.
[0031] When the pressure in the mixed refrigerant circulation system 8 is low or when the content of light components (methane and nitrogen) in the mixed refrigerant circulation system 8 is greater than 99%, the recovery of the mixed refrigerant is stopped.
[0032] At this time, the gas in the mixed refrigerant circulation system 8 is mainly nitrogen and methane, which are sent to the boiler as fuel gas or to the flare for combustion as needed.
[0033] Adjust the mixed refrigerant composition mode:
[0034] 1. Separation of nitrogen
[0035] When the nitrogen content in the mixed refrigerant circulation system 8 is high, the nitrogen needs to be separated and discharged.
[0036] Open the twelfth valve V12, start the compressor 1, open the sixth valve V6, and the liquid phase separated by the gas-liquid separator 3 returns to the mixed refrigerant circulation system 8. Adjust the ratio of the two gas phases of the multi-stream heat exchanger 7 so that most of the gas phase returns to the inlet of the compressor 1 after throttling. The mixed refrigerant circulates continuously, and the temperature of the multi-stream heat exchanger 7 gradually decreases. When the outlet temperature of the multi-stream heat exchanger drops to -160°C, gradually increase the gas phase to the separation tower 4, and control the pressure at the top of the separation tower 4 to 2MpaG. The gas separated from the top of the separation tower is nitrogen containing a small amount of methane. After being reheated by the multi-stream heat exchanger 7, it is discharged from the mixed refrigerant circulation system through the first valve V1. At the same time, methane is added to the mixed refrigerant circulation system until the nitrogen content in the system reaches the target value.
[0037] 2. Separation of isopentane
[0038] When the isopentane content in the mixed refrigerant circulation system 8 is high, the isopentane needs to be separated and discharged to a storage tank for temporary storage.
[0039] Open the twelfth valve V12, start the compressor 1, open the fourteenth valve V14, and the liquid phase separated by the gas-liquid separator 3 enters the separation tower 4. Adjust the opening of the thirteenth valve V13 to allow part of the high-temperature mixed refrigerant at the compressor outlet to enter the reboiler 42 at the bottom of the separation tower. Control the temperature at the bottom of the separation tower 4 to 85°C and the pressure at the top of the tower to 0.45MpaG. At this time, the liquid coming out of the bottom of the separation tower is almost pure isopentane. Open the eighth valve V8 and the eleventh valve V11 to recover the isopentane into the second storage tank 6. The gas at the top of the separation tower passes through the multi-stream heat exchanger 7 and then returns to the mixed refrigerant circulation system 8 until the isopentane content in the mixed refrigerant circulation system 8 reaches the target value.
Claims
1. A mixed refrigerant recovery, storage and component adjustment device for FLNG, comprising a compressor, wherein the compressor inlet is connected to a first mixed refrigerant separation tank in a mixed refrigerant circulation system through a pipeline, and the compressor outlet is connected to a cooler through a pipeline, characterized in that: The cooler is connected to the gas-liquid separator through a pipeline, the liquid phase port of the gas-liquid separator is connected to the first storage tank through a pipeline, the gas phase port of the gas-liquid separator is connected to the first loop in the multi-stream heat exchanger through a pipeline, the first loop is connected to the feed port in the middle of the separation tower through a pipeline, the gas phase port of the gas-liquid separator is connected to the second loop in the multi-stream heat exchanger through a second pipeline, the second loop is connected to the condenser at the top of the separation tower through a pipeline, the condenser is connected to the third loop in the multi-stream heat exchanger through a pipeline, and the third loop is connected to the compressor inlet through a pipeline; the top of the separation tower is connected to the fourth loop in the multi-stream heat exchanger through a pipeline, and the fourth loop is connected to the mixed refrigerant compressor inlet separation tank in the mixed refrigerant circulation system through a pipeline; the bottom of the separation tower is connected to the second storage tank through a pipeline; The fourth circuit is connected to the outside through a pipeline; The bottom of the separation tower is connected to the third mixed refrigerant separation tank in the mixed refrigerant circulation system through a pipeline.
2. The FLNG mixed refrigerant recovery storage and component adjustment device according to claim 1, characterized in that: The liquid phase port of the gas-liquid separator is connected to the second mixed refrigerant separation tank in the mixed refrigerant circulation system through a pipeline.
3. The FLNG mixed refrigerant recovery storage and component adjustment device according to claim 1, characterized in that: The liquid phase port of the gas-liquid separator is connected to the feed port in the middle of the separation tower through a pipeline, the compressor outlet is connected to the reboiler at the bottom of the separation tower through a pipeline, and the reboiler is connected to the gas-liquid separator through a pipeline.
4. The FLNG mixed refrigerant recovery storage and component adjustment device according to claim 1, characterized in that: The first storage tank and the second storage tank are connected via a pipeline.
5. The FLNG mixed refrigerant recovery, storage and component adjustment device according to any one of claims 1 to 4, characterized in that: Each section of the pipeline is equipped with a valve.
6. The FLNG mixed refrigerant recovery, storage and component adjustment device according to any one of claims 1 to 4, characterized in that: The compressor is a screw compressor, a reciprocating compressor or a diaphragm compressor.
7. The FLNG mixed refrigerant recovery, storage and component adjustment device according to any one of claims 1 to 4, characterized in that: The multi-stream heat exchanger is a PCHE heat exchanger or a plate-fin heat exchanger.
Citation Information
Patent Citations
Mixed refrigerant recovery and storage and component adjustment device for FLNG (floating liquefied natural gas)
CN214582078U