A wind farm wind turbine operation and maintenance virtual training and emergency drill system
By designing virtual training and emergency drill systems in wind farms and using three-dimensional models and virtual reality technology, the problem that traditional training methods cannot simulate large-scale equipment operations is solved, and the technical level and management efficiency of wind farm inspection personnel has been improved.
Patent Information
- Application Number
- CN202110153642.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-02-04
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2041-02-04
AI Technical Summary
The traditional wind farm fan safety training method cannot effectively simulate the operation of large equipment, making it difficult for operators to truly feel and master actual operations, and lack of sufficient virtual technology application in emergency drills, which fails to effectively improve the technical level of operation and inspection personnel. and management efficiency.
A virtual training and emergency drill system for wind farm fan operation and maintenance was designed. Combined with virtual reality, software development, database and network technology, a three-dimensional model of direct drive fan and asynchronous double-feed fan was established, providing interactive assembly and demonstration modules, and training Units, assessment units and emergency units, including yaw counter replacement, fan fire, collapse and speed modules, are used for comprehensive training and emergency drills, and are equipped with file units, user management, scenario configuration and help units.
It has improved the technical level of operation inspection personnel and the efficiency of wind farm operation and management, provided information-based auxiliary tools, and promoted the improvement of wind farm management technical level.
Smart Images

Figure CN112950419B_ABST
Abstract
Description
Technical Field
[0001] The invention discloses a wind farm wind turbine operation and maintenance virtual training and emergency drill system, and relates to the technical field of virtual simulation. Background Art
[0002] Safety operation training and safety emergency drills are important guarantees for the safe use and safe operation of wind turbines in wind farms. Traditional safety training methods are conducted through book operation manuals, PPTs, teaching videos, on-site guidance, etc. Obviously, traditional safety training methods have certain limitations, especially in large-scale equipment operation teaching and training. Operators can only learn by watching operation manuals or videos, and cannot really experience the actual operation of large-scale equipment.
[0003] Over the years, virtual simulation technology has been fully developed. Through three-dimensional computer graphics technology, a complete set of virtual three-dimensional models can be built and 3D stereoscopic display can be achieved, which can be well applied to solve virtual training work. However, for large wind farm wind turbine equipment, although virtual simulation technology has been applied to a certain extent in wind farms, it has not been fully and well applied in the operation training and emergency drills of wind farm wind turbines, nor has it fully solved the technical problems of virtual training and emergency drills of wind farm wind turbines. Therefore, it is of great significance to combine virtual reality, software development, database and network technology to solve the operation management needs such as personnel technical training in the actual operation management of wind farm groups and emergency handling during wind turbine operation, and improve the technical level of operation and inspection personnel. Summary of the invention
[0004] Based on the above technical problems, the present invention proposes the following technical solutions:
[0005] A wind farm wind turbine operation and maintenance virtual training and emergency drill system, comprising: a wind turbine unit, an assessment unit, a training unit, and an emergency unit. The wind turbine unit comprises a direct-drive wind turbine interactive assembly and demonstration module and an asynchronous double-fed wind turbine interactive assembly and demonstration module; a three-dimensional model of a direct-drive type wind turbine is established in the direct-drive wind turbine interactive assembly and demonstration module for interactive assembly and demonstration of the direct-drive wind turbine; a three-dimensional model of an asynchronous double-fed type wind turbine is established in the asynchronous double-fed wind turbine interactive assembly and demonstration module for interactive assembly and demonstration of the asynchronous double-fed wind turbine; the assessment unit and the emergency unit are used for the training and assessment of the entire workflow of the yaw counter replacement work; the emergency unit comprises one or more of a wind turbine fire module, a wind turbine collapse module, and a wind turbine flying car module, for emergency disposal and drills of the wind turbine;
[0006] Furthermore, the system also includes a file unit, which includes: a loading scene module for preloading large scene content; a user management module, which is used by administrators to manage user groups and user data; and a scene configuration module for at least including settings for image quality, resolution, weather, and time items.
[0007] Furthermore, the training unit and the assessment unit include an interactive and key step demonstration module of the overall process of replacing the yaw counter, a wind turbine yaw motor maintenance and replacement module, and an anemometer and wind vane replacement module.
[0008] Furthermore, the assessment unit, based on the same modules as the training unit, also adds scoring and assessment evaluation function modules.
[0009] Furthermore, the system also includes an explanation unit, which includes a scenario operation explanation module, a training operation explanation module, an assessment operation explanation module, and an emergency operation explanation module.
[0010] Furthermore, the system also includes a help unit, which includes a help manual module, an online help module, a version module, and an about module.
[0011] Furthermore, the yaw technology device replacement work includes: 1) pre-work inspection; 2) on-site briefing; 3) pre-boarding inspection; 4) yaw technology device replacement; 5) work completion.
[0012] Furthermore, the data during the yaw technology device replacement work includes: climbing wind turbine data, personnel data, accurate use data of tower safety cover; tool lifting status data, wind turbine cable twisting status data, counter alignment port data, pulse pick position data, counter cam engagement position data, and data on residual objects in the cabin.
[0013] Furthermore, a wind farm wind turbine operation and maintenance virtual training and emergency drill method is provided, which adopts any of the wind farm wind turbine operation and maintenance virtual training and emergency drill systems described above, and comprises the following steps:
[0014] S1: A three-dimensional model of the direct-drive type wind turbine and a three-dimensional model of the asynchronous double-fed type wind turbine are established, which are used for interactive assembly and demonstration of direct-drive wind turbines or interactive assembly and demonstration of asynchronous double-fed wind turbines;
[0015] and / or S2: using the training unit to train the entire workflow of the yaw counter replacement work and / or using the assessment unit to assess the entire workflow of the yaw counter replacement work;
[0016] And / or S3: using the emergency unit to carry out emergency disposal and drills for one or more of the wind turbine fire, wind turbine collapse module and wind turbine flying car module.
[0017] Further, the emergency response and drill using the emergency unit fan fire includes the following steps:
[0018] S31: When a fan fire accident occurs, the on-duty supervisor will alarm;
[0019] S32: The emergency leadership team determines the level of the emergency situation. If the level of the emergency situation is determined to be high, the initial emergency organization is activated and initial rescue operations are carried out;
[0020] S33: After the initial emergency organization is activated, the on-site emergency command organization shall carry out emergency response work, which shall at least include one or more of personnel rescue, engineering rescue, warning and traffic control, medical rescue, personnel evacuation, environmental protection, on-site monitoring, and expert consultation;
[0021] S34: After the emergency handling work, the wind turbine fire accident status is controlled. After the situation is controlled, the leader of the emergency leadership team ends the emergency;
[0022] S35: After the emergency is over, emergency recovery work is carried out, and the emergency recovery work includes: site cleaning, lifting of alert, post-accident handling, accident investigation or one or more thereof;
[0023] S36: After emergency recovery, summarize and review the emergency response and drills for wind turbine fire accidents.
[0024] The beneficial technical effect of the present invention is that the virtual training and emergency drill system for wind farm wind turbine operation and maintenance can improve the technical level of operation and maintenance personnel, has practical promotion and application value, can provide information-based auxiliary means and tools for wind power operation management, and can further promote the improvement of wind farm operation management technical level and management efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 It is a system diagram for virtual training and emergency drills for wind farm wind turbine operation and maintenance.
[0026] Figure 2 It is a design drawing of the virtual assembly of the wind turbine and the demonstration database table.
[0027] Figure 3 It is a virtual disassembly and assembly of the wind turbine and demonstrates the manual interaction interface and functional design drawings.
[0028] Figure 4 It is an information diagram of wind turbine equipment.
[0029] Figure 5 It is a flow chart of training unit and assessment unit.
[0030] Figure 6 It is a flow chart of emergency response and drill procedures for fan fire;
[0031] Figure 7 It is a schematic diagram of the module composition of the present invention. DETAILED DESCRIPTION
[0032] like Figure 1 and Figure 7 As shown in the figure, the wind farm wind turbine operation and maintenance virtual training and emergency drill system includes:
[0033] (1) File unit Figure 1 The module also includes the following modules: scene loading module, which is used to preload large scene contents, such as terrain and booster station scenes; user management module, which is used by administrators to manage user groups and user data; scene configuration module, which includes settings for image quality, resolution, weather, and time items.
[0034] (2) Fan unit ( Figure 1 Wind turbines: Direct-drive wind turbine interactive assembly and demonstration module; Asynchronous double-fed wind turbine interactive assembly and demonstration module; Other content modules to be determined.
[0035] (3) Training unit Figure 1 The training module includes: interactive and key steps demonstration module of the overall process of yaw counter replacement; wind turbine yaw motor maintenance and replacement module; anemometer and wind vane replacement module.
[0036] (4) Assessment unit Figure 1 This part basically overlaps with the training content, but with the addition of scoring and assessment modules.
[0037] (5) Emergency Unit( Figure 1 Emergency in Chinese: Emergency: Operational level emergency personnel drill function for engine room fire case.
[0038] (6) Description unit Figure 1 Various operation instructions and rule instructions include scenario operation instruction module, training operation instruction module, assessment operation instruction module and emergency operation instruction module.
[0039] (7) Help Unit( Figure 1 Help module, online help module, version module, about module.
[0040] It is worth noting that Figure 1 The word "module" is omitted in many corresponding places in the middle unit, but its meaning is the same as that with the word "module", and is not regarded as inconsistent expression of technical terms.
[0041] like Figure 2-4 As shown, the virtual disassembly and assembly of wind turbines and the demonstration include asynchronous double-fed, direct drive and other contents.
[0042] 1) Click the asynchronous double-fed menu to pop up the wind turbine component tree directory. The component names in the tree directory are associated with scene objects.
[0043] 2) The preset demonstration button can automatically assemble the fan model in a certain order.
[0044] 3) Provide mouse and keyboard functions for interacting with scene objects, and select specific components to display detailed parameter information, functions, inspection and maintenance points and other practical information.
[0045] 4) It can further associate the actual on-site maintenance information and the dynamic information of fan equipment management (not yet implemented).
[0046] 5) Select the Direct Drive button to jump to the interactive and demonstration interface of the direct drive model.
[0047] 6) Other buttons are reserved for later functions.
[0048] 7) Figure 2 As shown, the database table design.
[0049] like Figure 5 As shown, the yaw technology device (or yaw counter) replacement work includes: 1) pre-work inspection; 2) on-site briefing; 3) pre-boarding inspection; 4) yaw technology device replacement; 5) work completion.
[0050] The data for yaw technology device replacement work include: climbing wind turbine related data, personnel data, accurate use data of tower safety cover; tool lifting status data, wind turbine cable twisting status data, counter alignment port data, pulse pick position data, counter cam engagement position data; one or more of the remaining objects data in the cabin and other defect data.
[0051] Based on the wind farm wind turbine operation and maintenance virtual training and emergency drill system, a wind farm wind turbine operation and maintenance virtual training and emergency drill method can be formed accordingly, which adopts any of the wind farm wind turbine operation and maintenance virtual training and emergency drill systems described above, and includes the following steps:
[0052] S1: A three-dimensional model of the direct-drive type wind turbine and a three-dimensional model of the asynchronous double-fed type wind turbine are established, which are used for interactive assembly and demonstration of direct-drive wind turbines or interactive assembly and demonstration of asynchronous double-fed wind turbines;
[0053] and / or S2: using the training unit to train the entire workflow of the yaw counter replacement work and / or using the assessment unit to assess the entire workflow of the yaw counter replacement work;
[0054] And / or S3: using the emergency unit to carry out emergency disposal and drills for one or more of the wind turbine fire, wind turbine collapse module and wind turbine flying car module.
[0055] It is worth noting that step S1, step S2, and step S3 may have a specific order, or step S1, step S2, and step S3 may have no specific order, in which case step S1, step S2, and step S3 are merely codes for the steps.
[0056] Operation and maintenance personnel can use single step S1, step S2 or step S3 in the virtual training and emergency drill method for wind farm wind turbine operation and maintenance to achieve separate assembly and demonstration or training and / or assessment, emergency response and drills, or can use two steps (steps S1, S2, step S2, step S3, step S1, step S3) in combination or three steps (step S1, step S2, step S3) in combination according to actual needs. The virtual training and emergency drill method for wind farm wind turbine operation and maintenance can meet the actual needs of operation and maintenance personnel, and can provide information-based and reliable auxiliary means and tools for wind power operation management.
[0057] like Figure 6 As shown in the figure, the emergency response and drill procedure flow chart for wind turbine fire is taken as an example. The main drill items are initially considered to be: fire, reporting of discovery personnel step by step, accident response initiation, initial rescue, personnel rescue, on-site monitoring and other links involving the simulation and drill design of specific work items of front-line team members, which specifically include the following steps:
[0058] S31: When a fan fire accident occurs, the on-duty supervisor will alarm;
[0059] S32: The emergency leadership team determines the level of the emergency situation. If the level of the emergency situation is determined to be high, the initial emergency organization is activated and initial rescue operations are carried out;
[0060] S33: After the initial emergency organization is activated, the on-site emergency command organization shall carry out emergency response work, which shall at least include one or more of personnel rescue, engineering rescue, warning and traffic control, medical rescue, personnel evacuation, environmental protection, on-site monitoring, and expert consultation;
[0061] S34: After the emergency handling work, the wind turbine fire accident status is controlled. After the situation is controlled, the leader of the emergency leadership team ends the emergency;
[0062] S35: After the emergency is over, emergency recovery work is carried out, and the emergency recovery work includes: site cleaning, lifting of alert, post-accident handling, accident investigation or one or more thereof;
[0063] S36: After emergency recovery, summarize and review the emergency response and drills for wind turbine fire accidents.
[0064] The above contents are further detailed descriptions of the present invention in combination with specific preferred embodiments, and it cannot be determined that the specific implementation of the present invention is limited to these descriptions. For ordinary technicians in the technical field to which the present invention belongs, several simple deductions or substitutions can be made without departing from the concept of the present invention, which should be regarded as falling within the protection scope of the present invention.
Claims
1. A wind farm wind turbine operation and maintenance virtual training and emergency drill method, the method adopts a wind farm wind turbine operation and maintenance virtual training and emergency drill system, the system include: The fan unit, training unit, assessment unit and emergency unit are characterized by: Wind turbine unit, including direct-drive wind turbine interactive assembly and demonstration module, asynchronous double-fed wind turbine interactive assembly and demonstration module; A three-dimensional model of a direct-drive type wind turbine is established in the interactive assembly and demonstration module of the direct-drive wind turbine, which is used for interactive assembly and demonstration of the direct-drive wind turbine; a three-dimensional model of an asynchronous double-fed type wind turbine is established in the interactive assembly and demonstration module of the asynchronous double-fed wind turbine, which is used for interactive assembly and demonstration of the asynchronous double-fed wind turbine; Training unit and assessment unit, used for training and assessment of the entire workflow of yaw counter replacement; Emergency unit, including wind turbine fire module, wind turbine collapse module and wind turbine flying module, used for emergency disposal and drills of wind turbines; The system also includes a file unit, which includes: a loading scene module for preloading large scene content; a user management module for administrators to manage user groups and user data; a scene configuration module for at least including settings for image quality, resolution, weather, and time items; The training unit includes an interactive and key step demonstration module of the overall process of yaw counter replacement, a module for wind turbine yaw motor maintenance and replacement, and a module for anemometer and wind vane replacement; The assessment unit has the same modules as the training unit, but also has scoring and assessment function modules; The system further includes an explanation unit, which includes a scenario operation explanation module, a training operation explanation module, an assessment operation explanation module, and an emergency operation explanation module; The system further comprises a help unit, which comprises a help manual module, an online help module, a version module and an about module; The yaw counter replacement work includes the following steps: 1) pre-work inspection; 2) on-site briefing; 3) pre-boarding inspection; 4) yaw counter replacement; 5) work completion; The data of the yaw counter replacement work includes: climbing wind turbine data, personnel data, accurate use data of tower safety cover; tool lifting status data, wind turbine twisting cable status data, counter alignment port data, pulse pick position data, counter cam bite position data, and cabin residue data; The method comprises the following steps: S1: using the three-dimensional model of the direct-drive type wind turbine and the three-dimensional model of the asynchronous double-fed type wind turbine established in the wind turbine unit to perform interactive assembly and demonstration of the direct-drive wind turbine or interactive assembly and demonstration of the asynchronous double-fed wind turbine; and S2: using the training unit to train the entire workflow of the yaw counter replacement work and using the assessment unit to assess the entire workflow of the yaw counter replacement work; and S3: using the emergency unit to conduct emergency disposal and drills for wind turbine fire, wind turbine collapse module and wind turbine flying car module; Using the emergency unit to conduct emergency response and drills for wind turbine fires includes the following steps: S31: When a fan fire accident occurs, the on-duty supervisor will alarm; S32: The emergency leadership team determines the level of the emergency situation. If the level of the emergency situation is determined to be high, the initial emergency organization is activated and initial rescue operations are carried out; S33: After the initial emergency organization is activated, the on-site emergency command organization shall carry out emergency response work, which shall at least include one or more of personnel rescue, engineering rescue, warning and traffic control, medical rescue, personnel evacuation, environmental protection, on-site monitoring, and expert consultation; S34: After the emergency handling work, the wind turbine fire accident status is controlled. After the situation is controlled, the emergency leadership team ends the emergency response; S35: After the emergency is over, emergency recovery work is carried out, and the emergency recovery work includes: site cleaning, lifting of alert, post-accident handling, accident investigation or one or more thereof; S36: After emergency recovery, summarize and review the emergency response and drills for wind turbine fire accidents.
Citation Information
Patent Citations
Emergency training exercise method and system
CN101777271A
Intelligent early-warning emergency system for wind power safety and method thereof
CN102436721A
Three-dimensional emergency drilling virtual system and construction method and use method thereof
CN105976670A
Wind power plant simulation system and method
CN106971663A
Operation and maintenance training and checking system of offshore wind power plant and risk evaluation method thereof
CN107862930A
