Energy consumption estimation method and system

By obtaining equipment energy consumption information within the preset time period and retrieving the fitted energy consumption curve, the problem of high cost of obtaining equipment energy consumption data in the prior art is solved, accurate and economical energy consumption estimation is achieved, and users are simplified. Measurement process.

CN112966215BActive Publication Date: 2024-11-19HANGZHOU BROADLINK ELECTRONICS TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202110139607.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-02-01
Publication Date
2024-11-19
Estimated Expiration
2041-02-01

AI Technical Summary

Technical Problem

In the prior art, the acquisition of equipment energy consumption data requires the installation of monitoring equipment, which is relatively expensive and it is difficult to control the cost of obtaining equipment energy consumption data.

Method used

By obtaining equipment energy consumption information within the preset time period, including the status values ​​in the product identification and product function array, searching the pre-fitted product energy consumption curve, and calculating the energy consumption of the equipment during this time period based on the status values ​​and curves. , a combination method of data acquisition module, curve matching module, power acquisition module and energy consumption acquisition module is adopted.

Benefits of technology

It realizes the more accurate acquisition of equipment energy consumption data, reduces the cost of obtaining equipment energy consumption data, and does not require additional hardware investment, simplifies user measurement and filling work, and significantly improves the accuracy of equipment energy consumption estimation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112966215B_ABST
    Figure CN112966215B_ABST
Patent Text Reader

Abstract

The present application relates to an energy consumption estimation method and system, wherein the energy consumption estimation method comprises: obtaining device energy consumption information within a preset time period, the device energy consumption information comprising a product identification, a product function array, and a status value corresponding to the product function in the product function array; retrieving a pre-fitted product energy consumption curve corresponding to the product identification based on the obtained product identification; obtaining a first power value based on the obtained status value and the retrieved product energy consumption curve; obtaining the energy consumption of the device within the preset time period based on the length of the preset time period and the first power value. Through the present application, the problem that monitoring equipment is required to more accurately obtain device energy consumption data but the cost of the monitoring equipment is relatively high is solved, and the device energy consumption data is obtained more accurately, and it is beneficial to control the cost of obtaining device energy consumption data.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of equipment energy consumption, and in particular to an energy consumption estimation method and system. Background Art

[0002] In related technologies, monitoring equipment is required to obtain equipment energy consumption data more accurately, so as to formulate energy-saving and emission reduction strategies based on the equipment's energy consumption. However, the cost of monitoring equipment is high, and it is difficult to control the cost of obtaining equipment energy consumption data.

[0003] Regarding the related technologies, no effective solution has been proposed on how to obtain equipment energy consumption data more accurately. Summary of the invention

[0004] The embodiments of the present application provide an energy consumption estimation method and system, which can obtain device energy consumption data more accurately and help control the cost of obtaining device energy consumption data.

[0005] In a first aspect, an embodiment of the present application provides an energy consumption estimation method, the method comprising:

[0006] Acquire device energy consumption information within a preset time period, the device energy consumption information including a product identifier, a product function array, and a status value corresponding to a product function in the product function array;

[0007] According to the obtained product identification, a pre-fitted product energy consumption curve corresponding to the product identification is retrieved, wherein the product energy consumption curve includes a corresponding relationship between a state of a product function and a power of the device;

[0008] Obtaining a first power value according to the acquired state value and the retrieved product energy consumption curve;

[0009] The energy consumption of the device in the preset time period is obtained according to the duration of the preset time period and the first power value.

[0010] In some embodiments, the process of fitting the product energy consumption curve includes:

[0011] Acquire product information, wherein the product information includes the product identifier and a product function array;

[0012] Acquire a product function status value corresponding to the product identifier and the product function array, and a second power value corresponding to the product function status value, and generate an actual energy consumption data list;

[0013] According to the actual energy consumption data list, the product energy consumption curve is fitted.

[0014] In some embodiments, the product energy consumption curve is shown in Formula 1:

[0015] y(w,x)=w0+w1x1+...+w p x p Formula 1

[0016] Wherein, y is the first power value, and x1 to x p are different product function status values, and w0~w p are different fitting coefficients.

[0017] In some embodiments, the product information also includes standby power, w0 is the standby power value, and the product of the product function status value and the fitting coefficient is the second power value.

[0018] In some embodiments, the device reports the device energy consumption information before acquiring the device energy consumption information within the preset time period.

[0019] In a second aspect, an embodiment of the present application provides an Internet of Things control platform, which is applied to an Internet of Things system. The execution steps of the platform during energy consumption estimation include:

[0020] Acquire energy consumption information of a device in the Internet of Things system within a preset time period, wherein the device energy consumption information includes a product identifier, a product function array, and a status value corresponding to a product function in the product function array;

[0021] According to the obtained product identification, a pre-fitted product energy consumption curve corresponding to the product identification is retrieved, wherein the product energy consumption curve includes a corresponding relationship between a state of a product function and a power of the device;

[0022] Obtaining a first power value according to the acquired state value and the retrieved product energy consumption curve;

[0023] The energy consumption of the device in the preset time period is obtained according to the duration of the preset time period and the first power value.

[0024] In a third aspect, an embodiment of the present application provides an energy consumption estimation system, the system comprising a data acquisition module, a curve matching module, a power acquisition module and an energy consumption acquisition module:

[0025] A data acquisition module, used to acquire device energy consumption information within a preset time period, wherein the device energy consumption information includes a product identifier, a product function array, and a status value corresponding to a product function in the product function array;

[0026] A curve matching module, configured to retrieve a pre-fitted product energy consumption curve corresponding to the product identification according to the obtained product identification, wherein the product energy consumption curve includes a corresponding relationship between a state of a product function and a power of the device;

[0027] A power acquisition module, configured to obtain a first power value according to the acquired state value and the retrieved product energy consumption curve;

[0028] The energy consumption obtaining module obtains the energy consumption of the device within the preset time period according to the duration of the preset time period and the first power value.

[0029] In a fourth aspect, an embodiment of the present application provides an electronic device, including a memory and a processor, wherein the memory stores a computer program, and the processor is configured to run the computer program to execute the energy consumption estimation method.

[0030] In a fifth aspect, an embodiment of the present application provides a storage medium, in which a computer program is stored, wherein the computer program is configured to execute the energy consumption estimation method when it is run.

[0031] Compared with the related art, the energy consumption estimation method provided in the embodiment of the present application obtains device energy consumption information within a preset time period, and the device energy consumption information includes a product identification, a product function array, and a status value corresponding to the product function in the product function array; based on the obtained product identification, a pre-fitted product energy consumption curve corresponding to the product identification is retrieved, wherein the product energy consumption curve includes the correspondence between the status of the product function and the power of the device; based on the obtained status value and the retrieved product energy consumption curve, a first power value is obtained; based on the length of the preset time period and the first power value, the energy consumption of the device in the preset time period is obtained, which solves the problem that monitoring equipment is needed to more accurately obtain device energy consumption data, but the cost of the monitoring equipment is relatively high, and achieves more accurate acquisition of device energy consumption data, and is beneficial to controlling the cost of obtaining device energy consumption data. BRIEF DESCRIPTION OF THE DRAWINGS

[0032] The drawings described herein are used to provide a further understanding of the present application and constitute a part of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:

[0033] Figure 1 is a schematic diagram of an application environment of the energy consumption estimation method according to an embodiment of the present application;

[0034] Figure 2 is a flow chart of an energy consumption estimation method according to an embodiment of the present application;

[0035] Figure 3 is a flow chart of a fitting process of a product energy consumption curve according to an embodiment of the present application;

[0036] Figure 4 is a schematic diagram of a variation curve of a first power value and a true power value obtained according to the data in Table 1;

[0037] Figure 5 is a flowchart of querying a device energy consumption list according to an embodiment of the present application;

[0038] Figure 6 This is a flow chart of the Internet of Things control platform during energy consumption estimation according to an embodiment of the present application;

[0039] Figure 7 is a structural block diagram of an energy consumption estimation system according to an embodiment of the present application;

[0040] Figure 8 It is a schematic diagram of the internal structure of an electronic device according to an embodiment of the present application. DETAILED DESCRIPTION

[0041] In order to make the purpose, technical solutions and advantages of the present application clearer, the present application is described and illustrated below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not intended to limit the present application. Based on the embodiments provided in the present application, all other embodiments obtained by ordinary technicians in the field without making creative work are within the scope of protection of the present application.

[0042] Obviously, the drawings described below are only some examples or embodiments of the present application. For ordinary technicians in this field, the present application can also be applied to other similar scenarios based on these drawings without creative work. In addition, it can also be understood that although the efforts made in this development process may be complicated and lengthy, for ordinary technicians in this field related to the content disclosed in this application, some changes in design, manufacturing or production based on the technical content disclosed in this application are just conventional technical means, and should not be understood as insufficient content disclosed in this application.

[0043] Reference to "embodiments" in this application means that a particular feature, structure, or characteristic described in conjunction with the embodiments may be included in at least one embodiment of the present application. The appearance of the phrase in various locations in the specification does not necessarily refer to the same embodiment, nor is it an independent or alternative embodiment that is mutually exclusive with other embodiments. It is explicitly and implicitly understood by those of ordinary skill in the art that the embodiments described in this application may be combined with other embodiments without conflict.

[0044] Unless otherwise defined, the technical terms or scientific terms involved in this application should be understood by people with ordinary skills in the technical field to which this application belongs. The words "one", "a", "a", "the" and the like involved in this application do not indicate a quantitative limitation, and may represent the singular or plural. The terms "include", "comprise", "have" and any of their variations involved in this application are intended to cover non-exclusive inclusions; for example, a process, method, system, product or device that includes a series of steps or modules (units) is not limited to the listed steps or units, but may also include steps or units that are not listed, or may also include other steps or units inherent to these processes, methods, products or devices. The words "connect", "connected", "coupled" and the like involved in this application are not limited to physical or mechanical connections, but may include electrical connections, whether direct or indirect. The "multiple" involved in this application refers to two or more. "And / or" describes the association relationship of associated objects, indicating that there may be three relationships, for example, "A and / or B" can represent: A exists alone, A and B exist at the same time, and B exists alone. The character " / " generally indicates that the objects before and after are in an "or" relationship. The terms "first", "second", "third", etc. involved in this application are only used to distinguish similar objects and do not represent a specific ordering of the objects.

[0045] The energy consumption estimation method provided in this application can be applied to Figure 1 In the IoT system shown in the figure, Figure 1 is a schematic diagram of an application environment of the energy consumption estimation method according to an embodiment of the present application, such as Figure 1 As shown, in the Internet of Things system, there can be one or more devices 102, and the server 101 communicates with the device 102 through the network; an Internet of Things control platform runs in the server 101, and within a preset time period, the Internet of Things control platform obtains the device energy consumption information, and the device energy consumption information includes a product identification, a product function array, and a status value corresponding to the product function in the product function array, so as to estimate the energy consumption of the device, wherein the server 101 can be implemented with an independent server or a server cluster composed of multiple servers.

[0046] In related technologies, monitoring equipment is required to obtain equipment energy consumption data more accurately, so as to formulate energy-saving and emission reduction strategies based on the equipment's energy consumption. However, the cost of monitoring equipment is high, and it is difficult to control the cost of obtaining equipment energy consumption data.

[0047] This embodiment provides an energy consumption estimation method. Figure 2 is a flow chart of the energy consumption estimation method according to an embodiment of the present application, such as Figure 2 As shown, the process includes the following steps:

[0048] Step S201, within a preset time period, obtaining device energy consumption information, the device energy consumption information includes a product identification, a product function array, and a status value corresponding to the product function in the product function array, wherein the product identification includes one or more of the device ID, PID, product ID, MAC, etc. For example, within the preset time period, the device energy consumption information is obtained by regularly retrieving the device or by regularly reporting the device, without manual intervention, and with good reliability;

[0049] Step S202, according to the obtained product identification, retrieving a pre-fitted product energy consumption curve corresponding to the product identification, wherein the product energy consumption curve includes a corresponding relationship between a state of a product function and a power of the device;

[0050] Step S203, obtaining a first power value according to the acquired state value and the retrieved energy consumption curve of the product;

[0051] Step S204, obtaining the energy consumption of the device in the preset time period according to the length of the preset time period and the first power value, and further, accumulating the power consumption of the device in each preset time period to obtain the energy consumption of the device on a certain day.

[0052] Through the above steps S201 to S204, compared with the problem in the prior art that monitoring equipment is required to more accurately obtain equipment energy consumption data, but the cost of the monitoring equipment is relatively high, this embodiment obtains equipment energy consumption information within a preset time period, and the equipment energy consumption information includes a product identification, a product function array, and a state value corresponding to the product function in the product function array; according to the obtained product identification, a pre-fitted product energy consumption curve corresponding to the product identification is retrieved, wherein the product energy consumption curve includes a corresponding relationship between the state of the product function and the power of the equipment; according to the obtained state value and the retrieved product energy consumption curve, a first power value is obtained; according to the length of the preset time period and the first power value, the energy consumption of the equipment in the preset time period is obtained, and the energy consumption of the equipment can be estimated more accurately, which solves the problem that monitoring equipment is required to more accurately obtain equipment energy consumption data, but the cost of the monitoring equipment is relatively high, and the equipment energy consumption data is obtained more accurately without the need for additional hardware investment, which is conducive to controlling the cost of obtaining equipment energy consumption data.

[0053] Optional, Figure 3 is a flow chart of the fitting process of the product energy consumption curve according to the embodiment of the present application, such as Figure 3 As shown, the process includes the following steps:

[0054] Step S301, obtaining product information, wherein the product information includes the product identification and product function array;

[0055] Step S302, obtaining a product function status value corresponding to the product identifier and the product function array, and a second power value corresponding to the product function status value, and generating an actual energy consumption data list;

[0056] Step S303: fitting the product energy consumption curve according to the actual energy consumption data list.

[0057] Through the above steps S301 to S303, by configuring the product function array in the product information, it is possible to remove functions that are not related to the energy consumption of the device, thereby simplifying the subsequent user's measurement and filling of the product function status value and the second power value; at the same time, compared with the practice in the related art of directly taking the rated power of the device as the actual power of the device, the embodiment of the present application refines the actual power estimation of the device to the power corresponding to the status value of the function currently being used by the device. The user can obtain and enter the actual energy consumption data array into the system through offline measurement and other methods, and cooperate with the product energy consumption fitting curve, thereby significantly improving the accuracy of the device energy consumption estimation.

[0058] For example, a lamp is a commonly used IoT device and consumes a lot of energy in the IoT system. In the IoT system in the related technology, if the energy consumption monitoring device is not equipped, the IoT control platform can only monitor the switch status or certain other properties of the lamp, and cannot accurately monitor the energy consumption of the lamp. Therefore, it is impossible to accurately perceive the energy consumption of the lamp in the entire system, which is not conducive to energy conservation and emission reduction; if an energy consumption monitoring device is equipped, it is necessary to purchase corresponding current monitoring equipment, which is costly and difficult to control the manufacturing cost of the IoT system, and the feasibility is low. The energy consumption estimation method provided in the embodiment of the present application can estimate the energy consumption of the lamp more accurately without additional hardware investment, so that the user can understand the energy consumption of the lamp more accurately.

[0059] In some of the embodiments, the user adds a product through the World Wide Web (web) interface of the Internet of Things control platform, creates a new product addition page, selects the product, maintains the standby power, and selects the product function array. When selecting the product function array, the function that actually generates energy consumption of the product is selected, and the function that does not affect the energy consumption much can be unselected. For example, the product is selected as a fascon dimming bulb (000000000), and the standby power of the product is filled in as 0W. In the function set consisting of the power switch (identifier is pwr), brightness (identifier is brightness), brightness+ (identifier is brightness+), and brightness- (identifier is brightness-), the brightness (identifier is brightness) function is selected as the product function. Array. It should be noted that the function set maintained in advance can be the default template uniformly set for the product adding page, or all the functions corresponding to the product synchronized from other data tables. After clicking OK, the background corresponding to the web interface creates new product information, and saves the product information name (Name), product information description (Description) and product identification (PID) corresponding to the product according to the product selected by the user. According to the standby power value of the product filled in by the user, the standby power (StandbyPower) of the product is saved. According to the product function array selected by the user, the product function array of the product is saved. After saving, the background backend program returns a message of successful addition of product information to the web interface.

[0060] The user obtains actual energy consumption data through offline testing, and the energy consumption data includes a product function state value corresponding to each function in the product function array, and a second power value corresponding to each product function state value (i.e., the actual power corresponding to each product function state value). For example, when the power switch is on, the power corresponding to the brightness function state "0" is measured to be 0.85 watts, the power corresponding to the brightness function state "10" is measured to be 1.53 watts, and the power corresponding to the brightness function state "20" is measured to be 2.21 watts. The user enters the measured data into the product energy consumption data array to form an actual energy consumption data list, and the background saves the data entered by the user; the Internet of Things control platform fits the energy consumption curve through the algorithm model according to the actual energy consumption data list. Optionally, the algorithm model can be a linear model. For example, the product energy consumption curve is shown in Formula 1:

[0061] y(w,x)=w0+w1x1+...+w p x p Formula 1

[0062] Among them, y is the first power value of the product, and x1~x pFor different functional status values ​​of the product, w0~w p are different fitting coefficients. Further, w0 can be a standby power value, and the product of the product function status value and the fitting coefficient is the second power value. That is, the standby power value and the second power value corresponding to the acquired product function status value are linearly added to obtain the first power value.

[0063] For another example, the energy consumption curve of the product can also be shown as formula 2:

[0064] y(w,x)=w0+w1x1+w2x2+w3x1x2+w4x1 2 +w5x2 2 +…w t x p 2 Formula 2

[0065] Among them, y is the first power value of the product, and x1~x p For different functional status values ​​of the product, w0~w t are different fitting coefficients.

[0066] In some of the embodiments, the user can also maintain the rated power on the product adding page. The rated power can be used as the upper limit of the device power, and the standby power can be used as the lower limit of the device power. By setting these two values, the background can control the fitting accuracy to prevent overfitting. As long as the device is online, the power of the device is greater than or equal to the standby power and less than or equal to the rated power.

[0067] The IoT control platform uses a linear model (or other model) to automatically fit the energy consumption curves of various products through discrete data obtained by offline measurements by users, and the first power value obtained has a high accuracy. Table 1 is a comparison table of the first power value of the lamp (i.e., the estimated power value of the lamp) obtained according to the algorithm model of the embodiment of the present application and the actual power value of the lamp measured by the monitoring equipment:

[0068] Table 1

[0069] First power value True power value 0.8213934426229494 0.85 1.4968032786885237 1.53 2.172213114754098 2.21 2.8476229508196718 2.91 3.523032786885246 3.54 4.19844262295082 4.17 4.873852459016394 4.82 5.5492622950819674 5.48 6.224672131147543 6.21 6.900081967213116 6.91 7.57549180327869 7.67

[0070] According to the data in Table 1, as the brightness of the lamp increases, the increase in the first power value is very close to the actual power value. Through calculation, the average absolute error of the model is 0.040871833084948045. Figure 4 is a schematic diagram of a variation curve of the first power value and the real power value obtained according to the data in Table 1, such as Figure 4 As shown, the two curves are close to overlapping, so the energy consumption data estimated by the algorithm model according to the embodiment of the present application is more accurate.

[0071] Figure 5 is a flowchart of querying a device energy consumption list according to an embodiment of the present application, such as Figure 5 As shown, the user adds product information through the web interface, the background saves the product information, and returns a message that the product information is successfully added to the web interface; the user adds a list of actual energy consumption data through the web interface, and the background fits the product energy consumption curve according to the actual energy consumption data list through the algorithm model, and returns the added product energy consumption data list to the web interface; the background regularly queries the device attributes and calculates the energy consumption, including regularly querying the product identification, product function array, and the status value corresponding to the product function in the product function array of the device, according to the obtained product identification, retrieving the pre-fitted product energy consumption curve corresponding to the product identification, according to the obtained status value and the retrieved product energy consumption curve, obtaining the first power value, according to the length of the preset time period and the first power value, obtaining the energy consumption of the device in the preset time period, and forming a device energy consumption list; when the user needs to understand the energy consumption of the device, he can query it in the web interface, the web interface queries the background for the device energy consumption list, and the background returns the device energy consumption list to the web interface.

[0072] It should be noted that the steps shown in the above process or the flowchart in the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described can be executed in an order different from that shown here.

[0073] This embodiment also provides an Internet of Things control platform, which is applied to the Internet of Things system. Figure 6 This is a flow chart of the Internet of Things control platform during energy consumption estimation according to an embodiment of the present application, such as Figure 6 As shown, the process includes the following steps:

[0074] Step S601, obtaining energy consumption information of a device in the Internet of Things system within a preset time period, the device energy consumption information including a product identifier, a product function array, and a status value corresponding to a product function in the product function array;

[0075] Step S602, according to the obtained product identification, retrieve a pre-fitted product energy consumption curve corresponding to the product identification, wherein the product energy consumption curve includes a corresponding relationship between the state of the product function and the power of the device;

[0076] Step S603, obtaining a first power value according to the acquired state value and the retrieved energy consumption curve of the product;

[0077] Step S604: obtaining the energy consumption of the device in the preset time period according to the duration of the preset time period and the first power value.

[0078] This embodiment further provides an energy consumption estimation system 70 for implementing the above embodiment. Figure 7 is a structural block diagram of an energy consumption estimation system according to an embodiment of the present application, such as Figure 7 As shown, the system includes a data acquisition module 701, a curve matching module 702, a power acquisition module 703 and an energy consumption acquisition module 704, wherein the data acquisition module 701 is used to acquire device energy consumption information within a preset time period, wherein the device energy consumption information includes a product identification, a product function array, and a state value corresponding to the product function in the product function array; the curve matching module 702 is used to retrieve a pre-fitted product energy consumption curve corresponding to the product identification according to the obtained product identification, wherein the product energy consumption curve includes a corresponding relationship between the state of the product function and the power of the device; the power acquisition module 703 is used to obtain a first power value according to the obtained state value and the retrieved product energy consumption curve; the energy consumption acquisition module 704 obtains the energy consumption of the device within the preset time period according to the length of the preset time period and the first power value.

[0079] In some embodiments, the energy consumption acquisition module 704 is also used to, after obtaining the energy consumption of the device in the preset time period, traverse other devices in the Internet of Things system within the preset time period, and obtain the energy consumption of the Internet of Things system within the preset time period based on the energy consumption of the device and the other devices in the preset time period.

[0080] In one embodiment, Figure 8 is a schematic diagram of the internal structure of an electronic device according to an embodiment of the present application, such as Figure 8 As shown, an electronic device is provided, which may be a server, and its internal structure diagram may be as shown in Figure 8 As shown. The electronic device includes a processor, a memory, a network interface and a database connected through a system bus. Among them, the processor of the electronic device is used to provide computing and control capabilities. The memory of the electronic device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The database of the electronic device is used to store data. The network interface of the electronic device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, an energy consumption estimation method is implemented.

[0081] Those skilled in the art will understand that Figure 8The structure shown in the figure is merely a block diagram of a partial structure related to the scheme of the present application, and does not constitute a limitation on the electronic device to which the scheme of the present application is applied. The specific electronic device may include more or fewer components than shown in the figure, or combine certain components, or have a different arrangement of components.

[0082] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to memory, storage, database or other media used in the embodiments provided in this application can include non-volatile and / or volatile memory. Non-volatile memory may include read-only memory (ROM), programmable ROM (PROM), electrically programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM) or flash memory. Volatile memory may include random access memory (RAM) or external cache memory. As an illustration and not limitation, RAM is available in many forms, such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double data rate SDRAM (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronous link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM).

[0083] Those skilled in the art should understand that the various technical features of the above embodiment can be combined arbitrarily. In order to make the description concise, not all possible combinations of the various technical features in the above embodiment are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0084] The above-mentioned embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the invention patent. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the patent of the present application shall be subject to the attached claims.

Claims

1. A method for estimating energy consumption, characterized in that: The method comprises: Acquire device energy consumption information within a preset time period, the device energy consumption information including a product identifier, a product function array, and a status value corresponding to a product function in the product function array; According to the obtained product identification, a pre-fitted product energy consumption curve corresponding to the product identification is retrieved, wherein the product energy consumption curve includes a corresponding relationship between a state of a product function and a power of the device; Obtaining a first power value according to the acquired state value and the retrieved product energy consumption curve; Obtaining energy consumption of the device within the preset time period according to the duration of the preset time period and the first power value; The fitting process of the product energy consumption curve includes: Acquire product information, wherein the product information includes the product identifier and a product function array; Acquire a product function status value corresponding to the product identifier and the product function array, and a second power value corresponding to the product function status value, and generate an actual energy consumption data list; wherein the second power value is not less than the standby power of the device and not greater than the rated power of the device; According to the actual energy consumption data list, fitting the product energy consumption curve, wherein different product function status values ​​correspond to different fitting coefficients; The actual power estimation of the device is refined to the power corresponding to the status value of the function currently being used by the device, and the actual energy consumption data array is obtained and recorded in the system through offline measurement and other methods; The product energy consumption curve is shown in Formula 1: Formula 1 Among them, the is the first power value, the ~ For different product function status values, the ~ are different fitting coefficients; The product information also includes standby power, is the standby power value, and the product of the product function status value and the fitting coefficient is the second power value; Maintain the rated power on the Add Product page. The rated power can be used as the upper limit of the device power, and the standby power can be used as the lower limit of the device power. By setting the rated power and the device power, the fitting accuracy is controlled to prevent overfitting.

2. The method according to any one of claims 1, characterized in that The device reports the device energy consumption information before acquiring the device energy consumption information within the preset time period.

3. An Internet of Things control platform, applied to an Internet of Things system, characterized in that: The platform performs the following steps when estimating energy consumption: Acquire energy consumption information of a device in the Internet of Things system within a preset time period, wherein the device energy consumption information includes a product identifier, a product function array, and a status value corresponding to a product function in the product function array; According to the obtained product identification, a pre-fitted product energy consumption curve corresponding to the product identification is retrieved, wherein the product energy consumption curve includes a corresponding relationship between a state of a product function and a power of the device; Obtaining a first power value according to the acquired state value and the retrieved product energy consumption curve; Obtaining energy consumption of the device within the preset time period according to the duration of the preset time period and the first power value; Acquire product information, wherein the product information includes the product identifier and a product function array; Acquire a product function status value corresponding to the product identifier and the product function array, and a second power value corresponding to the product function status value, and generate an actual energy consumption data list; wherein the second power value is not less than the standby power of the device and not greater than the rated power of the device; According to the actual energy consumption data list, fitting the product energy consumption curve, wherein different product function status values ​​correspond to different fitting coefficients; The actual power estimation of the device is refined to the power corresponding to the status value of the function currently being used by the device, and the actual energy consumption data array is obtained and recorded in the system through offline measurement and other methods; The product energy consumption curve is shown in Formula 1: Formula 1 Among them, the is the first power value, the ~ For different product function status values, the ~ are different fitting coefficients; The product information also includes standby power, is the standby power value, and the product of the product function status value and the fitting coefficient is the second power value; Maintain the rated power on the Add Product page. The rated power can be used as the upper limit of the device power, and the standby power can be used as the lower limit of the device power. By setting the rated power and the device power, the fitting accuracy is controlled to prevent overfitting.

4. An energy consumption estimation system, characterized in that: The system includes a data acquisition module, a curve matching module, a power acquisition module and an energy consumption acquisition module: A data acquisition module, used to acquire device energy consumption information within a preset time period, wherein the device energy consumption information includes a product identifier, a product function array, and a status value corresponding to a product function in the product function array; A curve matching module, configured to retrieve a pre-fitted product energy consumption curve corresponding to the product identification according to the obtained product identification, wherein the product energy consumption curve includes a corresponding relationship between a state of a product function and a power of the device; A power acquisition module, configured to obtain a first power value according to the acquired state value and the retrieved product energy consumption curve; an energy consumption obtaining module, for obtaining the energy consumption of the device within the preset time period according to the duration of the preset time period and the first power value; The fitting process of the product energy consumption curve includes: Acquire product information, wherein the product information includes the product identifier and a product function array; Acquire a product function status value corresponding to the product identifier and the product function array, and a second power value corresponding to the product function status value, and generate an actual energy consumption data list; wherein the second power value is not less than the standby power of the device and not greater than the rated power of the device; Fitting the product energy consumption curve according to the actual energy consumption data list; The actual power estimation of the device is refined to the power corresponding to the status value of the function currently being used by the device, and the actual energy consumption data array is obtained and recorded in the system through offline measurement and other methods; The product energy consumption curve is shown in Formula 1: Formula 1 Among them, the is the first power value, the ~ For different product function status values, the ~ are different fitting coefficients; The product information also includes standby power, is the standby power value, and the product of the product function status value and the fitting coefficient is the second power value; Maintain the rated power on the Add Product page. The rated power can be used as the upper limit of the device power, and the standby power can be used as the lower limit of the device power. By setting the rated power and the device power, the fitting accuracy is controlled to prevent overfitting.

5. An electronic device comprising a memory and a processor, characterized in that: A computer program is stored in the memory, and the processor is configured to run the computer program to execute the energy consumption estimation method according to any one of claims 1 to 2.

6. A storage medium, characterized in that: The storage medium stores a computer program, wherein the computer program is configured to execute the energy consumption estimation method according to any one of claims 1 to 2 when running.