Energy dissipation device and method for large flow to divert small flow underflow

By designing the inflected concrete structure and anchoring energy dissipation work, the problem of balancing small flow and large flow energy dissipation in pumped storage projects is solved, the safety and durability of the structure are achieved, and efficient flood discharge and energy dissipation are ensured. .

CN113026686BActive Publication Date: 2024-10-29NORTHWEST ENGINEERING CORPORATION LIMITED
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202110225838.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-03-01
Publication Date
2024-10-29
Estimated Expiration
2041-03-01

AI Technical Summary

Technical Problem

In pumped storage projects and water conservancy and hydropower projects, it is difficult for existing flood discharge and energy dissipation technologies to take into account the energy dissipation effects of small and large flows, affecting the safety and durability of the structure.

Method used

An energy dissipator with large flow and small flow is designed. It adopts the base plate, ridge and anchor rod of the inverted arc concrete structure, combined with the seamed steel mesh and vertical keyway structure. Through anchoring measures and construction joint layout, it forms Stable overall structure adapts to flow changes.

Benefits of technology

When discharging high water heads and large flows, it effectively lifts the flow and dissipates energy. The water tongue is far away from the building, reducing high-speed water erosion; under small flow rates, the erosion range is small, avoiding damage to the foundation of the flood discharge building, ensuring the safety and security of the structure. Durability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113026686B_ABST
    Figure CN113026686B_ABST
Patent Text Reader

Abstract

The present invention belongs to the technical field of flood discharge and energy dissipation, and relates to an energy dissipator and method for large flow diverting small flow bottom flow. The energy dissipator of the present invention comprises a bottom plate and a tooth sill; the bottom plate is an integrated reverse arc concrete structure; the upper and downstream ends of the bottom plate are respectively provided with tooth sills, and the tooth sills are connected to the bottom plate as a whole; the left and right sides of the bottom plate are respectively provided with side walls connected to the bottom plate as a whole; anchor rods are vertically arranged on the basis of the bottom plate, and the energy dissipator is completed through six steps of excavating the foundation, installing and fixing the anchor rods, connecting and fixing the anchor rods with the connecting steel bars, installing the steel bars, installing the water stop and inserting the bars, and pouring the concrete. The present invention diverts the flow and dissipates energy when discharging flood with high head and large flow, and the water tongue is far away from the bank slope of the hub area, and the hub buildings and the bank slopes on both sides are not scoured by high-speed water flow; when the discharge water flow at a small flow rate passes through the reverse arc water-blocking section bottom flow energy dissipation and flows into the downstream river channel, and the scouring range is small and the degree is light, which avoids the scouring and damage of the foundation of the flood discharge building caused by long-term small flow operation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of flood discharge and energy dissipation in pumped storage projects and water conservancy and hydropower projects, and specifically relates to an energy dissipation device and method for large-flow diversion and small-flow bottom flow. Background Art

[0002] Appropriate energy dissipation and anti-scouring facilities must be adopted downstream of the discharge structure to prevent the discharged water from scouring the downstream riverbed and endangering the safety of the hub buildings and slopes.

[0003] In flood discharge and diversion structures in pumped storage projects and water conservancy and hydropower projects, due to the large fluctuation range of flow, the energy dissipation effects of small and large flows cannot be taken into account under the existing energy dissipation types, making it difficult to ensure the safety and durability of the structure. Summary of the invention

[0004] The object of the present invention is to provide an energy dissipation device and method which can take into account both small-flow and large-flow flood discharge and energy dissipation and can ensure the safety and durability of the structure.

[0005] In order to achieve the above object, the technical solution adopted by the present invention is:

[0006] An energy dissipator for large flow diversion and small flow bottom flow, comprising a bottom plate and a toothed sill; the bottom plate is an integrated reverse arc concrete structure; toothed sills are respectively arranged at the upstream and downstream ends of the bottom plate, and the toothed sills are connected to the bottom plate as a whole; side walls connected to the bottom plate are respectively arranged on the left and right sides of the bottom plate; anchor rods are vertically arranged on the basis of the bottom plate.

[0007] The bottom plate comprises an arc-shaped plate, an upstream slope section and a downstream slope section; the upstream slope section and the downstream slope section are respectively arranged at the upstream and downstream ends of the arc-shaped plate.

[0008] The slope ratios of the upstream slope section and the downstream slope section are 1:m and 1:n respectively, and m<n.

[0009] The length of the upstream slope section is smaller than the length of the downstream slope section.

[0010] The anchor rod is arranged in a plum blossom shape on the basis of the bottom plate.

[0011] The side wall is a concrete structure; construction joints are correspondingly arranged on the bottom plate and the side wall.

[0012] The construction joint is a vertical keyway structure.

[0013] The surfaces of the bottom plate and the side wall are respectively provided with over-seam steel meshes, and water stops are provided at the joints between the over-seam steel meshes and the key slots; and dowel bars are horizontally provided at intervals on the key slots.

[0014] A construction method for a large-flow diverter and a small-flow underflow energy dissipator, comprising the following steps:

[0015] Step 1: Excavation of foundation

[0016] Excavate the tooth sill, bottom plate and side wall foundation according to the preset shape;

[0017] Step 2: Install the anchor rod

[0018] After step 1 is completed, holes are drilled in the foundation rock, anchors are installed in the holes and anchor grouting is completed;

[0019] Step 3: Connect and fix the anchor rod and connecting steel bars

[0020] After step 2 is completed, one end of the connecting steel bar is welded to the exposed anchor rod, and the other end of the connecting steel bar is fixedly connected to the seam steel mesh on the flow surface of the bottom plate;

[0021] Step 4: Install the steel bars

[0022] Fabricate and install steel bars according to the preset steel bar diameter and spacing, and arrange and sew steel bars at construction joints;

[0023] Step 5: Install water stop and insert reinforcement

[0024] Install waterstops and dowel bars at the construction joints of the bottom slab and side wall concrete;

[0025] Step 6: Pour concrete

[0026] The bottom plate and the tooth sill are cast together with the side walls with a height of 1.5m to 1.0m.

[0027] The anchor rods penetrate 4m to 6m into the foundation rock mass.

[0028] Beneficial effects:

[0029] (1) The present invention diverts flow and dissipates energy when discharging flood water with high head and large flow, and the water tongue is far away from the bank slope of the hub area, thereby ensuring that the hub buildings and the bank slopes on both sides are not eroded by high-speed water flow.

[0030] (2) According to the present invention, at a small flow rate, the discharge water flows through the bottom flow of the anti-arc water-blocking section to dissipate energy and then flows into the downstream river channel. The scouring range is small and the scouring degree is light, thus solving the possibility of damage to the foundation of the flood discharge structure caused by long-term operation at a small flow rate.

[0031] The above description is only an overview of the technical solution of the present invention. In order to more clearly understand the technical means of the present invention and implement it according to the contents of the specification, the preferred embodiments of the present invention are described in detail below. BRIEF DESCRIPTION OF THE DRAWINGS

[0032] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0033] Figure 1 It is a schematic diagram of a standard longitudinal section of the bottom plate structure of the present invention;

[0034] Figure 2 yes Figure 1 A schematic diagram of the enlarged structure of the bottom plate structure split structure at center A;

[0035] Figure 3 It is a schematic diagram of the structure of the bottom plate, anchor rods and connecting steel bars of the present invention;

[0036] Figure 4 Schematic diagram of the plum blossom-shaped arrangement of anchor rods of the present invention.

[0037] In the figure: 1- bottom plate; 2- tooth edge; 3- side wall; 4- anchor rod; 5- keyway; 6- seam steel mesh; 7- water stop; 8- inserted steel bar; 9- connecting steel bar.

[0038] The above description is only an overview of the technical solution of the present invention. In order to more clearly understand the technical means of the present invention and implement it according to the contents of the specification, the following is a detailed description of the preferred embodiments of the present invention. DETAILED DESCRIPTION

[0039] The technical solution of the present invention will be clearly and completely described below in conjunction with the embodiments. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0040] Embodiment 1:

[0041] Reference Figure 1 to Figure 4 The energy dissipator for large flow diversion and small flow bottom flow shown in the figure comprises a bottom plate 1 and a toothed sill 2; the bottom plate 1 is an integrated reverse arc concrete structure; toothed sills 2 are respectively arranged at the upstream and downstream ends of the bottom plate 1, and the toothed sills 2 are connected to the bottom plate 1 as a whole; side walls 3 connected to the bottom plate 1 as a whole are respectively arranged on the left and right sides of the bottom plate 1; anchor rods 4 are vertically arranged on the basis of the bottom plate 1.

[0042] The working mechanism of the technical solution of the present invention is as follows: a certain pool depth is formed by utilizing the reverse arc water-blocking section, and a submerged water jump is formed when a small flow is discharged to dissipate bottom flow energy before flowing into the riverbed; when the flow increases, its working mechanism is as follows: the discharged water flow can be ejected from the reverse arc section to the riverbed, away from buildings and hub slopes.

[0043] In actual use, the tooth sills 2 are respectively arranged on the upstream and downstream sides of the anti-arc section bottom plate 1, and the foundation is located on the rock. The anti-arc section bottom plate 1 is maintained to form a stable concrete block by its own weight and contact with the rock surface or anchoring measures. The anchoring measures are to drill holes in the rock, arrange steel bars, and pour cement mortar to form anchor rods after the excavation of the anti-arc bottom plate 1 or the tooth sills 2 is completed.

[0044] Embodiment 2:

[0045] Reference Figure 1 The energy dissipator for large flow diversion and small flow bottom flow shown is based on the first embodiment, and the bottom plate 1 includes an arc-shaped plate, an upstream slope section and a downstream slope section; the upstream slope section and the downstream slope section are respectively arranged at the upstream and downstream ends of the arc-shaped plate.

[0046] In actual use, the bottom plate 1 is composed of arc-shaped plates, upstream slope sections and downstream slope sections to form an anti-arc structure. Through the anti-arc backwash section, a submerged water jump is formed when a small flow is discharged, and a spur is formed when a large flow is discharged. The plates are connected by construction joints to form an integral structure. It fully takes into account the requirements of flood discharge and energy dissipation of small and large flows, and is worthy of promotion in flood discharge and diversion buildings in pumped storage projects and water conservancy and hydropower projects, as well as flood discharge buildings with large flow changes.

[0047] Embodiment three:

[0048] Reference Figure 1 The energy dissipator with large flow rate and small flow rate underflow shown is based on the second embodiment, and the slope ratios of the upstream slope section and the downstream slope section are 1:m and 1:n respectively, and m<n.

[0049] Furthermore, the length of the upstream slope section is smaller than the length of the downstream slope section.

[0050] In actual use, the upstream slope section and the downstream slope section adopt this technical solution, so that the energy dissipation effect is better.

[0051] Embodiment 4:

[0052] Reference Figure 1 to Figure 3 The energy dissipator for large flow diversion and small flow bottom flow shown is based on the first embodiment, and the anchor rod 4 is arranged in a plum blossom shape on the basis of the bottom plate 1.

[0053] In actual use, the plum blossom-shaped arrangement makes the anchoring effect of the anchor rod 4 more uniform, strengthens the anchoring connection between the concrete structure and the bedrock, and can serve as a safety reserve for structural stability.

[0054] In this embodiment, the intervals between adjacent anchor rods 4 in the horizontal direction and the vertical direction are both 300 cm.

[0055] Embodiment five:

[0056] Reference Figure 1 The energy dissipator with large flow rate and small flow rate underflow shown is based on the first embodiment: the side wall 3 is a concrete structure; construction joints are correspondingly arranged on the bottom plate 1 and the side wall 3.

[0057] Furthermore, the construction joint is a vertical keyway 5 structure.

[0058] In actual use, construction joints are set at the downstream or upstream of the reverse arc concrete bottom plate 1 and the side wall 3 to make them integrated. Key grooves 5 are arranged on the joint surface to increase the contact area, and cross-joint steel bars 6 are arranged on the concrete structure surface of the bottom plate 1 and the side wall 3 to increase the strength of the bottom plate 1 and the side wall 3.

[0059] Embodiment six:

[0060] Reference Figure 1 The energy dissipator for large flow diverting small flow bottom flow shown is based on Example 5: the surfaces of the bottom plate 1 and the side wall 3 are respectively provided with over-seam steel mesh 6, and a water stop 7 is provided at the connection between the over-seam steel mesh 6 and the keyway 5; and dowel bars 8 are horizontally provided at intervals on the keyway 5.

[0061] In actual use, water stops 7 and inserted bars 8 are arranged at the construction joints, so that the strength of the present invention meets the requirements for energy dissipation when large and small flows are discharged.

[0062] Embodiment seven:

[0063] A construction method for a large-flow diverter and a small-flow underflow energy dissipator, comprising the following steps:

[0064] Step 1: Excavation of foundation

[0065] Excavate the foundation of the tooth sill 2, the bottom plate 1 and the side wall 3 according to the preset shape;

[0066] Step 2: Install the anchor rod

[0067] After step 1 is completed, a hole is drilled in the foundation rock, an anchor rod 4 is installed in the hole and the anchor rod grouting is completed;

[0068] Step 3: Connect and fix the anchor rod and connecting steel bars

[0069] After step 2 is completed, one end of the connecting steel bar 9 is welded to the exposed anchor rod 4, and the other end of the connecting steel bar 9 is fixedly connected to the seam steel mesh 6 on the flow surface of the bottom plate 1;

[0070] Step 4: Install the steel bars

[0071] Fabricate and install steel bars according to the preset steel bar diameter and spacing, and arrange and sew steel bars at construction joints;

[0072] Step 5: Install water stop 7 and reinforcing bar 8

[0073] Install water stop 7 and dowel 8 at the construction joints of the concrete of the bottom plate 1 and the side wall 3;

[0074] Step 6: Pour concrete

[0075] The bottom plate 1 and the tooth sill 2 are cast together with the side wall 3 with a height of 1.5m to 1.0m.

[0076] Furthermore, the anchor rod 4 penetrates 4m to 6m into the foundation rock mass.

[0077] In actual use, when the foundation is constructed, the foundation is bedrock. According to the design body shape, the tooth sill 2, the bottom plate 1 and the side wall 3 are excavated. After the excavation is completed, holes are drilled in the rock, anchor rods 4 are installed, and grouting of the anchor rods 4 is completed; after the construction of the anchor rods 4 is completed, one end of the connecting steel bar 9 is welded to the exposed anchor rod 4, and the other end is welded to the seam steel mesh 6 of the flow surface on the bottom plate 1; the steel bars are manufactured and installed according to the steel bar diameter and spacing required by the design, and the steel bars are arranged and seamed at the construction joints; then, according to the design requirements and construction organization, water stop 7 and inserted steel bar 8 are installed at the construction joints of the bottom plate 1 and the side wall 3 concrete. During the installation process, pay attention to the spacing between the position of the water stop 7 and the steel bar, and the keyway 5 template must meet the requirements of the specification. When pouring concrete, the bottom plate 1 should be poured first, and the 1.5m / 1.0m side wall 3 should be poured together. If there is impact-resistant and wear-resistant concrete on the flow surface of the bottom plate 1, it should be poured in the same warehouse. The flatness of the flow surface of the anti-arc bottom plate 1 and the side wall 3 must meet the requirements of the specification. If anchoring measures are required for the tooth ridge 2, they can be installed in parallel with the anchoring measures for the bottom plate 1 after the foundation surface excavation is completed. At the same time, the foundation can be covered and re-consolidated with grouting according to the bedrock conditions of the bottom plate.

[0078] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

[0079] In the absence of conflicts, technicians in this field can combine the relevant technical features in the above examples according to actual conditions to achieve corresponding technical effects. The specific combinations are not described here one by one.

[0080] It should be noted that all directional indications in the embodiments of the present invention (such as up, down, left, right, front, back, etc.) are only used to explain the relative position relationship, movement status, etc. between the components under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication will also change accordingly.

[0081] The above are only preferred embodiments of the present invention. The present invention will not be limited to the embodiments shown herein, but should conform to the widest scope consistent with the principles and novel features disclosed herein. Any simple modification, equivalent changes and modifications made to the above embodiments according to the technical essence of the present invention still fall within the scope of the technical solution of the present invention.

Claims

1. An energy dissipator with large flow rate and small flow rate underflow, characterized by: The invention comprises a bottom plate (1) and a toothed sill (2); the bottom plate (1) is an integrated reverse arc concrete structure; toothed sills (2) are respectively arranged at the upstream and downstream ends of the bottom plate (1), and the toothed sills (2) are connected to the bottom plate (1) as a whole; side walls (3) connected to the bottom plate (1) are respectively arranged on the left and right sides of the bottom plate (1); anchor rods (4) are vertically arranged on the base of the bottom plate (1); The bottom plate (1) comprises an arc-shaped plate, an upstream slope section and a downstream slope section; the upstream slope section and the downstream slope section are respectively arranged at the upstream and downstream ends of the arc-shaped plate; The slope ratios of the upstream slope section and the downstream slope section are 1:m and 1:n respectively, and m<n; The side wall (3) is a concrete structure; construction joints are correspondingly arranged on the bottom plate (1) and the side wall (3); the construction joints are vertical keyway (5) structures; The surfaces of the bottom plate (1) and the side wall (3) are respectively provided with a seam steel mesh (6), and a water stop (7) is provided at the junction of the seam steel mesh (6) and the keyway (5); and dowel bars (8) are horizontally provided at intervals on the keyway (5); The length of the upstream slope section is smaller than the length of the downstream slope section.

2. The energy dissipator for large flow diversion and small flow bottom flow as claimed in claim 1, characterized in that: The anchor rod (4) is arranged in a plum blossom shape on the basis of the base plate (1).

3. The construction method of a large flow diverter and small flow underflow energy dissipator as claimed in claim 1 or 2, characterized in that: The following steps are included: Step 1: Excavation of foundation Excavating the foundation of the tooth sill (2), the bottom plate (1) and the side wall (3) according to the preset body shape; Step 2: Install the anchor rod After step 1 is completed, a hole is drilled in the foundation rock, an anchor rod (4) is installed in the hole, and the anchor rod grouting is completed; Step 3: Connect and fix the anchor rod and connecting steel bars After step 2 is completed, one end of the connecting steel bar (9) is welded to the exposed anchor rod (4), and the other end of the connecting steel bar (9) is fixedly connected to the seam steel mesh (6) on the flow surface of the bottom plate (1); Step 4: Install the steel bars Fabricate and install steel bars according to the preset steel bar diameter and spacing, and arrange and sew steel bars at construction joints; Step 5: Install water stop (7) and dowel (8) Installing water stops (7) and dowel bars (8) at the construction joints of the concrete of the bottom plate (1) and the side wall (3); Step 6: Pour concrete The bottom plate (1) and the tooth sill (2) are cast together with the side wall (3) having a height of 1.5m to 1.0m.

4. The construction method of a large flow diverter and small flow underflow energy dissipator as claimed in claim 3, characterized in that: The anchor rod (4) penetrates 4m to 6m into the foundation rock mass.

Citation Information

Patent Citations

  • High-geostress narrow-valley inverted arch plunge pool and design method thereof

    CN101555687A

  • Gradually-changed drop sill type stilling pool

    CN109778800A

  • Arc cushion pool achieving bidirectional energy dissipation

    CN111648321A

  • Energy dissipater with large-flow flip flow and small-flow underflow

    CN215290010U