A reinforcement structure for an existing retaining wall and a construction method thereof

The steel pipe anchor rod and fill grouting system reinforcement method enhances retaining wall stability and integrity, addressing space and cost limitations of existing methods, particularly in confined areas.

CN113047351BInactive Publication Date: 2024-12-06ZHEJIANG COMM CONSTR GRP CO LTD
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN202110394935.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-04-13
Publication Date
2024-12-06
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Existing retaining wall reinforcement methods require significant construction space, are costly, and have limited effectiveness, especially in scenarios where space is restricted or the wall has severe damage, such as near cliffs or with increased soil pressure.

Method used

A reinforcement structure using a steel pipe anchor rod combination and an existing fill grouting system, involving drill holes, steel pipes, anchor rods, and grouting bodies, which are strategically placed to enhance the integrity and stability of the retaining wall without extensive site space requirements.

Benefits of technology

The structure effectively increases the anti-slip and anti-overturning capabilities of retaining walls, reduces soil pressure, and is cost-effective, making it suitable for various construction scenarios, including restricted spaces.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113047351B_ABST
    Figure CN113047351B_ABST
Patent Text Reader

Abstract

The invention relates to an existing retaining wall reinforcement structure, comprising an old road, wherein the old road comprises an existing retaining wall, an existing filling body and an existing mountain body; the base of the bottom of the existing retaining wall is located on the existing mountain body; the existing retaining wall reinforcement structure comprises a steel flower pipe anchor rod combination structure and an existing filling body grouting system structure; the steel flower pipe anchor rod combination structure comprises a plurality of drill holes drilled vertically downward to below the base of the retaining wall, steel flower pipes inserted into the drill holes and anchor rods buried in the steel flower pipes; a retaining wall rupture angle matched with the existing filling body grouting system structure is formed at the bottom of the existing filling body near the existing mountain body; the existing filling body grouting system structure comprises a common grouting body and a dense grouting body; the invention has a simple structure and an ingenious design; it effectively increases the anti-slip and anti-overturning capabilities of the existing retaining wall, thereby achieving the purpose of passive reinforcement; the filling body in the reinforcement range is separated by the dense grouting body, and the grouting amount of the filling body can be effectively controlled.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of geotechnical engineering, and in particular relates to an existing retaining wall reinforcement structure and a construction method thereof. Background Art

[0002] At present, in the construction of housing, highways, railways, mines, water conservancy and other projects, the wall-type structures that bear the lateral pressure of the soil body and are built to prevent the collapse of roadbed fill or hillside soil are collectively called retaining walls. Reasonable setting of retaining walls can effectively reduce the slope range of embankment slopes or cutting slopes, greatly reduce the number of earthwork projects, and play a very important role in engineering applications. Retaining walls are classified differently according to different types. Among them, gravity retaining walls have a relatively wide range of applications compared to other types of retaining walls. This type of retaining wall is most widely used, especially in areas with abundant stone materials.

[0003] As an open-air structure, retaining walls are subject to long-term rain erosion. At the same time, due to long construction time or changes in load and surrounding environment, retaining walls suffer from a variety of defects such as cracking, tilting, sliding, and bulging. If the above defects are not reinforced and treated in time, it is very easy to cause the retaining wall to suffer from aggravation of the defects until the whole wall overturns or becomes unstable.

[0004] In recent years, the reinforcement of existing retaining walls with defects usually adopts panel-type, rib-type, frame-type anchor rods or anchor cables, anti-slip piles, counter-pressure and other reinforcement methods, relying on external forces to increase the integrity of the existing retaining walls. From a technical point of view, the above methods can achieve the purpose of effective reinforcement, but the above methods have high requirements for construction space, relatively high costs and great construction difficulty. At the same time, when certain sites are restricted (such as the outside of the existing retaining wall is a cliff facing the air or very close to the structure), the above methods are difficult to implement on the one hand, and on the other hand, they greatly weaken the support capacity of the existing retaining wall, resulting in a waste of resources. Therefore, it is particularly necessary to find a technical solution for the reinforcement of existing retaining walls that does not require high construction site space, is safe and effective, is easy to construct, and has a low engineering cost.

[0005] The Chinese patent with publication number CN103510540A proposes a reinforcement construction method and structure of a mortar-laid rubble retaining wall, which casts reinforced concrete panels and vertical ribs with anchor rods on the outer side of the mortar-laid rubble retaining wall, so that the thickness of the existing retaining wall is enhanced, and the main load-bearing components are anchor rods, which play a role in reinforcing the existing retaining wall. However, the cost of the reinforcement structure project is relatively high, and it also requires sufficient space outside the retaining wall for scaffolding erection and formwork support, steel bar tying, concrete pouring or grouting, etc., which is difficult to meet the needs of projects where the outer side of the existing retaining wall is a cliff or very close to the structure.

[0006] The Chinese patent with publication number CN210766868U proposes a reinforcement structure for an existing gravity retaining wall, which includes a steel pipe-ground anchor combination structure and a crown beam. The reinforcement structure has low requirements for construction space and is suitable for situations where the space on the suspended surface is small. However, the reinforcement structure only reinforces the retaining wall, and the degree of reinforcement is limited. It is suitable for situations where the retaining wall suffers minor damage due to a small increase in soil pressure behind the wall. In actual projects, due to the long construction time of the retaining wall or changes in the load and surrounding environment, the filling material behind the wall is eroded by rainwater for a long time, and the soil pressure behind the wall often increases significantly. This reinforcement structure is difficult to meet the situation where the existing retaining wall has relatively serious damage.

[0007] The Chinese patent with publication number CN110670625A proposes a reinforced retaining wall structure and its construction method, which implants connecting main reinforcements from the wall surface and foundation surface of the original old retaining wall to the inside of the old retaining wall, connects the old retaining wall with the new retaining wall, and improves the overall force-bearing performance of the structure. On the one hand, this structure requires excavation of the retaining wall base, implantation of reinforcements, and concrete pouring in the formwork, which has high requirements for construction space and is limited in application in certain projects with limited sites; on the other hand, it is difficult to apply to projects where the existing retaining wall has slippage along the base, and its application has certain limitations.

[0008] In view of the above technical problems, improvements need to be made. Summary of the invention

[0009] The present invention aims to overcome the defects in the above-mentioned prior art and provide an existing retaining wall reinforcement structure and a construction method thereof which have low construction site space requirements, are safe and effective, are convenient to construct, and have low engineering cost.

[0010] In order to achieve the above purpose, the technical solution adopted by the present invention is: an existing retaining wall reinforcement structure, including an old road, the old road includes an existing retaining wall, an existing fill and an existing mountain; the base of the bottom of the existing retaining wall is located on the existing mountain; the existing retaining wall reinforcement structure includes a steel pipe anchor rod combination structure and an existing fill grouting system structure; the steel pipe anchor rod combination structure includes a number of drill holes drilled vertically downward to below the base of the retaining wall, steel pipes inserted into the drill holes and anchor rods buried in the steel pipes; the bottom of the existing fill is close to the existing mountain and a retaining wall rupture angle that is compatible with the existing fill grouting system structure is formed; the existing fill grouting system structure includes ordinary grouting body and dense grouting body.

[0011] As a preferred solution of the present invention, the plurality of drill holes are arranged in two rows at equal intervals, respectively along the longitudinal and transverse directions of the existing retaining wall, and the arrangement intervals are all 0.8m to 1.2m.

[0012] As a preferred solution of the present invention, the depth of the borehole is determined according to the rock and soil properties of the stratum where the base of the existing retaining wall is located; in the rock stratum, the depth of the borehole is at least 3m below the base of the existing retaining wall, and in the soil stratum, the depth of the borehole is at least 6m below the base of the existing retaining wall.

[0013] As a preferred solution of the present invention, the upper part of the steel flower pipe is 10 to 15 cm away from the top of the existing retaining wall; a plurality of grouting holes are provided in the middle and lower part of the steel flower pipe, with a hole diameter of 3 to 5 mm, arranged in a spiral pattern, a circulation spacing of 25 cm to 35 cm, and only one grouting hole in the same cross section.

[0014] As a preferred solution of the present invention, a bottom cover is provided at the bottom of the steel flower pipe, and the bottom cover is connected to a steel bottom bracket, and the steel bottom bracket is 0.5m long.

[0015] As a preferred solution of the present invention, the length of the anchor rod is consistent with the length of the steel flower tube, and the anchor rod is provided with centering brackets at equal intervals along the length direction.

[0016] As a preferred solution of the present invention, grouting material is poured into the borehole, wherein the top of the grouting material is 10 to 15 cm away from the orifice of the borehole.

[0017] As a preferred solution of the present invention, the common grouting body is located between the dense grouting bodies; the common grouting body includes a plurality of common grouting holes, and common grouting materials are poured into the common grouting holes; the common grouting holes are arranged at a vertical and horizontal spacing of 1.0 to 1.5 m. The common grouting materials are grouted to 10 to 15 cm from the hole mouth.

[0018] As a preferred solution of the present invention, the dense grouting body includes a plurality of dense grouting holes; the dense grouting holes are poured with dense grouting material, wherein the longitudinal spacing of the dense grouting holes is 10m for dividing the reinforcement area according to the reinforcement range of the existing retaining wall; the horizontal spacing of the dense grouting holes is 20cm to 30cm.

[0019] A construction method for reinforcing an existing retaining wall structure comprises the following steps:

[0020] Step A: Collect and review relevant information on existing retaining walls, determine the range of the rupture angle of the existing retaining walls, and divide the reinforcement range of the existing retaining walls into multiple reinforcement areas, such as area ①, area ②, area ③, etc.;

[0021] Step B: Based on step A, select any area, such as area ①, and drill a steel pipe-anchor combination structure vertically downward from the top of the existing retaining wall until it passes through a rock layer of not less than 3m or a soil layer of 6m below the base of the existing retaining wall;

[0022] Step C: When the existing retaining wall is relatively broken, a steel flower pipe with a bottom cover connected to a steel bottom bracket and multiple grouting holes in the middle and lower part is placed in the drilled hole by using a pipe drilling method; if the existing retaining wall is relatively intact, the whole steel flower pipe can be placed in the hole after drilling;

[0023] Step D: inserting the anchor rod provided with the centering bracket into the steel flower tube;

[0024] Step E: After the first grouting is completed in the borehole, the second grouting is performed in the steel tube to ensure that the grouting material is 10-15 cm away from the borehole mouth, and the first steel tube anchor rod assembly structure in area ① is completed;

[0025] Step F: Repeat steps B to E to complete all steel pipe anchor rod composite structures in area ① according to the skipping construction method until all steel pipe anchor rod composite structures in the entire existing retaining wall reinforcement range are completed;

[0026] Step G: according to the area selected in step B, drill holes symmetrically in the existing filling body from the dense grouting hole close to the existing retaining wall to the direction away from the existing retaining wall, and the drilling depth is at least 2m below the rupture angle of the existing retaining wall; after the drilling is completed, immediately use the dense grouting material to grout in the drilled hole to 10 to 15cm away from the hole position, until the dense grouting body in the entire existing retaining wall reinforcement range is completed;

[0027] Step H: according to the area selected in step G, the existing filling body is drilled symmetrically in sequence from the common grouting hole close to the existing retaining wall to the direction away from the existing retaining wall. After the drilling is completed, ordinary grouting material is immediately used to grout the drilled hole to 10 to 15 cm away from the hole position, until the ordinary grouting body in the entire existing retaining wall reinforcement range is fully constructed;

[0028] Step I: Repair the old road with the original old road surface material or pure cement slurry repair material in the drilled holes, dense grouting holes and the top 10 to 15 cm range of the common grouting holes of the steel pipe anchor combination structure.

[0029] The beneficial effects of the present invention are:

[0030] 1. The present invention has a simple structure and an ingenious design. The damage mechanism of the existing retaining wall is analyzed, and a reinforcement structure of a steel tube anchor rod combination structure and an existing fill grouting system system that combines active reinforcement and passive reinforcement of the existing retaining wall is proposed. The steel tube anchor rod and the drilled grouting body in the existing retaining wall greatly improve the integrity of the existing retaining wall. The steel tube anchor rod and the drilled grouting body that pass through the base of the retaining wall connect the existing retaining wall with the existing mountain as a whole, effectively increasing the anti-slip and anti-overturning capabilities of the existing retaining wall, thereby achieving the purpose of passive reinforcement. The fill within the reinforcement range is isolated by densifying the grouting body, which can effectively control the grouting amount of the fill, and the existing fill grouting system consolidates the fill, increases the friction angle in the fill, and thus reduces the soil pressure behind the retaining wall, thereby achieving the purpose of active reinforcement.

[0031] 2. The present invention does not require high construction site space for the reinforcement of existing retaining walls, and is safe, effective, easy to construct, and has low engineering cost. It solves the problem that conventional existing retaining wall reinforcement schemes have high requirements for construction site space, effectively improves the physical and mechanical properties of the soil behind the wall and reduces the active earth pressure of the retaining wall, improves the bearing capacity of the retaining wall base and the anti-slip stability, etc., and can provide a certain reference for the reinforcement design and construction of existing retaining wall disease treatment. BRIEF DESCRIPTION OF THE DRAWINGS

[0032] Figure 1 is a cross-sectional schematic diagram of the reinforcement structure of the present invention;

[0033] Figure 2 It is a plan view of the reinforcement structure of the present invention;

[0034] Figure 3 It is a schematic diagram of the current situation in which the outer side of the existing retaining wall is a cliff facing the sky;

[0035] Figure 4 It is a schematic diagram of the current situation in which the outer side of the existing retaining wall is very close to the structure;

[0036] Figure 5 It is a schematic diagram of the large sample of the invented steel pipe anchor rod composite structure passing through the retaining wall base;

[0037] The accompanying drawings are denoted as follows: old road 1, existing retaining wall 2, existing filled body 3, existing mountain 4, base 5, steep cliff 6, existing structure 7, rupture angle 8, steel flower pipe-anchor rod combination structure drilling hole 9, steel flower pipe 10, anchor rod 11, bottom end cover 12, steel bar bottom bracket 13, drilling grouting material 14, ordinary grouting hole 15, ordinary grouting material 16, dense grouting hole 17, repair material 18, centering bracket 19, reinforcement range 20, reinforcement area 21, ordinary grouting body 22, dense grouting body 23, steel flower pipe anchor rod combination structure 100, existing filled body grouting system structure 200. DETAILED DESCRIPTION

[0038] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0039] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0040] Example:

[0041] like Figure 1-5 As shown, the present embodiment provides an existing retaining wall reinforcement structure, including an old road 1, the old road 1 includes an existing retaining wall 2, an existing filling body 3 and an existing mountain body 4; the base 5 at the bottom of the existing retaining wall 2 is located on the existing mountain body 4, and the existing retaining wall 2 is very close to the steep cliff 6 or the existing structure 7; the existing retaining wall reinforcement structure includes a steel flower pipe anchor rod combination structure 100 and an existing filling body grouting system structure 200; the steel flower pipe anchor rod combination structure 100 includes a plurality of bore holes 9 drilled vertically downward to below the retaining wall base 5, steel flower pipes 10 inserted into the bore holes 9 and anchor rods 11 buried in the steel flower pipes 10; the bottom of the existing filling body 3 is formed with a retaining wall rupture angle 8 compatible with the existing filling body grouting system structure 200 near the existing mountain body 4; the existing filling body grouting system structure 200 includes a common grouting body 22 and a dense grouting body 23.

[0042] The grouting system range of the existing fill grouting system structure 200 is determined by the existing retaining wall rupture angle 8. Specifically, the existing retaining wall rupture angle 8 is comprehensively determined by the wall height and heel position of the existing retaining wall 2 and the internal friction angle of the existing fill 3.

[0043] The present invention has a simple structure and an ingenious design. The damage mechanism of the existing retaining wall is analyzed, and a reinforcement structure of a steel flower tube anchor rod combination structure and an existing fill grouting system system that combines active reinforcement and passive reinforcement for the existing retaining wall is proposed. The steel flower tube anchor rod and the drilled grouting body in the existing retaining wall greatly improve the integrity of the existing retaining wall. The steel flower tube anchor rod and the drilled grouting body that pass through the base of the retaining wall connect the existing retaining wall and the existing mountain into a whole, effectively increasing the anti-slip and anti-overturning capabilities of the existing retaining wall, thereby achieving the purpose of passive reinforcement. The fill within the reinforcement range is isolated by densifying the grouting body, which can effectively control the grouting amount of the fill, and the existing fill grouting system consolidates the fill, increases the friction angle in the fill, and thus reduces the soil pressure behind the retaining wall, thereby achieving the purpose of active reinforcement.

[0044] The plurality of bore holes 9 are arranged in two rows at equal intervals, respectively along the longitudinal and transverse directions of the existing retaining wall 2, and the arrangement intervals are all 0.8m to 1.2m.

[0045] The depth of the borehole 9 is determined according to the rock and soil properties of the stratum where the existing retaining wall base 5 is located; in rock strata, the depth of the borehole 9 is at least 3m below the existing retaining wall base 5, and in soil strata, the depth of the borehole 9 is at least 6m below the existing retaining wall base 5.

[0046] The upper part of the steel flower pipe 10 is 10-15 cm away from the top of the existing retaining wall 2; the lower part of the steel flower pipe 10 is provided with a plurality of grouting holes with a hole diameter of 3-5 mm, which are arranged in a spiral pattern with a circulation spacing of 25 cm-35 cm, and there is only one grouting hole in the same cross section.

[0047] A bottom cover 12 is provided at the bottom of the steel flower pipe 10, and the bottom cover 12 is connected to a steel bar bottom bracket 13, and the steel bar bottom bracket 13 is 0.5 m long.

[0048] The length of the anchor rod 11 is consistent with that of the steel flower tube 10 , and the anchor rod 11 is provided with centering brackets 19 at equal intervals along the length direction.

[0049] The borehole 9 is filled with grouting material 14 , wherein the top of the grouting material 14 is preferably 10 to 15 cm away from the orifice of the borehole 9 .

[0050] The common grouting body 22 is located between the dense grouting bodies 23; the common grouting body 22 includes a plurality of common grouting holes 15, in which common grouting material 16 is poured; the common grouting holes 15 are arranged at a spacing of 1.0 to 1.5 m in both the vertical and horizontal directions. The common grouting material 16 is grouted to a position 10 to 15 cm away from the hole mouth; the drilling depth of the common grouting holes 15 and the dense grouting holes 17 is at least 2 m below the rupture angle 8 of the existing retaining wall.

[0051] The densified grouting body 23 includes a plurality of densified grouting holes 17; the densified grouting holes 17 are filled with densified grouting material, the densified grouting holes 17 are preferably 0.5m close to the top of the rupture angle 8 of the existing retaining wall, and the drilled hole 9 close to the steel flower pipe anchor rod composite structure 100 is preferably no more than 2m; the longitudinal spacing of the densified grouting holes 17 is divided into reinforcement areas 21 according to the reinforcement range 20 of the existing retaining wall 2, and generally 10m is preferably used; the horizontal layout spacing of the densified grouting holes 17 is 20cm-30cm; the densified grouting material should have strong fluidity, low viscosity, and good permeability, and it is preferably grouted to 10-15cm from the hole mouth.

[0052] A construction method for reinforcing an existing retaining wall structure comprises the following steps:

[0053] Step A: Collect and review relevant information of the existing retaining wall 2, determine the range of the rupture angle 8 of the existing retaining wall, and divide the reinforcement range 20 of the existing retaining wall 2 into a plurality of reinforcement areas 21, such as area ①, area ②, area ③, etc.;

[0054] Step B: Based on step A, any area is selected, such as area ①, and a steel pipe-anchor combination structure hole 9 is drilled vertically downward from the top of the existing retaining wall 2 until it passes through a rock layer of not less than 3m or a soil layer of 6m below the base 5 of the existing retaining wall;

[0055] Step C: When the existing retaining wall 2 is relatively broken, a steel flower pipe 10 having a bottom cover 12 connected to a steel bottom bracket 13 and a plurality of grouting holes in the middle and lower part is placed in the drill hole 9 by using a pipe drilling method; if the existing retaining wall 2 is relatively intact, the whole steel flower pipe 10 can be placed in the drill hole after drilling;

[0056] Step D: inserting the anchor rod 11 provided with the centering bracket 19 into the steel flower tube 10;

[0057] Step E: After the first grouting is performed in the borehole 9, the second grouting is performed in the steel tube 10 to ensure that the drilling grouting material 14 is 10-15 cm away from the hole position of the borehole 9, and the first steel tube anchor rod assembly structure 100 of area ① is completed;

[0058] Step F: Repeat steps B to E to complete all steel flower pipe anchor rod composite structures 100 in area ① according to the skipping construction method, until all steel flower pipe anchor rod composite structures 100 in the reinforcement range 20 of the entire existing retaining wall 2 are completed;

[0059] Step G: according to the area selected in step B, the existing filling body 3 is drilled symmetrically in sequence from the dense grouting hole 17 close to the existing retaining wall 2 to the direction away from the existing retaining wall 2, and the drilling depth is at least 2m below the rupture angle 8 of the existing retaining wall; after the drilling is completed, the dense grouting material 17 is immediately used to grout the drilled hole to 10 to 15cm away from the hole position, until the dense grouting body 23 of the entire reinforcement range 20 of the existing retaining wall 2 is fully constructed;

[0060] Step H: according to the area selected in step G, the existing filling body 3 is symmetrically drilled in sequence from the common grouting hole 15 close to the existing retaining wall 2 to the direction away from the existing retaining wall 2, and after the drilling is completed, the common grouting material 16 is immediately used to grout the drilled hole to 10 to 15 cm away from the hole position, until the common grouting body 22 of the entire reinforcement range 20 of the existing retaining wall 2 is completely constructed;

[0061] Step I: Repair the old road 1 with the original pavement surface material of the old road 1 or the repair material 18 of pure cement slurry in the range of 10 to 15 cm from the top of the drilled hole 9, the dense grouting hole 17 and the common grouting hole 15 of the steel flower pipe anchor assembly structure 100.

[0062] The above description of the disclosed embodiments enables one skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to one skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention; therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein.

[0063] Although the following terms are used more frequently in this article: old road 1, existing retaining wall 2, existing filling body 3, existing mountain 4, base 5, cliff 6, existing structure 7, rupture angle 8, steel tube-anchor combination structure drilling 9, steel tube 10, anchor 11, bottom end cover 12, steel bottom bracket 13, drilling grouting material 14, ordinary grouting hole 15, ordinary grouting material 16, dense grouting hole 17, repair material 18, centering bracket 19, reinforcement range 20, reinforcement area 21, ordinary grouting body 22, dense grouting body 23, steel tube anchor combination structure 100, existing filling body grouting system 200, etc., the possibility of using other terms is not excluded. These terms are used only to more conveniently describe and explain the essence of the present invention; interpreting them as any additional restrictions is contrary to the spirit of the present invention.

Claims

1. An existing retaining wall reinforcement structure, comprising an old road (1), wherein the old road (1) comprises an existing retaining wall (2), an existing fill (3) and an existing mountain (4); a base (5) at the bottom of the existing retaining wall (2) is located on the existing mountain (4); and the structure is characterized in that: The existing retaining wall reinforcement structure comprises a steel pipe anchor rod combination structure (100) and an existing fill grouting system structure (200); the steel pipe anchor rod combination structure (100) comprises a plurality of boreholes (9) vertically drilled downward to below the retaining wall base (5), steel pipes (10) inserted into the boreholes (9), and anchor rods (11) buried in the steel pipes (10); a retaining wall rupture angle (8) adapted to the existing fill grouting system structure (200) is formed at the bottom of the existing fill (3) near the existing mountain (4); the existing fill grouting system structure (200) comprises an ordinary grouting body (22) and a dense grouting body (23); the ordinary grouting body (22) is located between the dense grouting bodies (23); the ordinary grouting body (22) comprises a plurality of ordinary grouting holes (15), the ordinary grouting holes (15) ) is poured with ordinary grouting material (16); the vertical and horizontal spacing of the ordinary grouting holes (15) are 1.0 to 1.5 m; the ordinary grouting material (16) is grouted to a position 10 to 15 cm away from the hole mouth; the dense grouting body (23) includes a plurality of dense grouting holes (17); the dense grouting material is poured into the dense grouting holes (17), wherein the vertical spacing of the dense grouting holes (17) is divided into reinforcement areas (21) according to the reinforcement range (20) of the existing retaining wall (2), and the spacing is 10 m; the horizontal spacing of the dense grouting holes (17) is 20 cm to 30 cm; the dense grouting material has strong fluidity, low viscosity and good permeability, and is grouted to a position 10 to 15 cm away from the hole mouth; the grouting material (14) is poured into the borehole (9), wherein the top of the grouting material (14) is 10 to 15 cm away from the hole mouth of the borehole (9).

2. The existing retaining wall reinforcement structure according to claim 1, characterized in that: The plurality of drill holes (9) are arranged in two rows at equal intervals, respectively arranged along the longitudinal and transverse directions of the existing retaining wall (2), and the arrangement intervals are all 0.8m to 1.2m.

3. The existing retaining wall reinforcement structure according to claim 2, characterized in that: The depth of the borehole (9) is determined according to the rock and soil properties of the stratum where the existing retaining wall base (5) is located; in a rock stratum, the depth of the borehole (9) is at least 3 m below the existing retaining wall base (5); in a soil stratum, the depth of the borehole (9) is at least 6 m below the existing retaining wall base (5).

4. The existing retaining wall reinforcement structure according to claim 3 is characterized in that: The upper portion of the steel flower pipe (10) is 10 to 15 cm away from the top of the existing retaining wall (2); a plurality of grouting holes are provided in the middle and lower portion of the steel flower pipe (10), the hole diameters of which are 3 to 5 mm and which are arranged in a spiral pattern, with a circulation spacing of 25 to 35 cm, and only one grouting hole is provided in the same cross section.

5. The existing retaining wall reinforcement structure according to claim 4, characterized in that: The bottom of the steel flower tube (10) is provided with a bottom cover (12), and the bottom cover (12) is connected to a steel bottom bracket (13), and the steel bottom bracket (13) is 0.5 m long.

6. The existing retaining wall reinforcement structure according to claim 5, characterized in that: The length of the anchor rod (11) is consistent with that of the steel flower tube (10), and the anchor rod (11) is provided with centering brackets (19) at equal intervals along the length direction.

7. A construction method for reinforcing an existing retaining wall structure according to any one of claims 1 to 6, characterized in that: The following steps are involved: Step A: Collect and review relevant information of the existing retaining wall (2), determine the range of the rupture angle (8) of the existing retaining wall, and divide the reinforcement range (20) of the existing retaining wall (2) into a plurality of reinforcement areas (21), such as area ①, area ②, area ③, etc.; Step B: Based on step A, any area is selected, such as area ①, and a steel pipe anchor rod composite structure hole (9) is drilled vertically downward from the top of the existing retaining wall (2) until it passes through a rock layer of not less than 3 m or a soil layer of 6 m below the base (5) of the existing retaining wall; Step C: When the existing retaining wall (2) is relatively broken, a steel flower pipe (10) having a bottom cover (12) connected to a steel bottom bracket (13) and a plurality of grouting holes in the middle and lower part is placed in the drill hole (9) by using a pipe drilling method; when the existing retaining wall (2) is relatively intact, the entire steel flower pipe (10) can be placed in the drill hole after drilling; Step D: inserting the anchor rod (11) provided with the centering bracket (19) into the steel flower tube (10); Step E: After the first grouting is performed in the borehole (9), a second grouting is performed in the steel tube (10), ensuring that the drilling grouting material (14) is 10-15 cm away from the borehole (9), thereby completing the first steel tube anchor rod assembly structure (100) in area ①; Step F: Repeat steps B to E to complete all the steel flower pipe anchor rod composite structures (100) in area ① according to the skipping construction method, until the construction of the steel flower pipe anchor rod composite structures (100) in the reinforcement range (20) of the entire existing retaining wall (2) is completed; Step G: according to the area selected in step B, the existing fill (3) is symmetrically drilled in sequence from the dense grouting hole (17) close to the existing retaining wall (2) in the direction away from the existing retaining wall (2), and the drilling depth is at least 2m below the rupture angle (8) of the existing retaining wall; after the drilling is completed, the dense grouting material is immediately used to grout the drilled hole to 10 to 15cm away from the hole position, until the dense grouting body (23) of the entire reinforcement range (20) of the existing retaining wall (2) is completely constructed; Step H: according to the area selected in step G, the existing fill (3) is symmetrically drilled in sequence from the common grouting hole (15) close to the existing retaining wall (2) in the direction away from the existing retaining wall (2), and after the drilling is completed, the common grouting material (16) is immediately used to inject grout into the drilled hole until it is 10 to 15 cm away from the hole mouth, until the common grouting body (22) of the entire reinforcement range (20) of the existing retaining wall (2) is completely constructed; Step I: The old road (1) is repaired using the original old road (1) pavement surface material or pure cement slurry repair material (18) in the top 10 to 15 cm range of the drilled holes (9), the dense grouting holes (17) and the common grouting holes (15) of the steel flower pipe anchor rod assembly structure (100).

Citation Information

Patent Citations

  • Construction method for reinforcing mortar rubble retaining wall and structure of mortar rubble retaining wall

    CN103510540A

  • Reinforced retaining wall structure and construction method thereof

    CN110670625A

  • The reinforcing structure is used for existing gravity type retaining wall

    CN210766868U

  • Grouting reinforcement construction method and earth surface construction method

    CN107035389A

  • Vertical control grouting perforated steel pipe bar planting micro-pile and construction method thereof

    CN108130911A