A thin plastering reinforcement fireproof insulation system for buildings and its construction method
The system addresses the issues of structural integrity and fire safety in thin plaster external insulation by incorporating a reinforced fireproof insulation system with a concrete main body, organic and A-class insulation layers, and connectors, ensuring the insulation layer's longevity and safety.
Patent Information
- Application Number
- CN202110173537.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-02-09
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2041-02-09
AI Technical Summary
Existing thin plaster external insulation systems face issues with structural integrity, fire safety, and construction efficiency, leading to premature degradation, increased energy consumption, and safety hazards due to the use of rivets and adhesives, which compromise the insulation effect and require frequent re-making, and lack adequate fire protection.
A thin plastering reinforced fireproof insulation system with a concrete main body layer, organic thermal insulation layer, mortar layer, A-class thermal insulation material layer, reinforcement system, and connectors that include slurry mesh and metal connectors, enhancing the fixing strength and fire protection while avoiding cold bridges.
The system extends the service life of the external insulation layer to match the main structure's life, improves fire safety, reduces material and labor costs, and enhances construction efficiency by addressing the structural integrity and insulation efficiency, while meeting fire safety standards.
Smart Images

Figure CN113152701B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of thin-plaster external thermal insulation buildings, and in particular to a thin-plaster reinforced fireproof thermal insulation system for buildings and a construction method thereof. Background Art
[0002] The thin plastering system is increasingly used in the field of building insulation. The thin plastering exterior wall insulation system uses thermal insulation core materials such as polystyrene boards as the exterior insulation materials of buildings. When the main structure of the building is completed, polymer cement mortar is applied to the surface of the polystyrene boards.
[0003] In recent years, with the rapid development of China's national economy, energy shortages, reducing energy consumption, improving energy utilization efficiency, low emissions, low pollution, low energy consumption and low-carbon economy are the key to promoting energy conservation and emission reduction. The energy consumption in the use of buildings and the energy consumption in the manufacturing process of building materials in my country account for 46% of the total social energy consumption. Therefore, building energy conservation is an important part of my country's energy conservation and emission reduction work. The existing thin plastering external insulation technology adopts the method of bonding the insulation layer to the main body of the building and fixing it in the form of rivets. Excessive use of rivets will increase the cold and hot bridge of the building and reduce the insulation effect. And the structural design service life of this type of external insulation layer is 25 years. However, the design service life of the main building is 50 years. After 25 years, the external insulation needs to be re-made, which will cause economic waste to the government and society. The energy utilization efficiency of this building structure is low, which is not conducive to the requirements and development of low energy consumption, energy conservation and emission reduction in current buildings.
[0004] The existing thin plaster external insulation technology relies on bonding mortar and insulation nails for anchoring. The materials in the system are connected by bonding, and the layers are stressed, with a high probability of damage. With the external environment and years of use, the rivets and adhesives degrade. Once a layer of material is damaged, the entire outer layer of the insulation system will fall off, causing major safety hazards. In addition, the existing technology has a difficult construction process and high requirements. It is impossible to use heavier finishing materials for the construction of external finishes.
[0005] The development and requirements of fire safety of external insulation of building exterior walls have been reformed, and clear requirements have been made for the fire safety performance of external wall insulation systems. The insulation materials of the existing thin plastering external insulation technology are bonded to the outside of the base wall, and the thickness of the plastering on the outer surface is 3-5mm. Since there is no fire protection layer, the fire protection treatment of the external thin plastering insulation system relies on adding a fire isolation belt of insulation materials at the position of the adjacent upper and lower floors, and the fire protection effect of the entire building system is relatively poor. In the event of a fire, after the outer surface is damaged, the insulation material whose fuel performance grade does not reach Class A may be ignited or even spread. In addition, there are many projects that use mesh cloth to paste tiles outside the main structure layer. Once a fire occurs, the fire resistance performance of the early panel system is better than that of the paint finishing system. When the fire continues, the organic insulation board fuel is heated to produce thermal shrinkage and deformation, which can easily cause the tiles to fall, causing great hidden dangers.
[0006] In order to prevent the organic insulation layer from burning, it is necessary to increase the outer fireproof layer or increase the thickness of the fireproof layer. However, the external wall fixed by bonding and riveting in the prior art has the risk of falling off. If the mortar layer is simply thickened, the risk of the external wall falling off is increased.
[0007] The existing insulation board is fixed by rivets, and the size of the insulation board is basically 600mmX400mm. The material consumption during processing is relatively large, which increases the construction tasks for construction workers during construction, prolongs the construction period, and increases time and labor costs for construction units. Summary of the invention
[0008] The purpose of the present invention is to provide a thin plastering reinforced fireproof insulation system for buildings that meets the fireproof requirements and the strength requirements of the external insulation structure, so that the external insulation layer has the same service life as the main structure, so as to solve the shortcomings of the above-mentioned background technology;
[0009] The second object of the present invention is to provide a construction method for the above-mentioned thin plastering reinforcement fireproof and thermal insulation system for construction. In order to achieve the above-mentioned object, the technical solution provided by the present invention is: a thin plastering reinforcement fireproof and thermal insulation system for construction, comprising a concrete main body layer, an organic thermal insulation layer arranged outside the concrete main body layer, a mortar layer arranged outside the organic thermal insulation layer, and also comprising an A-class thermal insulation material layer arranged between the organic thermal insulation layer and the mortar layer, a reinforcement system arranged in the organic thermal insulation layer, and a connector that passes through the mortar layer, the A-class thermal insulation material layer, the organic thermal insulation layer, and the concrete main body layer in sequence;
[0010] A slurry mesh is arranged between the mortar layer and the A-class thermal insulation material layer;
[0011] The connecting piece is arranged in a horizontal direction;
[0012] The connecting member is fixedly connected to the reinforcement system;
[0013] The reinforcement system is fixedly connected from bottom to top to the inner side or the outer side of the organic thermal insulation layer;
[0014] The reinforcement system includes a bottom-up vertical reinforcement system and a transverse reinforcement system;
[0015] The vertical reinforcement system is fixedly connected to the transverse reinforcement system;
[0016] The connecting piece includes a thermal break connecting piece arranged in the mortar layer and a metal connecting piece connected to one end of the thermal break connecting piece;
[0017] The other end of the thermal break connector is fixedly connected in the mortar layer;
[0018] The metal connector connects the slurry mesh, the A-grade thermal insulation material layer, the organic thermal insulation layer, and the concrete main body layer at one time.
[0019] Further:
[0020] The transverse reinforcement system includes a horizontal crossbar arranged in a horizontal direction;
[0021] The vertical reinforcement system includes vertical vertical rods arranged in a vertical direction;
[0022] The horizontal cross bar is fixedly connected to the vertical vertical bar;
[0023] The vertical rods penetrate the organic thermal insulation layer from bottom to top.
[0024] Further:
[0025] The vertical rods are evenly distributed along the organic insulation layer;
[0026] A horizontal cross bar is fixedly connected between every two adjacent vertical bars;
[0027] The horizontal cross bars are evenly distributed from bottom to top between the vertical vertical bars;
[0028] The two adjacent horizontal crossbars are on the same horizontal line.
[0029] Further:
[0030] The vertical rod is a round or square profile;
[0031] The horizontal cross bar is a round or square profile.
[0032] Further:
[0033] A slurry mesh is arranged between the mortar layer and the A-class thermal insulation material layer;
[0034] One end of the connecting piece is fixedly connected to the slurry hanging mesh;
[0035] The other end of the connecting piece is fixedly connected to the concrete main body layer;
[0036] The connecting piece passes through the intersection of the vertical vertical rod and the horizontal cross rod, and is fixedly connected to the vertical vertical rod.
[0037] Further:
[0038] The thermal break connector includes a thermal break connector nail disposed in the mortar layer;
[0039] The metal connecting piece comprises a metal connecting sleeve connected to one end of the broken bridge connecting nail and a nut sleeved on the outer circumference of the metal connecting sleeve;
[0040] The metal connecting sleeve passes through the concrete main body layer, the organic insulation layer and the vertical rod in sequence;
[0041] The other end of the broken bridge connecting nail is fixedly connected to the slurry hanging mesh;
[0042] The nut is fixedly connected in the A-grade thermal insulation material layer.
[0043] Further:
[0044] The metal connecting piece includes a corbel-type triangular bracket;
[0045] The bracket-type triangular bracket includes a bottom plate, a horizontal cylinder fixedly and vertically connected to the bottom plate, and a rib plate fixedly connected to the bottom plate and the horizontal cylinder;
[0046] The horizontal cylinder is threadedly connected to one end of the broken bridge connecting nail;
[0047] The outer circumference of the horizontal cylinder is threadedly connected to the nut;
[0048] The bottom plate is fixedly connected to the concrete main body layer.
[0049] Further:
[0050] A ground breaking bridge is arranged between the vertical reinforcement system and the ground base.
[0051] For example, a construction method for reinforcing a fireproof and thermal insulation system with thin plastering is described above.
[0052] Step 1: Drill holes when prefabricating the A-grade insulation material layer, and the hole diameter is larger than the outer diameter of the nut; when prefabricating the organic insulation layer, fix the horizontal crossbar and the vertical vertical bar in advance on the inside or outside of the organic insulation layer; when prefabricating the organic insulation layer, drill holes when prefabricating the organic insulation layer, and the hole diameter is larger than the outer diameter of the horizontal cylinder and the metal connecting sleeve; reserve a hole larger than the outer diameter of the nut on the slurry mesh;
[0053] Step 2: After the main concrete layer is poured, a hole is drilled on the outside of the layer at a position corresponding to the hole drilled in the organic insulation layer, and the hole diameter is the same as the hole diameter larger than the outer diameter of the horizontal cylinder and the metal connecting sleeve;
[0054] Step 3: Apply gel material on the outside of the concrete main layer, and stick the organic insulation layer to the concrete main layer. The drilling holes of the concrete main layer and the organic insulation layer are concentric.
[0055] Step 4: Connect the nut to the horizontal cylinder or metal connecting sleeve.
[0056] Insert the assembled horizontal cylinder or metal connecting sleeve, and use tools to fix the nut to lock the vertical rod and the organic insulation layer;
[0057] Step 5: Apply gel material on the outside of the organic insulation layer, and stick the A-level insulation material layer to the organic insulation layer. The holes of the A-level insulation material layer and the organic insulation layer are drilled concentrically; the holes of the A-level insulation material layer are inserted into the nuts;
[0058] Step 6: Place the slurry mesh outside the A-class thermal insulation material layer, and pass the broken bridge connecting nails through the slurry mesh to connect with the horizontal cylinder or metal connecting sleeve;
[0059] Step 6: Apply mortar on the outer layer of the slurry mesh.
[0060] For example, a construction method for reinforcing a fireproof and thermal insulation system with thin plastering is described above.
[0061] Step 1: Use connectors in the factory to connect the slurry mesh, Class A insulation material layer, vertical rods, and organic insulation layer into a whole. Apply gel material between the Class A insulation material layer and the organic insulation layer, and process them according to the size as required by the construction.
[0062] Step 2: Connect the horizontal cylinder and the metal connecting sleeve to the steel bars in the concrete main layer;
[0063] Step 3: pouring the main concrete layer;
[0064] Step 4: Apply mortar on the outer layer of the slurry mesh.
[0065] Compared with the prior art, the present invention has the following beneficial effects:
[0066] 1. A reinforcement system is added to the inside or outside of the organic insulation layer, which is connected to the reinforcement system through connectors and then fixed to the main concrete layer. This improves the fixing strength of the A-class insulation material layer and the organic insulation layer, and the fixing strength of the organic insulation layer and the main structural layer of the building, so that the external insulation layer of the building will not fall off, and the design service life can be extended to 50 years, the same life as the building.
[0067] 2. Adding a layer of Class A insulation material increases the fire protection function of the thin plaster external insulation system, reaches the national standard fire protection level, and reduces fire hazards.
[0068] 3. The connectors are made of a combination of organic material connectors and metal connectors, which not only ensures the structural safety of the external insulation system and prevents it from falling off, but also properly handles the cold bridges.
[0069] 4. Two different structures, metal connecting sleeves and corbel-type triangular brackets, are used on the connecting parts. Under the premise that the thickness of the external insulation layer is thin and the weight is light, the structural characteristics of the corbel-type triangular bracket can meet the requirements of horizontal shear force and longitudinal gravity. The requirements can be met without using a reinforcement system, and the scope of application is more flexible.
[0070] 5. Reduce the energy loss caused by windows to the building. A provision is made for double-layer windows. In a building with 90% energy saving, the cost of double-layer thermal insulation system windows is lower than the single-layer passive windows currently used.
[0071] 6. This system is applicable to a wide range of applications and is suitable for the construction of various buildings. BRIEF DESCRIPTION OF THE DRAWINGS
[0072] Attached Figure 1 It is a schematic diagram of the top view of the structure of Embodiment 1 of the present invention;
[0073] Attached Figure 2 This is a schematic diagram of the main structure of Embodiment 1 of the present invention;
[0074] Attached Figure 3 This is a schematic structural diagram of a connecting piece according to Embodiment 1 of the present invention;
[0075] Attached Figure 4 This is a schematic diagram of the top view of the window portion of Example 1 of the present invention;
[0076] Attached Figure 5 This is a schematic diagram of the main structure of the window portion of Example 1 of the present invention;
[0077] Attached Figure 6 This is a schematic diagram of the main structure of Embodiment 2 of the present invention;
[0078] Attached Figure 7 This is a schematic diagram of the structure of Embodiment 3 of the present invention;
[0079] Attached Figure 8 This is a schematic diagram of the structure of Embodiment 4 of the present invention;
[0080] Attached Fig. 9 This is a schematic structural diagram of a bracket-type tripod according to Embodiment 5 of the present invention;
[0081] Attached Fig.10 Schematic diagram of the structure of the bracket type tripod according to embodiment 6 of the present invention.
[0082] 1 mortar layer; 2 slurry mesh; 3 A-grade insulation material layer; 4 organic insulation layer; 5 concrete main layer; 6 connectors; 61 thermal break connector nails; 62 nuts; 63 metal connector sleeves; 64 thermal break connector sleeves; 65 metal connector nails; 66 fixing bolts; 7 reinforcement system; 71 vertical rod; 72 horizontal cross bar; 73 vertical rod thermal break connector; 74 vertical rod connector sleeves; 8 windows; 9 corbel-type triangular bracket; 91 bottom plate; 92 rib plate; 93 horizontal column; 94 corbel support rod. DETAILED DESCRIPTION
[0083] The technical solution of this patent is further described in detail below in conjunction with specific implementation methods.
[0084] It should be explained that the terms "length", "width", "up", "down", "left", "right", "inside", "outside", etc., which indicate directions or positional relationships, are based on the directions or positional relationships shown in the drawings. "Inside" refers to the right side in the drawings and "outside" refers to the left side in the drawings. They are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction. Therefore, they cannot be understood as a display of the present invention.
[0085] like Figure 1 , 2 As shown in 3, a thin plaster reinforcement fireproof insulation system for construction includes a concrete main layer 5, an organic insulation layer 4 arranged on the outside of the concrete main layer 5, and a mortar layer 1 arranged on the outside of the organic insulation layer 4, and also includes an A-class insulation material layer 3 arranged between the organic insulation layer 4 and the mortar layer 1, a reinforcement system 7 arranged in the organic insulation layer 4, and a connecting member 6 that passes through the mortar layer 1, the A-class insulation material layer 3, the organic insulation layer 4, and the concrete main layer 5 in sequence; a slurry mesh is arranged between the mortar layer and the A-class insulation material layer; the connecting member 6 is arranged in a horizontal direction; the connecting member 6 is fixedly connected to the reinforcement system 7; the reinforcement system 7 is fixedly connected to the inner or outer side of the organic insulation layer 4 from bottom to top; the reinforcement system 7 includes a vertical reinforcement system and a horizontal reinforcement system from bottom to top; the vertical reinforcement system is fixedly connected to the horizontal reinforcement system. By connecting the reinforcement system 7 to the concrete main body layer 5 through the connector 6, the strength of the organic thermal insulation layer 4 and the A-class thermal insulation material layer 3 is enhanced to resist their gravity, thereby avoiding the external thermal insulation layer from falling off.
[0086] The connector 6 includes a thermal break connector arranged in the mortar layer 1 and a metal connector connected to one end of the thermal break connector; the other end of the thermal break connector is fixedly connected in the mortar layer 1; the metal connector once connects the Class A insulation material layer 3, the organic insulation layer 4, and the concrete main body layer 5. The lateral reinforcement system includes a horizontal crossbar 72 arranged in a horizontal direction; the vertical reinforcement system includes a vertical vertical bar 71 arranged in a vertical direction; the horizontal crossbar 72 is welded or bolted to the vertical vertical bar 71; the vertical vertical bar 71 is evenly arranged along the outer side of the organic insulation layer 4; a horizontal crossbar 72 is fixedly connected between every two adjacent vertical vertical bars 71; the horizontal crossbar 72 is evenly distributed from bottom to top between the vertical vertical bars 71; the two adjacent horizontal crossbars 72 are on the same horizontal line.
[0087] The vertical vertical rod 71 is a circular or square profile; the horizontal cross bar 72 is a circular or square profile, or an H-shaped profile. When the organic thermal insulation layer 4 is prefabricated in the factory, the vertical vertical rod 71 and the horizontal cross bar 72 can be fixedly connected (welded or bolted) first, and then the welded reinforcement system 6 can be fixedly connected to the organic thermal insulation layer 4. The method of pre-embedding metal pads in the organic thermal insulation layer 4 can be adopted, and then the reinforcement system is fixed to the outer side of the organic thermal insulation layer 4 by welding or bolting. The length of the vertical vertical rod 71 is consistent with the height of the organic thermal insulation layer 4. The two vertical vertical rods 71 adjacent to each other are connected by a vertical rod connecting sleeve 74. A ground breaking bridge 73 is provided between the bottom vertical vertical rod 71 and the ground base. The vertical vertical rod 71 runs through the A-class thermal insulation material layer 3 and the organic thermal insulation layer 4 from bottom to top, and the reinforcement system can also be fixed after the organic thermal insulation layer 4 is assembled at the construction site.
[0088] When the vertical rods 71 can meet the use requirements of the organic insulation layer 4 and the A-grade insulation material layer 3, the horizontal cross bars 72 may not be used. The vertical rods 71 play a role in resisting vertical gravity, and the connectors 6 play a role in resisting horizontal shear force.
[0089] A slurry mesh 2 is arranged between the mortar layer 1 and the A-class thermal insulation material layer 3; the slurry mesh 2 is close to the left side of the A-class thermal insulation material layer 3, and one end of the connecting member 6 is fixedly connected to the slurry mesh 2; the other end of the connecting member 6 is fixedly connected to the concrete main body layer 5; the connecting member 6 passes through the intersection of the vertical vertical rod 71 and the horizontal cross rod 72, and is fixedly connected to the vertical vertical rod 71.
[0090] The thermal break connector includes a thermal break connector nail 61 arranged in the mortar layer 1; the metal connector includes a metal connecting sleeve 63 connected to one end of the thermal break connector nail 61 and a nut 62 sleeved on the outer circumference of the metal connecting sleeve 63; the metal connecting sleeve 63 sequentially penetrates the concrete main layer 5, the organic insulation layer 4 and the vertical vertical rod 71; the other end of the thermal break connector nail 61 is fixedly connected to the slurry hanging mesh 2; the nut 62 is fixedly connected in the A-level insulation material layer 3.
[0091] The broken bridge connecting nail 61 is a truncated cone, with the end with a large diameter fixed to the slurry mesh 2, and the end with a small diameter passing through the reserved hole on the slurry mesh 2 and threadedly connected to the metal connecting sleeve 63. The nut 62 is threadedly connected to the metal connecting sleeve 63. The connecting piece adopts the form of threaded connection to facilitate the deformation correction of the insulation layer, so that the bonding strength between the insulation layer and the main structure layer is balanced and durable. The part where the metal connecting sleeve 63 is connected to the concrete main layer 5 is provided with a rebar planting device or an anchor bolt device, so that the metal connecting sleeve 63 is firmly connected to the concrete main layer 5.
[0092] The material of the thermal break connecting nail 61 and the thermal break connecting sleeve 64 is organic material.
[0093] A reinforcement system is added to the inside or outside of the organic insulation layer, which is connected to the reinforcement system through connectors and then fixed to the concrete main layer 5. The organic insulation layer 4 can be made of expanded polystyrene board (EPS), extruded polystyrene board (XPS), spray polyurethane (SPU), polystyrene particles and other materials, which mainly play a thermal insulation role. A class A insulation material layer is added to the outside of the traditional organic insulation layer 4. The material of the class A insulation material layer can be rock wool board, foamed ceramic, foamed glass and other materials, which mainly play a fire prevention role. In addition to playing the role of thermal insulation and bridge breaking, the fire prevention function of the thin plaster external insulation system is increased, the fire prevention level of the national standard is reached, and the fire hazard is reduced. Since the outer A-class thermal insulation material layer 3 is added to the system, the overall weight of the external thermal insulation layer increases, but the connecting piece 6 is used to fix the outer mortar layer 1 and the A-class thermal insulation material layer 4 to the reinforcement system 7, and the reinforcement system 7 is further fixedly connected to the concrete main layer 5 through the metal connecting sleeve 63, thereby forming a door structure. The system improves the fixing strength of the A-class thermal insulation material layer and the organic thermal insulation layer, and improves the fixing strength of the organic thermal insulation layer and the concrete main layer 1, so that the external thermal insulation layer of the building will not fall off, and the designed service life can be extended to 50 years, the same life as the building.
[0094] like Figure 4 , 5 As shown in Figures 7 and 8, the window 8 is arranged at the position of the organic insulation layer 4, and the upper end is fixedly connected to the horizontal cross bar 72 of the reinforcement system 7 through the connector 6, and the connector 6 is fixedly connected to the concrete main layer 5. The connection between the connector 6 and the concrete main layer 5 can be in the form of a reinforcing bar or an expansion bolt. The lower end of the window 8 adopts a bracket type tripod 9, and the bracket type tripod 9 includes a bottom plate 91, a horizontal cylinder 93 fixedly connected vertically to the bottom plate 91, and a rib plate 92 fixedly connected to the bottom plate 91 and the horizontal cylinder 93; the bottom plate 91 is fixedly connected to the concrete main layer 5 by a fixing bolt 66, and the horizontal cylinder 93 is fixedly welded or bolted to the horizontal cross bar 72 of the reinforcement system 7. Setting the window 8 in the organic insulation layer 4 can avoid the cold and hot bridge caused by the metal parts on the outside of the organic insulation layer 4, and reduce the energy loss caused by the window part to the building. It is reserved for double-layer windows. In buildings with 90% energy saving, the cost of double-layer thermal insulation system windows is lower than that of single-layer passive windows currently used.
[0095] For example, a construction method for reinforcing a fireproof and thermal insulation system with thin plastering is described above.
[0096] Step 1: When prefabricating the A-class insulation material layer 3, a hole is drilled, and the hole diameter is larger than the outer diameter of the nut 62; when prefabricating the organic insulation layer 4, the horizontal cross bar 72 and the vertical vertical bar 71 are pre-fixed on the inner side or the outer side of the organic insulation layer 4; when prefabricating the organic insulation layer 4, a hole is drilled, and the hole diameter is larger than the outer diameter of the horizontal cylinder 93 and the metal connecting sleeve 63; the slurry mesh 2 is reserved with a hole larger than the outer diameter of the nut 62;
[0097] Step 2: After the concrete main layer 5 is poured, a hole is drilled on the outside of this layer at a position corresponding to the hole drilled in the organic insulation layer 4, and the hole diameter is larger than the outer diameter of the horizontal cylinder 93 and the metal connecting sleeve 63;
[0098] Step 3: Apply gel material on the outside of the concrete main layer 5, and stick the organic thermal insulation layer 4 to the concrete main layer 5, with the drilling holes of the concrete main layer 5 and the organic thermal insulation layer 4 being concentric;
[0099] Step 4: Connect the nut 62 to the horizontal cylinder 93 or the metal connecting sleeve 63.
[0100] Insert the assembled horizontal cylinder 93 or metal connecting sleeve 63, and use a tool to fix the nut 62 to lock the vertical vertical rod 71 and the organic insulation layer 4;
[0101] Step 5: Apply gel material on the outside of the organic insulation layer 4, and stick the A-class insulation material layer 3 to the organic insulation layer 4. The drilling holes of the A-class insulation material layer 3 and the organic insulation layer 4 are concentric; the holes of the A-class insulation material layer 3 are inserted into the nuts 62;
[0102] Step 6: Place the slurry mesh 2 outside the A-class thermal insulation material layer 3, and pass the broken bridge connecting nail 61 through the slurry mesh 2 to connect with the horizontal cylinder 93 or the metal connecting sleeve 63;
[0103] Step 6: Apply mortar on the outer layer of the slurry mesh 2.
[0104] As mentioned above, a construction method 2 of a thin plastering reinforcement fireproof insulation system and its construction method for buildings,
[0105] Step 1: Use the connector 6 in the factory to sequentially connect the slurry mesh 2, the A-class thermal insulation material layer 3, the vertical rod 71, and the organic thermal insulation layer 4 into a whole, apply gel material between the A-class thermal insulation material layer 3 and the organic thermal insulation layer 4, and process them according to the size as required by the construction;
[0106] Step 2: Connect the horizontal cylinder 93 and the metal connecting sleeve 63 to the steel bars in the concrete main layer 5;
[0107] Step 3: pouring concrete main layer 5;
[0108] Step 4: Apply mortar on the outer layer of the slurry mesh 2.
[0109] Example 2
[0110] like Figure 6 As shown, the vertical vertical rod 71 penetrates the organic thermal insulation layer 4 from bottom to top, and the horizontal cross bar 72 is also arranged in the organic thermal insulation layer 4 and welded between two adjacent vertical vertical rods 71. One end of the metal connecting sleeve 63 is threadedly connected with the nut 62, and a circular hole larger than the outer circumference of the nut 62 is pre-drilled on the inner side of the A-class thermal insulation material layer 3. The nut 62 drives the metal connecting sleeve 63 to be placed in the A-class thermal insulation material layer 3, and the other end of the metal connecting sleeve 63 extends into the concrete main body layer 5. This structure sets the reinforcement system 7 in the organic thermal insulation layer 4, and avoids the contact between the metal parts and the A-class thermal insulation material layer 3, so as to reduce the energy consumption of the cold and hot bridge.
[0111] Example 3
[0112] like Figure 7 As shown, the connector 6 can also be composed of a thermal bridge connection sleeve 64 and a metal connection nail 65. One end of the thermal bridge connection sleeve 64 is provided with a threaded hole adapted to the outer circumference of the metal connection nail 65. The thermal bridge connection sleeve 64 is threadedly connected to the metal connection nail 65. One end of the metal connection nail 65 is fixed in the concrete main layer 5, and the other end of the metal connection nail 65 is a threaded end and is sleeved with a nut 62.
[0113] After the concrete main body layer 5 is poured, a hole is drilled on the outer side of the concrete main body layer 5, the hole diameter is the same as the metal connecting nail 65, and the A-level thermal insulation material layer 3 and the organic thermal insulation layer 4 are pasted on the concrete main body layer 5. The broken bridge connection sleeve 64 is a truncated cone body, and the truncated cone with a small diameter passes through the reserved hole of the slurry mesh 2 and is connected to the metal connecting nail 65. One end of the truncated cone with a large diameter is clamped on the outer side of the slurry mesh 2, and then the broken bridge connection sleeve 64 is fixed to the metal connecting nail 65 by the nut 62.
[0114] When the concrete main body layer 5 is not poured, the metal connecting nails 65 can be connected to the preset steel bars of the concrete main body layer 5 by welding or bundling, and then the concrete main body layer 5 can be poured.
[0115] Example 4
[0116] like Figure 8 As shown, the metal connector includes a corbel-type triangular bracket 9; the corbel-type triangular bracket 9 includes a bottom plate 91, a horizontal cylinder 93 fixedly connected to the bottom plate 91, and a rib plate 92 fixedly connected to the bottom plate 91 and the horizontal cylinder 93; the horizontal cylinder 93 is threadedly connected to one end of the broken bridge connecting nail 61; the outer circumference of the horizontal cylinder 93 is threadedly connected to the nut 62; the bottom plate 91 is fixedly connected to the concrete main body layer 5. The bottom plate 91 is fixedly connected to the concrete main body layer 5 by fixing bolts 66.
[0117] Since the bottom plate 91 of the corbel-type triangular bracket 9 is fixedly connected to the concrete main body layer 5, the horizontal cylinder 93 and the rib plate 92 work together to increase the vertical strength of the organic thermal insulation layer 4, thereby supporting the weight of the organic thermal insulation layer 4, the A-class thermal insulation material layer 3 and the mortar layer 1. Compared with the structure of the reinforcement system in the prior art that is not vertically fixedly connected to the concrete main body layer 5, it can ensure that the thermal insulation outer layer is not easy to fall off and has the same life as the concrete main body layer 5. The horizontal cylinder 93 and the rib plate 92 work together to increase the horizontal shear resistance of the organic thermal insulation layer 4, thereby enhancing the overall shear strength of the reinforcement system.
[0118] The rib plate 92 can be a round tube, a square tube or an angle steel. When the corbel type triangular bracket 9 is connected before pouring the concrete main body layer 5, the bottom plate 91 can be eliminated, and the horizontal cylinder 93 is welded to the right angle side of the rib plate 92 and then welded to the vertical steel bars in the concrete main body layer 5, and the horizontal cylinder 93 of the corbel is fixed to the rib plate 92 and the steel bars. After pouring the concrete, the corbel and the main structure layer can be connected together.
[0119] Example 5
[0120] like Fig. 9 As shown, a threaded hole matching the broken bridge connecting nail 61 is provided in the horizontal cylinder 93, and the broken bridge connecting nail 61 is threadedly connected to the horizontal cylinder 93, and the broken bridge connecting nail 61 is fixed by a nut 62. A corbel support rod 94 is welded between the bottom plate 91 and the horizontal cylinder 93, and the corbel support rod 94 is set at an angle with the horizontal cylinder 93, and the setting of the angle is related to the length of the horizontal cylinder 93. When the corbel-type triangular bracket 9 is connected before pouring the concrete main layer 5, the bottom plate 91 can be eliminated, and the horizontal cylinder 93 and the corbel support rod 94 are welded at a designed angle, and then welded to the vertical steel bars of the concrete main layer 5.
[0121] Example 6
[0122] like Fig.10 As shown, one end of the metal connecting nail 65 is vertically welded to the bottom plate 91, and the other end is an external threaded end, which is threadedly connected to the thermal insulation bridge connecting sleeve 64. The thermal insulation bridge connecting sleeve 64 is fixed by a nut 62. A corbel support rod 94 is welded between the bottom plate 91 and the metal connecting nail 65, and the corbel support rod 94 is set at an angle with the metal connecting nail 65. The setting of the angle is related to the length of the metal connecting nail 65. When the corbel-type triangular bracket 9 is connected before pouring the concrete main body layer 5, the bottom plate 91 can be eliminated, and the metal connecting nail 65 and the corbel support rod 94 are welded at a designed angle, and then welded to the vertical steel bars in the concrete main body layer 5.
[0123] This system is mainly based on the requirements of low energy consumption and fire protection standards for buildings. It provides a thin plastering reinforcement fire insulation system for buildings, which can meet the fire protection requirements and improve the safety of buildings; and the outer layer connected to the concrete main layer 5 is firmly fixed and will not fall off. In addition, this system improves the insulation effect, cleverly avoids the generation of cold and hot bridges in buildings through structural design, and reduces the material and personnel costs of construction; and the construction method is flexible, the construction is simple, and it is easy to operate.
[0124] The embodiments of the present invention have been shown and described. It will be understood by those skilled in the art that various modifications, changes, substitutions and variations may be made to the embodiments without departing from the principles of the present invention. The scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A thin plaster reinforcement fireproof and thermal insulation system for construction, comprising a concrete main body layer (5), an organic thermal insulation layer (4) arranged outside the concrete main body layer (5), and a mortar layer (1) arranged outside the organic thermal insulation layer (4), characterized in that: It also includes an A-class thermal insulation material layer (3) arranged between the organic thermal insulation layer (4) and the mortar layer (1), a reinforcement system (7) arranged in the organic thermal insulation layer (4), and a connecting piece (6) that sequentially penetrates the mortar layer (1), the A-class thermal insulation material layer (3), the organic thermal insulation layer (4), and the concrete main body layer (5); A slurry mesh (2) is provided between the mortar layer (1) and the Class A thermal insulation material layer (3); The connecting member (6) is arranged in a horizontal direction; The connecting member (6) is fixedly connected to the reinforcement system (7); The reinforcement system (7) is fixedly connected from bottom to top to the inner side or the outer side of the organic thermal insulation layer (4); The reinforcement system (7) comprises a vertical reinforcement system from bottom to top and a transverse reinforcement system; The vertical reinforcement system is fixedly connected to the transverse reinforcement system; The connecting piece (6) comprises a thermal break connecting piece arranged in the mortar layer (1) and a metal connecting piece connected to one end of the thermal break connecting piece; The other end of the thermal break connector is fixedly connected in the mortar layer (1); The metal connector sequentially connects the slurry mesh sheet (2), the A-grade thermal insulation material layer (3), the organic thermal insulation layer (4), and the concrete main body layer (5); The transverse reinforcement system comprises a horizontal crossbar (72) arranged in a horizontal direction; The vertical reinforcement system comprises a vertical vertical rod (71) arranged in a vertical direction; The horizontal cross bar (72) is fixedly connected to the vertical vertical bar (71); The vertical rod (71) penetrates the organic thermal insulation layer (4) from bottom to top; One end of the connecting piece (6) is fixedly connected to the pulp-coated mesh sheet (2); The other end of the connecting member (6) is fixedly connected to the concrete main body layer (5); The connecting member (6) passes through the intersection of the vertical vertical rod (71) and the horizontal cross rod (72), and is fixedly connected to the vertical vertical rod (71); The thermal break connecting piece comprises a thermal break connecting nail (61) arranged in the mortar layer (1); The metal connecting piece comprises a metal connecting sleeve (63) connected to one end of the thermal bridge connecting nail (61) and a nut (62) sleeved on the outer circumference of the metal connecting sleeve (63); The metal connection sleeve (63) sequentially passes through the concrete main body layer (5), the organic thermal insulation layer (4) and the vertical rod (71); The other end of the broken bridge connecting nail (61) is fixedly connected to the slurry hanging mesh (2); The nut (62) is fixedly connected in the A-grade thermal insulation material layer (3); The metal connecting piece comprises a corbel-type triangular bracket (9); The corbel-type triangular bracket (9) comprises a bottom plate (91), a horizontal cylinder (93) fixedly connected vertically to the bottom plate (91), and a rib plate (92) fixedly connected to the bottom plate (91) and the horizontal cylinder (93); The horizontal cylinder (93) is threadedly connected to one end of the broken bridge connecting nail (61); The outer circumference of the horizontal cylinder (93) is threadedly connected to the nut (62); The bottom plate (91) is fixedly connected to the concrete main body layer (5).
2. A thin plaster reinforcement fireproof and thermal insulation system for construction according to claim 1, characterized in that: The vertical rods (71) are evenly distributed along the outer side of the organic thermal insulation layer (4); A horizontal cross bar (72) is fixedly connected between every two adjacent vertical bars (71); The horizontal cross bars (72) are evenly distributed from bottom to top between the vertical vertical bars (71); Two adjacent horizontal cross bars (72) are on the same horizontal line.
3. A thin plastering reinforcement fireproof and thermal insulation system for construction according to claim 1, characterized in that: The vertical rod (71) is a circular or square profile; The horizontal cross bar (72) is a circular or square profile.
4. A thin plaster reinforcement fireproof and thermal insulation system for construction according to claim 1, characterized in that: A ground breaking bridge member (73) is provided between the vertical reinforcement system and the ground base layer.
5. A construction method for a thin plaster reinforcement fireproof insulation system for buildings according to any one of claims 1 to 4, step 1: when prefabricating the A-class insulation material layer (3), a hole is drilled, and the hole diameter is larger than the outer diameter of the nut (62); when prefabricating the organic insulation layer (4), the horizontal cross bar (72) and the vertical vertical bar (71) are pre-fixed on the inner side or the outer side of the organic insulation layer (4); when prefabricating the organic insulation layer (4), a hole is drilled, and the hole diameter is larger than the outer diameter of the horizontal cylinder (93) and the metal connecting sleeve (63); the slurry mesh (2) reserves a hole larger than the outer diameter of the nut (62); Step 2: After the concrete main body layer (5) is poured, a hole is drilled at a position corresponding to the hole drilled in the organic insulation layer (4) on the outside of the layer, and the hole diameter is the same as the hole diameter greater than the outer diameter of the horizontal cylinder (93) and the metal connecting sleeve (63); Step 3: Apply gel material on the outside of the concrete main layer (5), and stick the organic thermal insulation layer (4) onto the concrete main layer (5), with the holes drilled in the concrete main layer (5) and the holes drilled in the organic thermal insulation layer (4) being concentric; Step 4: Connect the nut (62) to the horizontal cylinder (93) or the metal connecting sleeve (63), implant the assembled horizontal cylinder (93) or the metal connecting sleeve (63), fix the nut (62) with a tool, and lock the vertical rod (71) and the organic insulation layer (4); Step 5: Apply gel material on the outside of the organic thermal insulation layer (4), adhere the A-class thermal insulation material layer (3) to the organic thermal insulation layer (4), and drill holes in the A-class thermal insulation material layer (3) and the organic thermal insulation layer (4) concentrically; insert the nut (62) into the hole of the A-class thermal insulation material layer (3); Step 6: placing the slurry mesh (2) outside the A-class thermal insulation material layer (3), and passing the thermal break connecting nails (61) through the slurry mesh (2) to connect with the horizontal cylinder (93) or the metal connecting sleeve (63); Step 6: Apply mortar to the outer layer of the slurry mesh (2).
6. According to claim 5, a construction method for a thin plastering reinforcement fireproof insulation system for buildings, step 1: using a connector (6) in a factory to sequentially connect the slurry mesh (2), the A-class insulation material layer (3), the vertical rod (71), and the organic insulation layer (4) into a whole, applying gel material between the A-class insulation material layer (3) and the organic insulation layer (4), and processing them according to the size according to the construction requirements; Step 2: connecting the horizontal cylinder (93) and the metal connecting sleeve (63) to the steel bars in the concrete main layer (5); Step 3: pouring the main concrete layer (5); Step 4: Apply mortar to the outer layer of the slurry mesh (2).