Steel pile erection device at construction site

By using a combination of guide platform, telescopic support and support support in the steel pile erecting device on the construction site, the shaking and safety hazards caused by the lack of support during the steel pile erecting process are solved, and the stability and safety of the steel pile erecting process are achieved. promote.

CN113186922BActive Publication Date: 2024-12-27CHINA MCC 2 GRP CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202011624197.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-12-31
Publication Date
2024-12-27
Estimated Expiration
2040-12-31

AI Technical Summary

Technical Problem

During construction, steel piles are prone to shake due to lack of support during the erecting process, resulting in great safety hazards, and it is difficult for the existing technology to effectively stabilize steel piles.

Method used

A steel pile erecting device on construction site is designed, including a guide platform, telescopic support and support support. The ground-grabbing legs and wire retractor of the guide platform provide stable support. The telescopic support and support support support support the steel piles to ensure the erecting process. stability.

Benefits of technology

It effectively avoids shaking and safety hazards during the erecting process of steel piles, and enhances the stability of steel piles through unilateral support to ensure the safety and stability of the erecting process of steel piles.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113186922B_ABST
    Figure CN113186922B_ABST
Patent Text Reader

Abstract

The invention discloses a steel pile erecting device for a construction site, comprising a guide platform capable of guiding the placement position of the steel pile, a plurality of gripping legs being evenly fixed below the guide platform, two telescopic supports being arranged on a side surface of the guide platform perpendicular to the axis of the steel pile, the two telescopic supports being symmetrically distributed on both sides of the steel pile, a connecting rod being arranged on the telescopic support, one end of the connecting rod being fixed to the telescopic support, the other end of the connecting rod being provided with a supporting bracket, the supporting bracket being hinged to the connecting rod, wire take-ups being arranged on both sides of the guide platform avoiding the telescopic support and opposite to each other, a pulling rope being arranged in the wire take-up, one end of the pulling rope being able to freely retract in the wire take-up, the other end of the pulling rope being provided with a fixing ring sleeve capable of being sleeved on the steel pile, the fixing ring sleeve being fixed to the pulling rope, a supporting frame being arranged below the fixing ring sleeve, the pulling rope being placed on the supporting frame; by providing support to one side of the steel pile when hoisting the steel pile, the stability of the steel pile is enhanced, thereby achieving the purpose of effectively avoiding potential safety hazards.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of construction pile driving preparation auxiliary devices, in particular to a steel pile erecting device at a construction site. Background Art

[0002] During construction, because the ground has to bear great pressure if the building is to be built on the ground, it is necessary to ensure that the ground has enough strength to resist the pressure. This is often difficult to do, so the ground that supports the building must be reinforced or the way the ground bears the pressure must be improved. So people think of driving piles into the foundation, so that most of the weight of the building can be transferred to a position deep below the ground through the piles, because the foundation at this position has a much greater bearing capacity than the ground.

[0003] There are usually two types of foundation piles involved in construction. One is cement piles, which are usually formed by pouring piles after digging a deep pit with a pile driver. When a building needs to bear a large weight, steel piles are often needed. Steel piles cannot be poured into the ground like cement piles. During operation, the steel piles need to be erected first and then driven into the ground.

[0004] In the prior art, the main method of erecting steel piles is to use a mode of manual and mechanical lifting. During the lifting process, due to the lack of support points, the steel piles are prone to shaking, which is a great hidden danger of safety accidents. Therefore, how to stably erect steel piles to avoid safety hazards has become an urgent problem to be solved in the field of construction pile preparation auxiliary devices. Summary of the invention

[0005] The purpose of the present invention is to overcome the deficiency of the prior art that insufficient support is provided when erecting steel piles, causing the steel piles to shake easily and thus creating a great safety hazard. A device for erecting steel piles at a construction site is provided, which provides support for one side of the steel pile when hoisting the steel pile to enhance its stability and achieve the purpose of effectively avoiding safety hazards.

[0006] The purpose of the present invention is mainly achieved through the following technical solutions:

[0007] The device for erecting steel piles at construction sites comprises a guide platform capable of guiding the placement of steel piles, a plurality of gripping legs being evenly fixed below the guide platform, two telescopic supports being arranged on a side surface of the guide platform perpendicular to the axis of the steel pile, the two telescopic supports being symmetrically distributed on both sides of the steel pile, a connecting rod being arranged on the telescopic support, one end of the connecting rod being fixed to the telescopic support, and the other end of the connecting rod being provided with a support bracket, the support bracket being hinged to the connecting rod, a wire take-up device being arranged on both sides of the guide platform which avoid the telescopic support and are opposite to each other, the wire take-up device being fixed to the guide platform, a pulling rope being arranged inside the wire take-up device, one end of the pulling rope being able to freely retract inside the wire take-up device, and the other end of the pulling rope being provided with a fixing ring sleeve which can be sleeved on the steel pile, the fixing ring sleeve being fixed to the pulling rope, a support frame being arranged below the fixing ring sleeve, and the pulling rope being placed on the support frame.

[0008] At present, when it is necessary to use the form of driving steel piles into the ground for construction in building construction, the steel piles need to be erected first. Since steel piles are generally long and heavy, the process of erecting steel piles becomes very dangerous. The erection process needs to be stable and provide sufficient support. The existing technology usually adopts a hoisting method to erect steel piles. However, in the process of erecting steel piles, there is no support, which is a huge safety hazard for the construction party. Therefore, it is particularly important to provide sufficient support for the steel piles during the erection process so that the steel piles can be erected stably. Based on the work of erecting steel piles, the present invention first adopts a guide platform to ensure that the steel piles are in the correct direction when hoisted and will not shake. The gripping feet enable the force received by the guide platform to be effectively transmitted to the ground. The invention can effectively prevent the guide platform from tipping over and improve the gripping ability of the guide platform. The wire take-up device can effectively retract the pulling rope, so that the fixed ring sleeve can assist in providing pulling force for erecting the steel pile, and the telescopic support can effectively support the steel pile through the connecting rod and the support bracket, while also preventing the steel pile from shaking during the lifting process. The present invention effectively assists the process of lifting the steel pile under the support of the support frame through the fixed ring sleeve and the pulling rope, and effectively controls the movement direction of the steel pile during erection through the guide platform, the telescopic support and the support bracket, so that the steel pile can be erected more stably during the erection process, effectively avoiding safety hazards. The present invention provides support for one side of the steel pile when lifting the steel pile to enhance its stability, thereby achieving the purpose of effectively avoiding safety hazards.

[0009] Furthermore, the guide platform includes a platform shell, and a guide groove is opened on the upper surface of the platform shell. The guide groove runs through the side surface of the telescopic support and the opposite side surface thereof. A plurality of transverse rollers are evenly arranged on the groove surface in the guide groove, and a plurality of vertical rollers are evenly arranged on the two side walls of the guide groove. The transverse rollers and vertical rollers can rotate freely. The arrangement of the transverse rollers and vertical rollers in the present invention makes it easier for the steel pile to move in the guide groove, avoiding the hindrance of the movement of the steel pile caused by friction resistance. At the same time, due to the arrangement of the guide groove, the range of movement of the steel pile is limited, so that the guide platform can effectively guide the steel pile to avoid its shaking during the erection start.

[0010] Furthermore, the telescopic support includes a pushing base, which is located in the guide platform. A fixing rod is provided on the side of the pushing base, one end of the fixing rod is fixed to the pushing base, and the other end thereof is fixed to the inner wall of the guide platform. A hydraulic pushing rod is provided on the pushing base, one end of the hydraulic pushing rod is fixed to the pushing base, and the other end thereof extends out of the guide platform. An L-shaped rod is provided at the end of the hydraulic pushing rod close to the outside of the guide platform, one end of the L-shaped rod is fixed to the hydraulic pushing rod, and the other end thereof is provided with a fixing sleeve. The end of the L-shaped rod is sleeved in the fixing sleeve, and a support rod and a balancing rod are symmetrically provided on the fixing sleeve to avoid the position of the L-shaped rod. The support rod is hinged to the fixing sleeve, and the balancing rod is fixed to the fixing sleeve. The telescopic support of the present invention is based on a pushing base, and the support bracket and the connecting rod are effectively supported by the pushing of a hydraulic pushing rod, and can follow the erection of the steel pile and gradually extend to continue to provide support. The pushing base is supported by the fixing rod and effectively bears the weight brought by the steel pile. The L-shaped rod enables the fixing sleeve to be removed from the telescopic support, and the fixing sleeve is taken and placed on the L-shaped rod to avoid the support bracket and the steel pile from not fitting. The balance rod and the support rod are fixed on the fixing sleeve, and the symmetrical arrangement of the support rod and the balance rod avoids the risk of deformation caused by weight imbalance.

[0011] Furthermore, the support bracket includes a first arc support plate and a second arc support plate, the first arc support plate and the second arc support plate are respectively fixed on the two telescopic supports, and the first arc support plate and the second arc support plate can be spliced ​​and fixed to form a complete semicircular arc plate. Through the support of the two arc support plates, the steel pile is effectively supported and can be prevented from shaking during the erection process.

[0012] Furthermore, the first arc-shaped pallet includes a first pallet shell, which is a hollow quarter-arc plate, and a first motor fixed in the first pallet shell is provided at one end of the first pallet shell, and a rotating screw is provided at the output end of the first motor, and the rotating screw extends out of the first pallet shell, and a first pallet support filling capable of completely filling the first pallet shell is provided in the first pallet shell; the second arc-shaped pallet includes a second pallet shell, which can be spliced ​​with the first pallet shell to form a complete semi-arc plate, and a built-in nut is fixed at one end of the second pallet shell, and the built-in nut matches the rotating screw, and a second pallet support filling capable of completely filling the second pallet shell is provided in the second pallet shell. The first motor on the first support plate shell in the present invention can effectively drive the rotating screw to rotate, and the rotating screw will enter the built-in nut on the second support plate shell when it rotates. Through the cooperation of the built-in nut and the rotating screw, the first arc-shaped support plate and the second arc-shaped support plate are effectively locked to prevent them from dispersing during the support process of the erection of the steel piles and causing a lack of supporting force. The first support plate support filling and the second support plate support filling are made of rigid materials, which can not only effectively support and avoid deformation, but also avoid the risk of breakage under the protection of the shell.

[0013] Furthermore, the support frame includes a triangular support, a top support platform is fixed above the triangular support, a pulley is fixed above the top support platform, the number of pulleys matches the number of pull ropes, and the pull rope is connected to the fixed ring sleeve through the pulley. The present invention uses a pulley to support the pull rope, and the pulley can more effectively support the force of the pull rope, and the triangular support has strong stability, which can also ensure the stability of the support. The top support platform can effectively transmit the force received downward to avoid deformation at the pulley.

[0014] Furthermore, the fixing ring comprises a first half ring and a second half ring, the first half ring and the second half ring are respectively fixed on the pulling rope outside the two wire take-ups, and the first half ring and the second half ring can be spliced ​​and fixed into a complete circular ring. By locking the two half rings, the pulling rope can evenly and effectively apply tension to the steel pile in the circumferential direction.

[0015] Furthermore, the first half ring includes a first ring sleeve shell, which is a hollow semicircular ring plate, and a second motor fixed in the first ring sleeve shell is provided at both end portions of the first ring sleeve shell, and a locking screw is provided at the output end of the second motor, and the locking screw extends out of the first ring sleeve shell, and a first ring sleeve support filling capable of completely filling the first ring sleeve shell is provided in the first ring sleeve shell; the second half ring includes a second ring sleeve shell, and the second ring sleeve shell can be spliced ​​with the first ring sleeve shell to form a complete circular ring plate, and locking nuts are fixed at both end portions of the second ring sleeve shell, and the locking nuts match the locking screws, and a second ring sleeve support filling capable of completely filling the second ring sleeve shell is provided in the second ring sleeve shell. The second motor on the first ring sleeve shell in the present invention can effectively drive the locking screw to rotate, and the locking screw will rotate and enter the locking nut on the second ring sleeve shell. Through the cooperation of the locking nut and the locking screw, the first half ring and the second half ring are effectively locked, and the steel pile is wrapped from the circumferential direction to avoid uneven force. The steel pile can also be effectively pulled. The filling material used for the first ring sleeve support filling and the second ring sleeve support filling is metal material, which avoids unstable movement of the steel pile due to deformation of the fixed ring sleeve during the pulling process.

[0016] In summary, the present invention has the following beneficial effects compared with the prior art:

[0017] (1) The present invention effectively controls the movement direction of the steel pile during erection through the guide platform, telescopic support and support bracket, so that the steel pile can be erected more stably during the erection process, effectively avoiding safety hazards. By providing support for one side of the steel pile when hoisting the steel pile, its stability is enhanced, thereby achieving the purpose of effectively avoiding safety hazards.

[0018] (2) The present invention effectively locks the first arc-shaped support plate and the second arc-shaped support plate through the cooperation of the built-in nut and the rotating screw, thereby preventing them from spreading out and causing a loss of supporting force during the support process of the erection of the steel piles. The first support plate support filling and the second support plate support filling are made of rigid materials, which can not only effectively support and avoid deformation, but also avoid the risk of breakage under the protection of the outer shell.

[0019] (3) The present invention effectively locks the first half ring and the second half ring through the cooperation of the locking nut and the locking screw, and surrounds the steel pile from the circumferential direction to avoid uneven force on it. It can also effectively pull the steel pile. The filling materials used for the first ring sleeve support filling and the second ring sleeve support filling are metal materials, which avoids unstable movement of the steel pile due to deformation of the fixed ring sleeve during the pulling process. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] The drawings described herein are used to provide a further understanding of the embodiments of the present invention, constitute a part of this application, and do not constitute a limitation of the embodiments of the present invention. In the drawings:

[0021] Figure 1 It is a schematic diagram of the structure of the present invention;

[0022] Figure 2 A top view of the guide platform of the present invention;

[0023] Figure 3 It is a cross-sectional view of the wire take-up device of the present invention;

[0024] Figure 4 It is a schematic diagram of the telescopic support structure of the present invention;

[0025] Figure 5 This is a schematic diagram of the support structure of the present invention;

[0026] Figure 6 This is a schematic diagram of the structure of the fixing ring sleeve of the present invention;

[0027] The names corresponding to the figure numbers are: 1-guide platform, 2-grip support foot, 3-wire take-up device, 4-telescopic support, 5-connecting rod, 6-support bracket, 7-pull rope, 8-support frame, 9-fixing ring sleeve, 11-platform shell, 12-vertical roller, 13-horizontal roller, 14-guide groove, 31-device shell, 32-wire take-up drum, 33-third motor, 41-pushing base, 42-fixing rod, 43-hydraulic pushing rod, 44-L-shaped rod, 45-support rod, 46-fixing sleeve, 47-balance rod, 61-first arc-shaped support plate, 62-second arc-shaped support plate , 611-rotating screw, 612-first motor, 613-first pallet shell, 614-first pallet support filling, 621-second pallet shell, 622-second pallet support filling, 623-built-in nut, 81-triangular bracket, 82-pulley, 83-top support platform, 91-first half ring, 92-second half ring, 911-locking screw, 912-second motor, 913-first ring sleeve shell, 914-first ring sleeve support filling, 921-second ring sleeve shell, 922-second ring sleeve support filling, 923-locking nut. DETAILED DESCRIPTION

[0028] In order to make the objectives, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with embodiments and drawings. The exemplary embodiments of the present invention and their description are only used to explain the present invention and are not intended to limit the present invention.

[0029] Example:

[0030] like Figures 1 to 6As shown, the present embodiment relates to a steel pile erecting device for a construction site, comprising a guide platform 1 capable of guiding the placement position of the steel pile, a plurality of gripping legs 2 being evenly fixed below the guide platform 1, two telescopic supports 4 being arranged on a side surface of the guide platform 1 perpendicular to the axis of the steel pile, the two telescopic supports 4 being symmetrically distributed on both sides of the steel pile, a connecting rod 5 being arranged on the telescopic support 4, one end of the connecting rod 5 being fixed to the telescopic support 4, and a supporting bracket 6 being arranged at the other end thereof, the supporting bracket 6 being hinged to the connecting rod 5, a wire take-up device 3 being arranged on both sides of the guide platform 1 avoiding the telescopic support 4 and opposite to each other, the wire take-up device 3 being fixed to the guide platform 1, a pulling rope 7 being arranged inside the wire take-up device 3, one end of the pulling rope 7 being able to freely retract in the wire take-up device 3, and the other end thereof being provided with a fixing ring sleeve 9 which can be sleeved on the steel pile, the fixing ring sleeve 9 being fixed to the pulling rope 7, a supporting frame 8 being arranged below the fixing ring sleeve 9, and the pulling rope 7 being placed on the supporting frame 8.

[0031] The wire take-up device of this embodiment includes a device housing 31, in which a wire take-up drum 32 is provided. The pulling rope 7 is wound around the wire take-up drum 32, and a third motor 33 is provided at the center of the wire take-up drum 32. Through the rotation of the third motor 33, the wire take-up drum 32 can effectively reel in the pulling rope 7.

[0032] At the same time, the guide platform 1 includes a platform shell 11, and a guide groove 14 is opened on the upper surface of the platform shell 11. The guide groove 14 passes through the side surface of the telescopic support 4 and the opposite side surface thereof. A number of transverse rollers 13 are evenly arranged on the groove surface in the guide groove 14, and a number of vertical rollers 12 are evenly arranged on the two side walls of the guide groove 14. The transverse rollers 13 and the vertical rollers 12 can rotate freely; the support frame 8 includes a triangular bracket 81, and a top support platform 83 is fixed above the triangular bracket 81, and a pulley 82 is fixed above the top support platform 83. The number of the pulleys 82 matches the number of the pulling ropes 7, and the pulling rope 7 is connected to the fixed ring sleeve 9 through the pulley 82.

[0033] Similarly, the telescopic support 4 includes a pushing base 41, which is located in the guide platform 1. A fixing rod 42 is provided on the side of the pushing base 41, one end of the fixing rod 42 is fixed to the pushing base 41, and the other end thereof is fixed to the inner wall of the guide platform 1. A hydraulic pushing rod 43 is provided on the pushing base 41, one end of the hydraulic pushing rod 43 is fixed to the pushing base 41, and the other end thereof extends outside the guide platform 1. An L-shaped rod 44 is provided at the end of the hydraulic pushing rod 43 close to the outside of the guide platform 1, one end of the L-shaped rod 44 is fixed to the hydraulic pushing rod 43, and the other end thereof is provided with a fixing sleeve 46, the end of the L-shaped rod 44 is sleeved in the fixing sleeve 46, and a support rod 45 and a balancing rod 47 are symmetrically provided on the fixing sleeve 46 to avoid the position of the L-shaped rod 44, the support rod 45 is hinged to the fixing sleeve 46, and the balancing rod 47 is fixed to the fixing sleeve 46.

[0034] The hydraulic push rod 43 in this embodiment adopts a model that can be purchased in large quantities in the prior art to facilitate mass production of this embodiment. On this basis, the support bracket 6 includes a first arc-shaped support plate 61 and a second arc-shaped support plate 62, the first arc-shaped support plate 61 and the second arc-shaped support plate 62 are respectively fixed on the two telescopic supports 4, and the first arc-shaped support plate 61 and the second arc-shaped support plate 62 can be spliced ​​and fixed into a complete semi-circular arc plate; the first arc-shaped support plate 61 includes a first support plate shell 613, the first support plate shell 613 is a hollow quarter-circular arc plate, and a first motor 612 fixed in the first support plate shell 613 is provided at one end of the first support plate shell 613, and a rotating screw 611 is provided at the output end of the first motor 612, and the rotating screw 611 is provided at the output end of the first motor 612. The screw 611 extends outside the first pallet shell 613, and a first pallet support filling 614 capable of completely filling the first pallet shell 613 is provided inside the first pallet shell 613; the second arc-shaped pallet 62 includes a second pallet shell 621, and the second pallet shell 621 can be spliced ​​with the first pallet shell 613 to form a complete semicircular arc plate, and a built-in nut 623 is fixed at one end of the second pallet shell 621, and the built-in nut 623 matches the rotating screw 611, and a second pallet support filling 622 capable of completely filling the second pallet shell 621 is provided inside the second pallet shell 621.

[0035] On this basis, the fixed ring sleeve 9 includes a first half ring 91 and a second half ring 92, the first half ring 91 and the second half ring 92 are respectively fixed on the pulling rope 7 outside the two wire take-ups 3, and the first half ring 91 and the second half ring 92 can be spliced ​​and fixed into a complete circular ring; the first half ring 91 includes a first ring sleeve shell 913, the first ring sleeve shell 913 is a hollow semicircular ring plate, and the second motor 912 fixed in the first ring sleeve shell 913 is provided at both ends of the first ring sleeve shell 913, and the output end of the second motor 912 is provided with a locking screw 911, and the locking screw 911 It extends outside the first ring sleeve shell 913, and a first ring sleeve support filling 914 is provided inside the first ring sleeve shell 913, which can completely fill the first ring sleeve shell 913; the second half ring 92 includes a second ring sleeve shell 921, and the second ring sleeve shell 921 can be spliced ​​with the first ring sleeve shell 913 to form a complete circular ring plate, and locking nuts 923 are fixed at both end portions of the second ring sleeve shell 921, and the locking nuts 923 match the locking screw 911, and the second ring sleeve shell 921 is provided with a second ring sleeve support filling 922, which can completely fill the second ring sleeve shell 921.

[0036] The size specifications of the support support 6 and the fixing ring sleeve 9 in this embodiment can be replaced according to steel piles of different specifications to adapt to steel piles of different specifications; the first support plate support filling 614 and the second support plate support filling 622 in this embodiment are made of rigid materials, which can not only effectively support and avoid deformation, but also avoid the risk of breakage under the protection of the outer shell; the filling materials used for the first ring sleeve support filling 914 and the second ring sleeve support filling 922 are metal materials, which can avoid unstable movement of the steel pile due to deformation of the fixing ring sleeve 9 during the pulling process.

[0037] The specific implementation methods described above further illustrate the objectives, technical solutions and beneficial effects of the present invention in detail. It should be understood that the above description is only a specific implementation method of the present invention and is not intended to limit the scope of protection of the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.

Claims

1. A steel pile erection device for a construction site, characterized in that: The invention comprises a guide platform (1) capable of guiding the placement position of a steel pile, a plurality of ground-gripping legs (2) are evenly fixed below the guide platform (1), two telescopic supports (4) are arranged on a side of the guide platform (1) perpendicular to the axis of the steel pile, the two telescopic supports (4) are symmetrically distributed on both sides of the steel pile, a connecting rod (5) is arranged on the telescopic support (4), one end of the connecting rod (5) is fixed to the telescopic support (4), and the other end thereof is provided with a support bracket (6), the support bracket (6) is hinged to the connecting rod (5), and a wire take-up device (3) is arranged on both sides of the guide platform (1) that avoid the telescopic support (4) and are opposite to each other, the wire take-up device (3) is fixed to the guide platform (1), and a pulling rope is arranged inside the wire take-up device (3). (7), one end of the pulling rope (7) can be freely extended and retracted in the wire take-up device (3), and the other end thereof is provided with a fixed ring sleeve (9) that can be mounted on the steel pile, the fixed ring sleeve (9) is fixed to the pulling rope (7), a support frame (8) is provided below the fixed ring sleeve (9), and the pulling rope (7) is placed on the support frame (8); the guide platform (1) includes a platform shell (11), a guide groove (14) is provided on the upper surface of the platform shell (11), the guide groove (14) passes through the side surface of the telescopic support (4) and the opposite side surface thereof, a plurality of transverse rollers (13) are evenly provided on the groove surface of the guide groove (14), and a plurality of vertical rollers (12) are evenly provided on the two side walls of the guide groove (14), The transverse roller (13) and the vertical roller (12) can rotate freely; the telescopic support (4) comprises a driving base (41), the driving base (41) is located in the guide platform (1), a fixing rod (42) is provided on the side of the driving base (41), one end of the fixing rod (42) is fixed to the driving base (41), and the other end thereof is fixed to the inner wall of the guide platform (1); a hydraulic driving rod (43) is provided on the driving base (41), one end of the hydraulic driving rod (43) is fixed to the driving base (41), and the other end thereof extends outside the guide platform (1); an L-shaped rod (44) is provided at the end of the hydraulic driving rod (43) close to the outside of the guide platform (1), and one end of the L-shaped rod (44) is fixed to the hydraulic driving rod (43) is fixed, and a fixing sleeve (46) is provided at the other end thereof, the end of the L-shaped rod (44) is sleeved in the fixing sleeve (46), and a support rod (45) and a balance rod (47) are symmetrically provided on the fixing sleeve (46) to avoid the position of the L-shaped rod (44), the support rod (45) is hinged to the fixing sleeve (46), and the balance rod (47) is fixed to the fixing sleeve (46); the support bracket (6) comprises a first arc-shaped support plate (61) and a second arc-shaped support plate (62), the first arc-shaped support plate (61) and the second arc-shaped support plate (62) are respectively fixed to the two telescopic supports (4), and the first arc-shaped support plate (61) and the second arc-shaped support plate (62) can be spliced ​​and fixed to form a complete semicircular arc plate;The fixing ring sleeve (9) comprises a first half ring (91) and a second half ring (92), the first half ring (91) and the second half ring (92) are respectively fixed on the pulling rope (7) outside the two wire take-ups (3), and the first half ring (91) and the second half ring (92) can be spliced ​​and fixed into a complete circular ring. ; 2. The construction site steel pile erection device according to claim 1, characterized in that: The first arc-shaped support plate (61) comprises a first support plate shell (613), the first support plate shell (613) is a hollow quarter-circular arc plate, a first motor (612) fixed in the first support plate shell (613) is provided at one end of the first support plate shell (613), a rotating screw (611) is provided at the output end of the first motor (612), and the rotating screw (611) extends outside the first support plate shell (613), and a screw (611) capable of completely filling the first support plate shell (613) is provided in the first support plate shell (613). The first pallet support filler (614); the second arc-shaped pallet (62) includes a second pallet shell (621), the second pallet shell (621) can be spliced ​​with the first pallet shell (613) to form a complete semicircular arc plate, one end of the second pallet shell (621) is fixed with a built-in nut (623), the built-in nut (623) matches the rotating screw (611), and the second pallet shell (621) is provided with a second pallet support filler (622) that can completely fill the second pallet shell (621).

3. The construction site steel pile erection device according to claim 1, characterized in that: The support frame (8) comprises a triangular support (81), a top support platform (83) is fixed above the triangular support (81), a pulley (82) is fixed above the top support platform (83), the number of the pulleys (82) matches the number of the pulling ropes (7), and the pulling ropes (7) are connected to the fixed ring sleeve (9) via the pulleys (82).

4. The construction site steel pile erecting device according to claim 1, characterized in that: The first half ring (91) comprises a first ring sleeve shell (913), the first ring sleeve shell (913) is a hollow semicircular ring plate, and both ends of the first ring sleeve shell (913) are provided with a second motor (912) fixed in the first ring sleeve shell (913), the output end of the second motor (912) is provided with a locking screw (911), and the locking screw (911) extends outside the first ring sleeve shell (913), and a second screw (911) capable of completely filling the first ring sleeve shell (913) is provided in the first ring sleeve shell (913). A ring sleeve support filler (914); the second half ring (92) includes a second ring sleeve shell (921), the second ring sleeve shell (921) can be spliced ​​with the first ring sleeve shell (913) to form a complete circular ring plate, both ends of the second ring sleeve shell (921) are fixed with locking nuts (923), the locking nuts (923) match the locking screw (911), and the second ring sleeve shell (921) is provided with a second ring sleeve support filler (922) that can completely fill the second ring sleeve shell (921).

Citation Information

Patent Citations

  • Construction site steel pile erecting device

    CN215406056U