A suspended pre-compression structure and its use method
Through the suspended pre-pressure structure, the flexible adjustment and precise control of loads are achieved by using cantilever brackets and water bag systems, which solves the problems of low efficiency and unreal loads of pre-pressure methods in existing construction, and reduces construction costs and garbage generation , improve construction efficiency and prepression effect.
Patent Information
- Application Number
- CN202110711537.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-06-25
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2041-06-25
AI Technical Summary
The pre-pressure method of formwork brackets in existing construction has problems such as high site requirements, low working efficiency, and inability to simulate real loads, resulting in increased construction progress and costs.
It adopts a suspended pre-pressure structure, including cantilever brackets, hanging baskets, load bags and suspended water bags. The load size is controlled through the number and distribution of hanging water bags, and the load is accurately monitored and adjusted using tension sensors and water pipe valves.
It realizes flexible adjustment and precise control of loads, reduces construction costs, reduces construction waste, improves construction efficiency and pre-pressure effects, and is suitable for simulation of different load conditions.
Smart Images

Figure CN113374257B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of construction, in particular to a suspended pre-compression structure and a use method thereof. Background Art
[0002] The preloading of the support formwork system is an important part of the construction. It is an early inspection of the formwork support to eliminate non-elastic deformation, obtain elastic deformation, and provide a basis for subsequent construction. The selection of the preloading process requires simulating the actual stress state and is related to the construction progress and cost.
[0003] At present, the preloading of formwork support systems such as pipe column supports, brackets, hanging baskets, and clamps used in the construction of structures in my country mostly adopts concrete preloading block loading preloading, ordinary water bag loading preloading, and reaction frame preloading. In actual operation, the above preloading methods have several shortcomings: 1. Preloading preloading of concrete prefabricated blocks has high site requirements, low work efficiency, and is time-consuming and labor-intensive; 2. Preloading preloading of ordinary water bags is a uniformly distributed load and cannot simulate the actual situation of some concentrated load support formwork; 3. The reaction frame preloading is all concentrated loads, which cannot effectively preload the entire support formwork system. Summary of the invention
[0004] In order to overcome the deficiencies of the prior art, an object of the present invention is to provide a suspended pre-stressing structure and a method of using the structure which has a simple structure, is easy to use and has a low construction cost.
[0005] The present invention is achieved through the following technical scheme: a suspended pre-stressing structure, including a cantilever bracket, a hanging basket arranged at the free end of the cantilever bracket and a stacking water bag arranged in the hanging basket, the stacking water bag is arranged on the bottom surface of the inner surface of the hanging basket, and the hanging basket is provided with a guardrail surrounding the stacking water bag. The lower surface of the hanging basket is provided with a plurality of hooks, and the hooks are connected to a plurality of hanging water bags.
[0006] Furthermore, in order to better implement the present invention, the hooks are arranged in an array with a plurality of rows and a plurality of columns.
[0007] Furthermore, in order to better implement the present invention, a tension sensor is connected between the hook and the hanging water bag.
[0008] Furthermore, in order to better implement the present invention, the hanging water bag is connected to a water pipe, and a valve is provided at the free end of the water pipe.
[0009] Furthermore, in order to better realize the present invention, the hanging water bag adopts a rubber plastic water bag.
[0010] Furthermore, in order to better implement the present invention, the heaped water bag is connected to a water pipe, and a valve is provided at the free end of the water pipe.
[0011] Furthermore, in order to better implement the present invention, a triangular prism-shaped reinforcement bracket is provided on the cantilever bracket.
[0012] Furthermore, in order to better implement the present invention, a plurality of diagonal braces are provided in the triangular prism-shaped reinforcement bracket.
[0013] A method for using a suspended preloading structure includes installing a cantilever bracket on the top of a structure, hanging a hanging basket on the outside of the structure, placing a heaped water bag in the hanging basket to provide a load, and hanging the hanging water bag on a hook.
[0014] The beneficial effects achieved by this solution are: this solution utilizes both stacked water bags and hanging water bags to provide loads, and can control the number of hanging water bags as needed, thereby controlling the size of the load. It has the advantages of high adjustment accuracy and convenient and flexible use. The water resources in the water bags can be reused, which can reduce construction costs and reduce construction waste. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 This is a schematic diagram of the structure of this scheme;
[0016] Figure 2 for Figure 1 Right view of;
[0017] Among them, 1-hanging water bag, 2-stacked water bag, 3-hanging basket, 4-cantilever bracket, 5-triangular prism reinforced bracket, 6-structure. DETAILED DESCRIPTION
[0018] The present invention is further described in detail below in conjunction with examples, but the embodiments of the present invention are not limited thereto.
[0019] Embodiment 1:
[0020] like Figure 1 , Figure 2 As shown, in this embodiment, a hanging pre-pressing structure includes a cantilever bracket, a hanging basket arranged at the free end of the cantilever bracket and a heaped water bag arranged in the hanging basket, the heaped water bag is arranged on the bottom surface of the inner surface of the hanging basket, and the hanging basket is provided with a guardrail surrounding the heaped water bag. The lower surface of the hanging basket is provided with a plurality of hooks, and the hooks are connected with a plurality of hanging water bags.
[0021] When preloading is required, the cantilever bracket is built on the top of the structure, the hanging basket is located outside the structure, the heaped water bag filled with water is loaded into the hanging basket, and then the hanging water bag filled with water is added to the hook according to the required load size, so as to control the load that the overall structure can provide. When unloading is required, the hanging water bags can be removed one by one, and the time interval for removing each hanging water bag can be controlled to meet the needs of gradual unloading when necessary. The use of water bags has the advantages of a wide range of water sources, easy use, and low price. It will not generate construction waste, and water resources can be reused to reduce construction costs. There is no need to pour concrete to form counterweights, which can save waiting time to improve construction efficiency and has low site requirements.
[0022] If needed, the hanging water bag can also be hung directly on the cantilever bracket.
[0023] Embodiment 2:
[0024] On the basis of the above embodiment, in this embodiment, the hooks are arranged in an array with a plurality of rows and columns, thereby increasing the number of positions where the water bags can be hung, making it easier to control the distribution of the water bags to control the distribution of the load as needed, improving the efficiency and accuracy of the preloading, simulating the actual stress conditions of the structure, and enhancing the preloading effect.
[0025] Embodiment 3:
[0026] On the basis of the above embodiment, in this embodiment, a tension sensor is connected between the hook and the hanging water bag. The pressure sensor is used to monitor the pressure applied by the hanging water bag, so as to accurately monitor the pre-pressing process. It is also convenient to control the hanging water bag as needed to ensure the pre-pressing effect. In this embodiment, the pressure sensor is connected to a controller to collect and process the data detected by the pressure sensor.
[0027] Embodiment 4:
[0028] On the basis of the above embodiment, in this embodiment, the hanging water bag is connected with a water pipe, and a valve is provided at the free end of the water pipe, so as to facilitate the control of the water volume in the hanging water bag through the water pipe, and to facilitate the increase or decrease of water volume in the hanging water bag as needed, so as to improve the control accuracy of loading or unloading, and the pressure sensor is used to monitor the weight change of the hanging water bag in real time when the water volume is increased or decreased, so as to facilitate the real-time monitoring of the pressure provided by the entire structure.
[0029] When the hanging water bag needs to be removed, the water in the water bag can be drained out first, and then the hanging water bag can be removed, which makes it more convenient to remove the hanging water bag.
[0030] In this embodiment, the hanging water bag is a rubber plastic water bag. Under the action of water pressure, the hanging water bag can expand and become larger so as to be filled with more water, which can correspondingly reduce the number of hanging water bags required, making construction more convenient.
[0031] Embodiment 5:
[0032] On the basis of the above embodiment, in this embodiment, the heap water bag is connected to a water pipe, and a valve is provided at the free end of the water pipe. This facilitates adding water to the heap water bag or draining water from the heap water bag through the water pipe, so as to control the load provided by the heap water bag. In this embodiment, a pressure sensor can also be provided between the heap water bag and the hanging basket, so as to detect the pressure exerted by the heap water bag on the hanging basket and its changes.
[0033] Embodiment 6:
[0034] On the basis of the above embodiment, in this embodiment, a triangular prism-shaped reinforcement bracket is provided on the cantilever bracket. The triangular prism-shaped reinforcement bracket can increase the overall strength and stability of the cantilever bracket, which is conducive to improving the bearing capacity of the cantilever bracket and preventing the cantilever bracket from being deformed or tipped over under the load.
[0035] In this embodiment, a plurality of diagonal braces are arranged in the triangular prism-shaped reinforcement bracket, so as to enhance the strength and rigidity of the triangular prism-shaped reinforcement bracket and prevent the triangular prism-shaped reinforcement bracket from being deformed under the action of external force, thereby further increasing the strength and rigidity of the cantilever bracket.
[0036] In this embodiment, other contents not described are the same as those in the above embodiment, and thus will not be described in detail.
[0037] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any form. Any simple modification or equivalent change made to the above embodiment based on the technical essence of the present invention shall fall within the protection scope of the present invention.
Claims
1. A method for using a suspended preloading structure, characterized in that: The hanging preloading structure comprises a cantilever bracket, a hanging basket arranged at the free end of the cantilever bracket and a heaped water bag arranged in the hanging basket, the heaped water bag is arranged on the bottom surface of the inner surface of the hanging basket, the hanging basket is provided with a guardrail surrounding the heaped water bag, the lower surface of the hanging basket is provided with a plurality of hooks, and the hooks are connected with a plurality of hanging water bags; The hooks are arranged in an array with a plurality of rows and columns; A tension sensor is connected between the hook and the hanging water bag; The hanging water bag is connected to a water pipe, and a valve is provided at the free end of the water pipe; The hanging water bag is a rubber plastic water bag; The heap water bag is connected to a water pipe, and a valve is provided at the free end of the water pipe; The cantilever bracket is provided with a triangular prism-shaped reinforcement bracket; A plurality of diagonal braces are arranged in the triangular prism-shaped reinforcement bracket; The method comprises installing the cantilever bracket on the top of the structure, hanging the hanging basket on the outside of the structure, placing the heaped water bag in the hanging basket to provide load, and hanging the hanging water bag on the hook; The hanging water bag is connected with a water pipe, through which water is added into the hanging water bag or water in the hanging water bag is discharged to control the load provided by the hanging water bag.