A wiring harness assembly for a wind turbine generator set and a preparation method thereof
By designing a torsion-resistant cable structure and a detachable plug-and-pull-and-pull-and-pull-and-pull-and-pull-and-pull-and-pull-and-pull-and-pull-and-pull-and-pull-and-pull-and-pull-and-pull-and-pull-and-pull-and-pull-and-pull-and-pull-and-pull-and-pull-and-pull-and-pull-and-pull-and-pull-and-pull-and-pull-and-pull-and-pull-and-pull-and-pull-and-pull-and-pull-and-pull-and-pull-and-pull-and-pull-and-pull-and-pull-and-pull-and-pull-and-pull-and-pull-and-pull-and-pull-and-pull-and-pull-and and systematic testing ensures stable performance and electrical safety of the wiring harness components for wind turbine units.
Patent Information
- Application Number
- CN202111098306.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-09-18
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2041-09-18
AI Technical Summary
The medium-voltage torsion-resistant cables and T-type terminal joints for wind turbines are susceptible to harsh working conditions during on-site assembly, resulting in faults and fire risks. Incorrect on-site production, the cable joint failure cannot be carried out, which affects the electrical safety performance. .
A wire harness assembly for wind turbines is designed, including a torsion-resistant cable structure and a detachable plug-and-removable structure. The torsion-resistant cable structure consists of an outer sheath of the cable, a grounding core and a main wire core, and adopts a conductive grid belt winding and closing structure. Combining ground terminals and detachable plug-in and unpluggable structure ensures the matching use of cables and cable terminal accessories.
By reasonably setting up the torsion-resistant cable structure and grounding core, the cable structure is ensured to be stable, and good contact connection between the cable and the cable terminal accessories is achieved, the problems of on-site production are solved and irregular operation are not affected by working conditions, and the wiring harness for wind turbines is ensured The components are stable in performance and electrically safe.
Smart Images

Figure CN113725676B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of cable technology, and in particular to a wire harness assembly for wind turbine generators and its preparation method. Background Technology
[0002] Wind power generation, as an environmentally friendly power generation project, has been vigorously promoted and used in recent years. The initial implementation of wind power generation requires extensive infrastructure construction, including the investment in wind turbines. As an indispensable component in the wind power generation process, wind power cables have seen their usage expanded comprehensively with the continuous development of wind power projects.
[0003] Currently, most suppliers in the industry deliver wind turbine manufacturers by separately supplying medium-voltage anti-torsion cables and cable termination accessories, with the cable assemblies being fabricated and installed on-site at the wind turbine installation project site. Due to harsh on-site working conditions and non-standard fabrication methods, medium-voltage cable harness assemblies frequently malfunction, resulting in cable burnout and even fires. Specific technical issues are summarized below:
[0004] (1) Wind power medium-voltage anti-torsion cables and T-type terminal joints are assembled on the project site. The on-site working environment is harsh, especially the marine environment with high humidity and strong salt spray corrosion, which affects the objective conditions of the medium-voltage harness assembly and is very easy to cause the medium-voltage cable assembly to fail.
[0005] (2) The work of assembling medium-voltage cable harness components on the project site is usually done by a third-party construction team found by the owner or the wind turbine manufacturer. The production level of such construction teams varies and there is no standardized operating procedure. This can easily lead to errors in the production of medium-voltage cable harness components or failure to meet the process requirements of the product. Cable joints may malfunction or burst.
[0006] (3) When this medium-voltage wiring harness assembly is manufactured on-site, even after the assembly is completed, it is not possible to conduct systematic finished product testing, namely, the medium-voltage wiring harness assembly withstand voltage test and partial discharge test, thus failing to guarantee the electrical safety performance of the wiring harness assembly.
[0007] Therefore, ensuring the stable performance of wiring harness assemblies for wind turbine units has become an urgent problem to be solved. Summary of the Invention
[0008] In view of this, on the one hand, embodiments of the present invention provide a wiring harness assembly for wind turbine generators, characterized in that it includes an anti-torsion cable structure, a detachable pluggable structure, and a grounding terminal;
[0009] The anti-torsion cable structure includes a cable outer sheath, at least one grounding core, and at least one main core. The grounding core includes a first grounding core portion and a second grounding core portion connected to each other. The main core includes a first main core portion and a second main core portion connected to each other. The first grounding core portion and the first main core portion are covered by the cable outer sheath, while the second grounding core portion and the second main core portion are exposed outside the cable outer sheath.
[0010] The grounding core includes a grounding core conductor and a semi-conductive protective layer wrapped around the grounding core conductor. A portion of the semi-conductive protective layer of the second grounding core section has a break, which exposes the grounding core conductor.
[0011] Along the direction from the second main core portion to the first main core portion, the second main core portion sequentially includes a first sub-portion, a second sub-portion, and a third sub-portion; the first sub-portion includes a main core conductor, the second sub-portion includes the main core conductor and a core insulation layer wrapped around the main core conductor, and the third sub-portion includes the main core conductor, a core insulation layer wrapped around the main core conductor, and a semiconductive layer wrapped around the core insulation layer;
[0012] The anti-torsion cable structure further includes a conductive mesh belt and a gathering structure. The conductive mesh belt wraps around the main conductor and the grounding conductor corresponding to the main conductor. The gathering structure gathers the main conductor and the grounding conductor.
[0013] The detachable pluggable structure includes a terminal block, a cable adapter tube, and a detachable pluggable structure body. The terminal block is sleeved on the first sub-section, the cable adapter tube is sleeved on the second sub-section and part of the third sub-section, and the detachable pluggable structure body is sleeved on the terminal block and the cable adapter tube.
[0014] The grounding terminal is crimped onto the side of the second grounding core portion away from the first grounding core portion.
[0015] On the other hand, embodiments of the present invention provide a method for manufacturing a wiring harness assembly for wind turbine generators, characterized in that it includes:
[0016] A break is formed by stripping away the semiconductive protective layer at a portion of the second grounding core, exposing the grounding core conductor.
[0017] The main conductor and the grounding conductor corresponding to the main conductor are wound with conductive mesh tape.
[0018] The main conductor and the grounding conductor are gathered together using a gathering structure.
[0019] A grounding terminal is crimped onto the side of the second grounding core portion that is away from the first grounding core portion;
[0020] The cable adapter tube is fitted onto the second sub-section and part of the third sub-section;
[0021] A wiring terminal is fitted onto the first sub-section;
[0022] A detachable pluggable structure is fitted onto the cable adapter tube and the terminal block.
[0023] The wiring harness assembly for wind turbines provided in this invention combines a torsion-resistant cable structure, a detachable pluggable structure, and a grounding terminal. By fitting the terminals and cable adapter tubes onto the corresponding main core sections, and attaching the detachable pluggable structure to the terminals and cable adapter tubes, the assembly achieves the matching use of cables and cable terminal accessories. This solves the problems of on-site wiring harness assembly fabrication being affected by working conditions and the existence of non-standard operations and the inability to conduct systematic testing, thus ensuring the stable performance of the wiring harness assembly for wind turbines. Attached Figure Description
[0024] Other features, objects, and advantages of the invention will become more apparent from the following detailed description of non-limiting embodiments with reference to the accompanying drawings:
[0025] Figure 1 A schematic diagram of the anti-torsion cable structure of the wiring harness assembly for wind turbines provided in an embodiment of the present invention;
[0026] Figure 2 This is a schematic diagram of the detachable pluggable structure of the wiring harness assembly for wind turbines provided in an embodiment of the present invention.
[0027] Figure 3 This is a schematic diagram of the grounding terminal of the wiring harness assembly for wind turbine generators provided in an embodiment of the present invention;
[0028] Figure 4 A cross-sectional schematic diagram of the anti-torsion cable structure of the wiring harness assembly for wind turbines provided in an embodiment of the present invention;
[0029] Figure 5 A schematic diagram of the fracture surface, first end, first root, second end, and second root provided in an embodiment of the present invention;
[0030] Figure 6 This is a schematic diagram of the conductive mesh strip and the gathering structure provided in an embodiment of the present invention;
[0031] Figure 7 This is a schematic diagram of the covering layer in the gathering structure provided in an embodiment of the present invention;
[0032] Figure 8 This is a schematic diagram of the third gathering layer in the gathering structure provided in an embodiment of the present invention;
[0033] Figure 9 This is a schematic diagram of the heat-shrinkable multi-finger sleeve and the crimped grounding terminal in the collapsible structure provided in the embodiment of the present invention;
[0034] Figure 10 A schematic diagram of the structure of the marking strip, the second sub-part, and the third sub-part provided in an embodiment of the present invention;
[0035] Figure 11 This is a schematic diagram of the structure of the waterproof sealant provided in an embodiment of the present invention;
[0036] Figure 12 This is a schematic diagram of the structure of the connecting tape provided in an embodiment of the present invention;
[0037] Figure 13 This is a schematic diagram of the structure of the stress control putty and the first sub-part provided in an embodiment of the present invention;
[0038] Figure 14 A flowchart illustrating a method for preparing a wiring harness assembly for a wind turbine according to an embodiment of the present invention;
[0039] Figure 15 This is a schematic diagram of the cable adapter tube sleeve provided in an embodiment of the present invention;
[0040] Figure 16 This is a schematic diagram of the structure of the terminal block sleeve provided in an embodiment of the present invention;
[0041] Figure 17 This is a schematic diagram of the detachable pluggable structure body provided in an embodiment of the present invention;
[0042] Figure 18 A flowchart illustrating another method for preparing a wiring harness assembly for a wind turbine provided in an embodiment of the present invention;
[0043] Figure 19 This is a schematic diagram of the structure of the conductive mesh strip on the main wire core provided in an embodiment of the present invention;
[0044] Figure 20 This is a schematic diagram of the structure of the conductive mesh strip on the grounding conductor of the main conductor and the grounding conductor corresponding to the main conductor, provided in an embodiment of the present invention.
[0045] Explanation of reference numerals in the attached figures
[0046] 100 - Anti-torsion cable structure; 101 - Grounding core; 101-1 - Grounding core; 101-2 - Grounding core; 101-3 - Grounding core; 1011 - Second grounding core section; 102 - Main core; 102-1 - Main core; 102-2 - Main core; 102-3 - Main core; 1021 - Second main core section; 1021a - First sub-section; 1021b - Second sub-section; 1021c - Third sub-section; 50 - Break; 51 - First end; 52 - First root; 53 - Second end; 54 - Second root; 60 - Conductive mesh tape; 610 - Gathering structure; 611 - Covering layer; 612 - Third gathering layer; 613 - Heat-shrinkable multi-finger sleeve; 110 - Marking tape; 111 - Waterproof sealant; 112 - Connecting tape;
[0047] 113 - Stress control putty; 114 - Tilt angle; 115 - Tape; 116 - Tape; 200 - Separable pluggable structure; 201 - Separable pluggable structure body; 202 - Inner shielding layer; 203 - Outer shielding layer; 204 - Insulation layer; 205 - Type C interface; 206 - Terminal block; 207 - Insulating plug; 208 - Cable adapter tube; 209 - Conductive cover; 210 - Bolt; 211 - Grounding wire ; 300 - Grounding terminal; 400 - Cross-section of anti-torsion cable structure 100; 401 - Main conductor; 402 - Semi-conductive strip of main conductor; 403 - Conductor shielding layer; 404 - Core insulation layer; 405 - Semi-conductive layer; 406 - Semi-conductive filler layer; 407 - Wrapping tape; 408 - Inner sheath; 409 - Outer sheath; 410 - Grounding conductor; 411 - Semi-conductive protective layer; 412 - Semi-conductive covering layer. Detailed Implementation
[0048] To make the objectives, technical solutions, and advantages of this invention clearer, the technical solutions of this invention will be fully described below with reference to the accompanying drawings in the embodiments of this invention, through specific implementation methods. Obviously, the described embodiments are only some, not all, of the embodiments of this invention. All other embodiments obtained by those skilled in the art based on the embodiments of this invention without creative effort fall within the protection scope of this invention.
[0049] This invention provides a wiring harness assembly for wind turbine generators. Figure 1 A schematic diagram of the anti-torsion cable structure of the wiring harness assembly for wind turbines provided in an embodiment of the present invention; Figure 2 This is a schematic diagram of the detachable pluggable structure of the wiring harness assembly for wind turbines provided in an embodiment of the present invention. Figure 3 This is a schematic diagram of the grounding terminal of the wiring harness assembly for wind turbine generators provided in an embodiment of the present invention; Figure 4A cross-sectional schematic diagram of the anti-torsion cable structure of the wiring harness assembly for wind turbines provided in an embodiment of the present invention; Figure 5 A schematic diagram of the fracture surface, first end, first root, second end, and second root provided in an embodiment of the present invention; Figure 6 This is a schematic diagram of the conductive mesh strip and the gathering structure provided in an embodiment of the present invention; Figure 7 This is a schematic diagram of the covering layer in the gathering structure provided in an embodiment of the present invention; Figure 8 This is a schematic diagram of the third gathering layer in the gathering structure provided in an embodiment of the present invention; Figure 9 This is a schematic diagram of the heat-shrinkable multi-finger sleeve and the crimped grounding terminal in the collapsible structure provided in the embodiment of the present invention; Figure 10 A schematic diagram of the structure of the marking strip, the second sub-part, and the third sub-part provided in an embodiment of the present invention; Figure 11 This is a schematic diagram of the structure of the waterproof sealant provided in an embodiment of the present invention; Figure 12 This is a schematic diagram of the structure of the connecting tape provided in an embodiment of the present invention; Figure 13 This is a schematic diagram of the stress control putty and the first sub-section provided in an embodiment of the present invention.
[0050] refer to Figures 1 to 13 As shown, exemplarily, the wiring harness assembly for wind turbines includes an anti-torsion cable structure 100, a detachable pluggable structure 200, and a grounding terminal 300.
[0051] The anti-torsion cable structure 100 includes a cable outer sheath 409, at least one grounding core 101, and at least one main core 102. The grounding core 101 includes a first grounding core portion and a second grounding core portion 1011 connected to each other. The main core 102 includes a first main core portion and a second main core portion 1021 connected to each other. The first grounding core portion and the first main core portion are covered by the cable outer sheath 409, while the second grounding core portion 1011 and the second main core portion 1021 are exposed outside the cable outer sheath 409.
[0052] The grounding core 102 includes a grounding core conductor 410 and a semi-conductive protective layer 411 wrapped around the grounding core conductor 410. A portion of the semi-conductive protective layer 411 of the second grounding core portion 1011 has a break 50, which exposes the grounding core conductor 410.
[0053] Along the direction from the second main core section to the first main core section, the second main core section 1021 sequentially includes a first sub-section 1021a, a second sub-section 1021b, and a third sub-section 1021c; the first sub-section 1021a includes a main core conductor 401, the second sub-section 1021b includes a main core conductor 401 and a core insulation layer 404 wrapped around the main core conductor, and the third sub-section 1021c includes a main core conductor 401, a core insulation layer 404 wrapped around the main core conductor, and a semiconductive layer 405 wrapped around the core insulation layer;
[0054] The anti-torsion cable structure 100 also includes a conductive mesh belt 60 and a gathering structure 610. The conductive mesh belt 60 wraps around the main wire core 102-1 and the grounding wire core 101-1 corresponding to the main wire core 101-1. The gathering structure 610 gathers the main wire core 102-1 and the grounding wire core 101-1.
[0055] The detachable pluggable structure 200 includes a terminal block 206, a cable adapter tube 208, and a detachable pluggable structure body 201. The terminal block 206 is sleeved on the first sub-section 1021a, the cable adapter tube 208 is sleeved on the second sub-section 1021b and part of the third sub-section 1021c, and the detachable pluggable structure body 201 is sleeved on the terminal block 206 and the cable adapter tube 208.
[0056] The grounding terminal 300 is crimped onto the side of the second grounding core section 1011 away from the first grounding core section.
[0057] refer to Figure 1 and Figure 4As shown, exemplarily, taking an anti-torsion cable structure including six cores as an example, the anti-torsion cable structure 100 includes an outer sheath 409, three grounding cores 101-1, 101-2, and 101-3 respectively, and three main cores 102-1, 102-2, and 102-3 respectively. The main cores include a main core conductor 401, a main core semi-conductive tape 402, a conductor shielding layer 403, a core insulation layer 404, and a semi-conductive layer 405. The grounding cores include a grounding core conductor 410, a semi-conductive protective layer 411, and a semi-conductive covering layer 412. The anti-torsion cable structure 100 also includes a semi-conductive filling layer 406, a wrapping tape 407, an inner sheath 408, and an outer sheath 409 filled between the grounding cores and main cores, and between the main cores. Optionally, the main core conductor 401 adopts GB / T... The fifth type of round stranded soft copper conductor specified in standard 3956 has a smooth surface, free from burrs, sharp edges, protrusions, or broken single wires that could damage the insulation; the main conductor semi-conductive tape 402 is made of semi-conductive nylon tape covering the main conductor 401; the conductor shielding layer 403 is made of semi-conductive inner shielding material; the conductor insulation layer 404 is made of ultra-clean ethylene propylene rubber insulation material; the semi-conductive layer 405 is made of peelable semi-conductive outer shielding material; and the semi-conductive filling layer 406 is filled between the grounding conductor and the main conductor, as well as between the main conductor and the main conductor. Between the cores, it serves as an electrical connection between the main cores; after the main cores and grounding cores are cabled, they are wrapped and secured with wrapping tape 407; the inner sheath 408 is made of ethylene propylene rubber material, filling the gap between the outer layers of the main cores and the grounding cores, providing mechanical protection for the internal cores, and is co-extruded with the outer sheath 409 using a double-layer co-extrusion method; the outer sheath 409 is made of halogen-free low-smoke rubber sheath material, and is tightly bonded together with the inner sheath using a double-layer co-extrusion method; the grounding core conductor 410 is the fifth type of round stranded soft copper conductor specified in GB / T 3956 standard, with a smooth conductor surface free of burrs, sharp edges, protrusions, or broken single wires that damage the insulation; the semi-conductive protective layer 411 is made of semi-conductive nylon tape covering the grounding core conductor 410; the semi-conductive covering layer 412 is extruded on the outer surface of the semi-conductive protective layer 411, serving as an electrical connection between the main core conductor 401 and the grounding core conductor 410.
[0058] refer to Figure 2 As shown, exemplarily, the detachable pluggable structure 200 further includes an inner shielding layer 202, an outer shielding layer 203, an insulating layer 204 cast between the inner shielding layer 202 and the outer shielding layer 203, a C-type interface 205, an insulating plug 207, a conductive cover 209, a bolt 210, and a grounding wire 211. Optionally, both the inner shielding layer 202 and the outer shielding layer 203 are made of conductive EPDM rubber, the insulating layer 204 is made of EPDM rubber, and the conductive cover 209 is a rubber cover.
[0059] To illustrate the structure of the grounding core and the main core in detail, exemplarily, Figure 5and Figure 6 The following explanation uses an anti-torsion cable structure comprising one main conductor core 102-1 and one grounding conductor core 101-1 as an example. (Reference) Figure 5 and Figure 6 As shown, depending on actual needs, a certain length of the cable outer sheath can be cut off, leaving a certain length of the cable outer sheath, i.e., the cable outer sheath 409 shown in the figure. The second grounding core portion 1011 and the second main core portion 1021 are exposed outside the cable outer sheath 409. A break 50 is formed at the root of the second grounding core portion 1011, i.e., the portion near the first grounding core portion, exposing the grounding core conductor 410. A conductive mesh 60 is used to wrap around the main core 102-1 and the grounding core conductor 410 of the corresponding grounding core 101-1 to ensure close and good contact between the conductive mesh 60 and the grounding core conductor 410. The conductive mesh 60 can be further secured with metal wire to ensure good contact between the conductive mesh 60 and the grounding core conductor 410. Specifically, the conductive mesh 60 can be a copper mesh, and the metal wire can be a tin-plated copper wire. This embodiment of the invention does not limit this, as long as good contact between the conductive mesh 60 and the grounding core conductor 410 is ensured.
[0060] Furthermore, such as Figure 6 As shown, in order to ensure the structural stability of the anti-torsion cable structure 100, a further gathering structure 610 can be used to gather the main conductor core 102-1 and the grounding conductor core 101-1, ensuring that the anti-torsion cable structure 100 is firm and stable.
[0061] Furthermore, such as Figure 13 As shown, to ensure good contact between the anti-torsion cable structure 100 and the detachable pluggable structure 200, the structure of the second main conductor section 1021 can be adjusted. Specifically, the second main conductor section 1021 sequentially includes a first sub-section 1021a, a second sub-section 1021b, and a third sub-section 1021c; the first sub-section 1021a includes a main conductor 401, and a terminal 206 is sleeved on the first sub-section 1021a to ensure good electrical connection between the terminal 206 and the main conductor 401; the second sub-section 1021b includes the main conductor 401 and a conductor insulation layer 40 wrapped around the main conductor. 4. The third sub-section 1021c includes a main conductor 401, a core insulation layer 404 wrapped around the main conductor, and a semi-conductive layer 405 wrapped around the core insulation layer. The cable adapter tube 208 is sleeved on the second sub-section 1021b and part of the third sub-section 1021c. The detachable pluggable structure body 201 is sleeved on the terminal block 206 and the cable adapter tube 208 to ensure good contact between the second main conductor section 1021 and the detachable pluggable structure 200.
[0062] Furthermore, such as Figure 9 As shown, the grounding terminal 300 is crimped onto the side of the second grounding core portion 1011 away from the first grounding core portion, thus realizing the electrical connection between the grounding core 101-1 and the grounding terminal 300.
[0063] In summary, the wiring harness assembly for wind turbines provided by this invention, through the reasonable arrangement of the anti-torsion cable structure, grounding core, and main core, ensures the robust and stable structure of the anti-torsion cable, while also ensuring good electrical connection between the grounding core and the grounding terminal, and good contact connection between the main core and the detachable pluggable structure. This enables the matching use of cables and cable terminal accessories, solves the problems of on-site fabrication of wiring harness assemblies being affected by working conditions and environmental factors, as well as non-standard operations and the inability to conduct systematic testing, and ensures the stable performance of the wiring harness assembly for wind turbines.
[0064] As one possible implementation method, please refer to [reference]. Figure 5 As shown, the second grounding core portion 1011 includes a first end portion 51 on the side away from the first grounding core portion and a first root portion 52 on the side close to the first grounding core portion; the second main core portion 1021 includes a second end portion 53 on the side away from the first main core portion and a second root portion 54 on the side close to the first main core portion; a break 50 is formed at the position of the first root portion, and the length L1 of the break 50 satisfies 15mm≤L1≤25mm; Reference Figure 6 As shown, the conductive mesh 60 is wrapped around the main conductor 102-1 and the ground conductor conductor (not shown) of the ground conductor 101-1 corresponding to the main conductor 102-1 and the ground conductor conductor (not shown) of the main conductor 102-1 with a 40%-60% overlap from a preset position at the second end 53.
[0065] Optionally, the conductive mesh belt 60 is made of copper mesh belt, and the preset position is 245-255mm away from the second end 53. The 40%-60% overlap means that in two adjacent layers of the wound conductive mesh belt, the latter layer of conductive mesh belt overlaps the former layer of conductive mesh belt and covers 40%-60% of the area of the former layer of conductive mesh belt.
[0066] To facilitate a detailed explanation of the winding method and position of the conductive mesh tape, the first end 51 on the side away from the first grounding core section and the first root 52 on the side close to the first grounding core section are shown, as are the second end 53 on the side away from the first main core section and the second root 54 on the side close to the first main core section. Using copper mesh tape as the conductive mesh tape can effectively shield external electromagnetic interference. When the length L1 of the break 50 meets the condition of 15mm≤L1≤25mm, good contact between the conductive mesh tape 60 and the grounding core conductor can be guaranteed. According to actual needs, the preset position is 245-255mm away from the second end 53, which can ensure that the conductive mesh tape 60 wound on the main core 102-1 plays a shielding role. Using a 40%-60% overlap method can ensure that the conductive mesh tape 60 on the main core 102-1 is effectively connected to the conductive mesh tape 60 on the grounding core conductor, saving the use of conductive mesh tape.
[0067] To illustrate the detailed explanation of the convergence structure of the grounding core and the main core, exemplarily, Figure 6 , Figure 7 , Figure 8 and Figure 9 The following explanation uses an anti-torsion cable structure comprising one main conductor core 102-1 and one grounding conductor core 101-1 as an example. (Reference) Figure 6 , Figure 7 , Figure 8 and Figure 9 As shown, the gathering structure 610 includes a covering layer 611, a first gathering layer (not shown), a second gathering layer (not shown), a filler layer (not shown), a third gathering layer 612, a heat-shrinkable multi-finger sleeve 613, and a heat-shrinkable tube (not shown); the covering layer 611 covers the conductive mesh tape 60; the first gathering layer (not shown) covers the covering layer 611 at the first root position 52 and the second root position 54; the second gathering layer (not shown) covers the first gathering layer (not shown); the filler layer (not shown) covers the second gathering layer (not shown); the third gathering layer 612 covers the filler layer (not shown); the heat-shrinkable multi-finger sleeve 613 is fitted on the cable outer sheath 409, the grounding core 101-1, and the main core 102-1, and the number of fingers of the heat-shrinkable multi-finger sleeve 613 is equal to the sum of the number of grounding cores and the number of main cores; the heat-shrinkable tube (not shown) is fitted on the grounding core 101-1 and the covering layer 611.
[0068] Optionally, the sheathing layer, the first gathering layer, the second gathering layer, and the third gathering layer are all made of PVC, and the filler layer is made of filler putty. Specifically, the PVC sheathing layer covers the conductive mesh tape 60; the PVC first gathering layer covers the sheathing layer at the first root position 52 and the second root position 54; the PVC second gathering layer covers the PVC first gathering layer; the filler putty covers the PVC second gathering layer and fills it flush with the outer sheath; the PVC third gathering layer covers the filler putty; heat-shrinkable multi-finger sleeves 613 are fitted onto the cable outer sheath 409, the grounding core 101-1, and the main core 102-1, and the number of fingers on the heat-shrinkable multi-finger sleeves 613 is equal to the sum of the number of grounding cores and the number of main cores; heat-shrinkable tubing is fitted onto the grounding core 101-1 and the sheathing layer 611. In actual operation, a suitable heat-shrinkable multi-finger sleeve is selected based on the sum of the number of grounding cores and the number of main cores.
[0069] Among them, the coating layer refers to the gathering layer that gathers the conductive mesh tape, the first gathering layer refers to the gathering layer that gathers the coating layer at the first root position and the second root position, the second gathering layer refers to the gathering layer that gathers the first gathering layer, the filling layer refers to the gathering layer that gathers the second gathering layer, and the third gathering layer refers to the gathering layer that gathers the filling layer.
[0070] The sheathing layer 611 is made of PVC to cover the conductive mesh tape 60, which can effectively protect and secure the conductive mesh tape 60. The first and second gathering layers are also made of PVC, which can strengthen the protection of the conductive mesh tape 60 on the main conductor 102-1 and the conductive mesh tape 60 on the grounding conductor of the grounding conductor 101-1 corresponding to the main conductor, and realize the gathering of the first root position 52 and the second root position 54. The filling putty is wrapped around the second gathering layer to gather the second gathering layer, and can further strengthen the gathering and protection of the first root position 52 and the second root position 54. The filling putty is filled to be flush with the outer sheath 409, which can ensure that the heat-shrinkable multi-finger sleeve 613 is tightly connected to the cable when it is subsequently installed. The structure is robust and stable. The third gathering layer uses a PVC-coated filling layer, which can tighten and gather the filling layer. The heat-shrinkable multi-finger sleeve 613 is fitted on the cable outer sheath 409, grounding core 101-1 and main core 102-1, which can gather and tighten the cable root and play a role in corrosion prevention. It also separates the grounding core 101-1 and the main core 102-1 through the multi-finger structure, which facilitates subsequent structural adjustment of the main core 102-1 and the installation of the terminal block 206, cable adapter tube 208 and detachable pluggable main body 201. The heat-shrinkable tube is fitted on the grounding core 101-1 and the covering layer 611, which can effectively protect the grounding core 101-1 and the covering layer 611, and play a role in insulation, sealing and protection.
[0071] To illustrate the structural adjustments to the main wire core in detail, exemplarily, Figure 10 , Figure 11 , Figure 12 and Figure 13 The following explanation uses one of the main conductors, 102-1, in the anti-torsion cable structure as an example.
[0072] refer to Figure 13 As shown, the wiring harness assembly for wind turbine units also includes waterproof sealant 111, connecting tape 112, and stress-control sealant 113; Reference Figure 10 As shown, the third sub-section 1021c is exposed outside the heat shrink tubing (not shown), the second sub-section 1021b is exposed outside the third sub-section 1021c, and a marking strip 110 is provided on the heat shrink tubing; Reference Figure 11 As shown, waterproof sealant 111 is applied to the side of the first main core section near the third sub-section 1021c; Reference Figure 12 As shown, the connecting tape 112 is wrapped around the junction of the third sub-section 1021c and the second main core section, and the overlapping part of the connecting tape 112 is covered with waterproof sealant 111; Reference Figure 13 As shown, stress control putty 113 is disposed at the junction of the second sub-section 1021b and the third sub-section 1021c; the wire core insulation layer 404 of the second sub-section 1021b near the first sub-section 1021a is formed with an inclination angle 114; tape 115 is wrapped around the end of the main wire core conductor 401 of the first sub-section 1021a.
[0073] The first sub-section 1021a includes a main conductor 401; the second sub-section 1021b includes a main conductor 401 and a core insulation layer 404 wrapped around the main conductor; the third sub-section 1021c includes a main conductor 401, a core insulation layer 404 wrapped around the main conductor, and a semi-conductive layer 405 wrapped around the core insulation layer; the marking tape 110 is used to determine the installation position of the cable adapter tube 208 when it is subsequently installed; the waterproof sealant 111 has advantages such as waterproofing, moisture resistance, and chemical corrosion resistance, and can effectively protect the main conductor and play a waterproof sealing role; the connecting tape 112 is used to protect the third sub-section At the junction of sub-section 1021c and the second main conductor sub-section, the overlapping waterproof sealant 111 can fix the waterproof sealant; stress control sealant 113 is used to protect the junction of the second sub-section 1021b and the third sub-section 1021c, and plays a role in waterproof sealing; the conductor insulation layer 404 on the side of the second sub-section 1021b near the first sub-section 1021a forms an inclined angle 114, which can protect the main conductor 401 when the cable adapter tube 208 is subsequently installed; tape 115 is used to protect the end of the main conductor 401 of the first sub-section 1021a when the cable adapter tube 208 is installed.
[0074] refer to Figure 13As shown, the length L2 of the first sub-section 1021a and the length L3 of the terminal 206 satisfy 5mm≤L2-L3≤15mm.
[0075] When the length L2 of the first sub-section 1021a and the length L3 of the terminal 206 satisfy 5mm≤L2-L3≤15mm, it can be ensured that when the terminal 206 is subsequently crimped, the main conductor 401 of the first sub-section 1021a abuts against the bottom of the crimping hole of the terminal 206, and ensures good contact between the main conductor 401 and the terminal 206.
[0076] The wiring harness assembly for wind turbines provided in this invention, through the reasonable arrangement of the anti-torsion cable structure, grounding core, and main core, ensures the robust and stable structure of the anti-torsion cable, while also ensuring good electrical connection between the grounding core and the grounding terminal, and good contact connection between the main core and the detachable pluggable structure. This enables the matching use of cables and cable terminal accessories, solves the problems of on-site fabrication of wiring harness assemblies being affected by working conditions and environmental factors, as well as non-standard operations and the inability to conduct systematic testing, and ensures the stable performance of the wiring harness assembly for wind turbines.
[0077] Based on the same inventive concept, this invention also provides a method for preparing a wiring harness assembly for wind turbines, used to prepare the wiring harness assembly for wind turbines described in the above embodiments. Figure 14 A flowchart illustrating a method for preparing a wiring harness assembly for a wind turbine according to an embodiment of the present invention; Figure 15 This is a schematic diagram of the cable adapter tube sleeve provided in an embodiment of the present invention; Figure 16 This is a schematic diagram of the structure of the terminal block sleeve provided in an embodiment of the present invention; Figure 17 This is a schematic diagram of the detachable pluggable structure body provided in an embodiment of the present invention.
[0078] refer to Figure 14 As shown, the method specifically includes the following steps:
[0079] S110, A break is formed at a part of the second grounding core section where the semiconductive protective layer is stripped, exposing the grounding core conductor.
[0080] Continue to refer to Figure 5 As shown, exemplarily, Figure 5The following explanation uses an anti-torsion cable structure comprising one main conductor 102-1 and one grounding conductor 101-1 as an example. The second grounding conductor portion 1011 is exposed outside the cable outer sheath 409. A portion of the semi-conductive protective layer 411 of the second grounding conductor portion 1011 is stripped to form a break 50, exposing the grounding conductor 410. Optionally, the length L1 of the break 50 satisfies 15mm ≤ L1 ≤ 25mm. In actual operation, the anti-torsion cable structure includes three grounding conductors and three main conductors, and all three grounding conductors are processed according to the above steps.
[0081] When the length L1 of the break 50 is 15mm≤L1≤25mm, good contact between the conductive mesh 60 and the grounding conductor can be guaranteed. S120: The conductive mesh is used to wrap the main conductor and the grounding conductor corresponding to the main conductor.
[0082] Continue to refer to Figure 6 As shown, exemplarily, Figure 6 The following explanation uses an anti-torsion cable structure comprising one main core 102-1 and one grounding core 101-1 as an example. A conductive mesh tape 60 is used to wrap around the main core 102-1 and the grounding core 101-1 (not shown), which is the same grounding core conductor as in step S110. Optionally, the conductive mesh tape is made of copper to shield the electric field. In actual operation, the anti-torsion cable structure includes three grounding cores and three main cores. The six cores are divided into three groups, each group including one main core and a corresponding grounding core. A conductive mesh tape is used to wrap around the main core and the grounding core of each group.
[0083] Using copper mesh as a conductive mesh can effectively shield external electromagnetic interference. By wrapping the main conductor and the ground conductor corresponding to the main conductor with the conductive mesh, it can be ensured that the conductive mesh 60 on the main conductor 102-1 is effectively connected to the conductive mesh 60 on the ground conductor.
[0084] S130, adopts a folding structure to fold up the main conductor core and the grounding conductor core.
[0085] Continue to refer to Figure 6 As shown, exemplarily, Figure 6The following explanation uses an anti-torsion cable structure comprising one main conductor 102-1 and one grounding conductor 101-1 as an example. A gathering structure 610 is used to gather the main conductor 102-1 and the grounding conductor 101-1. In actual operation, the anti-torsion cable structure includes three grounding conductors and three main conductors. The six conductors are divided into three groups, each group including one main conductor and a corresponding grounding conductor. Specifically, firstly, the conductive mesh 60 of each group is gathered; secondly, the first section 52 and the second section 54 of the three groups are gathered; and finally, the three main conductors and the three grounding conductors are gathered.
[0086] The gathering structure 610 is used to gather the main conductor core 102-1 and the grounding conductor core 101-1, ensuring that the anti-torsion cable structure 100 is firm and stable.
[0087] S140. A grounding terminal is crimped onto the side of the second grounding core section away from the first grounding core section.
[0088] Continue to refer to Figure 9 As shown, exemplarily, Figure 9 Taking an anti-torsion cable structure including one main conductor 102-1 and one grounding conductor 101-1 as an example, the process is as follows: A grounding terminal 300 is crimped onto the side of the second grounding conductor 1011 furthest from the first grounding conductor 1011. Specifically, a grounding conductor 410 is stripped from the side of the second grounding conductor 1011 furthest from the first grounding conductor 1011, and a grounding terminal 300 is crimped onto the grounding conductor 410. In actual operation, the anti-torsion cable structure includes three grounding conductors and three main conductors. Grounding terminals are crimped onto the side of the second grounding conductor 1011 furthest from the first grounding conductor 1011 of each of the three grounding conductors, completing the entire processing of the grounding conductors.
[0089] The second grounding core portion 1011 is pressed onto the side away from the first grounding core portion to form a grounding terminal 300, thereby enabling an electrical connection between the grounding core 101-1 and the grounding terminal 300.
[0090] S150, cable adapter pipes are installed on the second sub-section and part of the third sub-section.
[0091] To illustrate the cable adapter conduit installation structure in detail, exemplarily, Figure 15 This explanation uses one main conductor, 102-1, in an anti-torsion cable structure as an example. (Reference) Figure 15As shown, the second sub-section 1021b includes a main conductor 401 and a core insulation layer 404 wrapped around the main conductor. The third sub-section 1021c includes a main conductor 401, a core insulation layer 404 wrapped around the main conductor, and a semi-conductive layer 405 wrapped around the core insulation layer. Cable adapter tubes 208 are fitted onto the second sub-section 1021b and part of the third sub-section 1021c. Optionally, before fitting the cable adapter tube 208, lubricating silicone grease is applied to the core insulation layer 404 and the inner surface of the cable adapter tube 208, and then the cable adapter tube is fitted onto the cable until it is flush with the marking tape 110. In actual operation, the anti-torsion cable structure includes three grounding cores and three main cores, and the cable adapter tubes are fitted onto all three main cores according to the above steps. S160, Terminal blocks are fitted onto the first sub-section.
[0092] To illustrate the terminal block mounting structure in detail, exemplarily, Figure 16 This explanation uses one main conductor, 102-1, in an anti-torsion cable structure as an example. (Reference) Figure 15 and Figure 16 As shown, the first sub-section 1021a includes a main conductor 401. Before installing the terminal 206, remove the tape 115 wrapped around the end of the main conductor 401 in the first sub-section 1021a. The terminal 206 is then fitted onto the first sub-section 1021a including the main conductor 401 until the main conductor 401 abuts the bottom of the crimping hole of the terminal 206. Before crimping, ensure that L4 is between 155mm and 165mm. After crimping, remove any burrs and rough edges left on the surface of the terminal 206 using sandpaper or a file, and wipe away any surface dirt with a cleaning cloth. In actual operation, the anti-torsion cable structure includes three grounding cores and three main cores. The three main cores are fitted with terminals according to the above steps.
[0093] Before installing the terminal block 206, remove the tape 115 wrapped around the end of the main conductor 401 of the first sub-section 1021a to ensure good contact between the main conductor 401 and the terminal block 206. When L4 is between 155mm and 165mm, the terminal block 206 can abut against the detachable pluggable structure body 201 when the detachable pluggable structure body 201 is installed later, ensuring good contact between the terminal block 206 and the detachable pluggable structure body 201.
[0094] S170. A detachable pluggable structure body is fitted onto the cable adapter tube and terminal block.
[0095] To illustrate the sleeve structure of the detachable pluggable main body in detail, exemplarily, Figure 17 This explanation uses one main conductor, 102-1, in an anti-torsion cable structure as an example. (Reference) Figure 17As shown, clean the outer surfaces of the cable adapter tube 208 and the terminal block 206. Apply a suitable amount of lubricating silicone grease evenly to the outer surface of the cable adapter tube 208 and the inner surface of the detachable pluggable structure body 201. Check and confirm that the longer interface side of the detachable pluggable structure body 201 faces the equipment sleeve. Wrap tape 116 around the junction of the side of the cable adapter tube 208 away from the terminal block 206 and the main conductor 102-1. Then, fit the detachable pluggable structure body 201 onto the cable adapter tube 208 and the terminal block 206. In actual operation, the anti-torsion cable structure includes three grounding conductors and three main conductors. All three main conductors are fitted onto the detachable pluggable structure body following the steps described above.
[0096] Tape 116 is wrapped around the side of the cable adapter tube 208 away from the terminal 206 and at the junction with the main core 102-1 to ensure that the cable adapter tube does not shift. The cable adapter tube 208 is fitted onto the second sub-section 1021b and part of the third sub-section 1021c. The detachable pluggable structure body 201 is fitted onto the terminal 206 and the cable adapter tube 208 to ensure good contact between the second main core section 1021 and the detachable pluggable structure 200.
[0097] The method for preparing a wiring harness assembly for wind turbines provided in this invention is used to prepare the wiring harness assembly for wind turbines described in the above embodiments. By rationally setting the anti-torsion cable structure, grounding core, and main core, the method ensures the robust and stable structure of the anti-torsion cable and guarantees good electrical connection between the grounding core and the grounding terminal, as well as good contact connection between the main core and the detachable pluggable structure. This enables the matching use of cables and cable terminal accessories, solves the problems of on-site wiring harness assembly fabrication being affected by working conditions and the existence of non-standard operations and the inability to conduct systematic testing, and ensures the stable performance of the wiring harness assembly for wind turbines.
[0098] Based on the same inventive concept, embodiments of the present invention also provide another method for preparing a wiring harness assembly for wind turbines, used to prepare the wiring harness assembly for wind turbines described in the above embodiments. Figure 18 A flowchart illustrating another method for preparing a wiring harness assembly for a wind turbine provided in an embodiment of the present invention. Figure 19 This is a schematic diagram of the structure of the conductive mesh strip on the main wire core provided in an embodiment of the present invention; Figure 20 This is a schematic diagram of the structure of the conductive mesh strip on the grounding conductor of the main conductor and the grounding conductor corresponding to the main conductor, provided in an embodiment of the present invention.
[0099] refer to Figure 18 As shown, the method specifically includes the following steps:
[0100] S201. A break is formed at a part of the second grounding core section where the semiconductive protective layer is stripped, exposing the grounding core conductor.
[0101] S202. The main wire core is wound with a conductive mesh tape at a preset position at the second end, with a 40%-60% overlap, and a preset length of conductive mesh tape is left at the second root.
[0102] To illustrate in detail the winding method of the conductive mesh tape on the main wire core, an example is provided below. Figure 19 The following explanation uses an anti-torsion cable structure comprising one main conductor core 102-1 and one grounding conductor core 101-1 as an example. (Reference) Figure 19 As shown, a conductive mesh 60 is used from the second end 53 at a preset position, and is wrapped around the main wire core 102-1 with a 40%-60% overlap, and a preset length of conductive mesh 60 is left at the second root 54.
[0103] Optionally, the conductive mesh tape 60 is made of copper mesh tape, with a preset position of 245-255mm from the second end 53. The preset length of the conductive mesh tape is between 450mm and 550mm. The 40%-60% overlap means that in two adjacent layers of the wound conductive mesh tape, the later layer overlaps the previous layer and covers 40%-60% of the area of the previous layer. In actual operation, the anti-torsion cable structure includes three grounding cores and three main cores, all of which are wound with conductive mesh tape according to the above steps.
[0104] Using copper mesh as the conductive mesh can effectively shield external electromagnetic interference; when the length L1 of the break 50 meets the requirement of 15mm≤L1≤25mm, it can ensure good contact between the conductive mesh 60 and the grounding core conductor; according to actual needs, the preset position is 245-255mm away from the second end 53, which can ensure that the conductive mesh 60 wrapped on the main core 102-1 plays a shielding role; using a 40%-60% overlap method to overlap the conductive mesh can play a shielding role on the main core 102-1 and save the use of conductive mesh; the preset length of conductive mesh left is between 450mm-550mm, which is used for subsequent wrapping of the grounding core conductor corresponding to the main core 102-1.
[0105] S203. Wrap the remaining conductive mesh strip around the grounding conductor of the second root and the grounding conductor of the grounding conductor corresponding to the main core.
[0106] To illustrate in detail the winding method of the conductive mesh tape on the grounding conductor core, an example is provided. Figure 20 The following explanation uses an anti-torsion cable structure comprising one main conductor core 102-1 and one grounding conductor core 101-1 as an example. (Reference) Figure 19 and Figure 20As shown, the remaining conductive mesh tape is wrapped around the second core 54 and the grounding conductor 410 of the grounding core 101-1 corresponding to the main core 102-1, and secured with tinned copper wire, ensuring the tinned copper wire ends are flat and without sharp points. In actual operation, the anti-torsion cable structure includes three grounding cores and three main cores. The grounding conductors of the three main cores and the three grounding cores corresponding to the main cores are all wrapped with conductive mesh tape according to the above steps.
[0107] The remaining conductive mesh is wrapped around the second root 54 and the grounding conductor 410 of the grounding conductor 101-1 corresponding to the main conductor 102-1, which ensures that the conductive mesh 60 on the main conductor 102-1 and the conductive mesh 60 on the grounding conductor 410 are effectively connected.
[0108] S204. The conductive mesh belt is covered with a coating layer.
[0109] Continue to refer to Figure 6 and Figure 7 As shown, exemplarily, Figure 6 and Figure 7 The following explanation uses an anti-torsion cable structure comprising one main conductor core 102-1 and one grounding conductor core 101-1 as an example. A sheathing layer 611 is used to cover the conductive mesh tape 60. Optionally, the conductive mesh tape 60 is made of copper, and the sheathing layer 611 is made of PVC; that is, PVC is used to cover the copper mesh tape. In actual operation, the anti-torsion cable structure includes three grounding conductor cores and three main conductor cores. All three main conductor cores and the three corresponding grounding conductor cores are covered with conductive mesh tape following the steps described above.
[0110] The covering layer 611 is made of PVC to cover the conductive mesh belt 60, which can effectively protect the conductive mesh belt 60 and fasten the conductive mesh belt 60.
[0111] S205, A first gathering layer is used to cover the covering layer at the first root position and the second root position.
[0112] S206. The first gathering layer is covered by a second gathering layer.
[0113] S207. The second gathering layer is covered with a filler layer, and the filler layer is flush with the outer sheath of the cable.
[0114] S208, The third gathering layer is used to cover the filling layer.
[0115] Continue to refer to Figure 6 and Figure 8 As shown, exemplarily, Figure 6 and Figure 8 The following explanation uses an anti-torsion cable structure comprising one main conductor core 102-1 and one grounding conductor core 101-1 as an example. (Reference) Figure 6 and Figure 8As shown, the first gathering layer (not shown) covers the covering layer 611 at the first root position 52 and the second root position 54; the second gathering layer (not shown) covers the first gathering layer (not shown); the filler layer (not shown) covers the second gathering layer (not shown), and the filler layer is flush with the cable outer sheath 409; the third gathering layer 612 covers the filler layer (not shown); the first gathering layer, the second gathering layer, the filler layer, and the third gathering layer are all located at the first root position 52 and the second root position 54. Optionally, the first gathering layer, the second gathering layer, and the third gathering layer are all made of PVC, and the filler layer is made of filler putty. Specifically, firstly, two layers of PVC are wound at the first root position and the second root position with a 40%-60% overlap to form the first gathering layer and the second gathering layer. Then, filler putty is wrapped around the second gathering layer PVC until the filler putty is flush with the cable outer sheath. Finally, one layer of PVC is wound around the filler putty with a 40%-60% overlap to form the third gathering layer. In practice, the anti-torsion cable structure includes three grounding cores and three main cores, and the roots of all six cores are gathered together according to the steps described above.
[0116] The first and second gathering layers are made of PVC, which strengthens the protection of the conductive mesh 60 on the main conductor 102-1 and the connection point of the conductive mesh 60 on the grounding conductor of the grounding conductor 101-1 corresponding to the main conductor, and achieves gathering of the first root position 52 and the second root position 54. Filler putty is wrapped around the second gathering layer to gather it, further strengthening the gathering and protection of the first root position 52 and the second root position 54. The filler putty is filled to be flush with the outer sheath 409, ensuring that the heat-shrinkable multi-finger sleeve 613 is in close contact with the cable during subsequent installation, resulting in a robust and stable structure. The first, second, and third gathering layers use a 40%-60% overlap method, ensuring effective gathering of the conductors and saving PVC usage.
[0117] S209. Heat-shrinkable multi-finger sleeves are used to cover the outer sheath, grounding core, and main core of the cable, and the number of the multi-finger sleeves is equal to the sum of the number of the grounding core and the main core.
[0118] S210, heat shrink tubing is used to cover the grounding core and the sheathing layer.
[0119] Continue to refer to Figure 9 For example, Figure 9 The following explanation uses an anti-torsion cable structure comprising one main conductor core 102-1 and one grounding conductor core 101-1 as an example. (Reference) Figure 9As shown, specifically, after completing steps S204-S208, heat-shrinkable multi-finger sleeves 613 are applied to the cable outer sheath 409, grounding core 102-1, and main core 101-1, with the number of fingers of the heat-shrinkable multi-finger sleeves 613 equal to the sum of the number of grounding cores and main cores; then, heat-shrinkable tubing (not shown) is applied to the grounding core 101-1 and the covering layer 611. In actual operation, the anti-torsion cable structure includes three grounding cores and three main cores. Heat-shrinkable six-finger sleeves are selected and applied to the cable outer sheath, grounding cores, and main cores, and heat-shrinkable tubing is applied to the covering layer of the grounding cores and main cores.
[0120] The heat-shrinkable multi-finger sleeve 613 is fitted onto the cable outer sheath 409, grounding core 101-1, and main core 102-1. It can tighten and secure the cable root and provide corrosion protection. The multi-finger structure separates the grounding core 101-1 from the main core 102-1, facilitating subsequent structural adjustments to the main core 102-1 and the installation of the terminal block 206, cable adapter tube 208, and detachable pluggable main body 201. The heat-shrinkable tubing is fitted onto the grounding core 101-1 and the sheathing layer 611, effectively protecting the grounding core 101-1 and the sheathing layer 611, providing insulation, sealing, and protection.
[0121] S211. A grounding terminal is crimped onto the side of the second grounding core section away from the first grounding core section.
[0122] S212. Waterproof sealant is applied to the side of the first main core section near the third sub-section.
[0123] Continue to refer to Figure 10 As shown, the second sub-section 1021b includes a main conductor (not shown) and a core insulation layer 404 wrapped around the main conductor. The third sub-section 1021c includes a main conductor (not shown), a core insulation layer 404 wrapped around the main conductor, and a semiconductive layer 405 wrapped around the core insulation layer. The third sub-section 1021c is exposed outside the heat shrink tubing (not shown), and the second sub-section 1021b is exposed outside the third sub-section 1021c. A marking tape 110 is provided on the heat shrink tubing. (Continue referring to...) Figure 11 As shown, waterproof sealant 111 is provided on the side of the first main core section near the third sub-section 1021c.
[0124] The marking tape 110 is used to determine the installation position of the cable adapter tube 208 when it is subsequently installed; the waterproof sealant 111 has advantages such as waterproof and moisture-proof, and chemical corrosion resistant, and can effectively protect the main core and play a role in waterproof sealing.
[0125] S213. Wrap connecting tape around the junction of the third sub-section and the second main core section, and apply waterproof sealant to the overlapping part of the connecting tape.
[0126] Continue to refer to Figure 12 As shown, connecting tape 112 is wrapped around the junction of the third sub-section 1021c and the second main core section, and waterproof sealant 111 is applied to the overlapping part of the connecting tape 112.
[0127] The connecting tape 112 is used to protect the junction of the third sub-section 1021c and the second main core section, and the overlapping waterproof sealant 111 can fix the waterproof sealant.
[0128] S214. Stress control putty is applied at the junction of the second and third sub-sections.
[0129] Continue to refer to Figure 13 As shown, stress control putty 113 is provided at the junction of the second sub-section 1021b and the third sub-section 1021c.
[0130] Stress-controlled putty 113 is used to protect the junction of the second sub-section 1021b and the third sub-section 1021c, serving as a waterproof seal.
[0131] S215. The insulation layer of the wire core on the side of the second sub-section closest to the first sub-section is chamfered to form an inclined angle.
[0132] Continue to refer to Figure 13 As shown, the insulation layer 404 of the wire core on the side of the second sub-section 1021b close to the first sub-section 1021a is chamfered to form an inclination angle 114; temporary protective tape 115 is wrapped around the end of the main wire core conductor 401 of the first sub-section 1021a.
[0133] The core insulation layer 404 of the second sub-section 1021b near the first sub-section 1021a forms an inclined angle 114, which can protect the main core conductor 401 when the cable adapter tube 208 is subsequently installed; the tape 115 is used to protect the end of the main core conductor 401 of the first sub-section 1021a when the cable adapter tube 208 is installed.
[0134] S216. Cable adapter pipes are installed on the second sub-section and part of the third sub-section.
[0135] S217. Install wiring terminals on the first sub-section.
[0136] S218. A detachable pluggable structure body is fitted onto the cable adapter tube and terminal block.
[0137] The cable adapter tube 208 is sleeved on the second sub-section 1021b and part of the third sub-section 1021c. The detachable pluggable structure body 201 is sleeved on the terminal block 206 and the cable adapter tube 208 to ensure good contact between the second main core section 1021 and the detachable pluggable structure 200.
[0138] In actual operation, the anti-torsion cable structure includes three grounding cores and three main cores, and the three main cores are processed according to steps S212-S218.
[0139] The method for preparing a wire harness assembly for wind turbines provided in this invention is used to prepare the wire harness assembly for wind turbines described in the above embodiments. It involves winding the main conductor with a conductive mesh tape at a predetermined position from the second end, with a 40%-60% overlap, and leaving a predetermined length of conductive mesh tape at the second root. This left conductive mesh tape is then wound around the second root and the grounding conductor of the grounding conductor corresponding to the main conductor, thus achieving the effect of shielding the external electric field of the main conductor and ensuring effective connection between the conductive mesh tape on the main conductor and the conductive mesh tape on the grounding conductor. The method utilizes the covering layer, first gathering layer, second gathering layer, filling layer, third gathering layer, heat-shrinkable multi-finger sleeve, and heat-shrinkable tubing in the gathering structure to achieve the gathering of the main conductor and the grounding conductor in the anti-torsion cable structure. Waterproof sealant is applied to the side of the first main conductor section near the third sub-section; connecting tape is wrapped around the junction of the third sub-section and the second main conductor section, with waterproof sealant applied to the overlapping portion of the connecting tape; stress-control sealant is applied at the junction of the second and third sub-sections; and the insulation layer of the conductor on the side of the second sub-section near the first sub-section is chamfered to form an inclined angle. This process facilitates the crimping of terminals and the installation of cable adapter tubes and the main body of the detachable pluggable structure in the anti-torsion cable structure.
[0140] Note that the above description is merely a preferred embodiment of the present invention and the technical principles employed. Those skilled in the art will understand that the present invention is not limited to the specific embodiments described herein. Features of various embodiments of the present invention can be partially or wholly coupled or combined with each other, and can cooperate and be technically driven in various ways. Various obvious changes, readjustments, combinations, and substitutions can be made by those skilled in the art without departing from the scope of protection of the present invention. Therefore, although the present invention has been described in detail through the above embodiments, the present invention is not limited to the above embodiments. Many other equivalent embodiments may be included without departing from the concept of the present invention, and the scope of the present invention is determined by the scope of the appended claims.
Claims
1. A wiring harness assembly for a wind turbine, characterized in that: It includes a torsion-resistant cable structure, a detachable plug-in structure and a grounding terminal; The torsion-resistant cable structure comprises a cable outer sheath, at least one grounding core and at least one main core, wherein the grounding core comprises a first grounding core section and a second grounding core section connected to each other, and the main core comprises a first main core section and a second main core section connected to each other, wherein the first grounding core section and the first main core section are covered by the cable outer sheath, and the second grounding core section and the second main core section are exposed outside the cable outer sheath; The grounding core comprises a grounding core conductor and a semi-conductive protective layer wrapped around the grounding core conductor, and a portion of the semi-conductive protective layer of the second grounding core section is formed with a break, and the break exposes the grounding core conductor; Along the direction from the second main core section to the first main core section, the second main core section includes a first sub-section, a second sub-section and a third sub-section in sequence; the first sub-section includes a main core conductor, the second sub-section includes the main core conductor and a core insulation layer wrapped around the main core conductor, and the third sub-section includes the main core conductor, a core insulation layer wrapped around the main core conductor and a semi-conductive layer wrapped around the core insulation layer; The torsion-resistant cable structure further comprises a conductive mesh belt and a gathering structure, wherein the conductive mesh belt is wound around the main core and the grounding core conductor of the grounding core corresponding to the main core, and the gathering structure gathers the main core and the grounding core; The detachable plug-in structure comprises a wiring terminal, a cable adapter tube and a detachable plug-in structure body, wherein the wiring terminal is sleeved on the first sub-division, the cable adapter tube is sleeved on the second sub-division and part of the third sub-division, and the detachable plug-in structure body is sleeved on the wiring terminal and the cable adapter tube; The grounding terminal is crimped on a side of the second grounding wire core section away from the first grounding wire core section; The second grounding core section includes a first end away from the first grounding core section and a first root close to the first grounding core section; the second main core section includes a second end away from the first main core section and a second root close to the first main core section; The fracture is formed at the first root position, and the length L1 of the fracture satisfies 15mm≤L1≤25mm; The conductive mesh belt is wound around the main core and the grounding core conductor of the grounding core corresponding to the main core in a 40%-60% overlap manner from the preset position of the second end; The torsion-resistant cable structure comprises an outer cable sheath, three main wire cores and three grounding wire cores.
2. The wire harness assembly for a wind turbine according to claim 1, characterized in that: The gathering structure comprises a covering layer, a first gathering layer, a second gathering layer, a filling layer, a third gathering layer, a heat shrinkable multi-finger sleeve and a heat shrinkable tube; The coating layer covers the conductive mesh belt; The first gathering layer covers the covering layer at the first root position and the second root position; The second gathering layer covers the first gathering layer; The filling layer covers the second gathering layer, and the filling layer is flush with the cable outer sheath; The third gathering layer covers the filling layer; The heat shrinkable multi-finger sleeve is mounted on the cable outer sheath, the grounding core and the main core, and the number of fingers of the heat shrinkable multi-finger sleeve is equal to the sum of the number of the grounding core and the main core; The heat shrink tube is sleeved on the ground wire core and the covering layer.
3. The wire harness assembly for a wind turbine according to claim 1, characterized in that: The wire harness assembly for the wind turbine generator set also includes waterproofing putty, connecting tape and stress control putty; The waterproof mastic is arranged on one side of the first main core section close to the third sub-section; The connecting tape is wound around the junction of the third sub-division and the second main line core division, and the connecting tape overlaps part of the waterproofing putty; The stress control mortar is arranged at the junction of the second sub-division and the third sub-division; The core insulation layer of the second sub-division on a side close to the first sub-division is formed with an inclined angle.
4. The wire harness assembly for a wind turbine according to claim 1, characterized in that: The length L2 of the first sub-division and the length L3 of the connecting terminal satisfy 5mm≤L2-L3≤15mm.
5. A method for preparing a wire harness assembly for a wind turbine generator set, used for preparing the wire harness assembly for a wind turbine generator set according to any one of claims 1 to 4, characterized in that: include: Stripping off the semi-conductive protective layer at a portion of the second grounding wire core to form a break, exposing the grounding wire core conductor; Using a conductive mesh tape to wrap the main core and the grounding core conductor of the grounding core corresponding to the main core; Adopting a gathering structure to gather the main wire core and the ground wire core; Crimping a grounding terminal on a side of the second grounding wire core section away from the first grounding wire core section; Sleeving the cable adapter tube on the second sub-division and part of the third sub-division; The first sub-division is provided with a wiring terminal; A detachable plug-in structure body is sleeved on the cable adapter tube and the wiring terminal.
6. The preparation method according to claim 5, characterized in that: The second grounding core section includes a first end away from the first grounding core section and a first root close to the first grounding core section; the second main core section includes a second end away from the first main core section and a second root close to the first main core section; A conductive mesh tape is used to wrap the main core and the grounding core conductor of the grounding core corresponding to the main core, including: Using a conductive mesh tape to wrap the main line core at a preset position of the second end portion in a 40%-60% overlap manner, and leaving a preset length of the conductive mesh tape at the second root portion; The remaining conductive mesh tape is respectively wound around the second root portion and the grounding core conductor of the grounding core corresponding to the main core, so that the conductive mesh tape connects the main core and the grounding core.
7. The preparation method according to claim 6, characterized in that: The gathering structure comprises a covering layer, a first gathering layer, a second gathering layer, a filling layer, a third gathering layer, a heat shrinkable multi-finger sleeve and a heat shrinkable tube; The main wire core and the ground wire core are gathered by using a gathering structure, including: Using the coating layer to cover the conductive mesh belt; Using the first gathering layer to cover the covering layer at the first root position and the second root position; Using the second gathering layer to cover the first gathering layer; The second gathering layer is covered with the filling layer, and the filling layer is flush with the outer sheath of the cable; Using the third gathering layer to cover the filling layer; The heat shrinkable multi-finger sleeve is used to be sleeved on the outer sheath of the cable, the grounding core and the main core, and the number of fingers of the heat shrinkable multi-finger sleeve is equal to the sum of the number of the grounding core and the main core; The heat shrink tube is sleeved on the grounding wire core and the covering layer.
8. The preparation method according to claim 5, characterized in that: Before the cable adapter tube is sleeved on the second sub-division and part of the third sub-division, the method further comprises: Disposing waterproofing putty on one side of the first main line core section close to the third sub-section; Winding a connection tape at the junction of the third sub-division and the second main line core division, and the connection tape overlaps part of the waterproofing putty; Disposing stress control mortar at the junction of the second sub-division and the third sub-division; The edge of the core insulation layer of the second sub-division close to the first sub-division is chamfered to form an inclined angle.