A smart city management method, system and device

Through GIS technology, the work intensity of urban grid workers is evaluated and dynamically divided, which solves the problem of unequal workload of grid workers in urban grid management, and realizes the rational management and grid division of smart cities.

CN113743772BActive Publication Date: 2024-11-29XIAMEN KINGTOP INFORMATION TECH
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202111022132.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-09-01
Publication Date
2024-11-29
Estimated Expiration
2041-09-01

Smart Images

  • Figure CN113743772B_ABST
    Figure CN113743772B_ABST
Patent Text Reader

Abstract

The present invention provides a smart city management method, system and device. The terminal device is installed with GIS software and stores a city map. The corresponding population number P and the number of city components Q are input based on the location information in the city map. According to (total population number P0+total number of components Q0) / number of grid workers n, initial grid division is performed based on the map. The grid workers fill in the work log. The administrator sets the difficulty value H of each work according to the actual situation. x , grid worker work intensity I=(H1*h1+H2*h2+H3*h3+……+H x *h x +……+H 26 *h 26 ) / (h1+h2+h3+……+h x +……+h 26 ), 1≤x≤26, where h x is the difficulty value H x The cumulative working hours; according to (population P i +Parts Quantity Q i )=[1 / (n‑1)]*(I1+I2+I i‑1 +I i+1 ……+I n ) / (I1+I2+……+I n )*(total population P0+total components Q0), (2≤i≤n‑1) is used to divide the i-th grid, from grid 1 to grid n‑1, and the remaining population and urban components belong to grid n. This is repeated in this way, and the urban grid is dynamically divided according to the grid workers’ work intensity at different stages.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to a management method, and in particular to a smart city management method, system and equipment. Background Art

[0002] Urban grid management is to divide the urban management area into multiple grids, and establish a management and service model in which supervision and disposal are separated by strengthening the inspection of unit grids. In order to proactively discover problems, deal with them in a timely manner, strengthen the government's management capacity and handling speed of the city, and solve problems before residents complain, each grid is responsible for the corresponding grid member. Grid members are grassroots service personnel who directly face the masses. They are the basic force for carrying out specific service work. They are in direct face-to-face contact with the masses and have the awareness and basic skills to serve the masses.

[0003] Since the population and components within the urban grid are changing dynamically, after a period of time, some grid workers will be busy and some will be idle, and the workload will be unequal. However, the salary and benefits of grid workers in the same area are the same or similar, and there will not be a big gap. In the long run, various urban management problems will arise due to the unequal workload, which goes against the original intention of urban grid management.

[0004] Therefore, it is urgent to design a new urban management method to supervise and evaluate the work of grid workers based on GIS and dynamically divide the urban grid according to the work intensity of grid workers. Summary of the invention

[0005] Therefore, in order to realize the dynamic division of urban grids, the present invention supervises and evaluates the work of grid workers and analyzes their work intensity based on GIS.

[0006] The technical solution adopted by the present invention is: a smart city management method, characterized in that:

[0007] Step 1: Input city information. The terminal device is installed with GIS software and stores a city map. The corresponding population number P and the number of city components Q are input based on the location information in the city map.

[0008] Step 2: Initial grid division: According to (total population P0 + total number of components Q0) / number of grid members n, based on the city map in GIS, the initial grid division is performed. The number of grids is equal to the number of grid members n, and the population in each grid is P i With the number of components Q i The sum of the numbers should be ≤10. Grid lines are drawn between grids in the map. The grids are numbered 0001, 0002, ..., 000i, ..., n and marked on the map. i and Q iare the population and components in the i-th grid respectively;

[0009] Step 3: Grid label setting. Set corresponding labels according to the focus of each grid's current work needs. There are nine types of labels, namely information collection and maintenance, social security patrol, safety hazard investigation, special population services, conflict investigation and resolution, urban and rural governance coordination, public opinion collection and investigation, policy and law publicity, and public agency services.

[0010] Step 4: Initial grid allocation. According to the principle of early selection, grid workers select unassigned grids based on their expertise and reference to tags.

[0011] Step 5: Terminal device allocation. The terminal device has a built-in Beidou positioning module and communication module. It uploads the location data to the GIS software in real time and draws a track line on the map. The GIS software assigns a unique account to each grid worker.

[0012] Step 6, filling in the work log. The information to be reported is divided into three parts: work location, work classification and working hours. The work location is directly circled on the track line, and the work classification and working hours are checked in the form of a drop-down menu. The work classification is divided into 9 categories: information collection and maintenance, social security patrol, safety hazard investigation, special population service, contradiction investigation and resolution, urban and rural governance coordination, public opinion collection and investigation, policy and law publicity, and public service agency services, which are located in the first-level drop-down menu; the second-level drop-down menu of the information collection and maintenance is divided into 4 small categories: basic information, organizational information, population information, and event information; the second-level drop-down menu of the social security patrol is divided into 4 small categories: public security prevention and control, facility inspection, hidden danger investigation, and investigation and rectification; the second-level drop-down menu of the safety hazard investigation is divided into production hazards, traffic hazards, fire hazards, and geological hazards. There are four categories of hidden dangers. The secondary drop-down menu of special population services is divided into three categories: public security group, stable group, and caring group. The urban and rural governance coordination is divided into seven categories: urban appearance management, environmental protection management, market management, land management, forest and fishery management, religious management, and meteorological management. The options in the working hours drop-down box are 0.5, 1.0, 1.5, 2.0, 2.5, 3.0, 3.5, 4.0, 4.5, 5.0, 5.5, 6.0, 6.5, 7.0, 7.5, and 8.0 respectively. The system background sets a difficulty value H for each type of work. There are work categories with a secondary drop-down menu, and the difficulty values ​​correspond to the work categories in the secondary drop-down menu. There are work categories without a secondary drop-down menu, and the difficulty values ​​correspond to the work categories in the primary drop-down menu. The difficulty values ​​are H1, H2, H3, ..., H 26 ;

[0013] Step 7, work intensity analysis, work intensity I = (H1*h1+H2*h2+H3*h3+……+H x *h x +……+H26 *h 26 ) / (h1+h2+h3+……h x +……+h 26 ), 1≤x≤26, where h x is the difficulty value H x The cumulative working time of the grid workers in areas 0001, 0002, 0003, ..., 000i, ..., n are I1, I2, I3, ..., I i ,……,I n .

[0014] Step 8, re-dividing the grids, re-dividing the grids one by one in the order of 0001, 0002, 0003, ..., 000i, ..., n;

[0015] Step (1) re-divide the grid 0001 area to meet

[0016] (Population number P1+Parts number Q1)=[1 / (n-1)]*(I2+I3+……+I n ) / (I1+I2+……+I n )*(total population P0+total number of components Q0), the division is completed;

[0017] Step (2) re-divide the grid 0002 area to meet

[0018] (Population number P2+Parts number Q2)=[1 / (n-1)]*(I1+I3+……+I n ) / (I1+I2+……+I n )*(total population P0+total number of components Q0), the division is completed;

[0019] Step (3) re-divide the grid 0003 area to meet

[0020] (Population number P3+Parts number Q3)=[1 / (n-1)]*(I1+I2+I4…+I n ) / (I1+I2+……+I n )*(total population P0+total number of components Q0), the division is completed;

[0021] …

[0022] Step (i) re-divides the grid 000i area to satisfy

[0023] (Population size P i +Parts Quantity Q i )=[1 / (n-1)]*(I1+I2+……+I i-1 +I i+1……+I n ) / (I1+I2+……+I n )*(total population P0+total number of components Q0), (2≤i≤n-1), the division is completed;

[0024] And so on.

[0025] Step (n-1): Re-divide the grid n-1 area to satisfy

[0026] (Population size P n-1 +Parts Quantity Q n-1 )=[1 / (n-1)]*(I1+I2+……I n-2 +I n ) / (I1+I2+……+I n )*(total population P0+total number of components Q0), the division is completed;

[0027] In step (n), the remaining area is the range of grid n;

[0028] Step 8, repeat step 6 to fill in a new round of work log;

[0029] Step 9, repeat step 7 to conduct a new round of work intensity analysis;

[0030] Step 10, repeat step 8 to perform a new round of grid division;

[0031] …

[0032] And so on, constantly adjust the grid.

[0033] Further, the urban components refer to public facilities, road traffic, urban environment, landscaping, houses and land, other facilities, and extended components; public facilities include various inspection wells and related public facilities such as water, electricity, gas, and heat; road traffic includes parking facilities, traffic sign facilities, bus stops, and overpasses; urban environment includes toilets, trash cans, and billboards; landscaping includes ancient trees, green spaces, urban sculptures, and street seats; houses and land include bulletin boards, civil air defense works, and basements; other facilities include major hazardous sources, construction sites, and water ancillary facilities; extended components refer to components that are not included in the above categories but need to be managed.

[0034] A smart city management system, characterized in that the system includes a user management module, a label editing module, a grid display module, a trajectory drawing module, a log reporting module, a grid initial division module, and a grid re-division module.

[0035] The user management module includes two types of users: administrators and grid workers. Each grid worker is assigned a unique account. Grid worker users can view the area range of the grid and fill in work logs; administrator users can edit grid labels, statistically analyze log data, and set the difficulty value of work categories.

[0036] The label editing module is used to edit the label of each grid. The editing method is to check the options from the drop-down menu. There are 9 options in the drop-down menu, namely information collection and maintenance, social security patrol, safety hazard inspection, special population service, conflict inspection and resolution, urban and rural governance coordination, public opinion collection and investigation, policy and legal publicity, and agency services for the people. The label content represents the focus of the work in the corresponding grid. When grid members select a grid for the first time, they can choose the grid based on the label content and their own expertise.

[0037] The grid display module divides the area range in the form of a map and is numbered in sequence of 0001, 0002, 0003, ..., 000i, ..., n, with a label displayed in each grid.

[0038] The trajectory drawing module is used to record the location data of the grid workers during working hours and draw the trajectory lines on the map.

[0039] The log reporting module is used for grid workers to fill in the work content and duration. The work content is checked in the form of a first-level drop-down box and a second-level drop-down box. The duration is divided into 16 options of 0.5, 1.0, 1.5, 2.0, 2.5, 3.0, 3.5, 4.0, 4.5, 5.0, 5.5, 6.0, 6.5, 7.0, 7.5, and 8.0, which are checked in the form of a drop-down box;

[0040] The log reporting module has the function of calculating the grid worker's work intensity, grid worker work intensity I=(H1*h1+H2*h2+H3*h3+……H x *h x +……+H 26 *h 26 ) / (h1+h2+h3+……+h x +……+h 26 ), where h x is the difficulty value H x The cumulative working time of the grid workers in areas 0001, 0002, 0003, ..., 000i, ..., n are I1, I2, I3, ..., I i ,……I n , only administrators can view the calculation results.

[0041] The initial grid division module performs initial grid division based on the city map in GIS according to (total population P0+total number of components Q0) / number of grid members n. The number of grids is equal to the number of grid members n. The population P in each grid i With the number of components Q i The sum of the numbers should be ≤10. Grid lines are drawn between grids in the map. The grids are numbered 0001, 0002, ..., 000i, ..., n and marked on the map. i and Q i are the population and number of components in the i-th grid respectively.

[0042] The grid re-dividing module re-divides the grids one by one in the order of 0001, 0002, 0003, ..., 000i, ..., n;

[0043] Step (1) re-divide the grid 0001 area to meet

[0044] (Population number P1+Parts number Q1)=[1 / (n-1)]*(I2+I3+……+I n ) / (I1+I2+……+I n )*(total population P0+total number of components Q0), the division is completed;

[0045] Step (2) re-divide the grid 0002 area to meet

[0046] (Population number P2+Parts number Q2)=[1 / (n-1)]*(I1+I3+……+I n ) / (I1+I2+……+I n )*(total population P0+total number of components Q0), the division is completed;

[0047] Step (3) re-divide the grid 0003 area to meet

[0048] (Population number P3+Parts number Q3)=[1 / (n-1)]*(I1+I2+I4…+I n ) / (I1+I2+……+I n )*(total population P0+total number of components Q0), the division is completed;

[0049] …

[0050] Step (i) re-divides the grid 000i area to satisfy

[0051] (Population size P i +Parts Quantity Q i )=[1 / (n-1)]*(I1+I2+……+I i-1+I i+1 ……+I n ) / (I1+I2+……+I n )*(total population P0+total number of components Q0), (2≤i≤n-1), the division is completed;

[0052] And so on.

[0053] Step (n-1): Re-divide the grid n-1 area to satisfy

[0054] (Population size P n-1 +Parts Quantity Q n-1 )=[1 / (n-1)]*(I1+I2+……I n-2 +I n ) / (I1+I2+……+I n )*(total population P0+total number of components Q0), the division is completed;

[0055] In step (n), the remaining area is the range of grid n.

[0056] A smart city management device has a built-in Beidou positioning module and a communication module, and also includes a processor, a memory, and a computer program stored in the memory and configured to be executed by the processor. When the processor executes the computer program, the above-mentioned smart city management method can be implemented.

[0057] The smart city management method, system and device of the present invention have the following advantages:

[0058] (1) Using the display function of GIS software, the city map, grid division, and grid worker work trajectory are displayed on the device;

[0059] (2) When the grid was first divided, the sum of the urban population and the number of urban components was evenly divided according to the grid worker data. When the grid was re-divided, it was divided based on the grid worker's work intensity, which was a clever idea;

[0060] (3) Set the difficulty value for each type of work content, and calculate the work intensity of each grid worker based on the difficulty value, which is a reasonable design.

[0061] Therefore, this smart city management method, system and equipment can help each grid worker arrange their work, assist administrators in analyzing and evaluating the work of each grid worker, realize the dynamic division of urban grids, and promote the rational management and harmonious development of smart cities.

[0062] Other features and advantages of the present invention will be set forth in the following description or may be learned by practicing the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0063] The drawings are only for the purpose of illustrating particular embodiments and are not to be considered limiting of the present invention. Like reference symbols denote like components throughout the drawings.

[0064] Figure 1 It is a flow chart of smart city management method.

[0065] Figure 2 This is a schematic diagram of the city grid division.

[0066] Figure 3 is the difficulty value of the job category H x Schematic diagram of .

[0067] Figure 4 This is a diagram of the drop-down box selection for grid workers’ job categories.

[0068] Figure 5 This is a diagram showing the drop-down box selection for grid workers’ working hours. DETAILED DESCRIPTION

[0069] The following will further describe in detail a smart city management method, system and device of the present invention in conjunction with the accompanying drawings and embodiments.

[0070] like Figure 1 , Figure 2 , Figure 3 , Figure 4 , Figure 5 As shown, a smart city management method is characterized by:

[0071] Step 1: Input city information. The device is installed with GIS software and stores a city map. Based on the location information in the city map, the corresponding population number P and the number of city components Q are input.

[0072] Step 2: Initial grid division: According to (total population P0 + total number of components Q0) / number of grid members n, based on the city map in GIS, the initial grid division is performed. The number of grids is equal to the number of grid members n, and the population in each grid is P i With the number of components Q i The sum of the numbers should be ≤10. Grid lines are drawn between grids in the map. The grids are numbered 0001, 0002, ..., 000i, ..., n and marked on the map. i and Q i are the population and components in the i-th grid respectively;

[0073] Step 3: Grid label setting. Set corresponding labels according to the focus of each grid's current work needs. There are nine types of labels, namely information collection and maintenance, social security patrol, safety hazard investigation, special population services, conflict investigation and resolution, urban and rural governance coordination, public opinion collection and investigation, policy and law publicity, and public agency services.

[0074] Step 4: Initial grid allocation. According to the principle of early selection, grid workers select unassigned grids based on their expertise and reference to tags.

[0075] Step 5: Terminal device allocation. The terminal device has a built-in Beidou positioning module and communication module. It uploads the location data to the GIS software in real time and draws a track line on the map. The GIS software assigns a unique account to each grid worker.

[0076] Step 6, filling in the work log. The information to be reported is divided into three parts: work location, work classification and working hours. The work location is directly circled on the track line, and the work classification and working hours are checked in the form of a drop-down menu. The work classification is divided into 9 categories: information collection and maintenance, social security patrol, safety hazard investigation, special population service, contradiction investigation and resolution, urban and rural governance coordination, public opinion collection and investigation, policy and law publicity, and public service agency services, which are located in the first-level drop-down menu; the second-level drop-down menu of the information collection and maintenance is divided into 4 small categories: basic information, organizational information, population information, and event information; the second-level drop-down menu of the social security patrol is divided into 4 small categories: public security prevention and control, facility inspection, hidden danger investigation, and investigation and rectification; the second-level drop-down menu of the safety hazard investigation is divided into production hazards, traffic hazards, fire hazards, and geological hazards. There are four categories of hidden dangers. The secondary drop-down menu of special population services is divided into three categories: public security group, stable group, and caring group. The urban and rural governance coordination is divided into seven categories: urban appearance management, environmental protection management, market management, land management, forest and fishery management, religious management, and meteorological management. The options in the working hours drop-down box are 0.5, 1.0, 1.5, 2.0, 2.5, 3.0, 3.5, 4.0, 4.5, 5.0, 5.5, 6.0, 6.5, 7.0, 7.5, and 8.0 respectively. The system background sets a difficulty value H for each type of work. There are work categories with a secondary drop-down menu, and the difficulty values ​​correspond to the work categories in the secondary drop-down menu. There are work categories without a secondary drop-down menu, and the difficulty values ​​correspond to the work categories in the primary drop-down menu. The difficulty values ​​are H1, H2, H3, ..., H 26 ;

[0077] Step 7, work intensity analysis, work intensity I = (H1*h1+H2*h2+H3*h3+……+H x *h x +……+H 26 *h 26 ) / (h1+h2+h3+……+hx +……+h 26 ), 1≤x≤26, where h x is the difficulty value H x The cumulative working time of the grid workers in areas 0001, 0002, 0003, ..., 000i, ..., n are I1, I2, I3, ..., I i ,……,I n .

[0078] Step 8, re-dividing the grids, re-dividing the grids one by one in the order of 0001, 0002, 0003, ..., 000i, ..., n;

[0079] Step (1) re-divide the grid 0001 area to meet

[0080] (Population number P1+Parts number Q1)=[1 / (n-1)]*(I2+I3+……+I n ) / (I1+I2+……+I n )*(total population P0+total number of components Q0), the division is completed;

[0081] Step (2) re-divide the grid 0002 area to meet

[0082] (Population number P2+Parts number Q2)=[1 / (n-1)]*(I1+I3+……+I n ) / (I1+I2+……+I n )*(total population P0+total number of components Q0), the division is completed;

[0083] Step (3) re-divide the grid 0003 area to meet

[0084] (Population number P3+Parts number Q3)=[1 / (n-1)]*(I1+I2+I4…+I n ) / (I1+I2+……+I n )*(total population P0+total number of components Q0), the division is completed;

[0085] …

[0086] Step (i) is to re-divide the grid 000i area to satisfy

[0087] (Population size P i +Parts Quantity Q i )=[1 / (n-1)]*(I1+I2+……+I i-1 +I i+1 ……+I n ) / (I1+I2+……+I n)*(total population P0+total number of components Q0), (2≤i≤n-1), the division is completed;

[0088] And so on.

[0089] Step (n-1): Re-divide the grid n-1 area to satisfy

[0090] (Population size P n-1 +Parts Quantity Q n-1 )=[1 / (n-1)]*(I1+I2+……I n-2 +I n ) / (I1+I2+……+I n )*(total population P0+total number of components Q0), the division is completed;

[0091] In step (n), the remaining area is the range of grid n;

[0092] Step 8, repeat step 6 to fill in a new round of work log;

[0093] Step 9, repeat step 7 to conduct a new round of work intensity analysis;

[0094] Step 10, repeat step 8 to perform a new round of grid division;

[0095] …

[0096] And so on, constantly adjust the grid.

[0097] Further, the urban components refer to public facilities, road traffic, urban environment, landscaping, houses and land, other facilities, and extended components; public facilities include various inspection wells and related public facilities such as water, electricity, gas, and heat; road traffic includes parking facilities, traffic sign facilities, bus stops, and overpasses; urban environment includes toilets, trash cans, and billboards; landscaping includes ancient trees, green spaces, urban sculptures, and street seats; houses and land include bulletin boards, civil air defense works, and basements; other facilities include major hazardous sources, construction sites, and water ancillary facilities; extended components refer to components that are not included in the above categories but need to be managed.

[0098] A smart city management system, characterized in that the system includes a user management module, a label editing module, a grid display module, a trajectory drawing module, a log reporting module, a grid initial division module, and a grid re-division module.

[0099] The user management module includes two types of users: administrators and grid workers. Each grid worker is assigned a unique account. Grid worker users can view the area range of the grid and fill in work logs; administrator users can edit grid labels, statistically analyze log data, and set the difficulty value of work categories.

[0100] The label editing module is used to edit the label of each grid. The editing method is to check the options from the drop-down menu. There are 9 options in the drop-down menu, namely information collection and maintenance, social security patrol, safety hazard inspection, special population service, conflict inspection and resolution, urban and rural governance coordination, public opinion collection and investigation, policy and legal publicity, and agency services for the people. The label content represents the focus of the work in the corresponding grid. When grid members select a grid for the first time, they can choose the grid based on the label content and their own expertise.

[0101] The grid display module divides the area range in the form of a map and is numbered in sequence from 0001, 0002, 0003, ..., n, with a label displayed in each grid.

[0102] The trajectory drawing module is used to record the location data of the grid workers during working hours and draw the trajectory lines on the map.

[0103] The log reporting module is used for grid workers to fill in the work content and duration. The work content is checked in the form of a first-level drop-down box and a second-level drop-down box. The duration is divided into 16 options of 0.5, 1.0, 1.5, 2.0, 2.5, 3.0, 3.5, 4.0, 4.5, 5.0, 5.5, 6.0, 6.5, 7.0, 7.5, and 8.0, which are checked in the form of a drop-down box;

[0104] The log reporting module has the function of calculating the grid worker's work intensity, grid worker work intensity I=(H1*h1+H2*h2+H3*h3+……+H x *h x +……+H 26 *h 26 ) / (h1+h2+h3+……+h x +……+h 26 ), 1≤x≤26, where h x is the difficulty value H x The cumulative working time of the grid workers in areas 0001, 0002, 0003, ..., 000i, ..., n are I1, I2, I3, ..., I i ,……,I n , only administrators can view the calculation results.

[0105] The initial grid division module performs initial grid division based on the city map in GIS according to (total population P0+total number of components Q0) / number of grid members n. The number of grids is equal to the number of grid members n. The population P in each grid i With the number of components Q iThe sum of the numbers should be ≤10. Grid lines are drawn between grids in the map. The grids are numbered 0001, 0002, ..., 000i, ..., n and marked on the map. i and Q i are the population and number of components in the i-th grid respectively.

[0106] The grid re-dividing module re-divides the grids one by one in the order of 0001, 0002, 0003, ..., 000i, ..., n;

[0107] Step (1) re-divide the grid 0001 area to meet

[0108] (Population number P1+Parts number Q1)=[1 / (n-1)]*(I2+I3+……+I n ) / (I1+I2+……+I n )*(total population P0+total number of components Q0), the division is completed;

[0109] Step (2) re-divide the grid 0002 area to meet

[0110] (Population number P2+Parts number Q2)=[1 / (n-1)]*(I1+I3+……+I n ) / (I1+I2+……+I n )*(total population P0+total number of components Q0), the division is completed;

[0111] Step (3) re-divide the grid 0003 area to meet

[0112] (Population number P3+Parts number Q3)=[1 / (n-1)]*(I1+I2+I4…+I n ) / (I1+I2+……+I n )*(total population P0+total number of components Q0), the division is completed;

[0113] …

[0114] Step (i) re-divides the grid 000i area to satisfy

[0115] (Population size P i +Parts Quantity Q i )=[1 / (n-1)]*(I1+I2+……+I i-1 +I i+1 ……+I n ) / (I1+I2+……+I n )*(total population P0+total number of components Q0), (2≤i≤n-1), the division is completed;

[0116] And so on.

[0117] Step (n-1): Re-divide the grid n-1 area to satisfy

[0118] (Population size P n-1 +Parts Quantity Q n-1 )=[1 / (n-1)]*(I1+I2+……I n-2 +I n ) / (I1+I2+……+I n )*(total population P0+total number of components Q0), the division is completed;

[0119] In step (n), the remaining area is the range of grid n.

[0120] A smart city management device has a built-in Beidou positioning module and a communication module, and also includes a processor, a memory, and a computer program stored in the memory and configured to be executed by the processor. When the processor executes the computer program, the above-mentioned smart city management method can be implemented.

[0121] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that can be easily conceived by any technician familiar with the technical field within the technical scope disclosed by the present invention should be covered within the protection scope of the present invention.

Claims

1. A smart city management method, characterized in that: Step 1: Input city information. The terminal device is installed with GIS software and stores a city map. The corresponding population number P and the number of city components Q are input based on the location information in the city map. Step 2: Initial grid division: According to (total population P0 + total number of components Q0) / number of grid members n, based on the city map in GIS, the initial grid division is performed. The number of grids is equal to the number of grid members n, and the population in each grid is P i With the number of components Q i The sum of the numbers should be ≤10. Grid lines are drawn between grids in the map. The grids are numbered 0001, 0002, ..., 000i, ..., n and marked on the map. P i and Q i are the population and components in the i-th grid respectively; Step 3: Grid label setting. Set corresponding labels according to the focus of each grid's current work needs. There are nine types of labels, namely information collection and maintenance, social security patrol, safety hazard investigation, special population services, conflict investigation and resolution, urban and rural governance coordination, public opinion collection and investigation, policy and law publicity, and public agency services. Step 4: Initial grid allocation. According to the principle of early selection, grid workers select unassigned grids based on their expertise and reference to tags. Step 5: Terminal device allocation. The terminal device has a built-in Beidou positioning module and communication module. It uploads the location data to the GIS software in real time and draws a track line on the map. The GIS software assigns a unique account to each grid worker. Step 6, filling in the work log. The information to be reported is divided into three parts: work location, work classification and working hours. The work location is directly circled on the track line, and the work classification and working hours are checked in the form of a drop-down menu. The work classification is divided into 9 categories: information collection and maintenance, social security patrol, safety hazard investigation, special population service, contradiction investigation and resolution, urban and rural governance coordination, public opinion collection and investigation, policy and law publicity, and public service agency services, which are located in the first-level drop-down menu; the second-level drop-down menu of the information collection and maintenance is divided into 4 small categories: basic information, organizational information, population information, and event information; the second-level drop-down menu of the social security patrol is divided into 4 small categories: public security prevention and control, facility inspection, hidden danger investigation, and investigation and rectification; the second-level drop-down menu of the safety hazard investigation is divided into production hazards, traffic hazards, fire hazards, and geological hazards. There are four categories of hidden dangers. The secondary drop-down menu of special population services is divided into three categories: public security group, stable group, and caring group. The urban and rural governance coordination is divided into seven categories: urban appearance management, environmental protection management, market management, land management, forest and fishery management, religious management, and meteorological management. The options in the working hours drop-down box are 0.5, 1.0, 1.5, 2.0, 2.5, 3.0, 3.5, 4.0, 4.5, 5.0, 5.5, 6.0, 6.5, 7.0, 7.5, and 8.0 respectively. The system background sets a difficulty value H for each type of work. There are work categories with a secondary drop-down menu, and the difficulty values ​​correspond to the work categories in the secondary drop-down menu. There are work categories without a secondary drop-down menu, and the difficulty values ​​correspond to the work categories in the primary drop-down menu. The difficulty values ​​are H1, H2, H3, ..., H 26 ; Step 7, work intensity analysis, work intensity I = (H1*h1+H2*h2+H3*h3+……+H x *h x +……+H 26 *h 26 ) / (h1+h2+h3+……+h x +……+h 26 ), 1≤x≤26, where h x is the difficulty value H x The cumulative working time of the grid workers in areas 0001, 0002, 0003, ..., 000i, ..., n are I1, I2, I3, ..., I i ,……,I n ; Step 8, re-dividing the grids, re-dividing the grids one by one in the order of 0001, 0002, 0003, ..., 000i, ..., n; Step (1) re-divide the grid 0001 area to meet (Population number P1+Parts number Q1)=[1 / (n-1)]*(I2+I3+……+I n ) / (I1+I2+……+I n )*(total population P0+total number of components Q0), the division is completed; Step (2) re-divide the grid 0002 area to meet (Population number P2+Parts number Q2)=[1 / (n-1)]*(I1+I3+……+I n ) / (I1+I2+……+I n )*(total population P0+total number of components Q0), the division is completed; Step (3) re-divide the grid 0003 area to meet (Population number P3+Parts number Q3)=[1 / (n-1)]*(I1+I2+I4…+I n ) / (I1+I2+……+I n )*(total population P0+total number of components Q0), the division is completed; …… Step (i) re-divides the grid 000i area to satisfy (Population size P i +Parts Quantity Q i )=[1 / (n-1)]*(I1+I2+……+I i-1 +I i+1 ……+I n ) / (I1+I2+……+I n )*(total population P0+total number of components Q0), (2≤i≤n-1), the division is completed; And so on. Step (n-1): Re-divide the grid n-1 area to satisfy (Population size P n-1 +Parts Quantity Q n-1 )=[1 / (n-1)]*(I1+I2+……I n-2 +I n ) / (I1+I2+……+I n )*(total population P0+total number of components Q0), the division is completed; In step (n), the remaining area is the range of grid n; Step 8, repeat step 6 to fill in a new round of work log; Step 9, repeat step 7 to conduct a new round of work intensity analysis; Step 10, repeat step 8 to perform a new round of grid division; …… And so on, constantly adjust the grid.

2. A smart city management system, characterized in that: The system includes user management module, label editing module, grid display module, trajectory drawing module, log reporting module, grid initial division module, and grid re-division module; The user management module includes two types of users: administrators and grid workers. Each grid worker is assigned a unique account. Grid worker users can view the area range of the grid and fill in work logs; administrator users can edit grid labels, statistically analyze log data, and set the difficulty value of work categories; The label editing module is used to edit the label of each grid. The editing method is to check from the drop-down menu. There are 9 options in the drop-down menu, namely information collection and maintenance, social security patrol, safety hazard investigation, special population service, conflict investigation and resolution, urban and rural governance coordination, public opinion collection and investigation, policy and law publicity, and public service. The label content represents the focus of the work in the corresponding grid. When the grid member selects the grid for the first time, he can choose the grid according to the label content and his own expertise; The grid display module divides the area range in the form of a map and is numbered in sequence from 0001, 0002, 0003, ..., n, with a label displayed in each grid; The trajectory drawing module is used to record the location data of the grid workers during working hours and draw a trajectory line on the map; The log reporting module is used for grid workers to fill in the work content and duration. The work content is checked in the form of a first-level drop-down box and a second-level drop-down box. The duration is divided into 16 options of 0.5, 1.0, 1.5, 2.0, 2.5, 3.0, 3.5, 4.0, 4.5, 5.0, 5.5, 6.0, 6.5, 7.0, 7.5, and 8.0, which are checked in the form of a drop-down box; The log reporting module has the function of calculating the grid worker's work intensity, grid worker work intensity I=(H1*h1+H2*h2+H3*h3+……+H x *h x +……+H 26 *h 26 ) / (h1+h2+h3+……+h x +……+h 26 ), 1≤x≤26, where h x is the difficulty value H x The cumulative working time of the grid workers in areas 0001, 0002, 0003, ..., 000i, ..., n are I1, I2, I3, ..., I i ,……I n , only administrators can view the calculation results; The initial grid division module performs initial grid division based on the city map in GIS according to (total population P0+total number of components Q0) / number of grid members n. The number of grids is equal to the number of grid members n. The population P in each grid i With the number of components Q i The sum of the numbers should be ≤10. Grid lines are drawn between grids in the map. The grids are numbered 0001, 0002, ..., 000i, ..., n and marked on the map. P i and Q i are the population and components in the i-th grid respectively; The grid re-dividing module re-divides the grids one by one in the order of 0001, 0002, 0003, ..., 000i, ..., n; Step (1) re-divide the grid 0001 area to meet (Population number P1+Parts number Q1)=[1 / (n-1)]*(I2+I3+……+I n ) / (I1+I2+……+I n )*(total population P0+total number of components Q0), the division is completed; Step (2) re-divide the grid 0002 area to meet (Population number P2+Parts number Q2)=[1 / (n-1)]*(I1+I3+……+I n ) / (I1+I2+……+I n )*(total population P0+total number of components Q0), the division is completed; Step (3) re-divide the grid 0003 area to meet (Population number P3+Parts number Q3)=[1 / (n-1)]*(I1+I2+I4…+I n ) / (I1+I2+……+I n )*(total population P0+total number of components Q0), the division is completed; …… Step (i) re-divides the grid 000i area to satisfy (Population size P i +Parts Quantity Q i )=[1 / (n-1)]*(I1+I2+……+I i-1 +I i+1 ……+I n ) / (I1+I2+……+I n )*(total population P0+total number of components Q0), (2≤i≤n-1), the division is completed; And so on. Step (n-1): Re-divide the grid n-1 area to satisfy (Population size P n-1 +Parts Quantity Q n-1 )=[1 / (n-1)]*(I1+I2+……I n-2 +I n ) / (I1+I2+……+I n )*(total population P0+total number of components Q0), the division is completed; In step (n), the remaining area is the range of grid n.

3. A smart city management device, characterized in that: The device has a built-in Beidou positioning module and a communication module, and also includes a processor, a memory, and a computer program stored in the memory and configured to be executed by the processor. When the processor executes the computer program, the smart city management method described in claim 1 can be implemented.

Citation Information

Patent Citations

  • Fire control safety management information system based on grid management mode

    CN106156917A

  • KR1020166610000B1