A battery testing equipment current synchronization system and method

By setting up a parallel circuit in the power control module and synchronously executing charge and discharge instructions, the problem of difference in current output and input time in the battery test equipment is solved, current synchronization and stability are achieved, and the accuracy of power battery testing is improved.

CN113777490BActive Publication Date: 2024-12-06FUJIAN NEBULA ELECTRONICS CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202110987924.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-08-26
Publication Date
2024-12-06
Estimated Expiration
2041-08-26

AI Technical Summary

Technical Problem

In battery testing equipment, there is a time difference in current output and input of multiple parallel channels, which leads to the inability to output or input at the same time, and the current synchronization cannot be achieved, affecting the dynamic impedance characteristics of the power battery and the accuracy of operating condition simulation test.

Method used

By setting up a parallel circuit in the power control module, each parallel circuit is connected to each other through a signal line (IO_BUS level bus). The signal is flipped only after receiving the low-level signals of all parallel circuits, and the charging and discharging command is executed simultaneously. Achieve synchronization of current output and input.

Benefits of technology

It significantly improves the synchronization and stability of current output and input, ensures the smoothness of current step changes, and improves the accuracy of power battery performance testing.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113777490B_ABST
    Figure CN113777490B_ABST
Patent Text Reader

Abstract

The present invention provides a battery testing equipment current synchronization system and method in the field of battery testing technology, the system comprising: a host computer; at least two power control modules, each comprising an MCU, a communication interface, a parallel circuit and a power supply unit; one end of the communication interface is connected to the MCU, and the other end is connected to the host computer; one end of the parallel circuit is connected to the MCU, and the other end is connected to the remaining parallel circuits; the power supply unit is connected to the MCU; a power battery is connected to each of the power supply units. The advantages of the present invention are: greatly improving the synchronization and stability of current output and input.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of battery testing, and in particular to a current synchronization system and method for battery testing equipment. Background Art

[0002] When conducting performance tests on power batteries of new energy vehicles, the battery testing equipment implements high-current charge and discharge tests by connecting channels in parallel. The battery testing equipment needs to simulate the working conditions of the power battery when the new energy vehicle is accelerating, decelerating, going downhill, etc. The working condition simulation process requires rapid current mutations and switching of positive and negative poles, so there are strict requirements on the current response (current change time) and current waveform of the battery testing equipment.

[0003] When the battery testing equipment uses multiple channels in parallel to achieve high-current charge and discharge testing, the outputs of all parallel channels are connected to the same power battery, and the parameter instructions sent by the host computer control the input and output of the current of each channel. Due to the time difference of the system scheduling of the host computer and the order of execution of tasks within each channel, there are differences in the time when each channel actually executes the parameter instructions, resulting in the inability to output or input current at the same time, that is, the inability to synchronize current, resulting in uneven current step changes or even loss of control, and the inability to accurately test the dynamic characteristics of the current, affecting the dynamic impedance characteristics, internal resistance, working condition simulation and other tests of the power battery, and unable to accurately reflect the actual performance of the power battery.

[0004] Therefore, how to provide a current synchronization system and method for battery testing equipment to improve the synchronization and stability of current output and input has become an urgent problem to be solved. Summary of the invention

[0005] The technical problem to be solved by the present invention is to provide a current synchronization system and method for battery testing equipment to improve the synchronization and stability of current output and input.

[0006] In a first aspect, the present invention provides a current synchronization system for battery testing equipment, comprising:

[0007] A host computer;

[0008] At least two power control modules, each comprising an MCU, a communication interface, a parallel circuit and a power supply unit; one end of the communication interface is connected to the MCU, and the other end is connected to the host computer; one end of the parallel circuit is connected to the MCU, and the other end is connected to the remaining parallel circuits; the power supply unit is connected to the MCU;

[0009] A power battery is connected to each of the power supply units.

[0010] Furthermore, the communication interface is an Ethernet interface, an RS485 interface, an RS232 interface or a CAN interface.

[0011] Further, the parallel circuit includes a resistor R1, a resistor R2, a resistor R3, a resistor R4, a resistor R5, a resistor R6, a transistor Q1, a transistor Q2 and a diode D1;

[0012] One end of the resistor R1 is connected to the signal output end of the MCU, and the other end is connected to the base of the transistor Q1; the collector of the transistor Q1 is connected to the resistor R2, the resistor R3, the diode D1 and the remaining parallel circuits, and the emitter is connected to the resistor R5, the diode D1 and the remaining parallel circuits and grounded; the base of the transistor Q2 is connected to the resistor R3, the collector is connected to the resistor R4, and the emitter is connected to the resistor R5 and the resistor R6; the resistor R2 is connected to the resistor R4; the resistor R6 is connected to the signal input end of the MCU.

[0013] Furthermore, the diode D1 is a clamping diode.

[0014] Furthermore, the parallel circuits are connected via signal wiring.

[0015] In a second aspect, the present invention provides a current synchronization method for a battery testing device, comprising the following steps:

[0016] Step S10: The host computer sends charge and discharge instructions to the MCU of each power control module;

[0017] Step S20, each MCU inputs a low level signal to the resistor R1 of the parallel circuit based on the received charge and discharge instruction;

[0018] Step S30, after receiving the low level signal from each parallel circuit, the IO_BUS level bus connected to each parallel circuit performs signal inversion and outputs a high level signal to each resistor R3;

[0019] Step S40, after receiving the high level signal, each parallel circuit transmits it to the MCU through the transistor Q2 and the resistor R6 in sequence;

[0020] Step S50: After receiving the high level signal, each MCU immediately executes the charge and discharge instruction to perform current synchronization;

[0021] Step S60: After the charge and discharge instructions are executed, each MCU inputs a high level signal to the resistor R1 of the parallel circuit to reset it.

[0022] Furthermore, in step S10, the charge and discharge instruction carries a current value for setting the output of the power supply unit.

[0023] The advantages of the present invention are:

[0024] By setting up parallel circuits in the power control module, each parallel circuit is connected to each other through a signal cable (IO_BUS level bus). When each power control module receives a charge and discharge instruction sent by the host computer, the power control module inputs a low-level signal to the parallel circuit and transmits it to the IO_BUS level bus. Only when the IO_BUS level bus receives the low-level signals of all parallel circuits, the signal is flipped and a high-level signal is sent to the MCU of each power control module to execute the charge and discharge instruction. That is, the time for each power control module to execute the charge and discharge instruction is synchronized through the parallel circuit, thereby realizing current synchronization, which ultimately greatly improves the synchronization and stability of current output and input. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] The present invention will be further described below in conjunction with embodiments with reference to the accompanying drawings.

[0026] Figure 1 The invention discloses a circuit principle block diagram of a current synchronization system for battery testing equipment.

[0027] Figure 2 It is a circuit diagram of the parallel circuit of the present invention.

[0028] Figure 3 The present invention is a flow chart of a current synchronization method for battery testing equipment.

[0029] Marking Description:

[0030] 100-A current synchronization system for battery testing equipment, 1-host computer, 2-power control module, 3-power battery, 21-MCU, 22-communication interface, 23-parallel circuit, 24-power unit. DETAILED DESCRIPTION

[0031] The technical solution in the embodiment of the present application has the following overall idea: by setting a parallel circuit 23 in the power control module 2, each parallel circuit 23 is connected to each other through a signal cable (IO_BUS level bus), and the IO_BUS level bus performs signal flipping only after receiving the low-level signal of all the parallel circuits 23. The time for each power control module 2 to execute the charge and discharge instructions is synchronized to improve the synchronization and stability of current output and input.

[0032] Please refer to Figures 1 to 3 As shown, a preferred embodiment of a current synchronization system 100 for battery testing equipment of the present invention includes:

[0033] A host computer 1, used to send charge and discharge instructions to each of the power control modules 2, thereby controlling each of the power control modules 2 to perform current synchronization, perform synchronous current input and output to the power battery 3, control the magnitude and direction of the current, collect current and voltage data of each of the power control modules 2, and automatically generate a detection report of the power battery 3;

[0034] At least two power control modules 2, respectively including an MCU21, a communication interface 22, a parallel circuit 23 and a power supply unit 24; one end of the communication interface 22 is connected to the MCU21, and the other end is connected to the host computer 1; one end of the parallel circuit 23 is connected to the MCU21, and the other end is connected to the remaining parallel circuits 23; the power supply unit 24 is connected to the MCU21; the MCU21 is used to control the work of the power control module 2. In specific implementation, it is sufficient to select an MCU that can realize this function from the prior art, and it is not limited to any model, such as the STM32F103 series MCU of ST Company, and the control program is well known to those skilled in the art, which can be obtained by those skilled in the art without creative labor; the communication interface 22 is used for communication between the power control module 2 and the host computer 1; the parallel circuit 23 is used to synchronize the execution time of the charge and discharge instructions sent by the host computer 1; the power supply unit 24 is used to charge and discharge the power battery 3 using a constant voltage mode or a cross-current mode;

[0035] A power battery 3 is connected to each of the power supply units 24 via a cable (not shown), and is the battery to be tested.

[0036] The communication interface 22 is an Ethernet interface, an RS485 interface, an RS232 interface or a CAN interface.

[0037] The parallel circuit 23 includes a resistor R1, a resistor R2, a resistor R3, a resistor R4, a resistor R5, a resistor R6, a transistor Q1, a transistor Q2 and a diode D1;

[0038] One end of the resistor R1 is connected to the signal output end of MCU21, and the other end is connected to the base of the transistor Q1; the collector of the transistor Q1 is connected to the resistor R2, the resistor R3, the diode D1 and the remaining parallel circuits 23, and the emitter is connected to the resistor R5, the diode D1 and the remaining parallel circuits 23 and grounded; the base of the transistor Q2 is connected to the resistor R3, the collector is connected to the resistor R4, and the emitter is connected to the resistor R5 and the resistor R6; the resistor R2 is connected to the resistor R4; the resistor R6 is connected to the signal input end of MCU21.

[0039] The diode D1 is a clamping diode used to prevent static electricity from damaging the circuit.

[0040] The parallel circuits 23 are connected via a signal cable (not shown), that is, the IO_BUS+ and IO_BUS- of the parallel circuits 23 are connected via a signal cable.

[0041] A preferred embodiment of a current synchronization method for a battery testing device of the present invention comprises the following steps:

[0042] Step S10: The host computer sends charge and discharge instructions to the MCU of each power control module;

[0043] Step S20, each MCU inputs a low level signal to the resistor R1 of the parallel circuit based on the received charge and discharge instruction, and transmits it to the IO_BUS level bus, and exits the control of pulling down the level signal of the IO_BUS level bus;

[0044] Step S30, after the IO_BUS level bus connected to each parallel circuit receives the low level signal of each parallel circuit, the signal is flipped according to the parallel circuit logic, and a high level signal is output to each resistor R3 at the same time; since the level signal transmission time is extremely short, the time of level signal transmission and signal flipping can be ignored;

[0045] Step S40, after receiving the high level signal, each parallel circuit transmits it to the MCU through the transistor Q2 and the resistor R6 in sequence;

[0046] Step S50: After receiving the high level signal, each MCU immediately executes the charge and discharge instruction to perform current synchronization;

[0047] Step S60, after the charge and discharge instructions are executed, each MCU inputs a high level signal to the resistor R1 of the parallel circuit to reset, that is, to resume the control of pulling down the level signal of the IO_BUS level bus, in preparation for the next current synchronization.

[0048] In the step S10, the charge and discharge instruction carries a current value for setting the output of the power supply unit, and the current value is the total current required by the power battery divided by the number of power control modules.

[0049] In summary, the advantages of the present invention are:

[0050] By setting up parallel circuits in the power control module, each parallel circuit is connected to each other through a signal cable (IO_BUS level bus). When each power control module receives a charge and discharge instruction sent by the host computer, the power control module inputs a low-level signal to the parallel circuit and transmits it to the IO_BUS level bus. Only when the IO_BUS level bus receives the low-level signals of all parallel circuits, the signal is flipped and a high-level signal is sent to the MCU of each power control module to execute the charge and discharge instruction. That is, the time for each power control module to execute the charge and discharge instruction is synchronized through the parallel circuit, thereby realizing current synchronization, which ultimately greatly improves the synchronization and stability of current output and input.

[0051] Although the specific implementation modes of the present invention are described above, those skilled in the art should understand that the specific implementation modes described are only illustrative and are not intended to limit the scope of the present invention. Equivalent modifications and changes made by those skilled in the art in accordance with the spirit of the present invention should be included in the scope of protection of the claims of the present invention.

Claims

1. A current synchronization system for battery testing equipment, characterized in that: include: A host computer; At least two power control modules, each comprising an MCU, a communication interface, a parallel circuit and a power supply unit; one end of the communication interface is connected to the MCU, and the other end is connected to the host computer; one end of the parallel circuit is connected to the MCU, and the other end is connected to the remaining parallel circuits; the power supply unit is connected to the MCU; A power battery connected to each of the power supply units; The communication interface is an Ethernet interface, an RS485 interface, an RS232 interface or a CAN interface; The parallel circuit includes a resistor R1, a resistor R2, a resistor R3, a resistor R4, a resistor R5, a resistor R6, a transistor Q1, a transistor Q2 and a diode D1; One end of the resistor R1 is connected to the signal output end of the MCU, and the other end is connected to the base of the transistor Q1; the collector of the transistor Q1 is connected to the resistor R2, the resistor R3, the diode D1 and the remaining parallel circuits, and the emitter is connected to the resistor R5, the diode D1 and the remaining parallel circuits and grounded; the base of the transistor Q2 is connected to the resistor R3, the collector is connected to the resistor R4, and the emitter is connected to the resistor R5 and the resistor R6; the resistor R2 is connected to the resistor R4; the resistor R6 is connected to the signal input end of the MCU.

2. A battery testing equipment current synchronization system as claimed in claim 1, characterized in that: The diode D1 is a clamping diode.

3. A battery testing equipment current synchronization system as claimed in claim 1, characterized in that: The parallel circuits are connected via signal wiring.

4. A method for synchronizing current of a battery testing device, characterized in that: The method requires the use of a current synchronization system as claimed in any one of claims 1 to 3, comprising the following steps: Step S10: the host computer sends a charge and discharge instruction to the MCU of each power control module; the charge and discharge instruction carries a current value for setting the output of the power supply unit; Step S20, each MCU inputs a low level signal to the resistor R1 of the parallel circuit based on the received charge and discharge instruction; Step S30, after receiving the low level signal from each parallel circuit, the IO_BUS level bus connected to each parallel circuit performs signal inversion and outputs a high level signal to each resistor R3; Step S40: After receiving the high level signal, each parallel circuit transmits it to the MCU through the transistor Q2 and the resistor R6 in sequence; Step S50: After receiving the high level signal, each MCU immediately executes the charge and discharge instruction to perform current synchronization; Step S60: After the charge and discharge instructions are executed, each MCU inputs a high level signal to the resistor R1 of the parallel circuit to reset it.

Citation Information

Patent Citations

  • Multi-independent-current-source parallel synchronization system, synchronization circuit and parallel synchronization method

    CN111384740A

  • Current synchronization system of battery test equipment

    CN216160789U