A cryogenic distillation device and process for producing high-purity boron trifluoride
By designing a low-temperature distillation device, using double-tower and lightweight de-light removal and mechanical refrigeration, the problems of high consumption and low purity of existing boron trifluoride distillation process equipment have been solved, and the industrialization continuous of high-purity boron trifluoride is achieved Production and energy consumption are reduced.
Patent Information
- Application Number
- CN202111203806.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-10-15
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2041-10-15
AI Technical Summary
The existing low-temperature distillation process of boron trifluoride has high requirements for equipment, consumes large liquid nitrogen, is high in cost, and is low in product purity, making it difficult to meet the requirements of industrial continuous production.
A low-temperature distillation device including a heavy-weight de-light de-tube, a light de-tube, a reboiler and a condenser was designed. It adopts mechanical refrigeration to remove heavy components and light groups at one time through a low-temperature distillation process of heavy-weight and light de-tubes. The production of high-purity boron trifluoride is achieved, and continuous distillation and recycling is achieved through controllers and online analysis and detection components.
The production of high-purity boron trifluoride is achieved, which reduces energy consumption, simplifies the structure, ensures the safety and reliability of the device, and is suitable for industrial continuous production.
Smart Images

Figure CN113819715B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of high-purity boron trifluoride production, and in particular to a low-temperature rectification device and process for producing high-purity boron trifluoride. Background Art
[0002] High-purity boron trifluoride is a widely used gas. It is mainly used in the electronics industry as a P-type doping source for silicon and germanium epitaxy, diffusion and ion implantation processes. Boron trifluoride can also be further separated into very important 10 B and 11 B isotope gas is widely used in the nuclear industry and semiconductor industry. The synthesis process of boron trifluoride gas has been greatly improved over the years, but the purification process has not made much progress. Han Duanxiong, Zhou Junbo and others reported a low-temperature distillation process, which uses liquid nitrogen refrigeration and performs low-temperature distillation near the boiling point of boron trifluoride (about -100°C). This method has high requirements for equipment, especially the large amount of liquid nitrogen consumed. If nitrogen is not recovered, the cost will be very high, and the purity of the boron trifluoride produced is low. Summary of the invention
[0003] In order to solve the above technical problems, the present invention provides a low-temperature distillation device and process for producing high-purity boron trifluoride, which makes the product have high purity, simple structure, safety and reliability, and can realize industrial continuous production.
[0004] To achieve the above object, the present invention provides the following solutions:
[0005] The present invention provides a low-temperature distillation device for producing high-purity boron trifluoride, comprising a de-weighting tower, a light-weighting tower, a first reboiler, a second reboiler, a first condenser, a second condenser, a raw material collecting tank, a heavy component collecting tank, a light component collecting tank, a product collecting tank and a controller, wherein the raw material collecting tank is connected to one side of the lower part of the de-weighting tower through a first pipeline, a first regulating valve and a first flow meter are arranged on the first pipeline, the bottom of the de-weighting tower is connected to the heavy component collecting tank through a second pipeline, a second regulating valve and a second flow meter are arranged on the second pipeline, the first reboiler is installed on one side of the lower part of the de-weighting tower, and the top of the de-weighting tower is connected to the heavy component collecting tank through a third regulating valve. The pipeline is connected to the inlet of the first condenser, the reflux port of the first condenser is connected to one side of the upper part of the de-weighting tower through the first liquid reflux pipe, the first liquid reflux pipe is provided with a first reflux valve, the outlet of the first condenser is connected to one side of the de-weighting tower through the fourth pipeline, the fourth pipeline is provided with a first online analysis and detection component, a third flowmeter and a third regulating valve, the first online analysis and detection component is arranged at one end close to the outlet of the first condenser, the bottom of the de-weighting tower is connected to the product collection tank through the fifth pipeline, the fifth pipeline is provided with a second online analysis and detection component, a fourth flowmeter and a fourth regulating valve The second online analysis and detection component is arranged at one end close to the light component removal tower, the second reboiler is installed on one side of the lower part of the light component removal tower, the top of the light component removal tower is connected to the inlet of the second condenser through the sixth pipeline, the reflux port of the second condenser is connected to one side of the upper part of the light component removal tower through the second liquid reflux pipe, the second liquid reflux pipe is provided with a second reflux valve, the outlet of the second condenser is connected to the light component collection tank through the seventh pipeline, the seventh pipeline is provided with a fifth flowmeter and a fifth regulating valve, the raw material collection tank is provided with a first cooling and regulating component, and the heavy component collection tank is provided with a second cooling and regulating component. The light component collecting tank is provided with a third cooling and regulating component, the product collecting tank is provided with a fourth cooling and regulating component, the first cooling and regulating component, the second cooling and regulating component, the third cooling and regulating component, the fourth cooling and regulating component, the first regulating valve, the first flow meter, the second regulating valve, the second flow meter, the third regulating valve, the third flow meter, the fourth regulating valve, the fourth flow meter, the fifth regulating valve, the fifth flow meter, the first online analysis and detection component, the second online analysis and detection component, the first reflux valve and the second reflux valve are all connected to the controller.
[0006] Preferably, it also includes a safety control valve, which is arranged on one end of the first pipeline close to the raw material collection tank, and the safety control valve is connected to the controller; the upper end of the raw material collection tank is connected to a feed pipe, and a feed control valve is arranged on the feed pipe, and the feed control valve is connected to the controller.
[0007] Preferably, a sixth flow meter is provided on the first liquid reflux pipe, a seventh flow meter is provided on the second liquid reflux pipe, and both the sixth flow meter and the seventh flow meter are connected to the controller.
[0008] Preferably, the inlet at the lower end of the first reboiler is connected to the bottom of the de-weighting tower through a first connecting pipe, and the outlet at the upper end of the first reboiler is connected to one side of the lower part of the de-weighting tower through a second connecting pipe; the inlet at the lower end of the second reboiler is connected to the bottom of the de-weighting tower through a third connecting pipe, and the outlet at the upper end of the second reboiler is connected to one side of the lower part of the de-weighting tower through a fourth connecting pipe.
[0009] Preferably, the heavy component removal tower, the light component removal tower, the raw material collecting tank, the heavy component collecting tank, the light component collecting tank and the product collecting tank are all provided with a liquid level gauge connected to the controller.
[0010] Preferably, it also includes a refrigeration circulation tank, the first cooling and regulating component includes a first cooling jacket, a third condenser, a first refrigerant inlet pipe, a first return pipe and a first refrigerant regulating valve, the first cooling jacket is arranged on the outside of the raw material collection tank, the third condenser is arranged on the top of the raw material collection tank, the first refrigerant inlet pipe is connected to the bottom of the first cooling jacket, the top of the first cooling jacket is connected to the inlet of the lower end of the third condenser, the outlet of the upper end of the third condenser is connected to the refrigeration circulation tank through the first return pipe, the first refrigerant regulating valve is arranged on the first refrigerant inlet pipe, and the first refrigerant regulating valve is connected to the controller.
[0011] Preferably, the second cooling and regulating component includes a second cooling jacket, a fourth condenser, a second refrigerant inlet pipe, a second reflux pipe and a second refrigerant regulating valve, the second cooling jacket is arranged on the outside of the heavy component collecting tank, the fourth condenser is arranged on the top of the heavy component collecting tank, the second refrigerant inlet pipe is connected to the bottom of the second cooling jacket, the top of the second cooling jacket is connected to the inlet of the lower end of the fourth condenser, the outlet of the upper end of the fourth condenser is connected to the refrigeration cycle tank through the second reflux pipe, the second refrigerant regulating valve is arranged on the second refrigerant inlet pipe, and the second refrigerant regulating valve is connected to the controller.
[0012] Preferably, the third cooling and regulating component includes a third cooling jacket, a fifth condenser, a third refrigerant inlet pipe, a third return pipe and a third refrigerant regulating valve. The third cooling jacket is arranged on the outside of the light component collecting tank, the fifth condenser is arranged on the top of the light component collecting tank, the third refrigerant inlet pipe is connected to the bottom of the third cooling jacket, the top of the third cooling jacket is connected to the inlet of the lower end of the fifth condenser, the outlet of the upper end of the fifth condenser is connected to the refrigeration cycle tank through the third return pipe, the third refrigerant regulating valve is arranged on the third refrigerant inlet pipe, and the third refrigerant regulating valve is connected to the controller.
[0013] Preferably, the fourth cooling and regulating component includes a fourth cooling jacket, a sixth condenser, a fourth refrigerant inlet pipe, a fourth return pipe and a fourth refrigerant regulating valve, the fourth cooling jacket is arranged on the outside of the product collecting tank, the sixth condenser is arranged on the top of the product collecting tank, the fourth refrigerant inlet pipe is connected to the bottom of the fourth cooling jacket, the top of the fourth cooling jacket is connected to the inlet at the lower end of the sixth condenser, the outlet at the upper end of the sixth condenser is connected to the refrigeration cycle tank through the fourth return pipe, the fourth refrigerant regulating valve is arranged on the fourth refrigerant inlet pipe, and the fourth refrigerant regulating valve is connected to the controller.
[0014] The present invention also provides a process based on a cryogenic distillation device for producing high-purity boron trifluoride, comprising the following steps:
[0015] Step 1: The boron trifluoride raw material gas enters the raw material collection tank and is liquefied into boron trifluoride raw material liquid under the cooling of the first cooling and regulating component;
[0016] Step 2, the boron trifluoride raw material liquid enters the deweighting tower through the first pipeline, the pressure difference between the raw material collection tank and the deweighting tower is 0.05-0.1MPa, the controller can control the feeding rate of the boron trifluoride raw material liquid by controlling the first regulating valve, the temperature of the first condenser is -30-50°C, the bottom temperature of the deweighting tower is -25-30°C by controlling the temperature and flow rate of the heat agent of the first reboiler, and the top pressure of the deweighting tower is 3.0-4.0Ma, and the heavy component is continuously deweighted and distilled, and the heavy component enters the heavy component collection tank through the second pipeline. The controller can control the discharge rate of the heavy component by controlling the second regulating valve, and the pressure difference between the deweighting tower and the heavy component collection tank is 0.05-0.1MPa;
[0017] Step 3, the boron trifluoride gas removed from the heavy component enters the first condenser through the third pipeline from the top of the de-heavy tower, and the liquid phase material formed after cooling in the first condenser is refluxed to the upper part of the de-heavy tower through the first liquid reflux pipe. The remaining boron trifluoride gas removed from the heavy component after cooling is detected by the first online analysis and detection component and enters the de-light tower from the top of the de-light tower through the fourth pipeline. The controller can control the extraction rate of the boron trifluoride gas removed from the heavy component by controlling the third regulating valve. The pressure difference between the de-heavy tower and the de-light tower is 0.05-0.1MPa, and the temperature of the second condenser is -30--50°C. The bottom temperature of the de-light tower is -25--30°C by controlling the temperature and flow rate of the hot agent of the second reboiler, so that the top pressure of the de-light tower is 3.0-4.0Ma, and the de-light distillation is continuous;
[0018] Step 4: The product formed after removing the light components enters the product collection tank through the fifth pipeline after being detected and qualified by the second online analysis and detection component. The controller can control the product extraction rate by controlling the fourth regulating valve, and the pressure difference between the light removal tower and the product collection tank is 0.05-0.1MPa; the light components enter the second condenser through the sixth pipeline, and the liquid light components formed after cooling in the second condenser are refluxed to the upper part of the light removal tower through the second liquid reflux pipe. The remaining gaseous light components after cooling enter the light component collection tank through the seventh pipeline. The controller can control the discharge rate of the light components by controlling the fifth regulating valve, and the pressure difference between the light removal tower and the light component collection tank is 0.05-0.1MPa.
[0019] Compared with the prior art, the present invention has achieved the following technical effects:
[0020] The invention provides a low-temperature distillation device and process for producing high-purity boron trifluoride, comprising a de-heavy tower, a de-light tower, a first reboiler, a second reboiler, a first condenser, a second condenser, a raw material collection tank, a heavy component collection tank, a light component collection tank, a product collection tank and a controller. Boron trifluoride raw material gas enters the raw material collection tank and is liquefied into boron trifluoride raw material liquid under cooling by a first cooling and regulating component. The boron trifluoride raw material liquid enters the de-heavy tower, and heavy components are removed in the de-heavy tower. The heavy components enter the heavy component collection tank. The boron trifluoride gas from which the heavy components are removed passes through the first condenser and then enters the de-light tower in gas phase. The de-light tower is continuously de-light distilled and the product formed after the light components are removed enters the product collection tank. The light components pass through the second condenser and then enter the light component collection tank in gas phase. The present invention adopts a double-tower low-temperature distillation process for removing heavy components and light components at one time, so that the product has high purity and can meet the requirements of the electronics industry for boron trifluoride. Both the heavy components and the light components can be recycled. Mechanical refrigeration is adopted to reduce energy consumption. The device has a simple structure, is safe and reliable, and can be continuously distilled, so that the device and the process are suitable for realizing industrial continuous production. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0022] Figure 1 The present invention provides a structural schematic diagram of a low-temperature distillation device for producing high-purity boron trifluoride.
[0023] Description of the accompanying drawings: 100, cryogenic distillation device for producing high-purity boron trifluoride; 1, raw material collecting tank; 2, de-heaving tower; 3, de-lightening tower; 4, heavy component collecting tank; 5, light component collecting tank; 6, product collecting tank; 7, first reboiler; 8, second reboiler; 9, first condenser; 10, second condenser; 11, first pipeline; 12, second pipeline; 13, third pipeline; 14, fourth pipeline; 15, fifth pipeline; 16, sixth pipeline; 17, seventh pipeline; 18, first liquid reflux pipe; 19, second liquid reflux pipe; 20, feed pipe; 21, first connecting pipe; 22, second connecting pipe; 23, third connecting pipe; 24, fourth connecting pipe; 25, first regulating valve; 2 6. The first flow meter; 27. The second regulating valve; 28. The second flow meter; 29. The third regulating valve; 30. The third flow meter; 31. The fourth regulating valve; 32. The fourth flow meter; 33. The fifth regulating valve; 34. The fifth flow meter; 35. The sixth flow meter; 36. The seventh flow meter; 37. The first online analysis and detection component; 38. The second online analysis and detection component; 39. The first reflux valve; 40. The second reflux valve; 41. The feed control valve; 42. The safety control valve; 43. The first cooling jacket; 44. The second cooling jacket; 45. The third cooling jacket; 46. The fourth cooling jacket; 47. The third condenser; 48. The fourth condenser; 49. The fifth condenser; 50. The sixth condenser. DETAILED DESCRIPTION
[0024] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0025] The purpose of the present invention is to provide a low-temperature distillation device and process for producing high-purity boron trifluoride, so that the product has high purity, simple structure, safety and reliability, and can realize industrial continuous production.
[0026] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.
[0027] Embodiment 1:
[0028] like Figure 1As shown, the present embodiment provides a cryogenic distillation device 100 for producing high-purity boron trifluoride, including a de-weighting tower 2, a de-lighting tower 3, a first reboiler 7, a second reboiler 8, a first condenser 9, a second condenser 10, a raw material collecting tank 1, a heavy component collecting tank 4, a light component collecting tank 5, a product collecting tank 6 and a controller, the raw material collecting tank 1 is connected to one side of the lower portion of the de-weighting tower 2 through a first pipeline 11, the first pipeline 11 is provided with a first regulating valve 25 and a first flowmeter 26, the bottom of the de-weighting tower 2 is connected to the heavy component collecting tank 4 through a second pipeline 12, the second pipeline 12 is provided with a second regulating valve 27 and a second flowmeter 28, and one side of the lower portion of the de-weighting tower 2 is provided with a first reboiler 29, and the first reboiler 30 is provided with a second regulating valve 28 and a second flowmeter 29, and the first reboiler 31 is provided with a second regulating valve 29 and a second flowmeter 29, and the first reboiler 32 is provided with a second regulating valve 29 and a second flowmeter 29, and the first reboiler 33 is provided with a second regulating valve 29 and a second flowmeter 29, and the first reboiler 34 is provided with a second regulating valve 29 and a second flowmeter 29, and the first reboiler 35 is provided with a second regulating valve 29 and a second flowmeter 29, and the first reboiler 36 is provided with a second regulating valve 29 and a second flowmeter 29, and the first reboiler 37 is provided with a second regulating valve 29 and a second flowmeter 29, and the first reboiler 38 is provided with a second regulating valve 29 The top of the de-weighting tower 2 is connected to the inlet of the first condenser 9 through the third pipeline 13, the reflux port of the first condenser 9 is connected to one side of the upper part of the de-weighting tower 2 through the first liquid reflux pipe 18, and the first liquid reflux pipe 18 is provided with a first reflux valve 39. The outlet of the first condenser 9 is connected to one side of the de-weighting tower 3 through the fourth pipeline 14, and the fourth pipeline 14 is provided with a first online analysis and detection component 37, a third flowmeter 30 and a third regulating valve 29. The first online analysis and detection component 37 is arranged at one end close to the outlet of the first condenser 9. The bottom of the de-weighting tower 3 is connected to the product collecting tank 6 through the fifth pipeline 15, and the fifth pipeline 15 is provided with a second online analysis and detection component 37. Detection component 38, fourth flowmeter 32 and fourth regulating valve 31, the second online analysis detection component 38 is arranged at one end close to the light component removal tower 3, a second reboiler 8 is installed on one side of the lower part of the light component removal tower 3, the top of the light component removal tower 3 is connected to the inlet of the second condenser 10 through the sixth pipeline 16, the reflux port of the second condenser 10 is connected to one side of the upper part of the light component removal tower 3 through the second liquid reflux pipe 19, the second liquid reflux pipe 19 is provided with a second reflux valve 40, the outlet of the second condenser 10 is connected to the light component collection tank 5 through the seventh pipeline 17, the seventh pipeline 17 is provided with a fifth flowmeter 34 and a fifth regulating valve 33, and the raw material collection tank 1 is provided with a first cooling regulating component A second cooling and regulating component is provided on the heavy component collecting tank 4, a third cooling and regulating component is provided on the light component collecting tank 5, and a fourth cooling and regulating component is provided on the product collecting tank 6. The first cooling and regulating component, the second cooling and regulating component, the third cooling and regulating component, the fourth cooling and regulating component, the first regulating valve 25, the first flow meter 26, the second regulating valve 27, the second flow meter 28, the third regulating valve 29, the third flow meter 30, the fourth regulating valve 31, the fourth flow meter 32, the fifth regulating valve 33, the fifth flow meter 34, the first online analysis and detection component 37, the second online analysis and detection component 38, the first reflux valve 39 and the second reflux valve 40 are all connected to the controller.
[0029] The present embodiment also includes a safety control valve 42, which is arranged on one end of the first pipeline 11 close to the raw material collection tank 1, and the safety control valve 42 is connected to the controller. When the device in the present embodiment fails, the delivery of the boron trifluoride raw material liquid can be disconnected by closing the safety control valve 42, which plays a role in safety protection. The upper end of the raw material collection tank 1 is connected to a feed pipe 20, and a feed control valve 41 is arranged on the feed pipe 20. The feed control valve 41 is connected to the controller, and the controller can adjust the delivery speed of the boron trifluoride raw material gas to the raw material collection tank 1 by controlling the feed control valve 41.
[0030] Specifically, a sixth flow meter 35 is provided on the first liquid reflux pipe 18, and a seventh flow meter 36 is provided on the second liquid reflux pipe 19. Both the sixth flow meter 35 and the seventh flow meter 36 are connected to the controller. When working, the first reflux valve 39 and the second reflux valve 40 are both in a fully open state, and the reflux amount of the first liquid reflux pipe 18 is observed in real time through the sixth flow meter 35, and the reflux amount of the second liquid reflux pipe 19 is observed in real time through the seventh flow meter 36.
[0031] Specifically, the inlet at the lower end of the first reboiler 7 is connected to the bottom of the de-weighting tower 2 through the first connecting pipe 21, and the outlet at the upper end of the first reboiler 7 is connected to one side of the lower part of the de-weighting tower 2 through the second connecting pipe 22. The first reboiler 7 is fed with a hot agent provided by the first heater, and the flow rate of the hot agent is controlled by the first pneumatic regulating valve. At the same time, the temperature of the hot agent is controlled by the first heater, and the first pneumatic regulating valve and the first heater are both connected to the controller. During operation, the liquid flowing out from the bottom of the de-weighting tower 2 enters the first reboiler 7 through the first connecting pipe 21, and the liquid is vaporized in the first reboiler 7 by the heating of the hot agent. The gas formed after vaporization returns to the de-weighting tower 2 through the second connecting pipe 22, and its own circulation can be realized. By adjusting the temperature and flow rate of the hot agent in the first reboiler 7, the bottom temperature of the de-weighting tower 2 can be controlled, and the top temperature of the de-weighting tower 2 is controlled by the first condenser 9 and the bottom temperature. The first reboiler 7 is heated by a heat agent, the temperature of the heat agent is 30-60°C, preferably 45°C, and a 6KW heat agent is used.
[0032] Specifically, the import of the second reboiler 8 lower end is connected with the bottom of the lightness removal tower 3 by the third connecting pipe 23, and the outlet of the second reboiler 8 upper end is connected with one side of the lightness removal tower 3 lower part by the fourth connecting pipe 24, and the second reboiler 8 is passed into the hot agent provided by the second heater, and the flow size of the hot agent is controlled by the second pneumatic regulating valve, and at the same time, the temperature of the hot agent is controlled by the second heater, and the second pneumatic regulating valve and the second heater are both connected with the controller. During work, the liquid flowing out from the bottom of the lightness removal tower 3 enters the second reboiler 8 through the third connecting pipe 23, and the liquid is gasified in the second reboiler 8 by the heating of the hot agent, and the gas formed after gasification returns to the lightness removal tower 3 by the fourth connecting pipe 24, and the circulation of itself can be realized. The tower bottom temperature of the lightness removal tower 3 can be controlled by adjusting the temperature and flow of the hot agent of the second reboiler 8, and the tower top temperature of the lightness removal tower 3 is controlled by the second condenser 10 and the tower bottom temperature. The second reboiler 8 is heated by a heat agent, the temperature of the heat agent is 30-60°C, preferably 45°C, and a 5KW heat agent is used.
[0033] Specifically, the de-heavy tower 2, the de-light tower 3, the raw material collection tank 1, the heavy component collection tank 4, the light component collection tank 5 and the product collection tank 6 are all provided with liquid level gauges connected to the controller, so as to respectively monitor the liquid levels in the de-heavy tower 2, the de-light tower 3, the raw material collection tank 1, the heavy component collection tank 4, the light component collection tank 5 and the product collection tank 6. The raw material collection tank 1, the heavy component collection tank 4, the light component collection tank 5 and the product collection tank 6 are all 304 stainless steel containers.
[0034] The present embodiment also includes a refrigeration circulation tank. The controller can adjust the temperature and pressure of the raw material collection tank 1 by controlling the first cooling regulating component. Specifically, the first cooling regulating component includes a first cooling jacket 43, a third condenser 47, a first refrigerant inlet pipe, a first return pipe and a first refrigerant regulating valve. The first cooling jacket 43 is arranged on the outside of the raw material collection tank 1, and the third condenser 47 is arranged on the top of the raw material collection tank 1. Specifically, the third condenser 47 is installed on the raw material collection tank 1 through a first flange, the first refrigerant inlet pipe is connected to the bottom of the first cooling jacket 43, the top of the first cooling jacket 43 is connected to the inlet of the lower end of the third condenser 47, and the outlet of the upper end of the third condenser 47 is connected to the refrigeration circulation tank through the first return pipe, that is, the refrigerant flowing out of the first cooling jacket 43 flows into the refrigeration circulation tank after preliminary cooling of the third condenser 47. The first refrigerant regulating valve is arranged on the first refrigerant inlet pipe, and the first refrigerant regulating valve is connected to the controller. The flow rate of the refrigerant entering the first cooling jacket 43 is adjusted by adjusting the first refrigerant regulating valve, so that the temperature of the raw material collection tank 1 is maintained at -35 to -40°C and the pressure is about 3.5 MPa, so that the boron trifluoride raw material gas is liquefied.
[0035] The controller can adjust the temperature and pressure of the heavy component collecting tank 4 by controlling the second cooling regulating component. Specifically, the second cooling regulating component includes a second cooling jacket 44, a fourth condenser 48, a second refrigerant inlet pipe, a second reflux pipe and a second refrigerant regulating valve. The second cooling jacket 44 is arranged on the outside of the heavy component collecting tank 4, and the fourth condenser 48 is arranged on the top of the heavy component collecting tank 4. Specifically, the fourth condenser 48 is installed on the heavy component collecting tank 4 through a second flange, the second refrigerant inlet pipe is connected to the bottom of the second cooling jacket 44, the top of the second cooling jacket 44 is connected to the inlet of the lower end of the fourth condenser 48, and the outlet of the upper end of the fourth condenser 48 is connected to the refrigeration circulation tank through the second reflux pipe, that is, the refrigerant flowing out of the second cooling jacket 44 flows into the refrigeration circulation tank after preliminary cooling of the fourth condenser 48. The second refrigerant regulating valve is arranged on the second refrigerant inlet pipe, and the second refrigerant regulating valve is connected to the controller. The flow rate of the refrigerant entering the second cooling jacket 44 is adjusted by adjusting the second refrigerant regulating valve, so that the temperature of the heavy component collecting tank 4 is maintained at -40 to -45°C and the pressure is approximately 3.2 MPa.
[0036] The controller can adjust the temperature and pressure of the light component collecting tank 5 by controlling the third cooling regulating component. Specifically, the third cooling regulating component includes a third cooling jacket 45, a fifth condenser 49, a third refrigerant inlet pipe, a third reflux pipe and a third refrigerant regulating valve. The third cooling jacket 45 is arranged on the outside of the light component collecting tank 5, and the fifth condenser 49 is arranged on the top of the light component collecting tank 5. Specifically, the fifth condenser 49 is installed on the light component collecting tank 5 through a third flange, the third refrigerant inlet pipe is connected to the bottom of the third cooling jacket 45, the top of the third cooling jacket 45 is connected to the inlet of the lower end of the fifth condenser 49, and the outlet of the upper end of the fifth condenser 49 is connected to the refrigeration circulation tank through the third reflux pipe, that is, the refrigerant flowing out of the third cooling jacket 45 flows into the refrigeration circulation tank after preliminary cooling of the fifth condenser 49. The third refrigerant regulating valve is arranged on the third refrigerant inlet pipe, and the third refrigerant regulating valve is connected to the controller. The flow rate of the refrigerant entering the third cooling jacket 45 is adjusted by adjusting the third refrigerant regulating valve, so that the temperature of the light component collecting tank 5 is maintained at -40 to -45°C and the pressure is about 3.2 MPa.
[0037] The controller can adjust the temperature and pressure of the product collecting tank 6 by controlling the fourth cooling regulating component. Specifically, the fourth cooling regulating component includes a fourth cooling jacket 46, a sixth condenser 50, a fourth refrigerant inlet pipe, a fourth return pipe and a fourth refrigerant regulating valve. The fourth cooling jacket 46 is arranged on the outside of the product collecting tank 6, and the sixth condenser 50 is arranged on the top of the product collecting tank 6. Specifically, the sixth condenser 50 is installed on the product collecting tank 6 through a fourth flange, the fourth refrigerant inlet pipe is connected to the bottom of the fourth cooling jacket 46, the top of the fourth cooling jacket 46 is connected to the inlet at the lower end of the sixth condenser 50, and the outlet at the upper end of the sixth condenser 50 is connected to the refrigeration circulation tank through the fourth return pipe, that is, the refrigerant flowing out of the fourth cooling jacket 46 flows into the refrigeration circulation tank after preliminary cooling of the sixth condenser 50, and the fourth refrigerant regulating valve is arranged on the fourth refrigerant inlet pipe, and the fourth refrigerant regulating valve is connected to the controller. The flow rate of the refrigerant entering the fourth cooling jacket 46 is adjusted by adjusting the fourth refrigerant regulating valve, so that the temperature of the product collecting tank 6 is maintained at -40 to -45°C and the pressure is approximately 3.2 MPa.
[0038] In this specific embodiment, the cold source is realized by a complete set of refrigeration units, the temperature is controllable, and the operating temperature is -30°C to -50°C. It can be seen that the cold source equipment in this embodiment is simple to operate, the temperature control is stable, and the mechanical refrigeration method is adopted to reduce energy consumption. That is, the refrigerants of the first condenser 9, the second condenser 10, the third condenser 47, the fourth condenser 48, the fifth condenser 49, the sixth condenser 50, the first cooling jacket 43, the second cooling jacket 44, the third cooling jacket 45 and the fourth cooling jacket 46 in this embodiment are all provided by the refrigeration unit, and the refrigerant in the refrigeration cycle tank is re-refrigerated by the refrigeration unit.
[0039] In this specific embodiment, the first online analysis and detection component 37 and the second online analysis and detection component 38 are both online gas chromatographs.
[0040] This embodiment also provides a process based on a cryogenic distillation device 100 for producing high-purity boron trifluoride, comprising the following steps:
[0041] Step 1, boron trifluoride raw material gas enters the raw material collection tank 1, and is liquefied into boron trifluoride raw material liquid under the cooling of the first cooling and regulating component; specifically, the composition of the boron trifluoride raw material gas is N2600ppm, O2200ppm, CO2300ppm, CO25ppm, CH420ppm, SO280ppm, SO315ppm, SIF45ppm, and the purity of BF3 gas is greater than 99.5%. The 3.7MPa boron trifluoride raw material gas from the cylinder or container is transported to the raw material collection tank 1 through the feed pipe 20. The raw material collection tank 1 is cooled by the first cooling jacket 43 and the third condenser 47. The refrigerant flow is controlled by the first refrigerant regulating valve to control the pressure of the raw material collection tank 1, so that the pressure of the raw material collection tank 1 is controlled at 3.5MPa, and the refrigerant temperature is controlled at -35 to -40°C.
[0042] Step 2, the boron trifluoride raw material liquid enters the deweighting tower 2 through the first pipeline 11, the pressure difference between the raw material collection tank 1 and the deweighting tower 2 is 0.05-0.1MPa, and the controller can control the feeding rate of the boron trifluoride raw material liquid by controlling the first regulating valve 25. The temperature of the first condenser 9 is -30-50°C, that is, the top temperature of the deweighting tower 2 is -30-50°C, and the bottom temperature of the deweighting tower 2 is -25-30°C by controlling the temperature and flow rate of the hot agent of the first reboiler 7, so that the top pressure of the deweighting tower 2 is 3.0-4.0Ma, so that the pressure difference of the top of the deweighting tower 2 is within 0.02MPa, and the heavy component is continuously deweighted and distilled. The heavy component enters the heavy component collection tank 4 through the second pipeline 12. The controller can control the discharge rate of the heavy component by controlling the second regulating valve 27. The pressure difference between the deweighting tower 2 and the heavy component collection tank 4 is 0.05-0.1MPa. Preferably, the temperature of the first condenser 9 is -40°C, and the top pressure of the deweighting tower 2 is 3.5 Ma.
[0043] Step 3: The boron trifluoride gas removed from the heavy component enters the first condenser 9 from the top of the de-heavy tower 2 through the third pipeline 13. The liquid phase material formed after cooling in the first condenser 9 flows back to the upper part of the de-heavy tower 2 through the first liquid reflux pipe 18. The remaining boron trifluoride gas removed from the heavy component after cooling is detected by the first online analysis detection component 37 and then enters the de-heavy tower 3 from the top of the de-heavy tower 3 through the fourth pipeline 14. The controller can control the boron trifluoride removal of the heavy component by controlling the third regulating valve 29. The gas extraction rate, the pressure difference between the de-heavy tower 2 and the de-light tower 3 is 0.05-0.1MPa, the temperature of the second condenser 10 is -30--50°C, that is, the top temperature of the de-light tower 3 is -30--50°C, and the bottom temperature of the de-light tower 3 is -25--30°C by controlling the temperature and flow rate of the hot agent of the second reboiler 8, so that the top pressure of the de-light tower 3 is 3.0-4.0Ma, so that the pressure difference of the top of the tower kettle of the de-light tower 3 is within 0.02MPa, and the de-light distillation is continuous. Preferably, the temperature of the second condenser 10 is -45°C, and the top pressure of the de-light tower 3 is 3.3Ma. Specifically, heavy components such as SO2, SO3, CO2 and HF are removed in the de-heavy tower 2, and the first online analysis and detection component 37 performs online detection on the boron trifluoride gas from which the heavy components are removed. When the key heavy component CO2 impurity in the boron trifluoride is qualified, the controller opens the third regulating valve 29 to allow the boron trifluoride gas from which the heavy components are removed to enter the light-removal tower 3.
[0044] Step 4: The product formed after removing the light components is tested and qualified by the second online analysis and detection component 38 and enters the product collection tank 6 through the fifth pipeline 15. The controller can control the product extraction rate by controlling the fourth regulating valve 31, and the pressure difference between the light removal tower 3 and the product collection tank 6 is 0.05-0.1MPa; the light components enter the second condenser 10 through the sixth pipeline 16, and the liquid light components formed after cooling in the second condenser 10 are refluxed to the upper part of the light removal tower 3 through the second liquid reflux pipe 19. The remaining gaseous light components after cooling enter the light component collection tank 5 through the seventh pipeline 17. The controller can control the discharge rate of the light components by controlling the fifth regulating valve 33. The pressure difference between the light removal tower 3 and the light component collection tank 5 is 0.05-0.1MPa. Specifically, light components such as N2, O2, CO and CH4 are removed in the light removal tower 3, and the second online analysis and detection component 38 performs online detection on the boron trifluoride gas from which the light components are removed. When the content of the key light component CO impurity in the boron trifluoride is less than 0.5ppm, the controller opens the fourth regulating valve 31 so that the product boron trifluoride is produced into the product collection tank 6. Specifically, the product composition is: N2<3ppm, O2<0.5ppm, CO2<0.5ppm, CO<0.5ppm, CH4<0.5ppm, SO2<2ppm, SO3<0.5ppm, SIF4<1ppm, and the purity of BF3 gas is greater than 99.999%.
[0045] In this embodiment, the pressure difference between the raw material collection tank 1 and the de-weighting tower 2 is 0.05-0.1MPa, the pressure difference between the de-weighting tower 2 and the heavy component collection tank 4 is 0.05-0.1MPa, the pressure difference between the de-weighting tower 2 and the light component collection tank 3 is 0.05-0.1MPa, the pressure difference between the light component collection tank 3 and the product collection tank 6 is 0.05-0.1MPa, and the pressure difference between the light component collection tank 3 and the light component collection tank 5 is 0.05-0.1MPa, so that the pressure difference between each process is maintained at 0.05-0.1MPa to ensure the continuity of the entire process.
[0046] In this specific embodiment, taking 10KG / h high-purity boron trifluoride equipment as an example, the purity of boron trifluoride raw gas is 99.5%, and the impurity content is: N2600ppm, O2200ppm, CO2300ppm, CO25ppm, CH420ppm, SO280ppm, SO315ppm, SIF45ppm. The boron trifluoride raw gas enters the raw material collection tank 1 for liquefaction, and then enters the deweighting tower 2 in the form of liquid phase at a feed rate of 15KG / h. The tower bottom of the deweighting tower 2 continuously discharges heavy components and enters the heavy component collection tank 4 at a production rate of 4KG / h. The tower top of the deweighting tower 2 continuously produces the deweighted boron trifluoride at a production rate of 11KG / h. Enter the light-removal tower 3, the top of the light-removal tower 3 continuously discharges light components, and enters the light component collection tank 5 at a withdrawal rate of 1KG / h. The bottom of the light-removal tower 3 continuously withdraws qualified boron trifluoride products at a withdrawal rate of 10KG / h and enters the product collection tank 6. The top pressure of the de-heavy tower 2 is 3.5MPa, and the temperature of the first condenser 9 is -40°C. The top pressure of the light-removal tower 3 is 3.3MPa, and the temperature of the second condenser 10 is -45°C. The purification effect of boron trifluoride is as follows:
[0047]
[0048] It can be seen that in this embodiment, the boron trifluoride raw material gas enters the raw material collection tank 1, and is liquefied into a boron trifluoride raw material liquid under the cooling of the first cooling and regulating component. The boron trifluoride raw material liquid enters the de-heavy tower 2, and the heavy component is removed in the de-heavy tower 2. The heavy component enters the heavy component collection tank 4, and the boron trifluoride gas with the heavy component removed passes through the first condenser 9 and then enters the light component removal tower 3 in the gas phase. The light component is continuously de-lightened and distilled in the light component removal tower 3. The product formed after the light component is removed enters the product collection tank 6, and the light component passes through the second condenser 10 and then enters the light component collection tank 5 in the gas phase. In this embodiment, the double tower low-temperature distillation of de-heavy and de-light is adopted, and the process of removing the heavy component and the light component at one time is adopted, so that the product purity is high, which can meet the requirements of the electronics industry for boron trifluoride, and the heavy component and the light component can be recycled, basically achieving zero emission, and the distillation tower structure is transformed, and high-efficiency fillers are preferably selected; the mechanical refrigeration method is adopted, the refrigeration equipment is simple and easy to obtain, and the energy consumption is reduced, and the structure is simple, safe and reliable, and continuous distillation can be performed, so that the device and process are suitable for realizing industrial continuous production.
[0049] Embodiment 2:
[0050] In this embodiment, a 20KG / h high-purity boron trifluoride device is used as an example. The purity of the boron trifluoride raw gas is 99.5%, and the impurity content is: N2600ppm, O2200ppm, CO2300ppm, CO25ppm, CH420ppm, SO280ppm, SO315ppm, SIF45ppm. The boron trifluoride raw gas enters the raw material collection tank 1 for liquefaction, and then enters the deweighting tower 2 in the form of liquid phase at a feed rate of 60KG / h. The tower bottom of the deweighting tower 2 continuously discharges heavy components and enters the heavy component collection tank 4 at a production rate of 36KG / h. The tower top of the deweighting tower 2 continuously produces the deweighted boron trifluoride at a production rate of 24KG / h. Enter the light-removal tower 3, the top of the light-removal tower 3 continuously discharges light components, and enters the light component collection tank 5 at a withdrawal rate of 4KG / h. The bottom of the light-removal tower 3 continuously withdraws qualified boron trifluoride products at a withdrawal rate of 20KG / h and enters the product collection tank 6. The top pressure of the de-heavy tower 2 is 3.5MPa, and the temperature of the first condenser 9 is -40°C. The top pressure of the light-removal tower 3 is 3.3MPa, and the temperature of the second condenser 10 is -45°C. The purification effect of boron trifluoride is as follows:
[0051]
[0052] The present specification uses specific examples to illustrate the principles and implementation methods of the present invention. The above examples are only used to help understand the method and core idea of the present invention. At the same time, for those skilled in the art, according to the idea of the present invention, there will be changes in the specific implementation methods and application scope. In summary, the content of this specification should not be understood as limiting the present invention.
Claims
1. A process for producing high-purity boron trifluoride in a cryogenic distillation device, characterized in that: The low-temperature distillation device for producing high-purity boron trifluoride comprises a de-weighting tower, a light-removing tower, a first reboiler, a second reboiler, a first condenser, a second condenser, a raw material collecting tank, a heavy component collecting tank, a light component collecting tank, a product collecting tank and a controller, wherein the raw material collecting tank is connected to one side of the lower part of the de-weighting tower through a first pipeline, a first regulating valve and a first flowmeter are arranged on the first pipeline, the bottom of the de-weighting tower is connected to the heavy component collecting tank through a second pipeline, a second regulating valve and a second flowmeter are arranged on the second pipeline, the first reboiler is installed on one side of the lower part of the de-weighting tower, and the top of the de-weighting tower is connected to the first regulating valve and the second flowmeter through a third pipeline. The first condenser is connected to the inlet of the first condenser, the reflux port of the first condenser is connected to one side of the upper part of the de-weighting tower through a first liquid reflux pipe, the first liquid reflux pipe is provided with a first reflux valve, the outlet of the first condenser is connected to one side of the de-weighting tower through a fourth pipeline, the fourth pipeline is provided with a first online analysis and detection component, a third flowmeter and a third regulating valve, the first online analysis and detection component is arranged at one end close to the outlet of the first condenser, the bottom of the de-weighting tower is connected to the product collecting tank through a fifth pipeline, the fifth pipeline is provided with a second online analysis and detection component, a fourth flowmeter and a fourth regulating valve, the first The second online analysis and detection component is arranged at one end close to the light component removal tower, the second reboiler is installed on one side of the lower part of the light component removal tower, the top of the light component removal tower is connected to the inlet of the second condenser through the sixth pipeline, the reflux port of the second condenser is connected to one side of the upper part of the light component removal tower through the second liquid reflux pipe, the second liquid reflux pipe is provided with a second reflux valve, the outlet of the second condenser is connected to the light component collection tank through the seventh pipeline, the fifth flow meter and the fifth regulating valve are provided on the seventh pipeline, the raw material collection tank is provided with a first cooling and regulating component, and the heavy component collection tank is provided with a second cooling and regulating component, The light component collection tank is provided with a third cooling and regulating component, the product collection tank is provided with a fourth cooling and regulating component, the first cooling and regulating component, the second cooling and regulating component, the third cooling and regulating component, the fourth cooling and regulating component, the first regulating valve, the first flow meter, the second regulating valve, the second flow meter, the third regulating valve, the third flow meter, the fourth regulating valve, the fourth flow meter, the fifth regulating valve, the fifth flow meter, the first online analysis and detection component, the second online analysis and detection component, the first reflux valve and the second reflux valve are all connected to the controller; The process includes the following steps: Step 1: The boron trifluoride raw material gas enters the raw material collection tank and is liquefied into boron trifluoride raw material liquid under the cooling of the first cooling and regulating component; Step 2, the boron trifluoride raw material liquid enters the deweighting tower through the first pipeline, the pressure difference between the raw material collection tank and the deweighting tower is 0.05~0.1MPa, the controller can control the feeding rate of the boron trifluoride raw material liquid by controlling the first regulating valve, the temperature of the first condenser is -30~-50°C, the bottom temperature of the deweighting tower is -25~-30°C by controlling the temperature and flow rate of the heat agent of the first reboiler, and the top pressure of the deweighting tower is 3.0~4.0Ma, continuous deweighting distillation, the heavy component enters the heavy component collection tank through the second pipeline, the controller can control the discharge rate of the heavy component by controlling the second regulating valve, and the pressure difference between the deweighting tower and the heavy component collection tank is 0.05~0.1MPa; Step 3, the boron trifluoride gas removed from the heavy component enters the first condenser through the third pipeline from the top of the de-weighting tower, and the liquid phase material formed after cooling in the first condenser is refluxed to the upper part of the de-weighting tower through the first liquid reflux pipe. The remaining boron trifluoride gas removed from the heavy component after cooling is detected by the first online analysis and detection component and enters the de-lighting tower from the top of the de-lighting tower through the fourth pipeline. The controller can control the extraction rate of the boron trifluoride gas removed from the heavy component by controlling the third regulating valve. The pressure difference between the de-weighting tower and the de-lighting tower is 0.05~0.1MPa, and the temperature of the second condenser is -30~-50℃. The bottom temperature of the de-lighting tower is -25~-30℃ by controlling the temperature and flow rate of the hot agent of the second reboiler, so that the top pressure of the de-lighting tower is 3.0~4.0Ma, and the de-lighting distillation is continuous; Step 4: The product formed after removing the light components enters the product collection tank through the fifth pipeline after being detected and qualified by the second online analysis and detection component. The controller can control the production speed of the product by controlling the fourth regulating valve. The pressure difference between the light removal tower and the product collection tank is 0.05~0.1MPa; the light components enter the second condenser through the sixth pipeline, and the liquid light components formed after cooling in the second condenser are refluxed to the upper part of the light removal tower through the second liquid reflux pipe. The remaining gaseous light components after cooling enter the light component collection tank through the seventh pipeline. The controller can control the discharge speed of the light components by controlling the fifth regulating valve. The pressure difference between the light removal tower and the light component collection tank is 0.05~0.1MPa.
2. The process for producing high-purity boron trifluoride by a cryogenic distillation device according to claim 1, characterized in that: It also includes a safety control valve, which is arranged on one end of the first pipeline close to the raw material collection tank, and the safety control valve is connected to the controller; the upper end of the raw material collection tank is connected to a feed pipe, and a feed control valve is arranged on the feed pipe, and the feed control valve is connected to the controller.
3. The process of the cryogenic distillation device for producing high-purity boron trifluoride according to claim 1, characterized in that: The first liquid reflux pipe is provided with a sixth flow meter, the second liquid reflux pipe is provided with a seventh flow meter, and both the sixth flow meter and the seventh flow meter are connected to the controller.
4. The process for producing high-purity boron trifluoride using a cryogenic distillation device according to claim 1, characterized in that: The inlet at the lower end of the first reboiler is connected to the bottom of the de-weighting tower through a first connecting pipe, and the outlet at the upper end of the first reboiler is connected to one side of the lower part of the de-weighting tower through a second connecting pipe; the inlet at the lower end of the second reboiler is connected to the bottom of the de-weighting tower through a third connecting pipe, and the outlet at the upper end of the second reboiler is connected to one side of the lower part of the de-weighting tower through a fourth connecting pipe.
5. The process for producing high-purity boron trifluoride using a cryogenic distillation device according to claim 1, characterized in that: The deheaving tower, the delightening tower, the raw material collecting tank, the heavy component collecting tank, the light component collecting tank and the product collecting tank are all provided with liquid level gauges connected to the controller.
6. The process for producing high-purity boron trifluoride using a cryogenic distillation device according to claim 1, characterized in that: It also includes a refrigeration cycle tank, the first cooling and regulating component includes a first cooling jacket, a third condenser, a first refrigerant inlet pipe, a first return pipe and a first refrigerant regulating valve, the first cooling jacket is arranged on the outside of the raw material collection tank, the third condenser is arranged on the top of the raw material collection tank, the first refrigerant inlet pipe is connected to the bottom of the first cooling jacket, the top of the first cooling jacket is connected to the inlet of the lower end of the third condenser, the outlet of the upper end of the third condenser is connected to the refrigeration cycle tank through the first return pipe, the first refrigerant regulating valve is arranged on the first refrigerant inlet pipe, and the first refrigerant regulating valve is connected to the controller.
7. The process for producing high-purity boron trifluoride using a cryogenic distillation device according to claim 6, characterized in that: The second cooling and regulating component includes a second cooling jacket, a fourth condenser, a second refrigerant inlet pipe, a second reflux pipe and a second refrigerant regulating valve. The second cooling jacket is arranged on the outside of the heavy component collecting tank, the fourth condenser is arranged on the top of the heavy component collecting tank, the second refrigerant inlet pipe is connected to the bottom of the second cooling jacket, the top of the second cooling jacket is connected to the inlet of the lower end of the fourth condenser, the outlet of the upper end of the fourth condenser is connected to the refrigeration cycle tank through the second reflux pipe, the second refrigerant regulating valve is arranged on the second refrigerant inlet pipe, and the second refrigerant regulating valve is connected to the controller.
8. The process for producing high-purity boron trifluoride using a cryogenic distillation device according to claim 6, characterized in that: The third cooling and regulating component includes a third cooling jacket, a fifth condenser, a third refrigerant inlet pipe, a third return pipe and a third refrigerant regulating valve. The third cooling jacket is arranged on the outside of the light component collecting tank, the fifth condenser is arranged on the top of the light component collecting tank, the third refrigerant inlet pipe is connected to the bottom of the third cooling jacket, the top of the third cooling jacket is connected to the inlet of the lower end of the fifth condenser, the outlet of the upper end of the fifth condenser is connected to the refrigeration cycle tank through the third return pipe, the third refrigerant regulating valve is arranged on the third refrigerant inlet pipe, and the third refrigerant regulating valve is connected to the controller.
9. The process for producing high-purity boron trifluoride using a cryogenic distillation device according to claim 6, characterized in that: The fourth cooling and regulating component includes a fourth cooling jacket, a sixth condenser, a fourth refrigerant inlet pipe, a fourth return pipe and a fourth refrigerant regulating valve. The fourth cooling jacket is arranged on the outside of the product collecting tank, the sixth condenser is arranged on the top of the product collecting tank, the fourth refrigerant inlet pipe is connected to the bottom of the fourth cooling jacket, the top of the fourth cooling jacket is connected to the inlet of the lower end of the sixth condenser, the outlet of the upper end of the sixth condenser is connected to the refrigeration cycle tank through the fourth return pipe, the fourth refrigerant regulating valve is arranged on the fourth refrigerant inlet pipe, and the fourth refrigerant regulating valve is connected to the controller.