A coordinated dispatching method for wind power, photovoltaic, solar thermal and thermal power generation

By constructing objective functions and optimization strategies, and coordinating the joint scheduling of wind power, photovoltaic, photothermal and thermal power, the problems of peak and trough fluctuations and high costs of generator sets are solved, and load balance and cost reduction are achieved.

CN113852140BInactive Publication Date: 2024-11-26LANZHOU UNIVERSITY OF TECHNOLOGY +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202111271423.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-10-29
Publication Date
2024-11-26
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In the combined power generation technology of wind power, photovoltaic, photothermal and thermal power, the existing technology is difficult to effectively reduce the peak and valley fluctuations of the residual load of the generator set and at the same time reduce operating costs.

Method used

By constructing the minimum objective function of the peak-to-valley difference of the residual load and the minimum objective function of the thermal power unit operation cost, combined with the predicted output of wind power, photovoltaic and photothermal heat, the combined adjustment cost of thermal power and photothermal heat can be optimized to achieve wind power, photovoltaic, photothermal heat and thermal power Coordinate scheduling.

Benefits of technology

During peak load periods, photothermal power stations are used to make up for the insufficient output of wind power and photovoltaics, reduce the frequent start and stop of thermal power units, reduce the operating costs of thermal power units, and maximize the acceptance capacity of wind power and photovoltaics, and achieve load balance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113852140B_ABST
    Figure CN113852140B_ABST
Patent Text Reader

Abstract

The present invention discloses a coordinated dispatching method for wind power, photovoltaic, solar thermal and thermal power generation, including: constructing constraint conditions for wind power output, photovoltaic output and solar thermal output respectively on the day before, constructing the minimum objective function of peak-to-valley difference of residual load based on the constraint conditions, and obtaining the residual load value; satisfying the residual load value through thermal power units, and constructing the minimum objective function of thermal power unit operation cost, wherein the constraint conditions are constructed for the thermal power output; obtaining the predicted wind power output and photovoltaic predicted output of multiple dispatching periods in the day, and combining the solar thermal output and thermal power output on the day before the step, constructing the minimum objective function of thermal power and solar thermal joint regulation cost; according to the minimum objective function of thermal power and solar thermal joint regulation cost, obtaining the solar thermal output and thermal power output of multiple dispatching periods in the day. This method can reduce the peak-to-valley fluctuation of the residual load of the generator set, and reduce the cost at the same time.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of complementary power generation, and in particular to a coordinated dispatching method for combined power generation of wind power, photovoltaic power, solar thermal power and thermal power. Background Art

[0002] Renewable energy such as wind power and photovoltaic power has gradually attracted public attention in recent years due to its clean, low-carbon and renewable advantages. The boom of renewable energy power generation has caused the installed capacity of renewable energy power generation represented by wind power and photovoltaic power to continue to grow. However, wind power and photovoltaic power generation have brought a series of unstable problems to the power system due to their random uncertainty.

[0003] Solar thermal power generation is a new type of renewable energy power generation technology that uses the heat energy of the sun to generate electricity. Because it is equipped with a large-capacity energy storage device, the solar thermal power station is dispatchable and is expected to play an important role in the power system with high penetration of renewable energy. Thermal power generation is a power generation technology that uses the heat energy generated by the combustion of combustibles and converts it into electrical energy through a power generation device. Although the existing technology considers combining multiple power generation technologies to make up for the defects of one power generation technology, if only two or three power generation technologies are considered, the peak and valley fluctuations of the residual load of the generator set are still relatively obvious, and the cost of operating multiple units together is relatively high.

[0004] Therefore, how to combine the four power generation technologies of wind power, photovoltaic power, solar thermal power and thermal power to further reduce the peak-to-valley fluctuations of the residual load of the generator sets while reducing costs has become a key issue in current research. Summary of the invention

[0005] In view of the above problems, the present invention provides a coordinated scheduling method for combined wind power, photovoltaic, solar thermal and thermal power generation that at least solves some of the above technical problems. The method can reduce the peak-to-valley fluctuations of the residual load of the generator set while reducing costs.

[0006] The embodiment of the present invention provides a coordinated scheduling method for wind power, photovoltaic power, solar thermal power and thermal power combined power generation, including:

[0007] S1. Constraints are established for wind power output, photovoltaic output and solar thermal output respectively. Based on these constraints, the minimum peak-to-valley difference objective function of the residual load is constructed to obtain the residual load value.

[0008] S2. Satisfying the remaining load value through the thermal power unit, and constructing the minimum operating cost objective function of the thermal power unit, wherein the constraint conditions are constructed for the thermal power output;

[0009] S3, obtaining the predicted wind power output and photovoltaic power output for multiple scheduling periods within the day; constructing a minimum objective function for the combined regulation cost of thermal power and photovoltaic power based on the predicted wind power output and photovoltaic power output, combined with the photovoltaic power output in step S1 and the thermal power output in step S2;

[0010] S4. According to the minimum objective function of the combined regulation cost of thermal power and solar thermal power, the solar thermal power output and the thermal power output in the multiple scheduling periods within the day are obtained.

[0011] Furthermore, in step S1, the constraints for wind power output, photovoltaic output and solar thermal output are respectively established a day ago, specifically including:

[0012] Wind power output constraint: 0≤P w,t ≤P' w,t (4)

[0013] Photovoltaic output constraint: 0≤P v,t ≤P' v,t (5)

[0014] Solar thermal output constraint: P csp,min ≤P csp,t ≤P csp,max (6)

[0015] Among them, P w,t represents the actual wind power output at time t; P′ w,t represents the predicted wind power output at time t; P v,t represents the actual photovoltaic output at time t; P′ v,t represents the predicted photovoltaic output at time t; P csp,t represents the actual solar and thermal output at time t; P csp,min represents the minimum light and heat output at time t; P csp,max Indicates the maximum light and heat output at time t.

[0016] Furthermore, in step S1, the residual load peak-to-valley difference minimum objective function is expressed as:

[0017]

[0018] P l,t =P t -(P w,t +P v,t +P csp,t ) (3)

[0019] Where f2 represents the peak-to-valley difference function of the remaining load; T represents the dispatch period; P t represents the predicted load at time t; P l,t represents the residual load at time t.

[0020] Furthermore, in step S2, the minimum operating cost objective function of the thermal power unit is expressed as:

[0021]

[0022] F i (P G,i,t )=a i (PG,i,t) 2 +b i P G,i,t +c i (14)

[0023] Where f3 represents the operating cost of thermal power units; T represents the dispatching period; N G Indicates the number of thermal power units; P G,i,t represents the dispatching output of the i-th thermal power unit at time t; u i,t represents the start / stop status of the i-th thermal power unit at time t; S i represents the startup cost of the i-th thermal power unit; a i , b i 、c i Both represent the fuel cost coefficient of thermal power units.

[0024] Furthermore, in step S2, the constraint conditions for the output of the thermal power unit specifically include:

[0025] Power balance constraints:

[0026] Output constraints of thermal power units:

[0027] Thermal power unit climbing constraint: -u i,t R id ≤P G,i,t -P G,i,t-1 ≤u i,t R iu (17)

[0028] in, represents the minimum output of the i-th thermal power unit; represents the maximum output of the i-th thermal power unit; R id represents the downward ramp rate of the i-th thermal power unit; R iu Represents the upward climbing rate of the i-th thermal power unit.

[0029] Furthermore, in step S3, the minimum objective function of the combined regulation cost of thermal power and solar thermal power is expressed as:

[0030]

[0031] Among them, KG represents the thermal power regulation cost; K c represents the light and heat regulation cost; P′ G,i,t represents the rolling modified dispatch output of the i-th thermal power unit at time t within the day; P′ csp,t It indicates the rolling correction dispatch output of solar thermal power at time t within the day; T0 indicates the dispatch period within the day.

[0032] Compared with the prior art, the coordinated dispatching method for wind power, photovoltaic, solar thermal and thermal power generation described in the present invention has the following beneficial effects:

[0033] (1) In the day-ahead dispatch, a two-stage optimization approach is adopted to jointly dispatch CSP with wind power and photovoltaic power. During the peak load period, CSP power stations can generate electricity to make up for the insufficient output of wind power and photovoltaic power, thus playing the role of "peak shaving". At the same time, in the second stage, thermal power is used to meet the relatively smooth remaining load, which can reduce the frequent start and stop of thermal power units, make the output of thermal power units more stable, and thus reduce the operating cost of thermal power units.

[0034] (2) In daily scheduling, the latest wind power, photovoltaic, and load power forecast data are used to obtain the optimal scheduling results of thermal power and solar thermal power stations. Compared with the optimization results of the previous day, this maximizes the wind power and photovoltaic acceptance capacity and can better meet the load balance.

[0035] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or understood by practicing the present invention. The purpose and other advantages of the present invention can be realized and obtained by the structures particularly pointed out in the written description, claims, and drawings.

[0036] The technical solution of the present invention is further described in detail below through the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:

[0038] Figure 1 A flow chart of a coordinated scheduling method for combined wind power, photovoltaic, solar thermal and thermal power generation provided in an embodiment of the present invention.

[0039] Figure 2 A system wiring diagram provided for an embodiment of the present invention.

[0040] Figure 3 This is a graph of the day-ahead dispatch output results of wind power, photovoltaic power and solar thermal power provided by an embodiment of the present invention.

[0041] Figure 4 A diagram of heat storage capacity and heat storage and release power in each scheduling period of a solar thermal power station provided in an embodiment of the present invention.

[0042] Figure 5 This is a diagram of the day-ahead dispatch results of thermal power units provided in an embodiment of the present invention.

[0043] Figure 6 This is a graph of the daily output adjustment results of a thermal power unit provided in an embodiment of the present invention.

[0044] Figure 7 This is a diagram of the daily output adjustment results of a solar thermal power station provided by an embodiment of the present invention. DETAILED DESCRIPTION

[0045] The exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. Although the exemplary embodiments of the present disclosure are shown in the accompanying drawings, it should be understood that the present disclosure can be implemented in various forms and should not be limited by the embodiments set forth herein. On the contrary, these embodiments are provided to enable a more thorough understanding of the present disclosure and to fully convey the scope of the present disclosure to those skilled in the art.

[0046] See also Figure 1 As shown, the embodiment of the present invention provides a coordinated scheduling method for wind power, photovoltaic power, solar thermal power and thermal power combined power generation, which specifically includes the following steps:

[0047] S1. Constraints are established for wind power output, photovoltaic output and solar thermal output respectively. Based on these constraints, the minimum peak-to-valley difference objective function of the residual load is constructed to obtain the residual load value.

[0048] S2. Satisfying the remaining load value through the thermal power unit, and constructing the minimum operating cost objective function of the thermal power unit, wherein the constraint conditions are constructed for the thermal power output;

[0049] S3, obtaining the predicted wind power output and photovoltaic power output for multiple scheduling periods within the day; constructing a minimum objective function for the combined regulation cost of thermal power and photovoltaic power based on the predicted wind power output and photovoltaic power output, combined with the photovoltaic power output in step S1 and the thermal power output in step S2;

[0050] S4. According to the minimum objective function of the combined regulation cost of thermal power and solar thermal power, the solar thermal power output and the thermal power output in the multiple scheduling periods within the day are obtained.

[0051] The following is a detailed description of each of the above steps.

[0052] In the above step S1, since the complementarity of wind and solar output is better in winter and summer, and worse in spring and autumn, and the complementarity of wind and solar output is the worst in autumn; therefore, it is possible to consider combining wind power and photovoltaic power generation to alleviate the uncertainty caused by the grid connection of wind and solar power alone. In addition, because the implementation of the heat storage system of the solar thermal power station brings significant advantages, the most significant advantage is that it is possible to make renewable energy power generation dispatchable, thereby eliminating one of the main disadvantages of other renewable energy sources such as wind power and photovoltaic power; dispatchability reduces the dependence of solar thermal power station power generation on weather conditions, allowing power plants to increase flexibility and operating range; jointly dispatching solar thermal with wind power and photovoltaic power can alleviate the uncertainty caused by the grid connection of wind and solar power; therefore, in the first stage of the embodiment of the present invention, that is, step S1, according to the combined power generation of wind power, photovoltaic power and solar thermal power, the maximum power generation objective function and the minimum residual load peak-to-valley difference objective function are established to provide the residual load value for the second stage (i.e., step 2);

[0053] The maximum objective function of daily power generation of wind power, photovoltaic power and solar thermal power is expressed as:

[0054]

[0055] The objective function of minimizing the peak-to-valley difference of residual load is expressed as:

[0056]

[0057] P l,t =P t -(P w,t +P v,t +P csp,t ) (3)

[0058] Where f1 represents the power generation of wind power, photovoltaic power and solar thermal power generation; f2 represents the peak-to-valley difference function of the residual load; T represents the scheduling period, which is 24h; Δt represents the time interval; P w,t represents the actual wind power output at time t; P v,t represents the actual photovoltaic output at time t; P csp,t represents the actual solar and thermal output at time t; P t represents the predicted load at time t; P l,t represents the residual load at time t.

[0059] Construct constraints for wind power, photovoltaic and solar thermal power generation respectively:

[0060] Wind power output constraint: 0≤P w,t ≤P' w,t (4)

[0061] Photovoltaic output constraint: 0≤P v,t ≤P' v,t(5)

[0062] Solar thermal output constraint: P csp,min ≤P csp,t ≤P csp,max (6)

[0063] CSP station ramp rate constraint: -RD≤P csp,t -P csp,t-1 ≤RU (7)

[0064] Thermal storage capacity constraints of CSP power stations:

[0065] Thermal storage energy balance constraints of thermal storage device:

[0066] Heat storage and heat release power constraints of heat storage devices:

[0067]

[0068]

[0069] Among them, P w,t represents the actual wind power output at time t; P' w,t represents the predicted wind power output at time t; P v,t represents the actual photovoltaic output at time t; P' v,t represents the predicted photovoltaic output at time t; P csp,t represents the actual solar and thermal output at time t; P csp,min represents the minimum light and heat output at time t; P csp,max Indicates the maximum output of CSP at time t. RD indicates the maximum downward ramp rate of the CSP station; RU indicates the maximum upward ramp rate of the CSP station; Indicates the upper limit of the thermal storage capacity of a CSP plant; Indicates the lower limit of the thermal storage capacity of a CSP plant; represents the heat storage capacity of the heat storage device at time t; represents the heat dissipation coefficient of the heat storage device; represents the heat storage power of the heat storage device at time t; It represents the heat release power of the heat storage device at time t; Δt represents the time interval.

[0070] In the above step S2, the residual load value is satisfied by the thermal power unit, and the objective function of the minimum operation cost of the thermal power unit is constructed, and the constraint conditions are constructed for the output of the thermal power unit, so as to optimize the output of each thermal power unit at each moment;

[0071] Among them, the minimum objective function of the thermal power unit operating cost is expressed as:

[0072]

[0073] F i (P G,i,t )=a i (PG,i,t) 2 +b i P G,i,t +c i (14)

[0074] Where f3 represents the operating cost of thermal power units; T represents the dispatching period; N G Indicates the number of thermal power units; P G,i,t represents the dispatching output of the i-th thermal power unit at time t; u i,t represents the start / stop status of the i-th thermal power unit at time t; S i represents the startup cost of the i-th thermal power unit; a i , b i 、c i Both represent the fuel cost coefficient of thermal power units.

[0075] The constraints on the output of thermal power units are as follows:

[0076] Power balance constraints:

[0077] Output constraints of thermal power units:

[0078] Thermal power unit climbing constraint: -u i,t R id ≤P G,i,t -P G,i,t-1 ≤u i,t R iu (17)

[0079] in, represents the minimum output of the i-th thermal power unit; represents the maximum output of the i-th thermal power unit; R id represents the downward ramp rate of the i-th thermal power unit; R iu Represents the upward climbing rate of the i-th thermal power unit.

[0080] The above steps S1 and S2 belong to day-ahead scheduling, while steps S3 and S4 belong to intraday scheduling. In the intraday scheduling stage, based on the planned output of solar thermal and thermal power in the day-ahead plan and the latest wind power and photovoltaic power forecast output within the day, an intraday scheduling model with the goal of minimizing the cost of joint regulation of solar thermal and thermal power is constructed to obtain the dispatch output of solar thermal and thermal power in each period of the day. In the above step S3, the objective function of minimizing the cost of joint regulation of thermal power and solar thermal is expressed as:

[0081]

[0082] Among them, K G represents the thermal power regulation cost; K c represents the light and heat regulation cost; P′ G,i,t represents the rolling modified dispatch output of the i-th thermal power unit at time t within the day; P′ csp,t It represents the rolling correction scheduling output of solar thermal power at time t within the day; T0 represents the scheduling period within the day, and 96 is taken in this embodiment.

[0083] Constraints for combined thermal and solar thermal power generation:

[0084]

[0085] in, Respectively represent the latest wind power, photovoltaic power, and load forecast power within the day; P′ csp,t Represents the revised dispatch output of the CSP power station during the day;

[0086] The wind power output constraints, photovoltaic output constraints, related constraints of solar thermal power stations, thermal power unit output constraints, and thermal power ramping power constraints during the intraday dispatch stage are basically the same as those during the day-ahead dispatch stage, see the above formulas (4)-(12) and (16)-(17) respectively.

[0087] Next, we will further explain the above steps from a holistic perspective through example analysis.

[0088] In the embodiment of the present invention, four conventional thermal power units, a wind farm with an installed capacity of 350MW, a photovoltaic power station with an installed capacity of 50MW, and a photothermal power station with an installed capacity of 50MW are selected. The system wiring diagram is as follows: Figure 2 The output upper and lower limits and ramp rates of the four thermal power units are shown in Table 1, and the operating parameters of the CSP power station are shown in Table 2. In the day-ahead dispatching stage, a day is divided into 24 periods, and the regulation cost K of the thermal power units within the day is G = 300 yuan / MW, the regulation cost of the CSP station K c =130 yuan / MW.

[0089] Table 1. Thermal power unit parameters

[0090]

[0091] Table 2. CSP power plant operating parameters

[0092]

[0093] Analysis of day-ahead dispatch results:

[0094] In MATLAB, YALMIP is used to call the CPLEX solver to solve the minimum objective function of the peak-to-valley difference of the residual load of the wind power-photovoltaic-solar thermal power generation and the minimum objective function of the operation cost of the thermal power unit. The optimal dispatch output of wind power, photovoltaic power and solar thermal power can be obtained as follows: Figure 3 As shown; Figure 4 It represents the heat storage capacity of the CSP power plant at each dispatching time during the day-ahead dispatching and the heat storage and release power of the heat storage system of the CSP power plant in each dispatching period; combined with Figure 3 , Figure 4 It can be seen that from 1:00 to 5:00 in the morning, the load is at a low point, the wind power output is large, and the CSP station generates electricity through the heat stored during the day when the solar radiation is strong; from 6:00 to 16:00 in the daytime, the solar radiation gradually increases, the photovoltaic power station starts to generate electricity, and the CSP station stores heat energy at this time; from 18:00 to 24:00 in the evening, the CSP station uses the heat energy stored during the day to generate electricity, and together with wind power and thermal power, it meets the load during this period. It can be seen that since the CSP station has a heat storage system, it can allow the CSP station to transfer power generation to the sunrise and sunset periods.

[0095] Through the optimization in the first stage, according to the optimal dispatching output of wind power, photovoltaic power, and solar thermal power, the amount of residual load can be obtained, which is brought into the second stage as a known quantity to optimize the output of the four thermal power units. The dispatching output of the four thermal power units after optimization is as follows: Figure 5 As shown. Figure 5 From the day-ahead dispatch results of the four thermal power units, it can be seen that after wind power, photovoltaic and solar thermal power generation are arranged according to their day-ahead dispatch results, the remaining load will be met by the four thermal power units. After the participation of the solar thermal power station, it not only does not increase the impact of grid fluctuations, but relies on the complementary operation of wind power, photovoltaic and solar thermal power to help the thermal power units reduce the peak and valley fluctuations of the remaining load, making the output power of each thermal power unit more stable.

[0096] Analysis of intraday scheduling results:

[0097] The intraday dispatch stage is to divide a day into 96 periods, each of which is 15 minutes. Based on the near-accurate prediction of ultra-short-term wind power, photovoltaic power, and load, the predicted output of wind power and photovoltaic power is used as the intraday dispatch output on the basis of the day-ahead dispatch, and the output of thermal power and solar thermal power in each period is adjusted. CPLEX is also used to solve the intraday rolling dispatch model, and the optimization results are as follows: Figure 6 , 7 As shown. Figure 6It can be seen that the adjustment of the first thermal power unit is 0, while the output of the other three thermal power units is adjusted based on the planned output the day before. During the peak load period, the thermal power units are adjusted upward, and during the low load period, the thermal power units are adjusted downward, leaving more space for wind power and photovoltaic power to be connected to the grid. Figure 7 It can be seen that since the intraday scheduling adopts the latest wind power, photovoltaic and load forecast information of the day to execute the scheduling plan, the intraday scheduling results of the CSP power station are corrected on the basis of the day-ahead scheduling results, so that the scheduling plan can better meet the real-time power balance.

[0098] Comparative analysis of different scheduling strategies:

[0099] In order to better verify the effectiveness of the scheduling strategy proposed in this paper in improving the wind power and photovoltaic power consumption capacity, the embodiment of the present invention compares and analyzes three scheduling modes: Mode 1, only considering the day-ahead optimization scheduling, no longer formulating the intraday scheduling strategy; Mode 2, based on Mode 1, considering the intraday optimization scheduling, and only thermal power units participate in the adjustment during the day; Mode 3, adopting the scheduling strategy of this paper. Table 3 is a comparison of the abandoned wind and abandoned solar power under the three scheduling modes.

[0100] Table 3. Wind and solar curtailment under different dispatch modes

[0101]

[0102] It can be seen intuitively from Table 3 that if only the day-ahead dispatch plan is adopted, a large amount of wind and solar power will be abandoned. Only by using day-ahead and intraday coordinated dispatch can the errors in wind power and photovoltaic power forecasts be eliminated step by step, ensuring the safe and stable operation of the power system while reducing the amount of wind and solar power abandoned.

[0103] The embodiment of the present invention provides a scheduling strategy with photovoltaic and wind power as the main output power sources, thermal power and solar thermal power combined regulation, and establishes a three-stage coordinated scheduling model of the wind power-photovoltaic-solar thermal-thermal power combined power generation system in the day-ahead and day-intraday. In MATLAB, the CPLEX solver is called by YALMIP to solve the model. Through simulation analysis, the following conclusions can be drawn:

[0104] (1) In the day-ahead dispatch, a two-stage optimization approach is adopted to jointly dispatch CSP with wind power and photovoltaic power. During the peak load period, CSP power stations can generate electricity to make up for the insufficient output of wind power and photovoltaic power, thus playing the role of "peak shaving". At the same time, in the second stage, thermal power is used to meet the relatively smooth remaining load, which can reduce the frequent start and stop of thermal power units, make the output of thermal power units more stable, and thus reduce the operating cost of thermal power units.

[0105] (2) In daily scheduling, the latest wind power, photovoltaic, and load power forecast data are used to obtain the optimal scheduling results of thermal power and solar thermal power stations. Compared with the optimization results of the previous day, this maximizes the wind power and photovoltaic acceptance capacity and can better meet the load balance.

[0106] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.

Claims

1. A coordinated dispatching method for wind power, photovoltaic power, solar thermal power and thermal power generation, characterized in that: include: S1. Constraints are established for wind power output, photovoltaic output and solar thermal output respectively. Based on these constraints, the minimum peak-to-valley difference objective function of the residual load is constructed to obtain the residual load value. S2. Satisfying the remaining load value through the thermal power unit, and constructing the minimum operating cost objective function of the thermal power unit, wherein the constraint conditions are constructed for the thermal power output; S3, obtaining the predicted wind power output and photovoltaic power output for multiple scheduling periods within the day; constructing a minimum objective function for the combined regulation cost of thermal power and photovoltaic power based on the predicted wind power output and photovoltaic power output, combined with the photovoltaic power output in step S1 and the thermal power output in step S2; S4. According to the minimum objective function of the combined regulation cost of thermal power and solar thermal power, the solar thermal output and the thermal power output in the multiple scheduling periods within the day are obtained; In step S1, the residual load peak-to-valley difference minimum objective function is expressed as: P l,t =P t -(P w,t +P v,t +P csp,t ) (3) Where f2 represents the peak-to-valley difference function of the remaining load; T represents the dispatch period; P t represents the predicted load at time t; P l,t represents the residual load at time t; In step S2, the minimum operating cost objective function of the thermal power unit is expressed as: F i (P G,i,t )=a i (P G,i,t ) 2 +b i P G,i,t +c i (14) Where f3 represents the operating cost of thermal power units; T represents the dispatching period; N G Indicates the number of thermal power units; P G,i,t represents the dispatching output of the i-th thermal power unit at time t; u i,t represents the start / stop status of the i-th thermal power unit at time t; S i represents the startup cost of the i-th thermal power unit; a i , b i 、c i Both represent the fuel cost coefficient of thermal power units; In step S3, the minimum objective function of the combined regulation cost of thermal power and solar thermal power is expressed as: Among them, K G represents the thermal power regulation cost; K c represents the light and heat regulation cost; P' G,i,t represents the rolling modified dispatch output of the i-th thermal power unit at time t within the day; P' csp,t It indicates the rolling correction dispatch output of solar thermal power at time t within the day; T0 indicates the dispatch period within the day.

2. A coordinated dispatching method for wind power, photovoltaic power, solar thermal power and thermal power combined power generation as claimed in claim 1, characterized in that: In step S1, the constraints for wind power output, photovoltaic output and solar thermal output are respectively established a day ago, specifically including: Wind power output constraint: 0≤P w,t ≤P' w,t (4) Photovoltaic output constraint: 0≤P v,t ≤P' v,t (5) Solar thermal output constraint: P csp,min ≤P csp,t ≤P csp,max (6) Among them, P w,t represents the actual wind power output at time t; P' w,t represents the predicted wind power output at time t; P v,t represents the actual photovoltaic output at time t; P' v,t represents the predicted photovoltaic output at time t; P csp,t represents the actual solar and thermal output at time t; P csp,min represents the minimum light and heat output at time t; P csp,max Indicates the maximum light and heat output at time t.

3. A coordinated dispatching method for wind power, photovoltaic power, solar thermal power and thermal power combined power generation as claimed in claim 1, characterized in that: In step S2, the constraints for the output of the thermal power unit are constructed as follows: Power balance constraints: Output constraints of thermal power units: Thermal power unit climbing constraint: -u i,t R id ≤P G,i,t -P G,i,t-1 ≤u i,t R iu (17) in, represents the minimum output of the i-th thermal power unit; represents the maximum output of the i-th thermal power unit; R id represents the downward ramp rate of the i-th thermal power unit; R iu Represents the upward climbing rate of the i-th thermal power unit.