GIS-based natural disaster comprehensive risk survey method, system and equipment
By using drones and distance sensors combined with GIS platform in the comprehensive risk census of natural disasters, the problem of measuring building heights in the no-fly zone is solved, efficient data collection and display is achieved, work efficiency is improved, and earthquakes are also provided. Refuge location paths provide reference.
Patent Information
- Application Number
- CN202111103703.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-09-22
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2041-09-22
AI Technical Summary
In the comprehensive natural disaster risk census, it is difficult for the existing technology to accurately measure the height data of rectangular buildings without flying over buildings, especially in the case of no-fly zones, which affects work efficiency.
Design a GIS-based method, using the distance sensor at the bottom of the drone for distance measurement, record the distance measurement data at different time points, calculate the building height based on geometric relationships, and display the data on the GIS platform, including the execution module, Data library building module, map display module and optimal path analysis module generate building height distribution map and path map to low building areas.
It has achieved accurate measurement of the height of the rectangular building without flying over the building, improved the work efficiency of the comprehensive risk census of natural disasters, and provided a reference for the path of earthquake shelter.
Smart Images

Figure CN113869690B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to a survey method, and in particular to a GIS-based natural disaster comprehensive risk survey method, system and equipment. Background Art
[0002] Doing a good job in disaster prevention and mitigation is an important foundation for protecting the lives and property of the people. The national comprehensive natural disaster risk survey deployed by the State Council is a major survey of the national conditions and national strength. It provides authoritative data for mastering the current natural disaster risk hidden danger data, enhancing the disaster risk awareness of the whole society, and improving the ability to prevent and control natural disasters.
[0003] Drones are widely used in comprehensive natural disaster risk surveys, especially in disaster-prone body attribute surveys. GIS platform is a geographic information system development platform used to input, store, query, analyze and display geographic data. It can provide multi-user concurrent operation control and transaction processing functions for GIS applications and has been fully applied in many urban departments.
[0004] Currently, there are no-fly zones above some buildings, so it is necessary to design a survey method that allows drones to measure building height data without flying over the buildings. The distribution of building height data can be displayed in the form of a map with the help of a GIS platform, which is of great significance for improving the efficiency of the comprehensive natural disaster risk survey. Summary of the invention
[0005] Therefore, in order to realize the height data investigation and display of the disaster-bearing body of rectangular buildings in the comprehensive natural disaster risk survey work, the present invention designs a GIS-based natural disaster comprehensive risk survey method, system and equipment.
[0006] The technical solution adopted by the present invention is: a natural disaster comprehensive risk survey method based on GIS, characterized by:
[0007] Step 1: A distance sensor is placed on the bottom of the drone. The distance sensor faces downward and the angle between it and the horizontal direction is θ. The drone travels at a speed of v The aircraft flies towards the building at a constant speed, with the flight altitude higher than the target rectangular building. The distance sensor continuously measures and records the distance at time points t0, t1, t2, ..., t i ,t i+1 ,……,t n The distance measurements are L0, L1, L2, ..., L i , L i+1 ,……,L n ;
[0008] Step 2, when L i+1 =L iWhen the end of the distance sensor's ranging line is on the ground and has not yet reached the vertical side of the building, the drone moves at a speed of v Continue to fly at a constant speed.
[0009] Step 3, when L i+1 =L i - v *(t i+1 -t i ) / (cosθ), then from t i At the beginning, the end of the distance sensor's ranging line is located on the vertical side of the building, and the ranging line begins to enter the measurement space area Q. The first ranging line in the measurement space area Q is marked as L first , the corresponding time point is t first ;
[0010] Step 4, when L i+1 ≠L i - v *(t i+1 -t i ) / (cosθ), then from t i+1 At the beginning, the end of the distance sensor's ranging line is no longer located on the vertical side of the building, but begins to be located on the top of the building. The ranging line exceeds the range of the measurement space area Q. The last ranging line in the measurement space area Q is marked as L last , the corresponding time point is t last ;
[0011] Step 5, calculate the height of the building H = v *(t last -t first )*(tanθ);
[0012] Step 6: Repeat the above steps to record the height data of multiple buildings in the survey area and display them in the form of a map in GIS.
[0013] A natural disaster comprehensive risk survey system based on GIS, characterized by:
[0014] It includes execution module, data building module, map display module, optimal path analysis module and map publishing module.
[0015] The execution module is used to calculate the building height, including the following steps:
[0016] (1) A distance sensor is placed on the bottom of the drone. The distance sensor faces downward and the angle between it and the horizontal direction is θ. The drone travels at a long distance at a speed of v The aircraft flies towards the building at a constant speed, with the flight altitude higher than the target rectangular building. The distance sensor continuously measures and records the distance at time points t0, t1, t2, ..., ti ,t i+1 ,……,t n The distance measurements are L0, L1, L2, ..., L i , L i+1 ,……,L n ;
[0017] (2) When L i+1 =L i When , the end of the distance sensor's distance measurement line is on the ground and has not yet reached the vertical side of the building;
[0018] (3) When L i+1 =L i - v *(t i+1 -t i ) / (cosθ), then from t i At the beginning, the end of the distance sensor's ranging line is located on the vertical side of the building, and the ranging line begins to enter the measurement space area Q. The first ranging line in the measurement space area Q is marked as L first , the corresponding time point is t first ;
[0019] (4) When L i+1 ≠L i - v *(t i+1 -t i ) / (cosθ), then from t i+1 At the beginning, the end of the distance sensor's ranging line is no longer located on the vertical side of the building, but begins to be located on the top of the building. The ranging line exceeds the range of the measurement space area Q. The last ranging line in the measurement space area Q is marked as L last , the corresponding time point is t last ;
[0020] (5) Calculate the building height H = v *(t last -t first )*(tanθ).
[0021] The data building module automatically adds the collected height data and geographic location data of multiple buildings into the database.
[0022] The map display module displays the height data of multiple buildings on the map layer.
[0023] The optimal path analysis module is used to mark the areas where low-rise buildings are located and to establish paths leading to these areas. The areas where low-rise buildings are located and the paths are displayed on the path layer.
[0024] The map publishing module is used to produce a building height distribution map and a path map leading to a low-building area as a reference for the path to an earthquake shelter.
[0025] A GIS-based natural disaster comprehensive risk survey device, characterized by:
[0026] It includes a drone and a computer terminal. The drone has a built-in communication module, a drone processor, and a drone memory. A distance sensor facing forward and downward is installed at the bottom of the drone. The angle between the distance sensor and the horizontal direction is θ. The drone processor executes instructions issued by the computer terminal, and the drone memory temporarily stores the distance measurement value and the corresponding time point.
[0027] The computer terminal has a built-in communication module and also includes a computer terminal processor, a computer terminal memory, and a computer program stored in the computer terminal memory and configured to be executed by the computer terminal processor. When the computer terminal processor executes the computer program, it can control and implement the above-mentioned GIS-based comprehensive natural disaster risk survey method and realize the above-mentioned GIS-based comprehensive natural disaster risk survey system.
[0028] The principle of the present invention is that when the end of the distance sensor's distance measurement line is on the ground and has not yet reached the vertical side of the building, the drone moves at a speed of v Flying at a constant speed horizontally, so the distance measured at the next time point is L i+1 The distance L from the previous time point i Equal, that is, L i+1 =L i .
[0029] Once the end of the ranging line reaches the vertical side of the building, the next time point t i+1 Compared with the previous time point t i The displacement between v *(t i+1 -t i ), because the angle between the ranging line and the horizontal direction is θ, then the vertical spacing between the two ranging lines is h=S*(sinθ); the horizontal displacement of the drone S, time point t i The distance measurement L i , time point t i+1 The distance measurement L i+1 , the ends of the two distance measuring lines are connected to form a trapezoid, and the distance measuring L i With range L i+1 parallel.
[0030] From L i+1 The two ends of L i The two vertical lines h divide the trapezoid into three parts: the triangles at the two ends and the rectangle in the middle. Then L i=S*(cosθ)+L i+1 +h*(tanθ), substitute into S= v *(t i+1 -t i )and h=S*(sinθ), we can finally deduce:
[0031] L i = v *(t i+1 -t i )*(cosθ)+L i+1 + v *(t i+1 -t i )*(sinθ)*(tanθ)
[0032] = v *(t i+1 -t i )*[(sinθ) 2 +(cosθ) 2 ] / (cosθ)+L i+1 , substitute (sinθ) 2 +(cosθ) 2 =1,
[0033] L i = v *(t i+1 -t i ) / (cosθ)+L i+1 , that is, L i+1 =L i - v *(t i+1 -t i ) / (cosθ).
[0034] So when L i+1 With L i When the linear relationship in the above formula is presented, it can be determined that the distance measuring line enters the measurement space area Q of the building height. When the linear relationship in the above formula is no longer presented, it is determined that the distance measuring line leaves the measurement space area Q of the building height.
[0035] If the first distance measurement line in the measurement space area Q marked with building height is L first , the corresponding time point is t first ; The last distance measurement line is L last , the corresponding time point is t last , then the height of the building H is a hypotenuse in the trapezoidal measurement space area Q, H = h / (cosθ), substitute into S = v *(t last -t first) and h=S*(sinθ), we finally get H= v *(t last -t first )*(tanθ).
[0036] The GIS-based natural disaster comprehensive risk survey method, system and device of the present invention have the following advantages:
[0037] (1) The application of drones and distance sensors in the survey of data related to building disaster-prone bodies is novel in design;
[0038] (2) The accurate height of the building can be calculated by using the geometric data relationship formed by the distance sensor's distance measurement lines at different time points. This is an ingenious idea;
[0039] (3) Based on the GIS platform, a building height distribution map and a path map leading to low-building areas are produced as a reference for the path to earthquake shelters.
[0040] Therefore, this GIS-based natural disaster comprehensive risk survey method, system and equipment can realize the height data investigation and display of the disaster-prone bodies of rectangular buildings in the natural disaster comprehensive risk survey work.
[0041] Other features and advantages of the present invention will be set forth in the following description or may be learned by practicing the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0042] The drawings are only for the purpose of illustrating particular embodiments and are not to be considered limiting of the present invention. Like reference symbols denote like components throughout the drawings.
[0043] Figure 1 It is a schematic diagram of the UAV assembly structure.
[0044] Figure 2 It is a schematic diagram of the structure in which the distance sensor is installed at the bottom of the drone.
[0045] Figure 3 It is a schematic diagram of the distance sensor structure.
[0046] Figure 4 It is a schematic diagram of the linear law of the distance measurement line length at different time nodes.
[0047] Figure 5 is the time node t i and t i+1 Schematic diagram of the geometric relationship of the ranging line length.
[0048] Figure 6 It is a schematic diagram of the measurement space area Q where the ranging line length is located in a linear pattern.
[0049] Figure 7 is the time node t first and t last Schematic diagram of the geometric relationship of the ranging line length.
[0050] Figure 8 It is a flow chart of the calculation method of building height.
[0051] Numbers in the figure: 1-UAV, 2-distance sensor, 3-rectangular building. DETAILED DESCRIPTION
[0052] The following will further describe in detail a GIS-based natural disaster comprehensive risk survey method, system and equipment of the present invention in conjunction with the accompanying drawings and embodiments. In the direction description, the horizontal forward direction of the drone is forward, and the opposite direction is backward.
[0053] The technical solution adopted by the present invention is as follows: Figure 1 , Figure 2 , Figure 3 , Figure 4 , Figure 5 , Figure 6 , Figure 7 , Figure 8 As shown: A GIS-based comprehensive natural disaster risk survey method, characterized by:
[0054] Step 1: A distance sensor is placed on the bottom of the drone. The distance sensor faces downward and the angle between it and the horizontal direction is θ. The drone travels at a speed of v The aircraft flies towards the building at a constant speed, with the flight altitude higher than the target rectangular building. The distance sensor continuously measures and records the distance at time points t0, t1, t2, ..., t i ,t i+1 ,……,t n The distance measurements are L0, L1, L2, ..., L i , L i+1 ,……,L n ;
[0055] Step 2, when L i+1 =L i When the end of the distance sensor's ranging line is on the ground and has not yet reached the vertical side of the building, the drone moves at a speed of v Continue to fly at a constant speed.
[0056] Step 3, when L i+1 =L i - v *(t i+1 -t i ) / (cosθ), then from t iAt the beginning, the end of the distance sensor's ranging line is located on the vertical side of the building, and the ranging line begins to enter the measurement space area Q. The first ranging line in the measurement space area Q is marked as L first , the corresponding time point is t first ;
[0057] Step 4, when L i+1 ≠L i - v *(t i+1 -t i ) / (cosθ), then from t i+1 At the beginning, the end of the distance sensor's ranging line is no longer located on the vertical side of the building, but begins to be located on the top of the building. The ranging line exceeds the range of the measurement space area Q. The last ranging line in the measurement space area Q is marked as L last , the corresponding time point is t last ;
[0058] Step 5, calculate the height of the building H = v *(t last -t first )*(tanθ);
[0059] Step 6: Repeat the above steps to record the height data of multiple buildings in the survey area and display them in the form of a map in GIS.
[0060] A GIS-based natural disaster comprehensive risk survey system, characterized by:
[0061] It includes execution module, data building module, map display module, optimal path analysis module and map publishing module.
[0062] The execution module is used to calculate the building height, including the following steps:
[0063] (1) A distance sensor is placed on the bottom of the drone. The distance sensor faces downward and the angle between it and the horizontal direction is θ. The drone travels at a long distance at a speed of v The aircraft flies towards the building at a constant speed, with the flight altitude higher than the target rectangular building. The distance sensor continuously measures and records the distance at time points t0, t1, t2, ..., t i ,t i+1 ,……,t n The distance measurements are L0, L1, L2, ..., L i , L i+1 ,……,L n ;
[0064] (2) When L i+1 =L iWhen , the end of the distance sensor's distance measurement line is on the ground and has not yet reached the vertical side of the building;
[0065] (3) When L i+1 =L i - v *(t i+1 -t i ) / (cosθ), then from t i At the beginning, the end of the distance sensor's ranging line is located on the vertical side of the building, and the ranging line begins to enter the measurement space area Q. The first ranging line in the measurement space area Q is marked as L first , the corresponding time point is t first ;
[0066] (4) When L i+1 ≠L i - v *(t i+1 -t i ) / (cosθ), then from t i+1 At the beginning, the end of the distance sensor's ranging line is no longer located on the vertical side of the building, but begins to be located on the top of the building. The ranging line exceeds the range of the measurement space area Q. The last ranging line in the measurement space area Q is marked as L last , the corresponding time point is t last ;
[0067] (5) Calculate the building height H = v *(t last -t first )*(tanθ).
[0068] The data building module automatically adds the collected height data and geographic location data of multiple buildings into the database.
[0069] The map display module displays the height data of multiple buildings on the map layer.
[0070] The optimal path analysis module is used to mark the areas where low-rise buildings are located and to establish paths leading to these areas. The areas where low-rise buildings are located and the paths are displayed on the path layer.
[0071] The map publishing module is used to produce a building height distribution map and a path map leading to a low-building area as a reference for the path to an earthquake shelter.
[0072] A GIS-based natural disaster comprehensive risk survey device, characterized by:
[0073] It includes a drone and a computer terminal. The drone has a built-in communication module, a drone processor, and a drone memory. A distance sensor facing forward and downward is installed at the bottom of the drone. The angle between the distance sensor and the horizontal direction is θ. The drone processor executes instructions issued by the computer terminal, and the drone memory temporarily stores the distance measurement value and the corresponding time point.
[0074] The computer terminal has a built-in communication module and also includes a computer terminal processor, a computer terminal memory, and a computer program stored in the computer terminal memory and configured to be executed by the computer terminal processor. When the computer terminal processor executes the computer program, it can control and implement the above-mentioned GIS-based comprehensive natural disaster risk survey method and realize the above-mentioned GIS-based comprehensive natural disaster risk survey system.
[0075] When the end of the distance sensor's ranging line is on the ground and has not yet reached the vertical side of the building, the drone is moving at a speed of v Flying at a constant speed horizontally, so the distance measured at the next time point is L i+1 The distance L from the previous time point i Equal, that is, L i+1 =L i .
[0076] Once the end of the ranging line reaches the vertical side of the building, the next time point t i+1 Compared with the previous time point t i The displacement between v *(t i+1 -t i ), because the angle between the ranging line and the horizontal direction is θ, then the vertical spacing between the two ranging lines is h=S*(sinθ); the horizontal displacement of the drone S, time point t i The distance measurement L i , time point t i+1 The distance measurement L i+1 , the ends of the two distance measuring lines are connected to form a trapezoid, and the distance measuring L i With range L i+1 parallel.
[0077] From L i+1 The two ends of L i The two vertical lines h divide the trapezoid into three parts: the triangles at the two ends and the rectangle in the middle. Then L i =S*(cosθ)+L i+1 +h*(tanθ), substitute into S= v *(t i+1 -t i )and h=S*(sinθ), we can finally deduce:
[0078] Li = v *(t i+1 -t i )*(cosθ)+L i+1 + v *(t i+1 -t i )*(sinθ)*(tanθ)
[0079] = v *(t i+1 -t i )*[(sinθ) 2 +(cosθ) 2 ] / (cosθ)+L i+1 , substitute (sinθ) 2 +(cosθ) 2 =1,
[0080] L i = v *(t i+1 -t i ) / (cosθ)+L i+1 , that is, L i+1 =L i - v *(t i+1 -t i ) / (cosθ).
[0081] So when L i+1 With L i When the linear relationship in the above formula is presented, it can be determined that the distance measuring line enters the measurement space area Q of the building height. When the linear relationship in the above formula is no longer presented, it is determined that the distance measuring line leaves the measurement space area Q of the building height.
[0082] If the first distance measurement line in the measurement space area Q marked with building height is L first , the corresponding time point is t first ; The last distance measurement line is L last , the corresponding time point is t last , then the height of the building H is a hypotenuse in the trapezoidal measurement space area Q, H = h / (cosθ), substitute into S = v *(t last -t first ) and h=S*(sinθ), we finally get H= v *(t last -t first )*(tanθ).
[0083] In the above description, * represents a multiplication sign and / represents a division sign.
[0084] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that can be easily conceived by any technician familiar with the technical field within the technical scope disclosed by the present invention should be covered within the protection scope of the present invention.
Claims
1. A GIS-based natural disaster comprehensive risk survey method, characterized by: Step 1: A distance sensor is placed on the bottom of the drone. The distance sensor faces downward and the angle between it and the horizontal direction is θ. The drone travels at a speed of v The aircraft flies towards the building at a constant speed, with the flight altitude higher than the target rectangular building. The distance sensor continuously measures and records the distance at time points t0, t1, t2, ..., t i ,t i+1 ,……,t n The distance measurements are L0, L1, L2, ..., L i , L i+1 ,……,L n ; Step 2, when L i+1 =L i When the end of the distance sensor's ranging line is on the ground and has not yet reached the vertical side of the building, the drone moves at a speed of v Continue to fly at a constant speed. Step 3, when L i+1 =L i - v *(t i+1 -t i ) / (cosθ), then from t i At the beginning, the end of the distance sensor's ranging line is located on the vertical side of the building, and the ranging line begins to enter the measurement space area Q. The first ranging line in the measurement space area Q is marked as L first , the corresponding time point is t first ; Step 4, when L i+1 ≠L i - v *(t i+1 -t i ) / (cosθ), then from t i+1 At the beginning, the end of the distance sensor's ranging line is no longer located on the vertical side of the building, but begins to be located on the top of the building. The ranging line exceeds the range of the measurement space area Q. The last ranging line in the measurement space area Q is marked as L last , the corresponding time point is t last ; Step 5, calculate the height of the building H = v *(t last -t first )*(tanθ); Step 6: Repeat the above steps to record the height data of multiple buildings in the survey area and display them in the form of a map in GIS.
2. A GIS-based natural disaster comprehensive risk survey system, characterized by: It includes execution module, data building module, map display module, optimal path analysis module and map publishing module; The execution module is used to calculate the building height, including the following steps: (1) A distance sensor is placed on the bottom of the drone. The distance sensor faces downward and the angle between it and the horizontal direction is θ. The drone travels at a long distance at a speed of v The aircraft flies towards the building at a constant speed, with the flight altitude higher than the target rectangular building. The distance sensor continuously measures and records the distance at time points t0, t1, t2, ..., t i ,t i+1 ,……,t n The distance measurements are L0, L1, L2, ..., L i , L i+1 ,……,L n ; (2) When L i+1 =L i When , the end of the distance sensor's distance measurement line is on the ground and has not yet reached the vertical side of the building; (3) When L i+1 =L i - v *(t i+1 -t i ) / (cosθ), then from t i At the beginning, the end of the distance sensor's ranging line is located on the vertical side of the building, and the ranging line begins to enter the measurement space area Q. The first ranging line in the measurement space area Q is marked as L first , the corresponding time point is t first ; (4) When L i+1 ≠L i - v *(t i+1 -t i ) / (cosθ), then from t i+1 At the beginning, the end of the distance sensor's ranging line is no longer located on the vertical side of the building, but begins to be located on the top of the building. The ranging line exceeds the range of the measurement space area Q. The last ranging line in the measurement space area Q is marked as L last , the corresponding time point is t last ; (5) Calculate the building height H = v *(t last -t first )*(tanθ); The data building module automatically adds the collected height data and geographic location data of multiple buildings into the database; The map display module displays the height data of multiple buildings on the map layer; The optimal path analysis module is used to mark the areas where low-rise buildings are located and establish paths to these areas, and the areas where low-rise buildings are located and the paths are displayed on the path layer; The map publishing module is used to produce a building height distribution map and a path map leading to a low-building area as a reference for the path to an earthquake shelter.
3. A GIS-based natural disaster comprehensive risk survey device, characterized by: It includes a drone and a computer terminal. The drone has a built-in communication module, a drone processor, and a drone memory. A distance sensor facing the front and bottom is installed at the bottom of the drone. The angle between the distance sensor and the horizontal direction is θ. The drone processor executes the instructions issued by the computer terminal. The drone memory temporarily stores the distance measurement value and the corresponding time point. The computer terminal has a built-in communication module and also includes a computer terminal processor, a computer terminal memory, and a computer program stored in the computer terminal memory and configured to be executed by the computer terminal processor. When the computer terminal processor executes the computer program, it can control and implement the GIS-based comprehensive natural disaster risk survey method described in claim 1 and implement the GIS-based comprehensive natural disaster risk survey system described in claim 2.
Citation Information
Patent Citations
Unmanned aerial vehicle-based data acquisition method and system for individual building modeling
CN107514993A
Ship clearance height detection method, system, equipment based on unmanned aerial vehicle, and medium
CN113256702A
Electronic mapping system and method using drones
KR101925366B1
