A reinforcement structure and construction method for horizontal joints of assembled concrete towers of wind turbine generator sets

By using a combined structure of inner-covered steel plate, vertical sliding bolts and filler layers at the horizontal joints of the assembly concrete tower of the wind turbine, the problem of insufficient shear bearing capacity of the tower is solved and the overall bearing capacity of the tower is improved and safety, while simplifying the construction process and reducing costs.

CN113944598BActive Publication Date: 2024-12-03CHONGQING UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202111388080.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-11-22
Publication Date
2024-12-03
Estimated Expiration
2041-11-22

AI Technical Summary

Technical Problem

The horizontal joints of the assembly-type concrete towers of wind turbines are prone to cracking under extreme external loads due to the lack of steel bars. This affects the overall safety of the tower. The existing reinforcement methods cannot effectively improve the shear bearing capacity, and may suppress the vertical direction. Open, thereby affecting the bending bearing capacity of the tower.

Method used

A combined structure of inner-covered steel plate, vertical sliding staple and newly added filling layer is adopted. The horizontal joint is covered with inner-covered steel plate and connected to the tower. The vertical sliding staple is embedded in the inside of the tower section, and high compression blocks are provided on the upper and lower surfaces. The filling layer uses gelled material to wrap the slip studs to enhance shear bearing capacity and reduce the binding force of vertical opening.

Benefits of technology

It significantly improves the shear bearing capacity of the tower, reduces the binding force of vertical opening, enhances the overall bending bearing capacity of the tower, simplifies the construction process, reduces production costs and construction time, and is suitable for a variety of wind farms. application.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113944598B_ABST
    Figure CN113944598B_ABST
Patent Text Reader

Abstract

The present invention discloses a reinforcement structure and construction method for the horizontal joints of the assembled concrete tower of a wind turbine. The reinforcement structure includes an inner steel plate, a vertical sliding bolt and an additional filling layer. The inner steel plate is arranged on the inner side of the assembled concrete tower, one end of the vertical sliding bolt is welded to the inner steel plate, and the other end is embedded in the concrete tower section, and high compression blocks are provided on the upper and lower surfaces to provide vertical deformation. The additional filling layer is cast from a cementitious material, located between the inner steel plate and the assembled concrete tower, and bonded to the inner steel plate, the vertical sliding bolt and the assembled concrete tower. The present invention is simple to construct, can effectively reinforce the horizontal joints of the assembled concrete tower, improve the integrity of the tower, and can significantly improve the shear bearing capacity of the structure without providing a constraint force that inhibits the vertical opening of the horizontal joints.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of wind power generation technology, and particularly relates to a reinforcement structure and construction method for horizontal joints of prefabricated concrete towers of wind turbine units. Background Technology

[0002] In recent years, wind power technology has flourished, and the ever-increasing demand for electricity generation has placed higher demands on the strength and stability of the wind turbine support structure, namely the tower. For ultra-high hubs, steel-concrete hybrid tower structures are commonly used to replace pure steel tower structures, addressing the limitations of pure steel tower structures in terms of processing, transportation, and cost. The steel-concrete hybrid tower structure uses a prefabricated prestressed concrete lower section and a steel upper section, significantly enhancing the lateral stiffness and stability of the support structure while controlling costs. The prefabricated prestressed concrete lower section is prefabricated in multiple segments and assembled on-site. During on-site assembly, multiple vertical segments are connected by grouting at horizontal joints, and prestressed steel strands are used to apply prestress, compressing the segments to form a unified tower.

[0003] Horizontal joints, lacking continuous reinforcement, become the weakest point in the tower structure, prone to cracking and opening under extreme external loads, affecting the overall safety of the tower. When horizontal joints crack, or when the load-bearing capacity requirements of the tower, especially the shear capacity requirements of the horizontal joints, increase due to factors such as unit replacement, reinforcement of the horizontal joints is necessary. Otherwise, further crushing of the concrete tower may lead to the overall collapse of the tower. It is important to note that in previous designs, prestressing was used to compress the segments without generating tensile forces, and the longitudinal reinforcement of each segment was often structurally reinforced, failing to provide sufficient bending capacity. Therefore, in such cases, the opening of the horizontal joints should be allowed to protect the segmental components from bending failure. On the other hand, once the horizontal joints open, the overall structural safety is mainly controlled by the shear capacity of the horizontal joints. Therefore, reinforcement should provide as much shear capacity as possible and reduce the restraining forces inhibiting the opening of the horizontal joints. Therefore, there is an urgent need to develop horizontal joint reinforcement structures and construction methods that have superior reinforcement performance, are easy to construct, and meet the above-mentioned stress requirements. Summary of the Invention

[0004] The purpose of this invention is to provide a reinforcement structure and construction method for the horizontal joints of prefabricated concrete towers of wind turbine units in order to solve existing engineering problems. By reinforcing the horizontal joints with increased load-bearing capacity requirements, the shear bearing capacity of the horizontal joints is enhanced.

[0005] To achieve the above objectives, the present invention provides a reinforcement structure and construction method for the horizontal joint of the prefabricated concrete tower of a wind turbine, which is applied near the horizontal joint of the prefabricated concrete tower. The structure includes an inner steel plate, vertical sliding studs, and an additional filling layer.

[0006] According to a preferred embodiment, the inner steel plate covers the horizontal joint, the upper concrete tower section and the lower concrete tower section along the inner side of the prefabricated concrete tower, and leaves a certain gap between it and the prefabricated concrete tower.

[0007] According to a preferred embodiment, the vertical sliding stud has a rectangular cross-section, with high compression blocks fitted on its upper and lower surfaces; one end of the vertical sliding stud is welded to the inner steel plate, and the other end is embedded inside the upper and lower concrete tower sections.

[0008] According to a preferred embodiment, the additional filling layer fills the gap between the inner steel plate and the prefabricated concrete tower, and wraps the vertical sliding stud.

[0009] The present invention also provides a construction method for reinforcing the horizontal joint of the prefabricated concrete tower of a wind turbine, wherein the reinforcing structure includes any of the preceding claims, and the construction method includes, but is not limited to: fabricating an inner steel plate, welding vertical sliding studs to the inner steel plate, arranging high compression blocks made of low elastic modulus material on the upper and lower surfaces of the vertical sliding studs; installing the inner steel plate; and pouring a new filling layer.

[0010] According to a preferred embodiment, the steps of installing the inner steel plate include: roughening and drilling holes in the upper and lower concrete tower sections and removing slag, with the hole depth not less than half the wall thickness of the upper and lower concrete tower sections and not less than five times the diameter of the vertical sliding stud; applying adhesive to the vertical sliding stud and embedding it into the holes in the upper and lower concrete tower sections, and injecting adhesive into the holes to seal them; fixing the inner steel plate at a predetermined position inside the prefabricated concrete tower, leaving a certain gap between it and the prefabricated concrete tower.

[0011] According to a preferred embodiment, the step of pouring the new filling layer includes: integrally injecting cementitious material into the gap between the inner steel plate and the prefabricated concrete tower cylinder, such as self-compacting concrete, self-leveling high-strength grout, or epoxy resin, to wrap the vertical sliding studs and bond them to the inner steel plate, horizontal joints, upper concrete tower section, and lower concrete tower section. After curing to a certain strength, the pouring of the new filling layer is completed, forming an integral reinforced structure.

[0012] The aforementioned main solution of the present invention and its various further alternative solutions can be freely combined to form multiple solutions, all of which are solutions that can be adopted and are claimed by the present invention; furthermore, the various material selections and basic process selections (each non-conflicting selection) in the present invention can also be freely combined with each other as well as with other selections. Those skilled in the art, after understanding the solution of the present invention, will realize that there are many combinations based on existing technology and common knowledge, all of which are technical solutions to be protected by the present invention, and will not be exhaustively listed here.

[0013] The beneficial effects of this invention are:

[0014] (1) This invention can effectively reinforce horizontal joints. When prefabricated concrete towers are subjected to extreme external loads or after the replacement of high-power units, the horizontal joints may crack and open due to the lack of continuous reinforcement. Continued use may lead to the collapse of the entire wind turbine due to insufficient bearing capacity of the opened section, especially its shear bearing capacity. This invention is based on composite structure technology and uses an inner steel plate, embedded studs, and a poured cementitious material filling layer to support and reinforce the original structure, reduce the load borne by the original structure, and effectively improve the tower's bearing capacity, especially its shear bearing capacity.

[0015] (2) This invention can significantly improve the shear bearing capacity of horizontal joints without providing a significant constraint force to inhibit the vertical opening of horizontal joints. When a horizontal joint cracks and opens under a large external load, the overall safety of the tower is mainly controlled by the shear bearing capacity of the opened horizontal joint section. However, in conventional designs, considering that prestressing compresses each segment of the tower without generating tension, the longitudinal reinforcement of each segment is often structurally reinforced because it is not under tension, which cannot provide sufficient bending bearing capacity for the segment. Therefore, in this case, the horizontal joint should be allowed to open to protect the segment from bending failure. This invention introduces vertical sliding studs with high compression blocks on the upper and lower surfaces, which can provide vertical deformation and limit lateral deformation, thereby greatly reducing the constraint force provided by the reinforcement structure to inhibit the vertical opening of the horizontal joint without affecting its shear bearing capacity.

[0016] (3) The reinforcement structure adopted in this invention is easy to manufacture, has a simple construction method, and has no environmental or site requirements, making it suitable for various wind farm applications. None of the components of this reinforcement structure involve complex processing or construction techniques. Reinforcement can be carried out regardless of whether the original structure's horizontal joints have been damaged, facilitating mass production, manufacturing, and construction. This effectively reduces production costs and construction time, resulting in good economic benefits. Attached Figure Description

[0017] Figure 1 This is a three-dimensional cross-sectional view of the reinforced structure after using the present invention;

[0018] Figure 2This is a sectional view of the elevation after the structure has been reinforced using the present invention;

[0019] Figure 3 This is a sectional elevation view of the structure before the reinforcement using the present invention;

[0020] Figure 4 This is a three-dimensional structural schematic diagram of the vertical sliding stud of the present invention;

[0021] Among them, 1-inner steel plate, 2-vertical sliding stud, 21-high compression block, 3-new filling layer, 4-horizontal joint, 5-upper concrete tower section, 6-lower concrete tower section. Detailed Implementation

[0022] The following specific examples illustrate the implementation of the present invention. Those skilled in the art can easily understand other advantages and effects of the present invention from the content disclosed in this specification. The present invention can also be implemented or applied through other different specific embodiments, and various details in this specification can also be modified or changed based on different viewpoints and applications without departing from the spirit of the present invention. It should be noted that, unless otherwise specified, the following embodiments and features described therein can be combined with each other.

[0023] It should be noted that, in order to make the objectives, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions of the embodiments of the present invention will be clearly and completely described below. Obviously, the described embodiments are some embodiments of the present invention, but not all embodiments.

[0024] Therefore, the following detailed description of embodiments of the present invention is not intended to limit the scope of the claimed invention, but merely to illustrate selected embodiments of the invention. All other embodiments obtained by those skilled in the art based on the embodiments of the present invention without inventive effort are within the scope of protection of the present invention.

[0025] In the description of this invention, it should be noted that the terms "inner", "outer", "inner side", "outer side", etc., indicate the orientation or positional relationship commonly used in the implementation of this invention. They are only for the convenience of describing this invention and simplifying the description, and do not indicate or imply that the component referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on this invention.

[0026] In the description of this invention, it should also be noted that, unless otherwise explicitly specified and limited, the connection definitions such as "arrangement," "installation," "connection," and "implantation" should be interpreted broadly. For example, they can refer to fixed connections, detachable connections, or integral connections; they can refer to direct connections or indirect connections through an intermediate medium; and they can refer to the internal communication between two components. Those skilled in the art can understand the specific meaning of the above terms in this invention based on the specific circumstances.

[0027] Furthermore, it should be noted that, unless otherwise specified, the structures, connections, and positional relationships involved in this invention are all things that a person skilled in the art can know without creative effort based on the prior art.

[0028] Example 1:

[0029] refer to Figures 1 to 4 As shown, this invention discloses a reinforcement structure and construction method for horizontal joints of prefabricated concrete towers for wind turbine units.

[0030] This invention is applied to the reinforcement of the horizontal joint 4 of a prefabricated concrete tower. The structure adopts a composite structure technology. In this embodiment, the components used include an inner steel plate 1, a vertical sliding stud 2, and a new filling layer 3.

[0031] In this embodiment, the cross-sectional shape of the prefabricated concrete tower is circular, and the cross-sectional shape of the inner steel plate 1 is also rolled into a circular shape. The inner steel plate 1 covers the horizontal joint 4, the upper concrete tower section 5, and the lower concrete tower section 6 along the inner side of the prefabricated concrete tower, and leaves a certain gap between it and the prefabricated concrete tower. The height of the inner steel plate 1 can be determined according to the calculated reinforcement range.

[0032] In this embodiment, one end of the vertical sliding stud 2 is welded to the inner steel plate 1, and the other end is embedded inside the upper concrete tower section 5 and the lower concrete tower section 6. The inner steel plate 1 is connected to the prefabricated concrete tower cylinder through the vertical sliding stud 2. The vertical sliding stud 2 has a rectangular cross-section, and high compression blocks 21 are provided on its upper and lower surfaces. The high compression blocks 21 are made of a low elastic modulus material, such as foam plastic, pearl cotton, or rubber.

[0033] In this embodiment, the newly added filling layer 3 fills the gap between the inner steel plate 1 and the prefabricated concrete tower, and can be made of cementing materials such as concrete, grouting material or epoxy resin, and wraps the vertical sliding studs 2.

[0034] This invention also provides a construction method for the above-mentioned reinforced structure, which mainly includes, but is not limited to: fabricating an inner steel plate 1; installing the inner steel plate 1; and pouring the new filling layer 3.

[0035] Specifically, the steps for fabricating the inner steel plate 1 include: rolling the steel plate and splicing it into a ring shape, using butt welds for the splicing, with an outer diameter smaller than the inner diameter of the prefabricated concrete tower. The height of the inner steel plate 1 can be determined according to the reinforcement range, but it should at least completely cover the horizontal joint 4. High-compression blocks 21 are fabricated using low-elasticity materials such as foam plastic, pearl cotton, and rubber. The length and width of the high-compression blocks are consistent with the dimensions of the upper and lower surfaces of the vertical sliding studs 2, and the thickness is determined according to the required vertical deformation. The high-compression blocks 21 are then attached to the upper and lower surfaces of the vertical sliding studs 2, and the vertical sliding studs 2 are welded to the inner steel plate 1.

[0036] Specifically, the steps for installing the inner steel plate 1 include: roughening and drilling holes in the upper concrete tower section 5 and the lower concrete tower section 6, and removing slag. The depth of the holes should be no less than half the wall thickness of the upper concrete tower section 5 and the lower concrete tower section 6, and no less than five times the diameter of the vertical sliding stud 2. A supporting template is then erected inside the prefabricated concrete tower. The vertical sliding stud 2 is applied with adhesive and then embedded into the holes in the upper concrete tower section 5 and the lower concrete tower section 6. Adhesive is then injected into the holes to seal them. The inner steel plate 1 is then fixedly installed at a predetermined position inside the prefabricated concrete tower, leaving a certain gap between it and the prefabricated concrete tower.

[0037] Specifically, the steps for pouring the new filling layer 3 include: sealing the gaps in the prefabricated concrete tower with adhesive, and then using self-compacting concrete, self-leveling high-strength grout, or epoxy resin as cementing materials to fill the gaps between the inner steel plate 1 and the prefabricated concrete tower, forming the new filling layer 5. After the cementing material is poured, it wraps around the vertical sliding studs 2 and bonds them to the inner steel plate 1, the horizontal joint 4, the upper concrete tower section 5, and the lower concrete tower section 6. After curing to a certain strength, the supporting formwork is removed, completing the pouring of the new filling layer 3 and forming an overall reinforced structure.

[0038] If the prefabricated concrete tower is already damaged before reinforcement, it must be repaired first. This involves chiseling away the damaged concrete, inserting steel mesh, using high-strength repair mortar for repair, and pressure grouting to close any existing concrete cracks.

[0039] This invention can effectively reinforce the horizontal joints of prefabricated concrete towers and significantly improve their shear bearing capacity.

[0040] Specifically, this reinforcement structure can significantly improve the shear capacity of the horizontal joints without providing a significant constraint force to inhibit the vertical opening of the horizontal joints. The shear mechanism and shear capacity calculation model of the prefabricated concrete tower differ significantly before and after the horizontal joint 4 cracks and opens. After the horizontal joint 4 opens, the shear capacity changes from being controlled by the Bredt torsional shear flow of the closed section to being controlled by the Saint Venant torque of the cracked section, resulting in a significant reduction in shear capacity. Therefore, before the horizontal joint 4 cracks and opens, the structural safety of the prefabricated concrete tower is controlled by the compressive bearing capacity of the concrete; after the horizontal joint 4 cracks and opens, the structural safety is controlled by the shear capacity of the horizontal joint 4, and at this point, it is extremely difficult to meet the shear capacity requirements. If the prestressing of the prestressed steel strands is increased to prevent the horizontal joint 4 from opening, it is easy to cause insufficient compressive bearing capacity and fatigue strength of the concrete. If the horizontal joint 4 is reinforced to prevent cracking and opening, the precast tower sections may fail due to insufficient bending capacity. This is because in conventional designs, preload is used to compress the tower sections without generating tension. Since the sections are not under tension, their longitudinal reinforcement is often structurally reinforced, which cannot provide sufficient bending capacity. Therefore, if the preload fails to tightly compress the sections, the reinforcement structure should allow the horizontal joint 4 to open to protect the sections from bending failure, while also providing sufficient shear capacity to prevent tower failure. This invention introduces vertical sliding studs 2 with high compression blocks 21 on the upper and lower surfaces. The high compression blocks 21 are made of a low elastic modulus material. When the horizontal joint 4 tends to crack and open, the high compression blocks 21 deform accordingly and drive the vertical sliding studs 2 to slide relative to the original structure as the horizontal joint 4 opens, thus providing vertical deformation. Since the two surfaces of the vertical sliding stud 2 in the horizontal direction are not equipped with high compression blocks 21, the displacement and deformation in the horizontal direction are constrained. The inner steel plate 1, the vertical sliding stud 2, and the newly added filling layer 3 can all provide shear and torsional bearing capacity in the horizontal direction, thereby effectively reducing the load borne by the original structure, enhancing the overall shear and torsional bearing capacity of the tower, and greatly reducing the constraint force provided by the reinforcement structure to inhibit the vertical opening of the horizontal joint.

[0041] Furthermore, none of the components of this reinforced structure involve complex processing and construction techniques, and there are no environmental or site requirements. It is suitable for various wind farm applications, and is easy to mass-produce, manufacture, and construct, thereby effectively reducing production costs and construction time, resulting in good economic benefits and promoting its widespread adoption.

[0042] The foregoing basic examples and their further alternative examples of the present invention can be freely combined to form multiple embodiments, all of which are embodiments that can be adopted and are claimed by the present invention. In the present invention, each alternative example can be arbitrarily combined with any other basic example and alternative example. Those skilled in the art will recognize numerous combinations.

[0043] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, and improvements made within the spirit and principles of the present invention should be included within the protection scope of the present invention.

Claims

1. A construction method for reinforcing a horizontal joint of an assembled concrete tower of a wind turbine generator system, wherein the reinforcing structure is applied near a horizontal joint (4) in an assembled concrete tower, and comprises an inner steel plate (1), a vertical sliding bolt (2), and a newly added filling layer (3); the inner steel plate covers the horizontal joint (4), an upper concrete tower section (5), and a lower concrete tower section (6) along the inner side of the assembled concrete tower; one end of the vertical sliding bolt (2) is welded to the inner steel plate (1), and the other end is embedded in the upper concrete tower section (5) and the lower concrete tower section (6); the newly added filling layer (3) is filled in the gap between the inner steel plate (1) and the assembled concrete tower, and wraps the vertical sliding bolt (2); The construction methods of the reinforcement structure include but are not limited to: The inner steel plate (1) is manufactured, and a vertical sliding bolt (2) is welded on the inner steel plate (1), wherein the cross section of the vertical sliding bolt (2) is set to be rectangular, and high compression blocks (21) made of a low elastic modulus material are arranged on the upper surface and the lower surface of the vertical sliding bolt (2); The inner steel plate (1) is installed, and the upper concrete tower section (5) and the lower concrete tower section (6) are roughened, drilled, and scum is removed, wherein the depth of the hole is not less than half the wall thickness of the upper concrete tower section (5) and the lower concrete tower section (6) and not less than five times the diameter of the vertical sliding bolt (2); the vertical sliding bolt (2) is coated with adhesive and then embedded into the holes of the upper concrete tower section (5) and the lower concrete tower section (6), and the adhesive is poured into the hole to seal the hole; the inner steel plate (1) is fixed at a preset position on the inner side of the assembled concrete tower tube, and a certain gap is left between the inner steel plate (1) and the assembled concrete tower tube; The newly added filling layer (3) is cast, and the cementitious material is integrally poured into the gap between the inner steel plate (1) and the assembled concrete tower tube, wrapping the vertical sliding bolts (2) and bonding them to the inner steel plate (1), the horizontal joint (4), the upper concrete tower section (5) and the lower concrete tower section (6). After curing to a certain strength, the newly added filling layer (3) is cast and an overall reinforced structure is formed.