A technical method for evaluating the cleaning effect of general industrial solid waste
Through scientific logical relationships and technical means, the identification, location determination, peeling and effect evaluation of general industrial solid waste in polluted plots was solved, and the problem of incomplete or excessive cleaning in polluted plots was achieved, and accurate assessment and reduction were achieved cost effect.
Patent Information
- Application Number
- CN202111220811.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-10-20
- Publication Date
- 2024-11-15
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing technology lacks effective methods to evaluate and deal with general industrial solid waste cleaning effects in contaminated plots, resulting in unnecessary expenditure and disposal loads, especially the problem of excessive sentencing when handling environmental pollution cases.
By designing scientific logical relationships, collecting and analyzing samples, combining expert analysis, identifying, determining, peeling and evaluation of general industrial solid waste in steps, drilling and geophysical exploration with a grid density of no more than 40m×40m is used. Screening technology and RTK measurement ensure that the cleaning effect meets the standard.
Achieve accurate assessment of the cleaning effect of general industrial solid waste in contaminated plots, reduce costs, reduce unnecessary expenditure and disposal load, and is suitable for a wide range of contaminated plots, especially for formal or informal landfills and Retired site of industrial enterprises.
Smart Images

Figure GHA0000006602200000041 
Figure GHA0000006602200000042
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of risk control and restoration of polluted land, and in particular to a technical method for evaluating the cleaning effect of general industrial solid waste that requires ex-situ cleaning and disposal. Background Art
[0002] There is no effective implementation method for the cleanup of general industrial solid waste, and the demand for the cleanup of general industrial solid waste is far greater than that of hazardous waste.
[0003] At present, there is an urgent need to form a set of guiding technical methods for evaluating the effectiveness of general industrial solid waste cleaning, which can accurately identify the amount of solid waste cleaning and significantly reduce unnecessary government fiscal expenditures. Summary of the invention
[0004] The present invention is mainly aimed at the large number of polluted plots in China that need to dispose of general industrial solid waste in situ, the unnecessary expenses and high disposal load caused by incomplete or excessive waste cleaning, and especially the excessive sentencing in handling environmental pollution cases. A technical method for evaluating the effect of general industrial solid waste cleaning is provided.
[0005] This technical method designs scientific logical relationships, reasonably arranges points and collects samples for testing and analysis, and comprehensively determines the cleaning effect of general industrial solid waste through expert judgment and result analysis. This technical method has clear ideas, accurate problem identification, low cost, wide application range, and easy promotion and implementation. It is fully suitable for solving the problem of ex situ cleaning of general industrial solid waste in polluted areas.
[0006] To achieve the above purpose, the technical solution provided by the present invention is:
[0007] A technical method for evaluating the effect of general industrial solid waste cleaning includes the following steps:
[0008] (1) Identification of general industrial solid waste: Collect typical solid waste samples by category, with no less than 5 samples collected from each category, and clarify their property classification, characteristic pollutants and their concentration levels;
[0009] (2) Determine the location of solid waste: Preliminarily determine the coordinates of the main burial depth center and inflection point of solid waste, and conduct drilling at a grid density of no more than 40m×40m, supplemented by geophysical survey, and use them as control points;
[0010] (3) Stripping from the original soil: After the main body of solid waste is cleaned up, the solid waste in the mixed layer at the interface with the original soil should be stripped by screening;
[0011] (4) Determine the cleaning status: After the solid waste is basically cleaned up, experts will use the method of determining the soil development type and compare the elevations of the control points one by one to determine whether the cleaning has reached the original soil layer;
[0012] (5) Evaluate the cleaning effect: Collect and analyze samples from the original soil surface to evaluate the cleaning effect; divide the interface into several working units of equal area according to its characteristics and size; collect several surface soil samples evenly distributed in each working unit to prepare a mixed sample. If the concentration level of characteristic pollutants exceeds the standard limit of hazardous waste concentration, continue cleaning until the standard is met.
[0013] In step (1), the general process of industrial solid waste identification is:
[0014] 1) Conduct source tracing analysis to determine the sources of different types of solid waste and their production processes;
[0015] 2) Determine the solid waste classification according to the General Rules for Solid Waste Identification Standards;
[0016] 3) Compare the solid waste types in the National Hazardous Waste List, or exclude them from being hazardous wastes based on the concentration of toxic pollution indicators in the Hazardous Waste Identification Standards;
[0017] 4) Collect different types of solid waste samples in accordance with the "Technical Specifications for Sampling and Preparation of Industrial Solid Waste", conduct sample testing and analysis according to the methods specified in the "Pollution Control Standards for General Industrial Solid Waste Storage and Disposal Sites", determine whether the solid waste belongs to Class I or Class II general industrial solid waste, and identify the characteristic pollutants.
[0018] In step (2), the investigation process for preliminarily determining the coordinates of the main burial depth center and inflection point of solid waste is as follows:
[0019] 1) Drill core sampling is carried out with a grid density of no more than 40m×40m, supplemented by geophysical exploration technology, to preliminarily determine the main burial depth center and inflection point coordinates of solid waste, and determine the absolute coordinates; in addition, combined with information such as the geographical location and hydrogeological conditions of the plot, determine whether the solid waste should be disposed of by in-situ risk control or ex-situ cleaning;
[0020] 2) When using the ex-situ cleaning disposal method, the main burial depth center and inflection point coordinates shall be used as control points for general industrial solid waste excavation.
[0021] In step (3), after the solid waste is cleaned up, the solid waste in the mixed layer bordering the original soil should be separated by screening. The implementation process is as follows:
[0022] 1) Experts on-site assessment determined that the waste had been cleaned to the mixed layer of solid waste and soil;
[0023] 2) The thickness of the mixed layer should generally be controlled within 1m. This layer can be screened on-site by manual or small mechanical equipment, or screened by large equipment after ex-situ cleaning. The stripped solid waste is disposed of together with the main body.
[0024] After the solid waste is basically cleaned up in step (4), the implementation process of judging whether the solid waste has been cleaned up to the original soil layer is as follows:
[0025] 1) Comparing the collected geological data, experts determined and determined the characteristics of the original soil at the cleaning interface;
[0026] 2) Through RTK measurement, compare the elevation of the area represented by the burial depth center and the inflection point coordinates one by one to see if they have reached the elevation requirements of the control point.
[0027] In step (5), the process of collecting and testing samples from the original soil surface and evaluating the cleaning effect is as follows:
[0028] 1) Divide the interface into several working units of equal area according to its characteristics and size. The unit area should not exceed 100m 2 ;
[0029] 2) When testing and analyzing according to the solid waste method, if the concentration of characteristic pollutants in the collected samples exceeds the standard limit for hazardous waste, continue to clean up until the standard is met.
[0030] Furthermore, in step (5), 9 surface soil samples are evenly distributed and collected in each working unit to prepare a mixed sample.
[0031] Furthermore, in step (5), samples for determining volatile organic compounds need to be sampled separately.
[0032] Compared with the prior art, the present invention has the following beneficial effects:
[0033] The technical method of the present invention makes up for the current situation of the lack of a cleaning effect evaluation system for general industrial solid waste, and fully solves the unnecessary expenses and high disposal load caused by incomplete or excessive cleaning of general industrial solid waste in polluted plots, especially the excessive sentencing in handling environmental pollution cases. In addition, the method has clear ideas, accurate problem identification, low cost, can be fully promoted, and is fully applicable to formal or informal landfills, industrial enterprise decommissioning sites, and other polluted plots that currently involve a large number of general industrial solid waste ex situ cleaning. DETAILED DESCRIPTION
[0034] The above contents of the present invention are further described in detail below in the form of embodiments, but this should not be understood as the scope of the above subject matter of the present invention being limited to the following embodiments, and all technologies realized based on the above contents of the present invention belong to the scope of the present invention.
[0035] Example
[0036] The implementation process of this embodiment is in a steel slag landfill site in Maanshan City, Anhui Province. The land covers an area of about 27129m 2 Due to historical reasons, a large amount of industrial solid waste was landfilled. Before remediation, the catchment area in the site was green, with white sediment clearly visible at the bottom, the vegetation was severely damaged, and there were potential environmental risks.
[0037] (1) Investigation of properties of solid waste in informal landfills:
[0038] ① Conduct source tracing analysis to determine that the industrial solid waste landfilled is steel slag produced during the steel smelting process. The relevant environmental impact assessment documents characterize it as general industrial solid waste;
[0039] ② Conduct on-site investigation and sampling. As the source of solid waste is relatively clear and its nature is single, 30 solid waste samples were collected. According to expert judgment and preliminary screening results, pH value, total zinc, total copper, total chromium, total cadmium, total arsenic, total manganese, total vanadium, fluoride, volatile phenol, phenol and dibutyl phthalate were selected as the main pollutant control indicators. According to the analysis of the test results, the main control indicator is pH, which is between 11.92 and 12.36, belonging to Class II general industrial solid waste, and its characteristic pollutant indicator is heavy metal vanadium, which is between 155 and 1290 mg / kg.
[0040] (2) Preliminarily determine the coordinates of the main burial depth center and inflection point of solid waste, conduct drilling at a grid density of no more than 40m×40m, supplemented by geophysical survey, and use them as control points:
[0041] ① Core sampling was carried out at a 20m×20m distribution point, supplemented by geophysical exploration technology. It was preliminarily determined that the solid waste layer is basically distributed throughout the site. On the whole, the southern part of the site has an NS distribution feature, and the northern part of the site has a NE distribution feature. The bottom surface burial depth in the south is slightly smaller than that in the north. The maximum bottom surface burial depth is located in the north-central position, with a burial depth of about 7.2m, and the minimum bottom surface is located at the southernmost position of the site, with a burial depth of about 1.0m; the average bottom surface burial depth is about 4-5m. Through drilling cataloging data and geophysical exploration data, the total stock of solid waste in the survey area is calculated to be about 64029.3m 3 .
[0042] According to the hydrogeological conditions of the plot, ① layer of miscellaneous fill (Q ml): Grayish brown, gray, wet, loose state. Mainly composed of silty clay; ② Layer silty clay (Q4 al ): Gray-brown, yellow-brown, wet, plastic state. See black oxide spots, banded gray clay; ③ layer of silty clay (Q4 l ): Gray, plastic state, partly silty clay. ④ Layer silty clay (Q3 al ): Brownish yellow, yellowish brown, slightly wet, hard plastic state. Occasionally black oxide spots, iron-manganese nodules, and lumpy gray-white clay.
[0043] Table 1 Statistics of site stratum thickness, layer bottom burial depth and elevation
[0044]
[0045] The double-ring method was used to conduct infiltration experiments to obtain the vertical infiltration coefficient of the vadose zone. According to Darcy's law K = QL / F (Hk + Z + L) ≈ Q / F = V, it was found that the permeability coefficient of the vadose zone in the site and the surrounding area was between 1.14×10 -4 ~9.85×10 -5 cm / s, with poor permeability; the mixed permeability coefficient of the porous phreatic aquifer is 1.09×10 -4 cm / s, weak water-richness, poor permeability, and weak permeability. The mixed permeability coefficient of the submerged micro-confined water aquifer is 8.40×10 -5 cm / s, weak water-rich, poor permeability, and weak permeability. This plot of land cannot meet the requirements of Class II general industrial solid waste storage and disposal sites. -7 cm / s anti-seepage coefficient and other risk control requirements.
[0046] In addition, according to the planning of this plot of land, it will be used to build a park green space (a type of construction land). In summary, it is determined that the solid waste will be disposed of by ex situ cleaning.
[0047] ②The coordinates of the main burial depth center and control points are as follows:
[0048] Table 2 Solid waste layer bottom elevation and elevation control point data (National 2000 coordinate system)
[0049]
[0050] (3) After the main body of solid waste is cleaned up, the solid waste in the mixed layer at the interface with the original soil should be removed by screening. The thickness of this layer should generally be controlled within 1m:
[0051] ① Experts on-site assessment determined that the solid waste and soil mixed layer had been cleaned up. The steel slag was in the form of grayish white powder, scattered and highly mixed, and the silty clay was grayish brown;
[0052] ② As powdered industrial solid waste is difficult to screen, a small excavator is used to strip and clean it. The cleaning thickness is about 0.5m. The stripped solid waste is stored and disposed of together with the main body.
[0053] (4) After the solid waste is basically cleaned up, experts use the method of determining the soil development type and compare the elevations of the control points one by one to determine whether the soil has been cleaned up to the original soil layer:
[0054] ① Experts determined that the cleaning interface was silty clay, gray-brown, gray, wet and loose, which was consistent with the geological survey results;
[0055] ② Through RTK measurement, the coordinates of the buried depth center and inflection point were compared one by one, and all 18 control points met the bottom elevation requirements.
[0056] (5) Collect and analyze samples from the original soil surface to evaluate the cleaning effect:
[0057] ①The unit area should not exceed 100m 2 , a total of 272 surface mixed samples were collected to test the control indicators pH value and heavy metal vanadium;
[0058] ②After testing, the pH value of 272 surface mixed samples was between 7.62 and 10.13, and the heavy metal vanadium was between 0 and 54 mg / kg. The concentration levels did not exceed the standard limit of hazardous waste with a pH value greater than or equal to 12.5 or a vanadium content greater than or equal to 3%, which can meet the control requirements of Class I construction land in the "Soil Environmental Quality Construction Land Soil Pollution Risk Control Standard (Trial)" (GB36600-2018). In addition, the data of this batch can be used as one of the bases for conducting a later soil pollution status survey.
[0059] In summary, the general industrial solid waste within the site can be deemed to have achieved the cleaning effect.
[0060] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any form. Any technician familiar with the profession, without departing from the scope of the technical solution of the present invention, according to the technical essence of the present invention, any simple modification, equivalent replacement and improvement made to the above embodiment still falls within the protection scope of the technical solution of the present invention.
Claims
1. A technical method for evaluating the cleaning effect of general industrial solid waste, characterized by: The steps include: (1) Identification of general industrial solid waste: Collect typical solid waste samples by category, with no less than 5 samples collected from each category, and clarify their property classification, characteristic pollutants and their concentration levels; (2) Determine the location of solid waste: Preliminarily determine the coordinates of the main burial depth center and inflection point of solid waste, conduct drilling at a grid density of no more than 40 m × 40 m, supplemented by geophysical survey, and use them as control points; (3) Separation from the original soil: After the main body of solid waste is cleaned up, the solid waste in the mixed layer at the interface with the original soil should be separated by screening; (4) Determine the cleaning status: After the solid waste is basically cleaned up, experts will use the method of determining the soil development type and compare the elevations of the control points one by one to determine whether the cleaning has reached the original soil layer; (5) Evaluation of the cleaning effect: Collect and test samples from the original soil surface to evaluate the cleaning effect; divide the interface into several work units of equal area according to its characteristics and size; collect several surface soil samples evenly distributed in each work unit to prepare a mixed sample; if the concentration level of characteristic pollutants exceeds the concentration standard limit of hazardous waste, continue cleaning until the standard is met; In step (2), the investigation process for preliminarily determining the coordinates of the main burial depth center and inflection point of solid waste is as follows: 1) Drill core sampling is carried out with a grid density of no more than 40 m × 40 m, supplemented by geophysical exploration technology, to preliminarily determine the main burial depth center and inflection point coordinates of solid waste, and determine the absolute coordinates; in addition, combined with the geographical location and hydrogeological conditions of the plot, determine whether the solid waste should be disposed of by in-situ risk control or ex-situ cleaning; 2) When using the ex situ cleaning disposal method, the main burial depth center and inflection point coordinates are used as control points for general industrial solid waste excavation; After the solid waste is basically cleaned up in step (4), the implementation process of determining whether the solid waste has been cleaned up to the original soil layer is as follows: 1) By comparing the collected geological data, experts determined and determined the characteristics of the original soil at the cleaning interface; 2) Through RTK measurement, compare the elevation of the area represented by the burial depth center and the inflection point coordinates one by one to see if they have reached the elevation requirements of the control point; In step (5), the process of collecting and testing samples from the original soil surface and evaluating the cleaning effect is as follows: 1) Divide the interface into several working units of equal area according to its characteristics and size. The unit area should not exceed 100m 2 ; 2) When testing and analyzing according to the solid waste method, if the concentration of characteristic pollutants in the collected samples exceeds the standard limit for hazardous waste, continue to clean up until the standard is met.
2. The technical method for evaluating the cleaning effect of general industrial solid waste according to claim 1 is characterized by: In step (1), the general process of industrial solid waste identification is: 1) Conduct source tracing analysis to determine the sources of different types of solid waste and their production processes; 2) Determine the solid waste classification according to the General Rules for Solid Waste Identification Standards; 3) Compare the solid waste types in the National Hazardous Waste List, or exclude them from being hazardous wastes based on the concentration of toxic pollution indicators in the Hazardous Waste Identification Standards; 4) Collect different types of solid waste samples in accordance with the "Technical Specifications for Sampling and Preparation of Industrial Solid Waste", conduct sample testing and analysis according to the methods specified in the "Pollution Control Standards for General Industrial Solid Waste Storage and Disposal Sites", determine whether the solid waste belongs to Class I or Class II general industrial solid waste, and identify the characteristic pollutants.
3. The technical method for evaluating the cleaning effect of general industrial solid waste according to claim 1 is characterized by: In step (3), after the solid waste is cleaned up, the solid waste in the mixed layer at the interface with the original soil should be separated by screening in the following process: 1) Experts on-site assessment determined that the waste had been cleaned to the mixed layer of solid waste and soil; 2) The thickness of the mixed layer should generally be controlled within 1 m. This layer can be screened on-site by manual or small mechanical equipment, or screened by large equipment after ex-situ cleaning. The stripped solid waste is disposed of together with the main body.
4. The technical method for evaluating the cleaning effect of general industrial solid waste according to claim 1 is characterized by: In the step (5), 9 surface soil samples are evenly distributed in each working unit to prepare a mixed sample.
5. The technical method for evaluating the cleaning effect of general industrial solid waste according to claim 1 is characterized by: In the step (5), samples for determining the volatile organic compound items need to be sampled separately.