A method for managing goaf areas in multi-layer inclined coal seams
Through ground directional drilling technology and multi-layer grouting and filling, the problems of large drilling volume and low grouting efficiency in the treatment of multi-layer sharply inclined coal seam goafs have been solved, fast and safe coal seam goaf treatment has been achieved, and geological Disaster risk and project costs.
Patent Information
- Application Number
- CN202111246347.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-10-26
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2041-10-26
AI Technical Summary
The existing technology has the problems of large drilling volume, large construction site occupation, low drilling and grouting efficiency, and high project cost in the treatment of multi-layer sharply inclined coal seam goafs, and it is difficult to meet the requirements of rapid treatment.
Ground directional drilling technology is used to arrange multiple boreholes along the direction of the inclined coal seam. Each borehole includes a main drilling hole and a branch hole. Inert filler, cement fly ash slurry material or composite quick-setting grout material is used for grouting. The fluid connection between the main drilling hole and the branch hole enables rapid filling and stable pipe fixation, reducing the construction site and engineering workload.
It achieves the treatment of multi-layer inclined coal seam goafs with small drilling volume, small construction site area, high drilling and grouting efficiency, and low engineering cost, reduces the risk of geological disasters, improves the treatment efficiency and filling rate, and is suitable for Multi-layer inclined coal seam goaf in the southwest mountainous area.
Smart Images

Figure CN114017104B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of coal seam goaf management, and more specifically to a multi-layer inclined coal seam goaf management method. Background Art
[0002] Multi-layer steeply inclined coal seam goafs can easily induce severe deformation of the overlying rock strata and the surface, causing uneven ground settlement and even causing collapse pits and settlement troughs on the ground. Surface deformation not only changes the original geomorphic environment, but also easily causes mining geological disasters, seriously threatening the lives and property of local residents. Large-scale steeply inclined coal seam goafs are widely distributed in southwest my country. In recent years, the geological disasters caused by steeply inclined coal seam goafs have attracted widespread attention. Therefore, it is very important to develop new inclined multi-layer goaf management technologies suitable for the southwestern mountainous areas.
[0003] At present, the conventional method of goaf treatment often adopts the ground vertical hole scheme, which has a large drilling workload and unnecessary treatment area, so the project cost is extremely high. At the same time, due to the complex terrain of the western mountainous area, it is difficult to move the drilling rig, and the temporary land use area of the vertical drilling construction site is large, and the land acquisition coordination problem is not easy to solve. The conventional ground vertical hole goaf treatment scheme has low drilling and grouting efficiency and cannot meet the requirements of rapid treatment of multi-layer inclined coal seam goaf. Summary of the invention
[0004] To this end, the technical problem to be solved by the present invention is to provide a method for managing multi-layer inclined coal seam goaf areas, which has a small drilling workload, a small construction site area, does not require frequent movement of the drilling rig, has high drilling and grouting efficiency, and has a low engineering cost, so as to meet the requirements for rapid management of multi-layer inclined coal seam goaf areas.
[0005] In order to solve the above technical problems, the present invention provides the following technical solutions:
[0006] A method for treating goaf areas in multi-layer inclined coal seams comprises the following steps:
[0007] Step A: Exploring the goaf area of the inclined coal seam and determining the scope of goaf management;
[0008] Step B: Arranging at least one row of drill holes on the ground within the goaf treatment range, wherein two or more rows of drill holes are arranged along the direction of the inclined coal seam; each row of drill holes includes two or more grouting holes, wherein the two or more grouting holes are arranged along the inclination of the inclined coal seam; the grouting holes include main drilling holes and branch holes, wherein the main drilling holes are in fluid communication with the branch holes;
[0009] Step C: preparing grouting materials, wherein the grouting materials are one or a combination of two or more of inert fillers, cement fly ash slurry or composite quick-setting slurry;
[0010] Step D: Drilling and grouting coordination: Drilling operations are performed according to the arranged boreholes, and a geological casing is lowered after the main borehole is drilled; when the branch hole is drilled to the goaf of the first layer of the inclined coal seam, the drilling operation is stopped and grouting is performed; after the grouting of the goaf of the first layer of the inclined coal seam is completed, and after the grouting material solidifies to form a filling body, drilling continues to pass through the filling body to allow the branch hole to enter the goaf of the next layer of the inclined coal seam, and grouting is performed; the drilling and grouting operations are repeated until the grouting of the goaf of the last layer of the inclined coal seam is completed.
[0011] In the above-mentioned multi-layer inclined coal seam goaf management method, one grouting hole includes one main drill hole and 2 to 4 branch holes, and one main drill hole is fluid-connected with 2 to 4 branch holes through branch hole inclination points respectively; the main drill hole is the casing section of the grouting hole, the branch hole is the branch hole grouting section of the grouting hole, and the branch hole grouting section is a bare hole section; the spacing between two adjacent branch hole inclination points is 30 to 100 m.
[0012] In the above-mentioned multi-layer inclined coal seam goaf management method, the opening of the branch hole in each inclined coal seam goaf is oriented perpendicular to the original coal seam surface of the inclined coal seam goaf; the branch hole passes through the interval stratum between two adjacent layers of the inclined coal seam goaf, from the first layer of the inclined coal seam goaf to the last layer of the inclined coal seam goaf; the aperture of the branch hole is Φ100mm~Φ160mm, and the distance between two adjacent branch holes starting from the same branch hole inclination point in the inclined coal seam goaf is 20~50m; the drilling target point of the branch hole is located at 30~60m above the upper wall of the first layer of the inclined coal seam goaf, and the terminal hole of the branch hole is located at 5~10m from the bottom plate of the last layer of the inclined coal seam goaf.
[0013] In the above-mentioned multi-layer inclined coal seam goaf management method, the casing section includes a straight hole section and a directional inclined section, the length of the straight hole section is greater than or equal to 15m; the terminal hole of the directional inclined section is located 50 to 60m above the goaf of the first layer of the inclined coal seam; the aperture of the casing section is Φ200 to Φ350mm; the diameter of the geological casing inserted into the casing section is Φ168 to Φ250mm.
[0014] In the above-mentioned multi-layer inclined coal seam goaf treatment method, the straight hole section adopts vertical drilling or inclined drilling, drills to a predetermined position, and lowers the geological casing; the directional beveling section adopts a downhole inclinometer and a screw drill to control the drilling trajectory, and the deviation of the drilling trajectory is controlled within a range of less than or equal to 0.5%. After the directional beveling section is drilled to the predetermined position, the geological casing is lowered; the geological casing lowered by the straight hole section and the geological casing lowered by the directional beveling section are both fixed with single-liquid cement slurry with a water-cement ratio of 0.75:1 as the pipe fixing material, and the solidification time of the pipe fixing material is greater than or equal to 48 hours.
[0015] In the above-mentioned multi-layer inclined coal seam goaf treatment method, the inert filling material is composed of part A and part B, the part A is composed of one or a combination of two or more of sandstone, loess, gangue powder or solid waste materials, the solid waste material is fly ash and / or tailings, and the particle size of part A is 0.75-25 mm; the part B is water or mud, and the mass ratio of water to clay in the mud is 1:0.2-1:0.5; the mass ratio of part A to part B is 3:4-3:7
[0016] In the above-mentioned multi-layer inclined coal seam goaf treatment method, the cement fly ash slurry is composed of water and powder, and the mass ratio of water to powder is 0.6-1.2:1; the powder is composed of fly ash, cement and composite additives, and the mass ratio of fly ash to cement is 5:1-10:1, the amount of the composite additive is 0.3-0.5wt% of the mass of cement, and the composite additive is composed of salt, triethanolamine and water glass A, the amount of salt is 0.3-0.5wt% of the mass of water glass A, and the amount of triethanolamine is 0.01-0.03wt% of the mass of water glass A; the modulus of water glass A is 2.6-3.8, and the concentration of water glass A is 36-42Be'.
[0017] In the above-mentioned multi-layer inclined coal seam goaf treatment method, the composite quick-setting slurry is composed of water, cement, modified admixture and accelerator; the mass ratio of water to cement is 1:1; the modified admixture is silica powder, the particle size of the silica powder is 1 to 50 um, and the amount of the modified admixture is 3 to 5 wt% of the cement mass; the accelerator is water glass B, the modulus of the water glass B is 2.6 to 3.8, the concentration of the water glass B is 36 to 42 Be', and the amount of the accelerator is 3 to 5 wt% of the cement mass.
[0018] In the above-mentioned multi-layer inclined coal seam goaf treatment method, in step D, during the grouting process, when the grouting pressure is 0 to 1.0 times the hydrostatic pressure, the cement fly ash slurry material with a water to powder mass ratio of 0.6 to 0.8 is selected as the grouting material; when the grouting pressure is 1.0 to 1.5 times the hydrostatic pressure, the cement fly ash slurry material with a water to powder mass ratio of 0.8 to 1.2 is selected as the grouting material;
[0019] If the grouting pressure increasing speed is less than or equal to 0.1MPa / h, the inert filling material is used for filling twice or more, and the filling amount of the inert filling material for a single time is 2m3~5m3, until the grouting pressure increasing speed reaches 0.1MPa / h, the cement fly ash slurry is replaced to continue grouting, and when the grouting pressure is 1.5 times the hydrostatic pressure, the grouting material is replaced with the composite quick-setting slurry to achieve the purpose of quickly setting the filling body around the borehole;
[0020] The grouting pressure end standard is adopted, and the final grouting pressure is 1.5 to 2.0 times the hydrostatic pressure.
[0021] In the above multi-layer inclined coal seam goaf treatment method, in step D, the principle of layered treatment from top to bottom is adopted. After the treatment of the goaf of the upper inclined coal seam is completed, and when the strength of the filling body formed by the solidification of the grouting material reaches 15-20MPa, drilling is then performed through the filling body to enter the next goaf for drilling and grouting operations;
[0022] There are 2 to 4 branch holes. During construction, the lower branch holes are firstly constructed and then the upper branch holes are constructed.
[0023] The technical solution of the present invention achieves the following beneficial technical effects:
[0024] (1) The present invention combines the advantages of ground directional drilling technology and filling grouting technology to achieve safe and rapid filling of multi-layer inclined goaf areas while avoiding waste of grouting materials. It is suitable for the treatment of multi-layer inclined coal seam goaf areas in the mountainous areas of southwest my country and reduces the risk of geological disasters caused by inclined coal seam goaf areas.
[0025] (2) The present invention first adopts directional drilling technology on the basis of the management scope of the inclined coal seam goaf area, constructs multiple boreholes perpendicular to the inclined coal seam goaf area, and forms a slurry filling channel connecting the goaf area, which effectively avoids the shortcomings of conventional numerical drilling schemes such as large temporary land use area of the construction site, large number of grouting holes, and large consumption of casing and solid pipe materials.
[0026] (3) The drilling and grouting of the present invention adopts a large set of drilling and grouting equipment, which can realize high-pressure grouting with large pumping volume, short construction period and high grouting efficiency. During construction, the principle of "injection when encountering voids" and grouting final pressure control are adopted, and the filling effect is reliable. The present invention can effectively control the residual deformation of the overburden in the goaf area and eliminate the risk of geological disasters caused by mining in the reinforced area. At the same time, the grouting material selects non-toxic and harmless environmentally friendly slurry, combined with inert filling materials, to achieve rapid management of inclined multi-layer goaf areas in western mountainous areas, which has important application value and promotion value.
[0027] (4) The present invention optimizes the spacing between the inclination points of two adjacent branch holes, the spacing between the branch hole grouting sections in the goaf of the inclined coal seam, the spacing between the branch hole drilling target point and the goaf of the inclined coal seam, and the terminal hole position of the branch hole by adopting a two-sequence phased construction method. At the same time, through a large number of experiments, cement fly ash slurry materials, inert filling materials and composite quick-setting slurry materials that match the drilling layout are selected to achieve a balance between the cost of grouting materials and the filling density; by reasonably setting directional branch holes, the damage of drilling to the stability of the spatial stratum structure of the goaf can be reduced, and at the same time, the grouting pressure can be reduced, and the damage of the grouting fluid to the internal environment of the goaf can be reduced, thereby improving the drilling and grouting construction efficiency in the treatment of goafs of multi-layer inclined coal seams; after the grouting is completed, the grouting quality is tested by drilling and coring, and the rock void filling rate and the goaf filling rate are both high, and the filling rate of the caving zone in the goaf reaches 97%, which fully demonstrates that a high-strength support structure is formed after grouting, avoiding secondary collapse in the goaf of large-scale multi-layer inclined coal seams. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 Schematic diagram of multi-layer inclined coal seam goaf management according to the present invention;
[0029] Figure 2 Schematic diagram of the drilling structure of the present invention;
[0030] Figure 3 Schematic diagram of grouting filling of multi-layer inclined goaf area according to the present invention.
[0031] The reference numerals in the figure are as follows: 1-drilling rig; 2-straight hole section; 3-directional inclination section; 4-branch hole grouting section; 5-inclined coal seam goaf; 6-goaf area management scope; 7-solid pipe material; 8-first opening casing; 9-second opening casing; 10-branch hole I; 11-branch hole II; 12-branch hole inclination point; 13-filling body; 14-interval formation; 15-casing section. DETAILED DESCRIPTION
[0032] The multi-layer inclined coal seam goaf area treated in this embodiment has a total of 5 layers, and the multi-layer inclined coal seam goaf area treatment method includes the following steps:
[0033] Step A: Exploring the goaf area 5 of the inclined coal seam and determining the goaf area management scope 6;
[0034] like Figure 1 As shown, due to the limitation of mountain terrain and considering the scope of goaf management, the construction site is set in the upper plate of the goaf, and the ground directional drilling technology is used to form a grouting filling channel connecting the goaf of multi-layer inclined coal seams;
[0035] Step B: Arrange a row of boreholes on the ground within the goaf treatment range 6; each row of boreholes includes four grouting holes, and the four grouting holes are arranged along the inclination of the inclined coal seam; the grouting holes include a main drilling hole and two branch holes, the main drilling hole is the casing section 15 of the grouting hole, and the two branch holes are branch hole I and branch hole II, respectively, and branch hole I 10 and branch hole II 11 constitute the branch hole grouting section 4 of the grouting hole, and the branch hole grouting section 4 is a bare hole section, such as Figure 2 As shown; one casing section 15 of each grouting hole is connected to the two branch holes through the branch hole deflection point 12, and the distance between the two adjacent branch hole deflection points 12 is 40m;
[0036] In this embodiment, the drilling adopts a three-level wellbore structure, the first drilling is a straight hole section, the second drilling is a directional deflection section, and the third drilling is a branch hole grouting section. The third drilling is an open hole drilling, and the drilling leakage and sudden drill loss are closely monitored. Figure 2 As shown, the casing section 15 includes a straight hole section 2 and a directional deflection section 3. The straight hole section 2 has a hole diameter of Φ350 mm and a length of 15 m. The terminal hole of the directional deflection section 3 is located 50 m above the goaf 5 of the first layer of inclined coal seam, which can ensure that it is far away from unstable strata such as the collapse zone of the goaf. The casing section 15 is lowered into a geological casing, and the specification of the geological casing is Φ244.5×8.94 mm.
[0037] The straight hole section 2 uses vertical drilling. When the hole is drilled to the predetermined depth of 15m, the geological casing is lowered. The directional beveling section 3 uses a gyro inclinometer and a screw drill to control the drilling trajectory. The deviation of the drilling trajectory is controlled within 0.5%. The borehole diameter of the directional beveling section 3 is Φ215.9mm, and the specification of the geological casing lowered in the directional beveling section 3 is Φ177.8×8.05mm. After the geological casing is lowered, the straight hole section 2 and the directional beveling section 3 use a single-liquid cement slurry with a water-cement ratio of 0.75:1 as the pipe-fixing material to fix the geological casing, and the setting time of the pipe-fixing material is 48h.
[0038] The branch hole grouting section 4 is a bare hole section with a hole diameter of Φ152.4mm; the spacing between branch holes I10 and II11 at the inclined coal seam goaf 5 is 30m (which can not only meet the slurry diffusion distance requirements, but also reduce the construction volume of the branch hole grouting section as much as possible); branch holes I10 and II11 are both perpendicular to the original coal seam surface of the inclined coal seam goaf 5 to ensure that the grouting drilling length through all goafs is the shortest; branch holes I10 and II11 pass through the interval stratum 14 between two adjacent layers of inclined coal seam goaf 5, and penetrate from the first layer of inclined coal seam goaf 5 to the last layer of inclined coal seam goaf 5; the drilling target points of branch holes I10 and II11 are located 60m above the upper wall of the first layer of inclined coal seam goaf 5, so as to ensure sufficient directional distance; the terminal holes of branch holes I10 and II11 are both located 10m from the bottom plate of the last layer of inclined coal seam goaf 5.
[0039] Step C: preparing grouting materials, wherein the grouting materials are a combination of inert fillers, cement fly ash slurry and composite quick-setting slurry;
[0040] The inert filling material is composed of part A and part B. Part A is local gangue powder with a particle size of 0.75-20 mm; part B is yellow mud slurry, in which the mass ratio of water to clay is 1:0.5; the mass ratio of part A to part B is 3:7;
[0041] The cement fly ash slurry material is composed of water and powder, and the mass ratio of water to powder is 0.8:1; the powder is composed of fly ash, cement and composite additives, and the mass ratio of fly ash to cement is 6:1, the amount of composite additives is 0.3wt% of the mass of cement, and the composite additives are composed of salt, triethanolamine and water glass A, the amount of salt is 0.3wt% of the mass of water glass A, and the amount of triethanolamine is 0.03wt% of the mass of water glass A; the modulus of water glass A is 3.8, and the concentration of water glass A is 42Be';
[0042] The composite quick-setting slurry is composed of water, cement, modified admixture and accelerator; the mass ratio of water to cement is 1:1; the modified admixture is silica fume, the particle size of the silica fume is 1-50um, and the amount of the modified admixture is 5wt% of the cement mass; the accelerator is water glass B, the modulus of water glass B is 3.8, the concentration of water glass B is 42Be', and the amount of the accelerator is 3wt% of the cement mass.
[0043] Step D: Drilling and grouting coordination: Drilling is performed according to the arranged boreholes. When the branch hole I10 or the branch hole II11 is drilled to the goaf 5 of the first layer of inclined coal seam, the drilling operation is stopped and grouting is performed; after the grouting of the goaf 5 of the first layer of inclined coal seam is completed and the grouting material solidifies to form a filling body 13, drilling is continued through the filling body 13 to allow the branch holes I10 and the branch holes II11 to enter the goaf 5 of the next layer of inclined coal seam, and grouting is performed; the drilling and grouting operations are repeated until the grouting of the goaf 5 of the last layer of inclined coal seam is completed; in the case of drill drop and full hole leakage, drilling and grouting are stopped immediately; drilling and grouting are performed alternately until the bottom plate of the last goaf;
[0044] Specifically, in this embodiment, a total of 4 grouting holes are arranged, and each grouting hole contains 2 branch holes (branch hole I and branch hole II). Therefore, the treatment of the inclined coal seam goaf area can be divided into 4 construction areas (each grouting hole is 1 construction area) and 2 treatment stages (sequence I construction stage and sequence II construction stage) for construction treatment. During the construction of each treatment stage, the 4 construction areas are carried out simultaneously. After the geological casing of the directional beveling section 3 is fixed, the construction of the branch hole grouting section 4 can be started:
[0045] In the first construction phase, the branch holes at the bottom of the four construction areas, namely branch holes I, are constructed and managed. During the drilling process, the mud loss and the hole-making speed are strictly monitored. If the whole hole is lost or the drill bit is dropped, the drilling and grouting are stopped immediately. When the branch holes I of the four construction areas are drilled to the goaf of the first layer of inclined coal seam respectively, the drilling is stopped and grouting is carried out. At this time, the branch holes I of the four construction areas are all grouting and filling in the goaf of the first layer of inclined coal seam. After the grouting is completed, the branch holes are drilled to the branch hole inclination point 12 of the branch hole I, and the curing is carried out for 48 hours. When the strength of the filling body formed by the solidification of the grouting material reaches 20MPa (to avoid the collapse of the borehole), drilling is started from the branch hole inclination point 12 and through the filling body 13 formed by the grouting material in the goaf of the first layer of inclined coal seam, and the drilling is carried out to the goaf of the second layer of inclined coal seam. When the branch hole When drilling reaches the goaf of the second inclined coal seam, stop drilling and carry out grouting; repeat the drilling and grouting steps until the goaf of the fifth inclined coal seam is completed with grouting; the final hole of branch hole I is located 10m from the bottom plate of goaf 5 of the fifth inclined coal seam; when the branch holes I in the four construction areas have completed grouting from the goaf of the first inclined coal seam to the goaf of the fifth inclined coal seam, the I construction stage is completed; the II construction stage mainly involves the drilling and grouting of branch holes II, which are the upper drilling holes of the four construction areas, and their construction methods are consistent with those of the I construction stage, which will not be repeated here; during construction, the branch holes at the bottom of the branch hole grouting section 4 are constructed first, and then the branch holes at the top of the branch hole grouting section 4 are constructed, in order to ensure that the goaf is densely filled and well connected to the top.
[0046] The first grouting is done with cement fly ash slurry. During the grouting process, the grouting pressure and grouting volume are recorded. If the grouting volume exceeds 200m 3 Or when there is no obvious increase in grouting pressure (the pressure increase rate is less than 0.1MPa / h), start filling with inert filling materials. To avoid gangue powder blocking the hole, the filling amount of inert filling materials is controlled to 5m3 per time. 3 After a single inert filling material is filled, a drill is used to drill through the hole once. If the drill is supported or the grouting pressure rises at a rate greater than 0.1MPa / h, the filling of the inert filling material is stopped and replaced with cement fly ash slurry. Finally, when the grouting pressure is 1.5 times the hydrostatic pressure, the composite quick-setting slurry is injected to achieve the purpose of quickly solidifying the filling body around the borehole. During the grouting process, the grouting pressure end standard is adopted, and the grouting final pressure is 2.0 times the hydrostatic pressure.
[0047] In some other embodiments, the slurry type, slurry ratio parameters and grouting times can be adjusted according to the pressure changes during the grouting process; if the volume of the voids in the goaf is large, inert materials are first used for partial filling to save slurry, and then composite quick-setting slurry is used to bond the inert materials for filling, and finally cement fly ash slurry is used to fill the remaining void volume.
[0048] Obviously, the above embodiments are merely examples for the purpose of clear explanation, and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived therefrom are still within the scope of protection of the claims of this patent application.
Claims
1. A method for managing goaf areas in multi-layer inclined coal seams, characterized in that: The method comprises the following steps: Step A: Exploring the goaf area (5) of the inclined coal seam and determining the goaf area management scope (6); Step B: Arranging at least two rows of drill holes on the ground within the goaf treatment range (6), wherein the two rows of drill holes are arranged along the direction of the inclined coal seam; each row of drill holes includes two or more grouting holes, wherein the two or more grouting holes are arranged along the inclination of the inclined coal seam; the grouting holes include a main drilling hole and a branch hole, wherein the main drilling hole is in fluid communication with the branch hole; Step C: preparing grouting materials, wherein the grouting materials are one or a combination of two or more of inert fillers, cement fly ash slurry or composite quick-setting slurry; Step D: Drilling and grouting coordination: Drilling is performed according to the arranged boreholes, and a geological casing is lowered after the main borehole is drilled; when the branch hole is drilled to the first layer of the inclined coal seam goaf (5), the drilling operation is stopped and grouting is performed; after the grouting of the first layer of the inclined coal seam goaf (5) is completed and the grouting material solidifies to form a filling body (13), drilling is continued through the filling body (13) to allow the branch hole to enter the next layer of the inclined coal seam goaf (5) and grouting is performed; the drilling and grouting operations are repeated until the grouting of the last layer of the inclined coal seam goaf (5) is completed; One grouting hole comprises one main drilling hole and 2 to 4 branch holes, and one main drilling hole is fluidly connected with the 2 to 4 branch holes through branch hole inclination points (12); the main drilling hole is the casing section (15) of the grouting hole, the branch hole is the branch hole grouting section (4) of the grouting hole, and the branch hole grouting section (4) is a bare hole section; the distance between two adjacent branch hole inclination points (12) is 30 to 100 m; The opening of the branch hole in each inclined coal seam goaf (5) is oriented perpendicular to the original coal seam surface of the inclined coal seam goaf (5); the branch hole passes through the interval stratum (14) between two adjacent inclined coal seam goafs (5), from the first inclined coal seam goaf (5) to the last inclined coal seam goaf (5); the aperture of the branch hole is Φ100 mm to Φ160 mm, and the distance between two adjacent branch holes starting from the same branch hole inclination point (12) in the inclined coal seam goaf (5) is 20 to 50 m; the drilling target point of the branch hole is located at 30 to 60 m above the upper wall of the first inclined coal seam goaf (5), and the terminal hole of the branch hole is located at 5 to 10 m below the bottom plate of the last inclined coal seam goaf (5); In step D, during the grouting process, when the grouting pressure is 0 to 1.0 times the hydrostatic pressure, a cement fly ash slurry material having a water to powder mass ratio of 0.6 to 0.8 is selected as the grouting material; when the grouting pressure is 1.0 to 1.5 times the hydrostatic pressure, a cement fly ash slurry material having a water to powder mass ratio of 0.8 to 1.2 is selected as the grouting material, and the cement fly ash slurry material is composed of water and powder; If the grouting pressure increase rate is less than or equal to 0.1 MPa / h, the inert filling material is used for filling in two or more times, and the filling amount of the inert filling material in a single time is 2 m 3 ~5 m 3 , until the pressure increase rate of the grouting pressure reaches 0.1MPa / h, the cement fly ash slurry is replaced to continue grouting, and when the grouting pressure is 1.5 times the hydrostatic pressure, the grouting material is replaced with the composite quick-setting slurry to achieve the purpose of quickly setting the filling body around the borehole; The grouting pressure end standard is adopted, and the final grouting pressure is 1.5 to 2.0 times the hydrostatic pressure; In step D, a multi-layer inclined coal seam goaf (5) is treated by a top-down layered treatment method. After the treatment of the upper inclined coal seam goaf (5) is completed and the strength of the filling body formed by the solidification of the grouting material reaches 15-20 MPa, drilling is then performed through the filling body (13) to enter the next layer of goaf for drilling and grouting operations; There are 2 to 4 branch holes. During construction, the lower branch holes are constructed first, and then the upper branch holes are constructed.
2. The method for treating goaf of multi-layer inclined coal seams according to claim 1 is characterized in that: The casing section (15) comprises a straight hole section (2) and a directional deflection section (3), the length of the straight hole section (2) being greater than or equal to 15 m; the terminal hole of the directional deflection section (3) is located 50 to 60 m above the goaf (5) of the first layer of the inclined coal seam; the aperture of the casing section (15) is Φ 200~ Φ 350 mm; the diameter of the geological casing into which the casing section (15) is lowered is Φ 168~ Φ 250 mm.
3. The method for treating goaf of multi-layer inclined coal seams according to claim 2 is characterized in that: The straight hole section (2) is drilled to a predetermined position by vertical drilling or inclined drilling, and the geological casing is lowered; the directional beveling section (3) uses a drilling inclinometer and a screw drill to control the drilling trajectory, and the drilling trajectory deviation is controlled within a range of less than or equal to 0.5%. After the directional beveling section (3) is drilled to the predetermined position, the geological casing is lowered; the geological casing lowered by the straight hole section (2) and the geological casing lowered by the directional beveling section (3) are both fixed by single-liquid cement slurry with a water-cement ratio of 0.75:1, and the solidification time of the fixing material is greater than or equal to 48 hours.
4. The method for treating goaf of multi-layer inclined coal seams according to claim 1, characterized in that: The inert filling material consists of part A and part B, wherein part A consists of one or a combination of two or more of sand, loess, gangue powder or solid waste materials, the solid waste materials are fly ash and / or tailings, and the particle size of part A is 0.75-25 mm; part B is water or mud, and the mass ratio of water to clay in the mud is 1:0.2-1:0.5; the mass ratio of part A to part B is 3:4-3:
7.
5. The method for treating goaf of multi-layer inclined coal seams according to claim 1 is characterized in that: The cement fly ash slurry material consists of water and powder, and the mass ratio of water to powder is 0.6-1.2:1; the powder consists of fly ash, cement and composite additives, and the mass ratio of fly ash to cement is 5:1-10:1, the amount of the composite additive is 0.3-0.5 wt% of the mass of cement, and the composite additive consists of salt, triethanolamine and water glass A, the amount of salt is 0.3-0.5 wt% of the mass of water glass A, and the amount of triethanolamine is 0.01-0.03 wt% of the mass of water glass A; the modulus of water glass A is 2.6-3.8, and the concentration of water glass A is 36-42 Be'.
6. The method for treating goaf of multi-layer inclined coal seams according to claim 1, characterized in that: The composite quick-setting slurry is composed of water, cement, a modified admixture and an accelerating agent; the mass ratio of water to cement is 1:1; the modified admixture is silica powder, the particle size of the silica powder is 1-50 um, and the amount of the modified admixture is 3-5 wt% of the cement mass; the accelerating agent is water glass B, the modulus of the water glass B is 2.6-3.8, the concentration of the water glass B is 36-42 Be', and the amount of the accelerating agent is 3-5 wt% of the cement mass.