A static performance test system and method for switching of ATES security power supply in power plant

By designing static performance testing systems and methods in power plants, including factory power supply sections, diesel generators and circuit breakers, and conducting switching performance and locking conditions testing, the problem of lack of clear testing methods in the existing technology is solved and the power supply is improved The safety and reliability of the switch.

CN114035102BActive Publication Date: 2024-12-03XIAN THERMAL POWER RES INST CO LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202111284037.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-11-01
Publication Date
2024-12-03
Estimated Expiration
2041-11-01

AI Technical Summary

Technical Problem

The prior art fails to clearly state the testing methods and evaluation standards of power plant security power switching systems, which affects the safety and reliability of the power supply.

Method used

Provide a static performance testing system and method for switching ATES power supply in power plant, including factory power supply section, diesel generator, circuit breaker and DCS control system, and perform switching performance testing, locking condition testing, and working power supply to standby Power switch test and working power switch test to diesel generator power switch test.

Benefits of technology

It improves the safety and reliability of the power plant security power system and ensures the correctness and reliability of power switching.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114035102B_ABST
    Figure CN114035102B_ABST
Patent Text Reader

Abstract

The invention discloses a static performance test system and method for switching of a security power supply ATES of a power plant. The plant power supply section PC I section is connected to a normal branch of a security section power supply ATES conversion switch via the plant power supply section PC I section feeder circuit breaker 1DL, the plant power supply section PC II section is connected to a standby branch of the security section power supply ATES conversion switch via the plant power supply section PC II section feeder circuit breaker 2DL, the diesel generator is connected to the security PC section via the diesel generator export circuit breaker 01DL and the security section emergency power supply circuit breaker 02DL, the security PC section is connected to the emergency power supply end of the security section power supply ATES conversion switch, the security PC section is connected to an external load via the security section load circuit breaker XXDL, and a DCS control system is connected to the security section load circuit breaker XXDL7. The system and method can test the static performance of the switching of the security power supply ATES of the power plant, and improve the safety and reliability of the power supply of the security power supply system of the power plant.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of power debugging and power testing, and relates to a static performance test system and method for switching of an ATES security power supply of a power plant. Background Art

[0002] When the working power supply of the safety section of the power plant is lost, the power supply of the safety section is switched to the backup power supply, or switched to the safety power supply of the diesel generator set. The load powered by the safety section is extremely important and directly affects the safety of the generator set. When the working power supply of the safety section is lost, the correctness and reliability of its power switching need to be tested.

[0003] At present, domestic technical standards such as GB / T 14285-2006 Technical Specifications for Relay Protection and Safety Automatic Devices and DL / T_526-2002 Technical Conditions for Automatic Switching Devices for Static Standby Power Supply have not clearly stated the specific requirements and evaluation criteria for the testing methods of the security power supply switching system. The acceptance criteria for the security power supply system commissioning unit project in DLT 5295-2013 Quality Acceptance and Evaluation Procedures for Thermal Power Construction Engineering Unit Commissioning are: normal operation and compliance with design and standard requirements. The DLT 5153-2014 Technical Specifications for Power Supply Design of Thermal Power Plants only stipulates the electrical interlocking conditions of diesel generators. Summary of the invention

[0004] The purpose of the present invention is to overcome the shortcomings of the above-mentioned prior art and provide a static performance test system and method for switching of a power plant security power supply ATES. The system and method can test the static performance of switching of a power plant security power supply ATES and improve the safety and reliability of the power supply of the power plant security power supply system.

[0005] To achieve the above-mentioned purpose, the static performance test system of the power plant security power ATES switching of the present invention comprises a plant power supply section PC I section, a plant power supply section PC II section, a plant power supply section PC I section feeder circuit breaker 1DL, a plant power supply section PC II section feeder circuit breaker 2DL, a security section power ATES transfer switch, a security PC section, a security section load circuit breaker XXDL, a diesel generator, a diesel generator outlet circuit breaker 01DL, a security section emergency power circuit breaker 02DL and a DCS control system;

[0006] The plant power supply section PC I section is connected to the normal branch of the security section power ATES transfer switch via the plant power supply section PC I section feeder circuit breaker 1DL, the plant power supply section PC II section is connected to the standby branch of the security section power ATES transfer switch via the plant power supply section PC II section feeder circuit breaker 2DL, the diesel generator is connected to the security PC section through the diesel generator export circuit breaker 01DL and the security section emergency power supply circuit breaker 02DL, the security PC section is connected to the emergency power supply end of the security section power ATES transfer switch, the security PC section is connected to the external load via the security section load circuit breaker XXDL, and the DCS control system is connected to the security section load circuit breaker XXDL7.

[0007] The static performance test method of the power plant security power supply ATES switching of the present invention comprises the following steps:

[0008] 1) Preliminary preparation for the switching performance test: add the first three-phase test power supply between the feeder circuit breaker 1DL of the plant power supply section PC I and the ATES switch of the security section power supply to simulate the working power supply, and add the second three-phase test power supply between the feeder circuit breaker 2DL of the plant power supply section PC II and the ATES switch of the security section power supply to simulate the standby power supply;

[0009] 2) Perform ATES lockout condition test;

[0010] 3) Test the switching from working power to standby power;

[0011] 4) Test the switching of working power supply to diesel generator power supply;

[0012] 5) ATES switching test is completed.

[0013] The specific process of the preliminary preparation for the handover performance test in step 1) is as follows:

[0014] The diesel generator has the conditions for self-starting, the diesel generator output circuit breaker 01DL and the safety section emergency power circuit breaker 02DL are in the test position, the plant power supply section PC I section feeder circuit breaker 1DL and the plant power supply section PC II section feeder circuit breaker 2DL are in the test sub-position.

[0015] If the following items are met at the same time, the switching function of the ATES transfer switch of the security section power supply is open;

[0016] a) ATES switching function is put into use;

[0017] b) The standby branch of the ATES transfer switch of the security section power supply has voltage;

[0018] c) There is voltage on the normal branch of the ATES switch of the security section power supply;

[0019] d) No external locking conditions.

[0020] If any of the following items is met, the switching function of the ATES transfer switch of the security section power supply is locked;

[0021] a) The switching function of the ATES transfer switch of the security section power supply is exited;

[0022] b) After the ATES switch of the security section power supply is switched;

[0023] c) The external locking is opened;

[0024] d) There is no voltage on the standby branch of the ATES transfer switch of the security section power supply.

[0025] The test conditions in step 3) are: the feeder circuit breaker 1DL of the plant power supply section PC I and the feeder circuit breaker 2DL of the plant power supply section PC II are in the open state, the diesel generator outlet circuit breaker 01DL and the emergency power supply circuit breaker 02DL of the security section are in the open state, the voltage, phase and amplitude of the working power supply are the same as the backup power supply, and the security section power supply ATES conversion switch operates on the working power supply;

[0026] The test content is: disconnect the first three-phase test power supply between the PC I section feeder circuit breaker 1DL of the plant power supply section and the ATES transfer switch of the security section power supply, simulate the working busbar without voltage and the main power supply without current to start the switching, the backup power supply is normal, and the security section power supply ATES transfer switch delays switching to the backup power supply;

[0027] The judging criteria are: the ATES switch of the security section power supply is switched with a delay of 1.5s, and the security PC section is powered by a backup power supply.

[0028] The test conditions in step 4) are: the feeder circuit breaker 1DL of the plant power supply section PC I and the feeder circuit breaker 2DL of the plant power supply section PC II are in the open state, the diesel generator outlet circuit breaker 01DL and the emergency power supply circuit breaker 02DL of the security section are in the open state, the security section power supply ATES conversion switch is running on the working power supply, the diesel generator is available and has the conditions for emergency starting, and the working power supply and the backup power supply have the same voltage, phase and amplitude;

[0029] The test content is: disconnect the first three-phase test power supply between the feeder circuit breaker 1DL of the plant power supply section PC I and the ATES transfer switch of the security section power supply, disconnect the second three-phase test power supply between the feeder circuit breaker 2DL of the plant power supply section PC II and the ATES transfer switch of the security section power supply, simulate the working busbar without voltage and the working power supply and the standby power supply without current, start the diesel generator, and after the start is completed, the diesel generator outlet circuit breaker 01DL automatically closes;

[0030] The judging criteria are: the ATES switch of the security section power supply delays 1.5s to start the diesel generator.

[0031] The present invention has the following beneficial effects:

[0032] The static performance test system and method for switching the power plant security power ATES of the present invention, when in specific operation, firstly performs preliminary preparation for the switching performance test, and then sequentially performs the ATES locking condition test, the working power supply to the standby power supply switching test, and the working power supply to the diesel generator power supply switching test, so as to test the static performance of the power plant security power ATES switching and improve the safety and reliability of the power supply of the power plant security power system. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] Figure 1 It is a structural schematic diagram of the present invention;

[0034] Figure 2 is a flow chart of the present invention;

[0035] Figure 3 Logic diagram for ATES functionality input.

[0036] Among them, 1 is the plant power supply section PC I section, 2 is the plant power supply section PC II section, 3 is the plant power supply section PC I section feeder circuit breaker 1DL, 4 is the plant power supply section PC II section feeder circuit breaker 2DL, 5 is the security section power ATES transfer switch, 6 is the security PC section, 7 is the security section load circuit breaker XXDL, 8 is the diesel generator, 9 is the diesel generator export circuit breaker 01DL, 10 is the security section emergency power circuit breaker 02DL, and 11 is the DCS control system. DETAILED DESCRIPTION

[0037] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiment of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiment of the present invention. Obviously, the described embodiment is only an embodiment of a part of the present invention, not all embodiments, and is not intended to limit the scope of the present invention. In addition, in the following description, the description of well-known structures and technologies is omitted to avoid unnecessary confusion of the concepts disclosed in the present invention. Based on the embodiments in the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work should fall within the scope of protection of the present invention.

[0038] The accompanying drawings show schematic diagrams of structures according to embodiments disclosed in the present invention. These figures are not drawn to scale, and some details are magnified and some details may be omitted for the purpose of clear expression. The shapes of various regions and layers shown in the figures and the relative sizes and positional relationships therebetween are only exemplary, and may deviate in practice due to manufacturing tolerances or technical limitations, and those skilled in the art may additionally design regions / layers with different shapes, sizes, and relative positions according to actual needs.

[0039] refer to Figure 1 The static performance test system of the power plant security power ATES switching of the present invention comprises a plant power supply section PC I section 1, a plant power supply section PC II section 2, a plant power supply section PC I section feeder circuit breaker 1DL3, a plant power supply section PCII section feeder circuit breaker 2DL4, a security section power ATES conversion switch 5, a security PC section 6, a security section load circuit breaker XXDL7, a diesel generator 8, a diesel generator outlet circuit breaker 01DL9, a security section emergency power circuit breaker 02DL10 and a DCS control system 11;

[0040] The plant power supply section PC I section 1 is connected to the normal branch of the security section power supply ATES transfer switch 5 via the plant power supply section PC I section feeder circuit breaker 1DL3, the plant power supply section PC II section 2 is connected to the standby branch of the security section power supply ATES transfer switch 5 via the plant power supply section PC II section feeder circuit breaker 2DL4, the diesel generator 8 is connected to the security PC section 6 through the diesel generator export circuit breaker 01DL9 and the security section emergency power supply circuit breaker 02DL10, the security PC section 6 is connected to the emergency power supply end of the security section power supply ATES transfer switch 5, the security PC section 6 is connected to the external load via the security section load circuit breaker XXDL7, and the DCS control system 11 is connected to the security section load circuit breaker XXDL7.

[0041] refer to Figure 2 The static performance test method of the power plant security power supply ATES switching of the present invention comprises the following steps:

[0042] 1) Conduct preliminary preparation for switching performance testing;

[0043] A test plan that conforms to the actual situation on site and meets the ATES switching function is formulated. The accident safety section is without load, the diesel generator 8 has the self-starting condition, the diesel generator export circuit breaker 01DL9 and the security section emergency power circuit breaker 02DL10 are in the test position, the plant power supply section PC I section feeder circuit breaker 1DL3 and the plant power supply section PC II section feeder circuit breaker 2DL4 are in the test sub-position, and the first three-phase test power supply is added between the plant power supply section PC I section feeder circuit breaker 1DL3 and the security section power ATES transfer switch 5 to simulate the working power supply, and the second three-phase test power supply is added between the plant power supply section PC II section feeder circuit breaker 2DL4 and the security section power ATES transfer switch 5 to simulate the standby power supply.

[0044] 2) ATES lockout condition test;

[0045] If the following items are met at the same time, the switching function of the security section power supply ATES conversion switch 5 is open.

[0046] a) ATES switching function is put into use;

[0047] b) The standby branch of the security section power supply ATES switch 5 has voltage;

[0048] c) The normal branch of the security section power supply ATES switch 5 has voltage;

[0049] d) No external locking conditions.

[0050] If any of the following items is met, the switching function of the security section power supply ATES transfer switch 5 is locked.

[0051] a) The switching function of the security section power supply ATES switch 5 is exited;

[0052] b) After the switching action of the ATES switch 5 of the security section power supply;

[0053] c) The external locking is opened;

[0054] d) The standby branch of the security section power supply ATES switch 5 has no voltage;

[0055] 3) Test the switching from working power supply to standby power supply;

[0056] Test conditions: The feeder circuit breaker 1DL3 of the plant power supply section PC I and the feeder circuit breaker 2DL4 of the plant power supply section PC II are in the open state, the diesel generator outlet circuit breaker 01DL9 and the emergency power supply circuit breaker 02DL10 of the security section are in the open state, the voltage, phase and amplitude of the working power supply are the same as the backup power supply, and the security section power supply ATES transfer switch 5 operates on the working power supply.

[0057] Test content and judging criteria:

[0058] Disconnect the first three-phase test power supply between the PC I section feeder circuit breaker 1DL3 and the security section power ATES switch 5, simulate the working busbar without voltage and the main power supply without current to start switching, the backup power supply is normal, and the security section power ATES switch 5 delays switching to the backup power supply. The evaluation criteria are: the security section power ATES switch 5 delays switching for 1.5s, and the security PC section 6 is powered by the backup power supply.

[0059] 4) Test the working power supply switching to the diesel generator 8 power supply.

[0060] Test conditions: The feeder circuit breaker 1DL3 of the plant power supply section PC I and the feeder circuit breaker 2DL4 of the plant power supply section PC II are in the open state, the diesel generator outlet circuit breaker 01DL9 and the emergency power supply circuit breaker 02DL10 of the security section are in the open state, the security section power ATES transfer switch 5 is operating in the working power supply, the diesel generator 8 is available and meets the conditions for emergency starting, and the working power supply and the backup power supply have the same voltage, phase and amplitude.

[0061] Test content and judging criteria:

[0062] Disconnect the first three-phase test power supply between the feeder circuit breaker 1DL3 of the plant power supply section PC I and the security section power supply ATES transfer switch 5, disconnect the second three-phase test power supply between the feeder circuit breaker 2DL4 of the plant power supply section PC II and the security section power supply ATES transfer switch 5, simulate the working busbar has no voltage and the working power supply and the standby power supply have no current, start the diesel generator 8, after the start is completed, the diesel generator outlet circuit breaker 01DL9 automatically closes, and the evaluation standard is: the security section power supply ATES transfer switch 5 delays 1.5s to start the diesel generator 8.

[0063] 5) ATES switching test is completed.

[0064] The present invention is applicable to a security power supply system of a power plant in which a diesel generator 8 is configured in a security section.

[0065] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any way. Any simple modification, change and equivalent structural change made to the above embodiment based on the technical essence of the present invention still falls within the protection scope of the technical solution of the present invention.

Claims

1. A static performance test method for ATES switching of power plant security power supply, It is characterized in that A static performance test system based on the ATES switching of the security power supply of a power plant, the static performance test system of the ATES switching of the security power supply of a power plant comprises a plant power supply section PC I section (1), a plant power supply section PCII section (2), a plant power supply section PCI section feeder circuit breaker 1DL (3), a plant power supply section PC II section feeder circuit breaker 2DL (4), a security section power ATES conversion switch (5), a security PC section (6), a security section load circuit breaker XXDL (7), a diesel generator (8), a diesel generator outlet circuit breaker 01DL (9), a security section emergency power circuit breaker 02DL (10) and a DCS control system (11); The plant power supply section PCI section (1) is connected to the normal branch of the security section power ATES conversion switch (5) via the plant power supply section PCI section feeder circuit breaker 1DL (3), the plant power supply section PC II section (2) is connected to the standby branch of the security section power ATES conversion switch (5) via the plant power supply section PC II section feeder circuit breaker 2DL (4), the diesel generator (8) is connected to the security PC section (6) via the diesel generator outlet circuit breaker 01DL (9) and the security section emergency power circuit breaker 02DL (10), the security PC section (6) is connected to the emergency power supply end of the security section power ATES conversion switch (5), the security PC section (6) is connected to the external load via the security section load circuit breaker XXDL (7), and the DCS control system (11) is connected to the security section load circuit breaker XXDL (7); The following steps are involved: 1) Preliminary preparation for the switching performance test: add a first three-phase test power supply between the feeder circuit breaker 1DL (3) of the plant power supply section PCI and the security section power supply ATES switch (5) to simulate the working power supply, and add a second three-phase test power supply between the feeder circuit breaker 2DL (4) of the plant power supply section PCII and the security section power supply ATES switch (5) to simulate the standby power supply; 2) Perform ATES lockout condition test; 3) Test the switching from working power to standby power; 4) Performing a test of switching the working power supply to the diesel generator (8); 5) ATES switching test is completed; The test conditions in step 3) are: the feeder circuit breaker 1DL (3) of the PCI section of the plant power supply section and the feeder circuit breaker 2DL (4) of the PCII section of the plant power supply section are in the open state, the diesel generator outlet circuit breaker 01DL (9) and the emergency power circuit breaker 02DL (10) of the security section are in the open state, the voltage, phase and amplitude of the working power supply and the backup power supply are the same, and the security section power supply ATES conversion switch (5) operates on the working power supply; The test content is: disconnect the first three-phase test power supply between the PCI section feeder circuit breaker 1DL (3) of the plant power supply section and the ATES transfer switch (5) of the security section power supply, simulate the working busbar without voltage and the main power supply without current to start switching, the backup power supply is normal, and the security section power supply ATES transfer switch (5) delays switching to the backup power supply; The judging criteria are as follows: the ATES switch (5) of the security section power supply is switched with a delay of 1.5 seconds, and the security PC section (6) is powered by a backup power supply.

2. The static performance test method of the power plant security power supply ATES switching according to claim 1, It is characterized in that The specific process of the preliminary preparation for the handover performance test in step 1) is as follows: The diesel generator (8) is capable of self-starting. The diesel generator output circuit breaker 01DL (9) and the safety section emergency power circuit breaker 02DL (10) are located in the test position. The plant power supply section PCI section feeder circuit breaker 1DL (3) and the plant power supply section PCII section feeder circuit breaker 2DL (4) are located in the test sub-position.

3. The static performance test method of the power plant security power supply ATES switching according to claim 1, It is characterized in that If the following items are met at the same time, the switching function of the security section power ATES switch (5) is open; a) ATES switching function is put into use; b) The standby branch of the ATES switch (5) of the security section power supply has voltage; c) The normal branch of the security section power supply ATES switch (5) has voltage; d) No external locking conditions.

4. The static performance test method of the power plant security power supply ATES switching according to claim 1, It is characterized in that If any of the following items is met, the switching function of the ATES transfer switch (5) of the security section power supply is locked; a) The switching function of the ATES transfer switch (5) of the security section power supply is terminated; b) After the switching action of the ATES switch (5) of the security section power supply; c) The external locking is opened; d) The standby branch of the ATES transfer switch (5) of the security section power supply has no voltage.

5. The static performance test method of the power plant security power supply ATES switching according to claim 1, It is characterized in that The test conditions in step 4) are: the feeder circuit breaker 1DL (3) of the PCI section of the plant power supply section and the feeder circuit breaker 2DL (4) of the PCII section of the plant power supply section are in the open state, the diesel generator outlet circuit breaker 01DL (9) and the emergency power circuit breaker 02DL (10) of the security section are in the open state, the security section power ATES switch (5) is running on the working power supply, the diesel generator (8) is available and meets the accident start-up conditions, and the working power supply and the backup power supply have the same voltage, phase and amplitude; The test content is as follows: disconnect the first three-phase test power supply between the feeder circuit breaker 1DL (3) of the plant power supply section PCI and the ATES transfer switch (5) of the security section power supply, disconnect the second three-phase test power supply between the feeder circuit breaker 2DL (4) of the plant power supply section PC II and the ATES transfer switch (5) of the security section power supply, simulate the working busbar without voltage and the working power supply and the standby power supply without current, start the diesel generator (8), and after the start is completed, the diesel generator outlet circuit breaker 01DL (9) is automatically closed; The judging criteria are: the ATES switch (5) of the security section power supply starts the diesel generator (8) with a delay of 1.5 seconds.

Citation Information

Patent Citations

  • Diesel generating set parallel operation system for safety source of thermal power plant

    CN105186575A

  • Emergency power supply capable of automatically detecting load fault

    CN107124032A

  • Disclosed is a three-power-supply switching wiring structure of a security section of a thermal power plant

    CN208890467U

  • Operating test apparatus for automatic transfer switch without electric power interruption

    KR101237286B1