A predictive management method for photoelectric converters in nuclear power plants
By fitting the optical power curve to the experimental data of the photoelectric converter, screening out the rapidly degraded equipment and predicting the lifespan, the problem of ineffective screening and waste in the existing technology is solved, and the refined management and cost reduction of the photoelectric converter is achieved.
Patent Information
- Application Number
- CN202111171517.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-10-08
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2041-10-08
AI Technical Summary
The prior art uses average lifespan evaluation photoelectric converters to be unable to effectively screen out rapidly degraded equipment, resulting in the possibility of replacement or wasting of resources before damage, increasing operating costs.
By obtaining experimental data of the photoelectric converter, fit the optical power curve using the least squares method, filter out the rapidly degraded equipment, and reduce the predicted life of its optical power, propose a replacement plan, and manage the photoelectric converter in a refined manner.
The refined management of each photoelectric converter is realized to ensure the safe operation of the nuclear power plant while reducing operating costs.
Smart Images

Figure CN114037117B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of maintenance of photoelectric converters in nuclear power plants, and more specifically to a predictive management method for photoelectric converters in nuclear power plants. Background Art
[0002] Photoelectric converters are commonly used electronic components in the DCS system of nuclear power plants. In order to ensure the safe operation of nuclear power plants, it is usually required to replace the photoelectric converters before they are damaged. The existing technology uses the statistical average method to calculate the average life of the photoelectric converter, and uses the average life to evaluate and replace the photoelectric converters. The average life cannot screen out fast-degrading photoelectric converters, and fast-degrading photoelectric converters may not have reached the average life when they are damaged. In addition, using the average life to replace the slower-degrading photoelectric converters early will result in premature replacement of the photoelectric converters, wasting components and increasing operating costs. Summary of the invention
[0003] The technical problem to be solved by the present invention is to provide a predictive management method for photoelectric converters in nuclear power plants in view of the above-mentioned defects of the prior art.
[0004] The technical solution adopted by the present invention to solve the technical problem is: constructing a predictive management method for photoelectric converters of nuclear power plants, comprising the following steps:
[0005] S1, obtaining the experimental date tik and average optical power Pik of the photoelectric converter during the kth round of nuclear power plant overhaul, where k is a positive integer;
[0006] S101, the output end of the test computer is connected to the input end of the photoelectric converter, and the light emitting end of the photoelectric converter is connected to the optical power meter;
[0007] S102, the test computer sends a data packet at a rated full-load speed to the photoelectric converter numbered i for a preset time, where i is a positive integer;
[0008] S103, calculating the average optical power Pik of the light received by the optical power meter during the preset time, and recording the current time as the experimental date tik;
[0009] S2, determine the minimum permissible optical power Pmin of the new photoelectric converter;
[0010] S3. Screening fast degraded photoelectric converters: The photoelectric converter numbered i has the relationship Pi(t)=a i *t+b, where t is time, Pi(t) is the output optical power of the optoelectronic converter numbered i at time t after the first test, and Pi(0) is the output optical power at the first test;
[0011] The least squares method can be used to calculate
[0012]
[0013] Get a corresponding to all photoelectric converters i After that, the normal distribution is fitted to obtain the standard deviation σ ai and the average value μ ai ; Check each a i Value, if it satisfies |a i |>|μ ai +3σ ai | and according to Pi(t)=a i *t+b calculates that Pi(t)<Pmin after the first preset number of nuclear power plants are overhauled, then the photoelectric converter is a fast-degrading photoelectric converter and it is recommended to replace it during the overhaul of this nuclear power plant.
[0014] Further, in the predictive management method for photoelectric converters of nuclear power plants described in the present invention, the preset time is 10 seconds;
[0015] The first preset number is 2 times.
[0016] Further, in the method for predictive management of photoelectric converters in nuclear power plants according to the present invention, step S2 comprises:
[0017] S201, selecting a second preset number of new photoelectric converters, and obtaining the average optical power P1 of the new photoelectric converters according to steps S101 to S103;
[0018] S202, the output end of the test computer is connected to the input end of the new photoelectric converter, and the light emitting end of the new photoelectric converter is connected to the light receiving end of the new photoelectric converter through an optical attenuation meter;
[0019] S203, the test computer sends a data packet at a rated full-load speed to the new photoelectric converter;
[0020] S204, gradually increasing the attenuation value of the optical attenuation meter until the packet loss rate of data received by the test computer reaches a preset packet loss rate, and recording the attenuation value P2 of the optical attenuation meter at this time;
[0021] S205 : Obtain a minimum allowable optical power Pmin from the difference between the average optical power P1 and the attenuation value P2 .
[0022] Further, in the predictive management method for photoelectric converters of nuclear power plants according to the present invention, the second preset number is greater than or equal to 3 and less than or equal to 5;
[0023] The preset packet loss rate is 0.5%.
[0024] Furthermore, in the method for predicting and managing the photoelectric converter of a nuclear power plant according to the present invention, after step S3, the method further includes:
[0025] S4. Predict the remaining photoelectric converter life: Calculate the remaining photoelectric converter life
[0026] Pi(t)=Pmin+μ ai *T=a i *t+b
[0027] At time t, it is calculated that the time when the packet loss rate will reach 0.5% after the output optical power of the optoelectronic converter decreases to the estimated time T, and the optoelectronic converter is replaced before this time in the replacement plan.
[0028] Furthermore, in the predictive management method for photoelectric converters in nuclear power plants described in the present invention, the estimated time T is 18 months.
[0029] The implementation of the predictive management method for photoelectric converters in a nuclear power plant of the present invention has the following beneficial effects: the present invention performs calculation prediction on each photoelectric converter individually, realizes refined management of the photoelectric converters, ensures safe operation of the nuclear power plant and reduces operating costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] The present invention will be further described below with reference to the accompanying drawings and embodiments, in which:
[0031] Figure 1 is a flow chart of a method for predictive management of photoelectric converters in a nuclear power plant provided by an embodiment of the present invention;
[0032] Figure 2 is a schematic diagram of the structure of a photoelectric converter detection system provided by an embodiment of the present invention;
[0033] Figure 3 is a schematic diagram of the structure of a photoelectric converter detection system provided by an embodiment of the present invention;
[0034] Figure 4 It is a flow chart of a method for predictive management of photoelectric converters in a nuclear power plant provided by an embodiment of the present invention. DETAILED DESCRIPTION
[0035] In order to have a clearer understanding of the technical features, purposes and effects of the present invention, specific embodiments of the present invention are now described in detail with reference to the accompanying drawings.
[0036] In a preferred embodiment, reference Figure 1 and Figure 2 The predictive management method for photoelectric converters of nuclear power plants of this embodiment is applied to the detection of photoelectric converters during the overhaul of nuclear power plants. The predictive management method for photoelectric converters of nuclear power plants includes the following steps:
[0037] S1. Obtain the experimental date tik and average optical power Pik of the photoelectric converter during the kth round of nuclear power plant overhaul, where k is a positive integer.
[0038] S101, the output end of the test computer is connected to the input end of the photoelectric converter, and the light emitting end of the photoelectric converter is connected to the optical power meter. During the test, one photoelectric converter is selected each time to be connected to the test system, and another photoelectric converter is replaced after the test is completed until all photoelectric converters have completed the test.
[0039] S102, the test computer sends a data packet at a rated full-load speed to the photoelectric converter numbered i for a preset time, where i is a positive integer. Optionally, the preset time is 10 seconds.
[0040] S103, calculating the average optical power Pik of the light received by the optical power meter within a preset time, and recording the current time as the experimental date tik.
[0041] S2. Determine the minimum permissible optical power Pmin of a brand new photoelectric converter, wherein the brand new photoelectric converter and the used photoelectric converter are of the same model.
[0042] S3. Screening fast degraded photoelectric converters: The photoelectric converter numbered i has the relationship Pi(t)=a i *t+b, where t is time, Pi(t) is the output optical power of the optoelectronic converter numbered i at time t after the first test, and Pi(0) is the output optical power at the first test;
[0043] The least squares method can be used to calculate
[0044]
[0045] Get a corresponding to all photoelectric converters i After that, the normal distribution is fitted to obtain the standard deviation σ ai and the average value μ ai ; Check each a i Value, if it satisfies |a i |>|μ ai +3σ ai | and according to Pi(t)=a i *t+b calculates the first preset number of nuclear power plant overhauls. If Pi(t) < Pmin, the photoelectric converter is a fast-degrading photoelectric converter, and it is recommended to replace it during this nuclear power plant overhaul. As an option, the first preset number is 2 times.
[0046] This embodiment performs calculation and prediction on each photoelectric converter individually, realizes refined management of the photoelectric converters, ensures safe operation of the nuclear power plant and reduces operating costs.
[0047] In some embodiments of the nuclear power plant optoelectronic converter predictive management method, reference Figure 3 , step S2 comprises:
[0048] S201, select a second preset number of new photoelectric converters, and obtain the average optical power P1 (dBm) of the new photoelectric converters according to steps S101 to S103. Optionally, the second preset number is greater than or equal to 3 and less than or equal to 5.
[0049] S202, the output end of the test computer is connected to the input end of the brand new photoelectric converter, and the light emitting end of the brand new photoelectric converter is connected to the light receiving end of the brand new photoelectric converter through an optical attenuation meter. During the test, one brand new photoelectric converter is connected each time for testing until all brand new photoelectric converters have completed the test.
[0050] S203. The test computer sends a data packet at a rated full-load speed to the new photoelectric converter.
[0051] S204, gradually increase the attenuation value of the optical attenuator until the packet loss rate of the data received by the test computer reaches a preset packet loss rate, and record the attenuation value P2 of the optical attenuator at this time. Alternatively, the preset packet loss rate is 0.5%.
[0052] S205 , obtaining the minimum allowed optical power Pmin from the difference between the average optical power P1 and the attenuation value P2 .
[0053] In some embodiments of the nuclear power plant optoelectronic converter predictive management method, reference Figure 4 , after step S3, further comprising:
[0054] S4. Predict the remaining photoelectric converter life: Calculate the remaining photoelectric converter life
[0055] Pi(t)=Pmin+μ ai *T=a i *t+b
[0056] At time t, the time when the optical power output of the photoelectric converter decreases to the estimated time T when the packet loss rate reaches 0.5% is calculated, and the photoelectric converter is replaced before this time. Alternatively, the estimated time T is 18 months, that is, 365*1.5 days.
[0057] This embodiment periodically measures the optical power output by the photoelectric converter in the nuclear power plant DCS system and uses the historical measurement data to screen out the rapidly degraded photoelectric converters and calculate the remaining life of normal photoelectric converters. This is beneficial to improving the reliability of the photoelectric converters in the nuclear power plant DCS system, reducing the impact of aging failure, and minimizing the cost of regular replacement of the photoelectric converters.
[0058] In this specification, each embodiment is described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the embodiments can be referred to each other. For the device disclosed in the embodiment, since it corresponds to the method disclosed in the embodiment, the description is relatively simple, and the relevant parts can be referred to the method part.
[0059] Professionals may further appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, computer software, or a combination of the two. In order to clearly illustrate the interchangeability of hardware and software, the composition and steps of each example have been generally described in the above description according to function. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professionals and technicians may use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of the present invention.
[0060] The steps of the method or algorithm described in conjunction with the embodiments disclosed herein may be implemented directly using hardware, a software module executed by a processor, or a combination of the two. The software module may be placed in a random access memory (RAM), a memory, a read-only memory (ROM), an electrically programmable ROM, an electrically erasable programmable ROM, a register, a hard disk, a removable disk, a CD-ROM, or any other form of storage medium known in the art.
[0061] The above embodiments are only for illustrating the technical concept and features of the present invention, and their purpose is to enable people familiar with the technology to understand the content of the present invention and implement it accordingly, and they cannot limit the scope of protection of the present invention. All equivalent changes and modifications made to the scope of the claims of the present invention should fall within the scope of the claims of the present invention.
Claims
1. A predictive management method for photoelectric converters in nuclear power plants, It is characterized in that The steps include: S1, obtaining the experimental date tik and average optical power Pik of the photoelectric converter during the kth round of nuclear power plant overhaul, where k is a positive integer; S101, the output end of the test computer is connected to the input end of the photoelectric converter, and the light emitting end of the photoelectric converter is connected to the optical power meter; S102, the test computer sends a data packet at a rated full-load speed to the photoelectric converter numbered i for a preset time, where i is a positive integer; S103, calculating the average optical power Pik of the light received by the optical power meter during the preset time, and recording the current time as the experimental date tik; S2, determine the minimum permissible optical power Pmin of the new photoelectric converter; S201, selecting a second preset number of new photoelectric converters, and obtaining the average optical power P1 of the new photoelectric converters according to steps S101 to S103; S202, the output end of the test computer is connected to the input end of the new photoelectric converter, and the light emitting end of the new photoelectric converter is connected to the light receiving end of the new photoelectric converter through an optical attenuation meter; S203, the test computer sends a data packet at a rated full-load speed to the new photoelectric converter; S204, gradually increasing the attenuation value of the optical attenuation meter until the packet loss rate of data received by the test computer reaches a preset packet loss rate, and recording the attenuation value P2 of the optical attenuation meter at this time; S205, obtaining the minimum allowed optical power Pmin from the difference between the average optical power P1 and the attenuation value P2; S3. Screening of fast degraded photoelectric converters: The photoelectric converter numbered i has the relationship Pi(t)=a i *t+b, where t is time, Pi(t) is the output optical power of the optoelectronic converter numbered i at time t after the first test, and Pi(0) is the output optical power at the first test; The least squares method can be used to calculate Get the corresponding values of all photoelectric converters Then, the normal distribution is fitted to obtain the standard deviation and average ; Check each Value, if satisfied And according to Pi(t)= *t+b calculates that Pi(t)<Pmin after the first preset number of nuclear power plants are overhauled, then the photoelectric converter is a fast-degrading photoelectric converter and it is recommended to replace it during the overhaul of this nuclear power plant.
2. The method for predicting and managing the photoelectric converter of a nuclear power plant according to claim 1, It is characterized in that The preset time is 10 seconds; The first preset number is 2 times.
3. The method for predicting and managing the photoelectric converter of a nuclear power plant according to claim 1, It is characterized in that The second preset number is greater than or equal to 3 and less than or equal to 5; The preset packet loss rate is 0.5%.
4. The method for predicting and managing the photoelectric converter of a nuclear power plant according to claim 3, It is characterized in that After step S3, the method further includes: S4. Predict the remaining photoelectric converter life: Calculate the remaining photoelectric converter life Pi(t)=Pmin+ *T= *t+b At time t, it is calculated that the time when the packet loss rate will reach 0.5% after the output optical power of the optoelectronic converter decreases to the estimated time T, and the optoelectronic converter is replaced before this time.
5. The method for predicting and managing the photoelectric converter of a nuclear power plant according to claim 4, It is characterized in that The estimated time T is 18 months.