Dyeing scheduling processing system, method and computer equipment based on cloud platform
Through the dyeing and scheduling processing system based on the cloud platform, the process processing module and dyeing and scheduling module are used to generate the production process list and scheduling chart, which solves the problem of low efficiency of ERP system in dyeing factory production management, and realizes the More efficient production management and scheduling rationality.
Patent Information
- Application Number
- CN202111314157.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-11-08
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2041-11-08
AI Technical Summary
The existing ERP system cannot effectively meet the needs of the process manufacturing links in the dyeing plant production management, resulting in low efficiency in production equipment management.
Provide a dyeing scheduling processing system based on cloud platform, including process processing module, scheduling information determination module and dyeing scheduling module. By generating a list of production processes based on order information, batch information and dyeing process information, and according to Schedule information is scheduled, generates a scheduling Gantt chart, reduces manual intervention, and improves production management efficiency.
By binding production tasks with process information and scheduling based on the formulated scheduling information, the production management efficiency and scheduling rationality of the equipment are improved, and manual intervention is reduced.
Smart Images

Figure CN114037269B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of data processing technology, and in particular to a dyeing scheduling processing system, method and computer equipment based on a cloud platform. Background Art
[0002] At present, dyeing factories generally use ERP (Enterprise Resource Planning) system to manage production process and use punch card to follow up. That is, after the production workers complete their respective processes, they will complete the code punch card operation on the terminal on site. However, in the link of machine production execution, the machine operation plan is completed entirely on paper. Before the employees execute the process, they need to enter the corresponding process parameters one by one on the controller according to the handwritten requirements of the technician.
[0003] Therefore, the current ERP production management function cannot meet the needs of dyeing factories in the process manufacturing link, resulting in low production management efficiency of production equipment. Summary of the invention
[0004] Based on this, it is necessary to provide a cloud-based dyeing scheduling processing system, method, computer equipment, computer-readable storage medium and computer program product that can improve the production management efficiency of equipment in response to the above technical problems.
[0005] In a first aspect, the present application further provides a dyeing schedule processing system based on a cloud platform, the system comprising a process processing module, a schedule information determination module and a dyeing schedule module, wherein:
[0006] The process processing module is used to generate a list of processes to be produced according to the association between order information, batch information and dyeing process information;
[0007] A scheduling information determination module is used to determine the scheduling information of each dyeing workshop in the production workshop; the scheduling information includes a scheduling type, a production process and a scheduling status; the production process includes at least one dyeing process;
[0008] The dyeing scheduling module is used to schedule the list of processes to be produced according to the scheduling information to obtain a corresponding scheduling Gantt chart; the scheduling Gantt chart at least includes the dyeing process, processing time period and production status of each process to be produced.
[0009] In one embodiment, the process processing module includes a dyeing process processing module, and the dyeing process processing module is used to update the dyeing process according to dyeing and finishing requirements; each dyeing process includes a dyeing process name, a corresponding production equipment model and a corresponding dyeing process group.
[0010] In one embodiment, the system further comprises:
[0011] The equipment processing module is used to update the production equipment of each dyeing workshop according to the actual production needs, and determine the equipment instance according to the equipment model of each production equipment; the attribute information of each equipment embodiment includes the corresponding equipment type, the module type, the regional location in the production area, and the associated data acquisition equipment and monitoring information.
[0012] In one embodiment, the system further comprises:
[0013] The equipment matching module is used to determine, from the equipment instance, target production equipment that matches each to-be-produced process in the to-be-produced process list.
[0014] In one embodiment, the system further comprises:
[0015] A production module, used for determining the production batch corresponding to each of the to-be-produced processes according to the scheduling Gantt chart;
[0016] Based on the production batch, each of the target production equipment is triggered in turn to operate the corresponding production process to be produced.
[0017] In one embodiment, the system further comprises:
[0018] The display module is used to display the scheduling Gantt chart in a preset form.
[0019] In a second aspect, the present application also provides a dyeing schedule processing method based on a cloud platform. The method comprises:
[0020] Generate a list of pending production processes based on the relationship between order information, batch information and dyeing process information;
[0021] Determine the scheduling information of each dyeing workshop in the production workshop; the scheduling information includes scheduling type, production process and scheduling status; the production process includes at least one dyeing process;
[0022] The list of processes to be produced is scheduled according to the scheduling information to obtain a corresponding scheduling Gantt chart; the scheduling Gantt chart at least includes the dyeing process, processing time period and production status of each process to be produced.
[0023] In a third aspect, the present application further provides a computer device. The computer device includes a memory and a processor, the memory stores a computer program, and the processor implements the following steps when executing the computer program:
[0024] Generate a list of pending production processes based on the relationship between order information, batch information and dyeing process information;
[0025] Determine the scheduling information of each dyeing workshop in the production workshop; the scheduling information includes scheduling type, production process and scheduling status; the production process includes at least one dyeing process;
[0026] The list of processes to be produced is scheduled according to the scheduling information to obtain a corresponding scheduling Gantt chart; the scheduling Gantt chart at least includes the dyeing process, processing time period and production status of each process to be produced.
[0027] In a fourth aspect, the present application further provides a computer-readable storage medium. The computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the following steps are implemented:
[0028] Generate a list of pending production processes based on the relationship between order information, batch information and dyeing process information;
[0029] Determine the scheduling information of each dyeing workshop in the production workshop; the scheduling information includes scheduling type, production process and scheduling status; the production process includes at least one dyeing process;
[0030] The list of processes to be produced is scheduled according to the scheduling information to obtain a corresponding scheduling Gantt chart; the scheduling Gantt chart at least includes the dyeing process, processing time period and production status of each process to be produced.
[0031] In a fifth aspect, the present application further provides a computer program product. The computer program product includes a computer program, and when the computer program is executed by a processor, the following steps are implemented:
[0032] Generate a list of pending production processes based on the relationship between order information, batch information and dyeing process information;
[0033] Determine the scheduling information of each dyeing workshop in the production workshop; the scheduling information includes scheduling type, production process and scheduling status; the production process includes at least one dyeing process;
[0034] The list of processes to be produced is scheduled according to the scheduling information to obtain a corresponding scheduling Gantt chart; the scheduling Gantt chart at least includes the dyeing process, processing time period and production status of each process to be produced.
[0035] The above-mentioned cloud-based dyeing scheduling processing system, method, computer device, storage medium and computer program product generate a list of processes to be produced according to the association between order information, batch information and dyeing process information through the process processing module; that is, the production task is bound to the process information; and the dyeing scheduling module schedules the list of processes to be produced according to the scheduling information of each dyeing workshop in the production workshop, obtains the corresponding scheduling Gantt chart, and schedules according to the formulated scheduling information, thereby reducing manual intervention and improving the production management efficiency of the equipment and the rationality of scheduling. BRIEF DESCRIPTION OF THE DRAWINGS
[0036] Figure 1 is a schematic diagram of a dyeing scheduling processing system based on a cloud platform in one embodiment;
[0037] Figure 2 A schematic diagram of an interface for scheduling information in an embodiment;
[0038] Figure 3 is a schematic diagram of a scheduling Gantt chart in one embodiment;
[0039] Figure 4 A schematic diagram of a scheduling interface in one embodiment;
[0040] Figure 5 A schematic diagram of scheduling visualization in one embodiment;
[0041] Figure 6 is a schematic diagram of a dyeing scheduling processing system based on a cloud platform in another embodiment;
[0042] Figure 7 A schematic diagram of an interface created for a device instance in an embodiment;
[0043] Figure 8 A schematic diagram of a dyeing process editing page in an embodiment;
[0044] Fig. 9 This is an application environment diagram of a dyeing scheduling processing method based on a cloud platform in one embodiment;
[0045] Fig.10 It is a flowchart of a dyeing scheduling processing method based on a cloud platform in one embodiment;
[0046] Fig.11 This is a practical application scenario of a dyeing scheduling processing method based on a cloud platform in an embodiment;
[0047] Fig.12 FIG. 4 is a diagram showing the internal structure of a computer device in one embodiment. DETAILED DESCRIPTION
[0048] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.
[0049] The dyeing scheduling processing system based on the cloud platform provided in this application is Figure 1 As shown, the cloud platform-based dyeing scheduling processing system includes a process processing module, a scheduling information determination module and a dyeing scheduling module. The production equipment in this embodiment is described by taking dyeing and finishing equipment (i.e., dyeing machine) as an example, wherein:
[0050] The process processing module is used to generate a list of processes to be produced based on the association between order information, batch information and dyeing process information.
[0051] Among them, batch information refers to batch number (such as 202106001, 20216002, etc.); order information includes customer information, production delivery time, cloth weight and cloth type (for example, 40s / 1 cotton + 50d / 36f polyester low elastic yarn + 30d cotton cover yarn, 80s / 1 mercerized fine cotton stretch frame, 70S / 1 special smooth stranded fine cotton stretch frame beaded, etc.), color and corresponding color number (01# white, corresponding color number is L25119; 20# light purple blue, corresponding color number is M26020, etc.), number of strips (for example, 29, 30, etc.). Dyeing process information, that is, process route, can be understood as the dyeing of cloth includes at least two processes: boiling and dyeing, and the process required for each process (shrinkage vertically 5%, horizontally 2%).
[0052] The list of pending production processes (pending production tasks) may be generated based on the association between order information, batch information and dyeing process information, or may be obtained by connecting to a third-party system (such as ERP, etc.), which is not limited here.
[0053] The scheduling information determination module is used to determine the scheduling information of each dyeing workshop in the production workshop; the scheduling information includes the scheduling type, production process and scheduling status; the production process includes at least one dyeing process.
[0054] The scheduling information includes the scheduling type (such as dyeing schedule and shaping schedule), production process (the production processes corresponding to dyeing schedule include dyeing 1 and dyeing 2, and the production processes corresponding to shaping schedule include scheduled, intermediate and final) and scheduling status (enabled and disabled). When the scheduling status is disabled, the corresponding scheduling information is not displayed; the production process includes at least one dyeing process. Figure 2As shown, it is a schematic diagram of the interface of scheduling information in one embodiment, including scheduling name (dyeing workshop 1 scheduling, dyeing workshop 2 scheduling and shaping workshop scheduling), scheduling type (dyeing workshop 1 scheduling and dyeing workshop 2 scheduling corresponding to the scheduling type is dyeing scheduling, shaping workshop scheduling corresponding to the scheduling type is shaping scheduling), production process including (dyeing 1, dyeing 2, scheduled, medium and final) and activation status (activation) and operation (including editing, equipment configuration and deletion operations). In other words, determining the scheduling information can know the scheduling type of each plan, the process responsible for the machine and the activation status.
[0055] Furthermore, the scheduling information of each dyeing workshop is configured with corresponding production equipment, and the maximum workload (XXXkg) and production characteristics (for example, white-only, blue-only) of the production equipment are configured.
[0056] The dyeing scheduling module is used to schedule the list of production processes to be produced according to the scheduling information to obtain the corresponding scheduling Gantt chart; the scheduling Gantt chart at least includes the dyeing process, processing time period and production status of each production process to be produced.
[0057] The scheduling Gantt chart includes the process, processing time period and production status of completed production processes, production processes in production and production processes to be produced. Production processes in different states are distinguished and displayed in different colors. For example, completed production processes are marked in gray, production processes in production are marked in green, and production processes to be produced are marked in blue. Figure 3 As shown, it is a scheduling Gantt chart of a cotton cloth workshop in an embodiment, which includes completed production processes, production processes in production and processes to be produced, as well as the production time period corresponding to each process, that is, it includes the scheduling Gantt chart of cotton 4#-cotton 18# and the corresponding operation weight. Cotton 4#-cotton 8# are in production, cotton 9# is in non-production state, cotton 10#-cotton 18# are in production, and different processes are produced in different time periods. For example, the process (i.e., dyeing process) corresponding to cotton 4# at 07:00-150;00 is 12000546-dyeing 1-dark gray-1003.4.
[0058] The order of each pending production process in the pending production process list determines the order in the scheduling Gantt chart, that is, the order of each pending production process in the pending production process list corresponds to the scheduling order in the scheduling Gantt chart.
[0059] Specifically, the current operating status of each production equipment in the production workshop is obtained, and scheduling is performed in combination with the pre-set scheduling information and the list of pending production processes to obtain the execution order of each pending production process in the list of pending production processes, and visualized in the form of a scheduling Gantt chart.
[0060] Furthermore, when scheduling the production process list according to the scheduling information, select "Production Category" through the task classification, select one or more batches according to production needs, the batch number has been entered into the database when the order is generated, and only batches of the same color can be checked; check the process according to production needs; the color number / color will be brought in according to the batch number, and the color needs to be classified according to production needs. Click to select equipment, and the equipment list will filter out equipment suitable for this type of production task according to the selected batch color classification and the total weight of the batch, and display them in ascending order according to the remaining production time, such as Figure 4 As shown. At this time, select one of the optional equipment to allocate the plan, select the dyeing process corresponding to the process, and then generate the corresponding planned time, and then complete the task addition. Among them, the dyeing process includes 001 easy crease boiled cloth, 002 ordinary boiled cloth, 003 dark cotton, 004 single wool, 005 cationic medium, dark, 006 dark stripping, 007 acetate light color, 008 acetate dark color, 009 dark wool dyeing one-bath method and 010R / C; Use the same method to add production tasks one by one to complete the scheduling plan, which can be displayed in the form of a card board to obtain a visual display of the workshop schedule, such as Figure 5 As shown, it includes the status of cotton 1# to cotton n# in the cotton workshop, and displays the status of each production part of the dyeing and finishing machine: idle time, the process and current progress of the production batch, and the process and current progress of the batch to be produced.
[0061] In the cloud platform-based dyeing scheduling processing system provided in the embodiment of the present application, a list of processes to be produced is generated through a process processing module according to the association between order information, batch information and dyeing process information; that is, the production tasks are bound to the process information; and the dyeing scheduling module schedules the list of processes to be produced according to the scheduling information of each dyeing workshop in the production workshop, obtains the corresponding scheduling Gantt chart, and schedules according to the formulated scheduling information, thereby reducing manual intervention and improving the production management efficiency of the equipment and the rationality of scheduling.
[0062] In another example, a cloud-based dyeing scheduling processing system is provided, such as Figure 6 As shown, the dyeing schedule processing system includes a process processing module, a schedule information determination module, a dyeing schedule module, an equipment processing module, a production module and a display module, wherein:
[0063] The equipment processing module is used to update the production equipment of each dyeing workshop according to the actual production needs, and determine the equipment instance according to the equipment model of each production equipment; the attribute information of each equipment embodiment includes the corresponding equipment type, the module type to which it belongs, the regional location in the production area, and the associated data acquisition equipment and monitoring information. That is, in the equipment update operation interface, enter the model name according to the equipment type, select "equipment model" for the module, click "OK", and then add a new equipment instance, enter the equipment name (for example, "H01"), the equipment type (such as "dyeing machine"), select the equipment group (such as "level 1 equipment"), select the regional location corresponding to the equipment, set the monitorability to "enabled", the model to which it belongs to "dyeing machine model", select the corresponding acquisition device, and click "OK". Figure 7 As shown, the device instance is created.
[0064] The process processing module includes a dyeing process processing module, which is used to update the dyeing process according to dyeing and finishing requirements; each dyeing process includes the dyeing process name, the production equipment model to which it belongs, and the corresponding dyeing process grouping. That is to say, when a new dyeing process needs to be added, if there is a suitable dyeing process, it is directly obtained from the existing dyeing process. If it exists, the dyeing process is updated, that is, the dyeing process number and dyeing process name are entered according to the naming specification, and the model to which it belongs is selected to be compatible with the target equipment. The dyeing process grouping method can be classified according to user needs. Here, select the classification suitable for the current dyeing process and click the OK button to enter the dyeing process editing page (such as Figure 8 Then drag the function bar to add and adjust each function and complete the update of the dyeing process.
[0065] The dyeing process scheduling module includes an equipment matching module, which is used to determine the target production equipment that matches each process to be produced in the list of processes to be produced from the equipment instance, that is, when scheduling the list of processes to be produced according to the scheduling information, select "production category" through task classification, select one or more batches according to production needs, the batch number has been entered into the database when the order is generated, and only batches of the same color can be checked; check the process according to production needs; the color number / color will be brought in according to the batch number, and the color needs to be classified according to production needs. Click to select equipment. Through the equipment matching module, the equipment list will filter out equipment suitable for this type of production task according to the selected batch color classification and the total weight of the batch, and display them in ascending order according to the remaining production time.
[0066] The production module is used to determine the production batches corresponding to each production process to be produced according to the scheduling Gantt chart; based on the production batches, each target production equipment is triggered in turn to operate the corresponding production process to be produced, and the production batch can be used to generate a barcode. That is, when scheduling the production process list according to the scheduling information, select "production category" through the task classification, select one or more batches according to production needs, the batch number has been entered into the database when the order is generated, and only batches of the same color can be checked; check the process according to production needs; the color number / color will be brought in according to the batch number, and the color needs to be classified according to production needs. Click to select equipment, and the equipment list will filter out equipment suitable for this type of production task according to the selected batch color classification and the total weight of the batch, and display it in ascending order according to the remaining production time. At this time, select one of the optional equipment to allocate the plan, select the dyeing process corresponding to the process, and then generate the corresponding planned time, and then complete the task addition. Use the same method to add production tasks one by one to complete the scheduling plan, and generate the barcode of the scheduling plan, and upload the barcode to the circulation card; display the scheduling plan in the form of a card board, and execute each scheduling task in sequence based on the scheduling plan.
[0067] The display module is used to display the scheduling Gantt chart in a preset form. Furthermore, the display module is also used to combine the machine status to visualize the batch information in the scheduling Gantt chart, the relevant information of the current process, and the information such as the tasks to be produced.
[0068] Furthermore, when executing a production task, the production module determines the batch to be executed by scanning the barcode on the circulation card through the terminal. The barcode number is the batch number (cylinder number) associated with the order information. The barcode is scanned to send a request to the server to verify whether the order number exists. Alternatively, the operator operates the controller, selects the corresponding batch to confirm the start of production, and sends a request to the server to verify whether the order number exists. When the order number is verified to exist, it is compared to see whether the current task is the first task to be produced. If so, the dyeing process information is sent to the controller after confirmation and the dyeing process is started. The controller controls the dyeing machine through the PLC according to the dyeing process file, and at the same time changes the tasks to be produced in the Gantt chart to the in-production state. After the dyeing process is completed, the corresponding production tasks are changed to the produced state, and the production process ends.
[0069] Optionally, in one embodiment, the system further includes a capacity calculation module for real-time statistics of production capacity, which can count the capacity of equipment in real time to avoid manual statistics that may cause data loss and low data reliability.
[0070] In the above-mentioned cloud-based dyeing scheduling processing system, a process processing module is used to generate a list of processes to be produced according to the correlation between order information, batch information and dyeing process information; that is, the production tasks are bound to the process information; and the dyeing scheduling module schedules the list of processes to be produced according to the scheduling information of each dyeing workshop in the production workshop, obtains the corresponding scheduling Gantt chart, schedules according to the established scheduling information, obtains production batches, and updates the production task status in the Gantt chart in real time according to the production status of each batch, thereby reducing manual intervention and improving the production management efficiency of the equipment and the rationality of scheduling.
[0071] Each module in the above-mentioned cloud-based dyeing scheduling processing system can be implemented in whole or in part by software, hardware, or a combination thereof. Each of the above-mentioned modules can be embedded in or independent of a processor in a computer device in the form of hardware, or can be stored in a memory in a computer device in the form of software, so that the processor can call and execute operations corresponding to each of the above modules.
[0072] Based on the same inventive concept, the embodiment of the present application also provides a cloud-based dyeing schedule processing method for realizing the cloud-based dyeing schedule processing system involved above. The implementation scheme for solving the problem provided by the device is similar to the implementation scheme recorded in the above method, so the specific limitations in one or more cloud-based dyeing schedule processing method embodiments provided below can refer to the above limitations on the cloud-based dyeing schedule processing system, and will not be repeated here.
[0073] The cloud platform-based dyeing scheduling processing method provided in the embodiment of the present application can be applied to Fig. 9 In the application environment shown, it includes dyeing and finishing equipment 4000 (dyeing machine), client 2000 and server 1000; a dyeing scheduling processing system 100 based on a cloud platform, the client obtains order information, batch information and dyeing process information from the server, generates a list of processes to be produced according to the association between the order information, batch information and dyeing process information; determines the scheduling information of each dyeing workshop in the production workshop; the scheduling information includes the scheduling type, production process and scheduling status; the production process includes at least one dyeing process; the list of processes to be produced is scheduled according to the scheduling information to obtain a scheduling Gantt chart corresponding to the dyeing machine; the scheduling Gantt chart at least includes the dyeing process, processing time period and production status of each process to be produced.
[0074] The dyeing machine and controller 3000 communicate using industrial protocols. The controller automatically controls the dyeing and finishing equipment to run according to instructions based on the pre-set process flow.
[0075] The client may be a PC client, including a processor 2100, a memory 2200, an interface device 2300, a communication device 2400, a display device 2500, an input device 2600, an output device 2700, and a camera device 2800. The controller is an industrial control computer, including a processor 3100, a memory 3200, an interface device 3300, a communication device 3400, a display device 3500, an input device 3600, an output device 3700, and a camera device 3800.
[0076] The client can be a mobile client, a mobile terminal such as a mobile phone or tablet, with a built-in APP or mini program.
[0077] The mobile client and PC client include a processor, a memory, an interface device, a communication device, a display device, an input device, an output device, and a camera device.
[0078] Among them, the processor can be a central processing unit CPU, a microprocessor MCU, etc. The memory includes, for example, ROM (read-only memory), RAM (random access memory), a non-volatile memory such as a hard disk, etc. The interface device includes, for example, a USB interface, a headphone interface, a serial port, etc. The communication device can, for example, perform wired or wireless communication. The display device is, for example, a liquid crystal display, a touch display, etc. The input device can, for example, include a touch screen, a keyboard, or a microphone, etc. The output device is used to output information, for example, it can be a speaker, which is used to output voice information to the user. The camera device is used to capture and obtain information, for example, it is a camera, etc.
[0079] The server 1000 provides a business point for processing, database, and communication facilities. The server 1000 can be an integral server or a distributed server across multiple computers or computer data centers. The server can be of various types, such as but not limited to, a network server, a news server, a mail server, a message server, an advertising server, a file server, an application server, an interactive server, a database server, or a proxy server. In some embodiments, each server may include hardware, software, or an embedded logic component or a combination of two or more such components for executing appropriate functions supported or implemented by the server. For example, a server such as a blade server, a cloud server, etc., or a server group (1000-1) composed of multiple servers, may include one or more of the above-mentioned types of servers, etc.
[0080] The server 1000 may include a processor 1100 , a memory 1200 , an interface device 1300 , a communication device 1400 , a display device 1500 , and an input device 1600 .
[0081] In one embodiment, Fig.10As shown, a dyeing scheduling processing method based on a cloud platform is provided, and the method is applied to Fig. 9 The following steps are used as an example to illustrate the client:
[0082] Step 1002, generating a list of processes to be produced according to the association between the order information, the batch information and the dyeing process information.
[0083] Optionally, in one embodiment, when the existing dyeing process cannot meet the current dyeing and finishing requirements, the dyeing process is updated according to the dyeing and finishing requirements; each dyeing process includes the dyeing process name, the corresponding production equipment model and the corresponding dyeing process group.
[0084] Optionally, in one embodiment, the production equipment of each dyeing workshop is updated according to actual production needs, and the equipment instance is determined according to the equipment model of each production equipment; the attribute information of each equipment embodiment includes the corresponding equipment type, the module type, the regional location in the production area, and the associated data acquisition equipment and monitoring information.
[0085] Step 1004, determining the scheduling information of each dyeing workshop in the production workshop; the scheduling information includes the scheduling type, production process and scheduling status; the production process includes at least one dyeing process.
[0086] Step 1006, schedule the list of pending production processes according to the scheduling information to obtain a corresponding scheduling Gantt chart; the scheduling Gantt chart at least includes the dyeing process, processing time period and production status of each pending production process.
[0087] Optionally, in one embodiment, the production batch corresponding to each of the to-be-produced processes is determined according to the scheduling Gantt chart; based on the production batch, each of the target production equipment is triggered in turn to operate the corresponding to-be-produced process.
[0088] Further, according to the scheduling Gantt chart, when determining the production batches corresponding to each of the to-be-produced processes, the target production equipment matching each to-be-produced process in the to-be-produced process list is determined from the equipment instance. For example, when scheduling the to-be-produced process list according to the scheduling information, select "production category" through task classification, select one or more batches according to production needs, the batch number has been entered into the database when the order is generated, and only batches of the same color can be checked; check the process according to production needs; the color number / color will be brought in according to the batch number, and the color needs to be classified according to production needs. Click to select equipment, and the equipment list will filter out equipment suitable for this type of production task according to the selected batch color classification and the total weight of the batch, and display it in ascending order according to the remaining production time. At this time, select one of the optional equipment to allocate the plan, select the dyeing process corresponding to the process, and then generate the corresponding planned time, and then complete the task addition. Use the same method to add production tasks one by one to complete the scheduling plan.
[0089] Furthermore, the scheduling Gantt chart is displayed in a preset form, and the batch information, current process, process requirements, machine status and other information in the scheduling Gantt chart are visualized, that is, the scheduling plan is visualized.
[0090] When the production module executes a production task, the terminal scans the barcode on the circulation card to determine the batch to be executed. The barcode number is the batch number (cylinder number) associated with the order information. Scanning the barcode sends a request to the server to verify whether the order number exists. Alternatively, the operator operates the controller, selects the corresponding batch to confirm the start of production, and sends a request to the server. When the order number is verified to exist, it compares whether the current task is the first task to be produced. After confirmation, the dyeing process information is sent to the controller and the dyeing process is started. The controller controls the dyeing machine through the PLC according to the dyeing process file. At the same time, the tasks to be produced in the Gantt chart become in production. After the dyeing process is completed, the corresponding production tasks become produced, and the production process ends.
[0091] like Fig.11As shown in the figure, it is an actual application scenario of the dyeing scheduling processing method based on the cloud platform. The PC client is loaded with cloud platform applications and ERP; the cloud platform application uses Web applications (data visualization system, production management system). ERP includes sales order placement and rolling pre-planning. The rolling pre-planning includes material requirement planning, commissioned processing planning and production planning. The ERP system is divided into multiple batches according to the order, including batch information and order delivery date, forming a batch number id. The production management system includes a production management module, a process management module and an equipment management module; the production management module includes a scheduling Gantt chart, a production statistics module, etc. The process management module includes dyeing process management and dye management. The dyeing process management stores dyeing process information for various dyeing and finishing requirements. Dye management includes color number, color name, color value and color classification. The equipment asset management module includes equipment modeling and equipment archives.
[0092] Specifically, order information, batch information and dyeing process information (i.e., process route) are obtained from ERP, and a list of processes to be produced (production tasks) is generated according to the association between the order information, batch information and dyeing process information; the production management system plans and schedules the production tasks according to the dyeing process information determined by the process management module, and the equipment information (equipment implementation example) in the equipment management module through the dyeing process scheduling module to obtain a corresponding scheduling Gantt chart; the scheduling Gantt chart at least includes the dyeing process, processing time period and production status of each process to be produced; a trigger controller controls the dyeing machine to work, and displays the scheduling Gantt chart on the dyeing scheduling board of the data visualization system.
[0093] In the above-mentioned cloud platform-based dyeing scheduling processing method, a list of processes to be produced is generated according to the correlation between order information, batch information and dyeing process information; that is, the production tasks are bound to the process information; the list of processes to be produced is scheduled according to the scheduling information of each dyeing workshop in the production workshop, and the corresponding scheduling Gantt chart is obtained. Scheduling is performed according to the formulated scheduling information, thereby reducing manual intervention and improving the production management efficiency of the equipment and the rationality of scheduling.
[0094] It should be understood that, although the steps in the flowcharts involved in the above embodiments are displayed in sequence according to the indication of the arrows, these steps are not necessarily executed in sequence according to the order indicated by the arrows. Unless there is a clear explanation in this article, the execution of these steps is not strictly limited in order, and these steps can be executed in other orders. Moreover, at least a part of the steps in the flowcharts involved in the above embodiments may include multiple steps or multiple stages, and these steps or stages are not necessarily executed at the same time, but can be executed at different times, and the execution order of these steps or stages is not necessarily carried out in sequence, but can be executed in turn or alternately with other steps or at least a part of the steps or stages in other steps.
[0095] In one embodiment, a computer device is provided. The computer device may be a terminal, and its internal structure diagram may be as follows: Fig.12 As shown. The computer device includes a processor, a memory, a communication interface, a display screen and an input device connected through a system bus. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system and a computer program. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The communication interface of the computer device is used to communicate with an external terminal in a wired or wireless manner, and the wireless manner can be implemented through WIFI, a mobile cellular network, NFC (near field communication) or other technologies. When the computer program is executed by the processor, a dyeing scheduling processing method based on a cloud platform is implemented. The display screen of the computer device can be a liquid crystal display screen or an electronic ink display screen, and the input device of the computer device can be a touch layer covered on the display screen, or a key, trackball or touchpad set on the computer device shell, or an external keyboard, touchpad or mouse, etc.
[0096] Those skilled in the art will understand that Fig.12 The structure shown in the figure is only a block diagram of a part of the structure related to the solution of the present application, and does not constitute a limitation on the computer device to which the solution of the present application is applied. The specific computer device may include more or fewer components than those shown in the figure, or combine certain components, or have a different arrangement of components.
[0097] In one embodiment, a computer device is further provided, including a memory and a processor, wherein a computer program is stored in the memory, and the processor implements the steps in the above method embodiments when executing the computer program.
[0098] In one embodiment, a computer-readable storage medium is provided, on which a computer program is stored. When the computer program is executed by a processor, the steps in the above-mentioned method embodiments are implemented.
[0099] In one embodiment, a computer program product is provided, including a computer program, which implements the steps in the above method embodiments when executed by a processor.
[0100] It should be noted that the user information (including but not limited to user device information, user personal information, etc.) and data (including but not limited to data used for analysis, stored data, displayed data, etc.) involved in this application are all information and data authorized by the user or fully authorized by all parties.
[0101] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to the memory, database or other medium used in the embodiments provided in the present application can include at least one of non-volatile and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetoresistive random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory can include random access memory (RAM) or external cache memory, etc. As an illustration and not limitation, RAM can be in various forms, such as static random access memory (SRAM) or dynamic random access memory (DRAM). The database involved in each embodiment provided in this application may include at least one of a relational database and a non-relational database. Non-relational databases may include distributed databases based on blockchains, etc., but are not limited to this. The processor involved in each embodiment provided in this application may be a general-purpose processor, a central processing unit, a graphics processor, a digital signal processor, a programmable logic device, a data processing logic device based on quantum computing, etc., but are not limited to this.
[0102] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0103] The above embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the present application. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the present application shall be subject to the attached claims.
Claims
1. A dyeing scheduling processing system based on a cloud platform, characterized in that: The system includes a process processing module, a scheduling information determination module, an equipment processing module and a dyeing process scheduling module, wherein: The process processing module is used to generate a list of processes to be produced according to the association between order information, batch information and dyeing process information; A scheduling information determination module is used to determine the scheduling information of each dyeing workshop in the production workshop; the scheduling information includes a scheduling type, a production process and a scheduling status; the production process includes at least one dyeing process; The equipment processing module is used to update the production equipment of each dyeing workshop according to the actual production needs, and determine the equipment instance according to the equipment model of each production equipment; the attribute information of each equipment instance includes the corresponding equipment type, the module type, the regional location in the production area, and the associated data collection equipment and monitoring information; The dyeing process scheduling module is used to schedule the list of processes to be produced according to the scheduling information to obtain a corresponding scheduling Gantt chart; the scheduling Gantt chart at least includes the dyeing process, processing time period and production status of each process to be produced, wherein the scheduling sequence in the scheduling Gantt chart corresponds to the sequence of each process to be produced in the list of processes to be produced; The dyeing process scheduling module includes an equipment matching module, and the equipment matching module is used to determine, from the equipment instance, target production equipment that matches each process to be produced in the list of processes to be produced.
2. The system according to claim 1, characterized in that The process processing module includes a dyeing process processing module, and the dyeing process processing module is used to update the dyeing process according to dyeing and finishing requirements; each dyeing process includes a dyeing process name, a corresponding production equipment model and a corresponding dyeing process group.
3. The system according to claim 1, characterized in that The system further comprises: A production module, used for determining the production batch corresponding to each of the to-be-produced processes according to the scheduling Gantt chart; Based on the production batch, each of the target production equipment is triggered in turn to operate the corresponding production process.
4. The system according to claim 1, characterized in that The system further comprises: The display module is used to display the scheduling Gantt chart in a preset form.
5. A dyeing scheduling processing method based on a cloud platform, characterized in that: The method comprises: Generate a list of pending production processes based on the relationship between order information, batch information and dyeing process information; Determine the scheduling information of each dyeing workshop in the production workshop; the scheduling information includes scheduling type, production process and scheduling status; the production process includes at least one dyeing process; The production equipment of each dyeing workshop is updated according to the actual production needs, and the equipment instance is determined according to the equipment model of each production equipment; the attribute information of each equipment instance includes the corresponding equipment type, the module type, the regional location in the production area, and the associated data collection equipment and monitoring information; The list of processes to be produced is scheduled according to the scheduling information to obtain a corresponding scheduling Gantt chart; the scheduling Gantt chart at least includes the dyeing process, processing time period and production status of each process to be produced, wherein the scheduling sequence in the scheduling Gantt chart corresponds to the sequence of each process to be produced in the list of processes to be produced; The step of scheduling the list of processes to be produced according to the scheduling information to obtain a corresponding scheduling Gantt chart includes determining, from the equipment instance, target production equipment that matches each process to be produced in the list of processes to be produced.
6. The method according to claim 5, characterized in that The method further comprises: The dyeing process is updated according to the dyeing and finishing requirements; each dyeing process includes the dyeing process name, the model of production equipment to which it belongs, and the corresponding dyeing process grouping.
7. The method according to claim 5, characterized in that The method further comprises: Determine the production batch corresponding to each of the to-be-produced processes according to the scheduling Gantt chart; Based on the production batch, each of the target production equipment is triggered in turn to operate the corresponding production process.
8. A computer device comprising a memory and a processor, wherein the memory stores a computer program, wherein: When the processor executes the computer program, the steps of the method according to claim 6 are implemented.
9. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method according to claim 6 are implemented.
10. A computer program product, comprising a computer program, characterized in that When the computer program is executed by a processor, the steps of the method according to claim 6 are implemented.