Suspended steel track beam square hole concentric positioning tool and construction method thereof
By using square hole concentric positioning tooling during the construction of suspended rail beams, the problem of difficulty in ensuring the concentricity of square holes is solved, efficient concentric positioning and welding fixing are achieved, manufacturing efficiency is improved and cost savings are saved.
Patent Information
- Application Number
- CN202111465710.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-12-03
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2041-12-03
AI Technical Summary
In the construction process of suspended rail beams, it is difficult to effectively ensure the concentricity of the square holes, resulting in inaccurate installation and large CNC milling machines are required for processing, which is inefficient.
The square hole concentric positioning tooling is adopted for hanging steel rail beams. Through the adjustment of upper and lower tightening bolts and left and right tightening bolts, the tooling is positioned accurately, and the concentric positioning of the square hole plate is achieved through welding fixing.
实现了悬挂式钢轨道梁方孔的同心定位,满足了钢轨道梁与立柱的同心度要求,提高了制造效率,节省了制作费用,并简化了工装结构,方便使用和调整。
Smart Images

Figure CN114055057B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of concentricity positioning tooling, and in particular relates to a concentricity positioning tooling for a square hole of a suspended steel track beam and a construction method thereof. Background Art
[0002] like Figure 1 The square hole plates 1 of the suspended steel track beam shown in the figure have two sets of square holes 2 at both ends, and the two sets of square holes 2 are used to connect the column and the steel track beam. When connecting: the column and the steel track beam are connected by a square shaft between the steel track beam and the square holes 2 on the column. Therefore, the two square holes 2 on the two square hole plates 1 of the steel track beam must be concentric to ensure the installation requirements of the steel track beam.
[0003] At present, if the square hole 2 is processed after the steel track beam is welded, such a construction sequence can ensure the concentricity requirements of the two square holes 2 processed by the machine tool, but due to the structural dimensions of the track beam length x width x height: 25mX1.2mX1.2m, a large CNC milling machine is required to complete it, and the processing efficiency is low. Therefore, under the existing technology, the process of first processing the square hole 2 on the single square hole plate 1 of the suspended steel track beam and then assembling it is generally adopted, which is called the first hole method construction process. If the first hole method construction process is adopted, it is necessary to design a matching concentric positioning tool for the square holes of the suspended steel track beam to ensure the concentricity requirements of the upper holes 2 on the two square hole plates 1. In this regard, the following technical solution is proposed. Summary of the invention
[0004] The technical problem solved by the present invention is to provide a concentric positioning tool for square holes of a suspended steel track beam and a construction method thereof, so as to solve the technical problem of concentric positioning of square holes of a suspended steel track beam during the construction process of a hole-first construction process.
[0005] The technical solution adopted by the present invention is a construction method for concentric positioning of square holes of a suspended steel track beam, comprising the following steps:
[0006] S001, Processing square holes: Process square holes on square hole plates according to size;
[0007] S002. Prepare the tooling: pre-install the upper and lower jacking bolts, the left and right jacking bolts and their respective locking nuts on the positioning crossbeam of the suspended steel track beam square hole concentric positioning tooling;
[0008] S003. Pre-assemble the square hole plate: pre-assemble the square hole plate on the suspended steel track beam, and adjust the relative position of the square hole plate to install the concentric positioning tool of the square hole of the suspended steel track beam into the corresponding square hole of the square hole plate;
[0009] S004. Concentric positioning adjustment: Rotate the upper and lower tightening bolts and the left and right tightening bolts outward respectively, so that the upper and lower reference surfaces and the left and right reference surfaces of the tooling are respectively close to the inner side surface of the square hole, and the outer axial end surfaces of the upper and lower tightening bolts and the left and right tightening bolts are also close to the inner side wall of the square hole, and then tighten the locking nut to lock the position of the tooling;
[0010] S005. Welding fixation: Weld the square hole plate and the suspended steel track beam firmly;
[0011] S006. Disassembling the tooling: Loosen the locking nut, rotate the upper and lower tightening bolts and the left and right tightening bolts inward, and remove the tooling from the square hole.
[0012] The invention also includes a concentric positioning tool for square holes of suspended steel rail beams used in the concentric positioning construction method for square holes of suspended steel rail beams, the tool consists of a positioning crossbeam, upper and lower jacking bolts, left and right jacking bolts, and locking nuts; the positioning crossbeam has upper and lower reference surfaces that are parallel to each other and left and right reference surfaces that are parallel to each other and left and right reference surfaces that are parallel to each other; the upper and lower reference surfaces are perpendicular to the left and right reference surfaces; both ends of the reference surfaces on one side of the upper and lower reference surfaces and both ends of the reference surfaces on one side of the left and right reference surfaces are respectively provided with internal threaded holes perpendicular to the reference surfaces; the internal threaded holes of the upper and lower reference surfaces are screwed and fitted to install the upper and lower jacking bolts; the internal threaded holes of the left and right reference surfaces are screwed and fitted to install the left and right jacking bolts, and the upper and lower jacking bolts and the left and right jacking bolts are respectively screwed and fitted to install the locking nuts; the aforementioned positioning crossbeam is inserted into the square holes of the two square hole plates, and the upper and lower jacking bolts and the left and right jacking bolts are respectively fitted to the inner side walls of the square holes; the upper and lower jacking bolts and the left and right jacking bolts are adjusted so that the reference surfaces on the other side of the upper and lower reference surfaces and the reference surfaces on the other side of the left and right reference surfaces are respectively close to the inner side walls of the square holes to locate the concentricity of the square holes of the two square hole plates.
[0013] In the above technical solution, further: the longitudinal section of the positioning beam is a square structure or an octagonal structure.
[0014] In the above technical solution, further: the positioning beam is welded with steel plates to form a square structure or an octagonal structure with a hollow longitudinal section, and a reinforcing support plate is provided at the hollow part of the positioning beam.
[0015] In the above technical solution, further: both ends of the straight-line crossbeam of the positioning crossbeam have boss structures with reduced sizes.
[0016] In the above technical scheme, further: there are two internal threaded holes formed at both ends of one side of the left and right reference surfaces, and the two internal threaded holes of the left and right reference surfaces are symmetrically arranged on the same side reference surface center line; there are four internal threaded holes formed at both ends of one side of the upper and lower reference surfaces, and the four internal threaded holes of the upper and lower reference surfaces are symmetrically arranged on the same side reference surface in pairs.
[0017] In the above technical solution, further: the upper and lower tightening bolts and the left and right tightening bolts have the same structure, and the upper and lower tightening bolts and the left and right tightening bolts are respectively composed of coaxial and integrally formed regular polygonal bolt heads and screw rods.
[0018] The advantages of the present invention compared with the prior art are:
[0019] 1. In the process of manufacturing the suspended steel track beam by the hole-first construction process of the present invention, the square hole is first processed on the square hole plate and then the square hole plate of the suspended steel track beam is assembled and welded. In the process of assembling and welding the square hole plate, the concentricity of the two square holes is controlled by the concentric positioning tool of the square hole of the suspended steel track beam to meet the concentricity requirements of the square hole of the suspended steel track beam and the column.
[0020] 2. The present invention does not require a large-scale CNC milling machine, but uses auxiliary tooling for positioning, assembly and welding, which can greatly improve the manufacturing efficiency of the suspended steel track beam and save a lot of production costs.
[0021] 3. The square hole concentric positioning fixture for the suspended steel track beam of the present invention has a simple structure, is easy to manufacture, has reliable positioning and clamping, is convenient to install and adjust, is reusable, is economical and practical, and is reliable and efficient. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 It is a schematic diagram of the square hole structure of the square hole plate of the suspended steel track beam;
[0023] Figure 2 This is a front view of the tooling of the present invention in use;
[0024] Figure 3 It is a side view of the tooling of the present invention;
[0025] Figure 4 A three-dimensional diagram of the tooling of the present invention in use;
[0026] Figure 5 It is a side view of the positioning principle of the concentric positioning of the two double holes of the tooling of the present invention;
[0027] Figure 6 It is a front view of the positioning beam in the tooling of the present invention;
[0028] Figure 7 for Figure 6 Side view of
[0029] Figure 8 for Figure 6 Bottom view of
[0030] Fig. 9 It is a front view of the upper and lower tightening bolts and the left and right tightening bolts in the tooling of the present invention;
[0031] Fig.10 for Fig. 9 Bottom view;
[0032] Fig.11 It is a front view of the locking nut in the tooling of the present invention;
[0033] Fig.12 for Fig.11 A top view of
[0034] Fig.13 It is a flow chart of the construction method of the present invention;
[0035] In the figure: 1-square hole plate, 2-square hole, 3-positioning beam, 4-upper and lower tightening bolts, 5-left and right tightening bolts, 6-locking nut, 4-1 upper and lower reference planes, 5-1 left and right reference planes, 301-internal threaded hole, 302-reinforced support plate. DETAILED DESCRIPTION
[0036] The following will be combined with the attached embodiment of the present invention Figure 1-13 , the technical solutions in the embodiments of the present invention are clearly and completely described. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0037] (like Fig.13 The construction method for concentric positioning of square holes of suspended steel track beams (as shown in FIG. 1 ) comprises the following steps:
[0038] Step S001, processing square holes: after marking according to the size, use a CNC machine tool to process square holes 2 on the square hole plate 1. The square holes 2 are processed step by step, and the CNC machine tool is used to control the processing size accuracy of the square holes 2 to meet the concentric positioning requirements of the subsequent two square holes 2.
[0039] Step S002, prepare the tooling: pre-install the upper and lower jacking bolts 4, the left and right jacking bolts 5 and their respective locking nuts 6 on the positioning beam 3 of the suspended steel track beam square hole concentric positioning tooling. That is, screw the upper and lower jacking bolts 4 into the internal threaded holes 301 formed on the lower reference surface of the upper and lower reference surfaces 4-1 of the positioning beam 3; screw the left and right jacking bolts 5 into the internal threaded holes 301 formed on the reference surface of the left and right reference surfaces 5-1 of the positioning beam 3 on the right side. Before screwing in, the left and right jacking bolts 5 and their respective locking nuts 6 need to be pre-installed with their respective locking nuts 6. During pre-installation, there is no need to fit the locking nuts 6 to the outer side of the positioning beam 3, that is, the tooling is in a non-locked state.
[0040] Step S003, pre-assemble the square hole plate: pre-assemble the square hole plate 1 on the suspended steel track beam, and adjust the relative position of the square hole plate 1 to install the suspended steel track beam square hole concentric positioning tooling into the corresponding square hole 2 of the square hole plate 1. That is, put the tooling pre-assembled in step S002 into the square hole 2, and at the same time, the end faces of the bolt heads of the left and right jacking bolts 5 and the upper and lower jacking bolts 4 are respectively abutted against the inner side wall of the square hole 2. That is, the upper and lower jacking bolts 4 and the left and right jacking bolts 5 are respectively adapted to the inner side wall of the square hole 2.
[0041] Step S004, concentric positioning adjustment: rotate the upper and lower tightening bolts 4 and the left and right tightening bolts 5 outward respectively: that is, rotate the upper and lower tightening bolts 4 and the left and right tightening bolts 5 so that the upper and lower tightening bolts 4 and the left and right tightening bolts 5 are axially displaced outward respectively, so that the upper and lower reference surfaces 4-1 and the left and right reference surfaces 5-1 of the tooling are gradually close to the inner side surface of the square hole 2. After the outer axial end surfaces of the bolt heads of the upper and lower tightening bolts 4 and the left and right tightening bolts 5 are also close to the inner side wall of the square hole 2, tighten the locking nut 6 so that the locking nut 6 is close to the outer side wall of the positioning beam 3 to lock the position of the tooling; so that the tooling is embedded and fixed on the inner side wall of the square hole 2 to ensure that the tooling does not shake. In this way, under the linear positioning guide of the positioning beam 3, the concentricity of the two square holes 2 during welding is guaranteed.
[0042] Step S005, welding and fixing: firmly weld the square hole plate 1 and the suspended steel track beam; complete the welding assembly and fixing of the suspended steel track beam under the premise of ensuring concentricity.
[0043] Step S006, disassembling the tooling: After the welding is completed, first loosen the locking nut 6, then rotate the upper and lower jacking bolts 4 and the left and right jacking bolts 5 inward: that is, rotate the upper and lower jacking bolts 4 and the left and right jacking bolts 5 so that the upper and lower jacking bolts 4 and the left and right jacking bolts 5 are axially inwardly positioned in a straight line. Thus, the upper and lower jacking bolts 4 and the left and right jacking bolts 5 loosen the tight state between the tooling and the inner wall of the square hole 2, and then take the tooling out of the square hole 2 to prepare for reuse, thus completing the concentric positioning welding of the square hole 2 in the first hole construction process.
[0044] It can be seen that in the process of manufacturing the suspended steel track beam by the hole-first construction process of the present invention, the square hole is first processed on the square hole plate and then the square hole plate of the suspended steel track beam is assembled and welded. During the assembly and welding process of the square hole plate, the concentricity of the square hole is controlled by the concentric positioning tool of the square hole of the suspended steel track beam to meet the concentricity requirements of the square hole of the suspended steel track beam and the column.
[0045] Furthermore, the hole-first process of the present invention does not require a large-scale CNC milling machine, but uses auxiliary tooling for positioning, assembly and welding, which can greatly improve the manufacturing efficiency of the suspended steel track beam and save a lot of production costs.
[0046] The present invention also includes a suspended steel track beam square hole concentric positioning tool used in the suspended steel track beam square hole concentric positioning construction method: the tool consists of a positioning crossbeam 3, upper and lower jacking bolts 4, left and right jacking bolts 5, and a locking nut 6. It can be seen that the four components of the present invention are combined into a suspended steel track beam square hole concentric positioning tool, and the tool structure is simple and easy to manufacture.
[0047] At the same time, the tooling described later in the present invention has the advantages of reliable positioning and clamping, convenient installation and adjustment, reusability, economy, practicality, reliability and efficiency during use.
[0048] Specifically: (such as Figure 3 , Figure 5 As shown in the figure, the positioning beam 3 has upper and lower reference surfaces 4-1 which are parallel to each other and left and right reference surfaces 5-1 which are parallel to each other and left and right reference surfaces 5-1 which are parallel to each other, and the upper and lower reference surfaces 4-1 and the left and right reference surfaces 5-1 are perpendicular to each other; when processing the positioning beam 3, the parallelism between the upper and lower reference surfaces and the left and right reference surfaces of the positioning beam 3 is ensured.
[0049] In the above embodiment, further: the longitudinal section of the positioning beam 3 is a square structure or an octagonal structure. The square structure or the octagonal structure referred to here includes two types: a solid structure and a hollow structure.
[0050] In the above embodiment, as a preferred embodiment: the positioning beam 3 is welded with steel plates to form a square structure or an octagonal structure with a hollow longitudinal section. The hollow structure has the advantage of a lightweight design tooling and is convenient for hand-held use.
[0051] Regardless of the hollow square structure or the hollow octagonal structure, both have upper and lower reference surfaces 4-1 spaced apart and parallel to each other, and left and right reference surfaces 5-1 spaced apart and parallel to each other, thereby satisfying the coplanar positioning requirement of the reference surfaces of the tooling positioning beam 3.
[0052] A reinforcing support plate 302 is provided at the hollow part of the positioning beam 3. When there is one reinforcing support plate 302, the reinforcing support plate 302 can be provided at the center; when there are multiple reinforcing support plates 302, the reinforcing support plates 302 are provided axially symmetrically at the hollow part to ensure that the hollow positioning beam 3 has a sufficiently stable and balanced structural support strength.
[0053] The side reference surface of the upper and lower reference surfaces 4-1 (i.e. Figure 5 The lower reference surface shown in FIG. 5) at both ends and the reference surface on one side of the left and right reference surfaces 5-1 (i.e., Figure 5 The two ends of the right reference surface shown in the figure are respectively provided with internal thread holes 301 perpendicular to the reference surface. The internal thread holes 301 are arranged perpendicular to the reference surface to effectively ensure the flatness of the tooling reference positioning surface.
[0054] In the above embodiment, further: (such as Figure 6 (As shown in the figure), there are two internal threaded holes 301 at both ends of one side reference surface (i.e., the right reference surface) of the left and right reference surfaces 5-1, and the two internal threaded holes 301 of the left and right reference surfaces 5-1 are symmetrically arranged on the same axis on the center line of the same side reference surface, thereby ensuring the support reliability of the bolt head support points of the left and right tightening bolts 5 after the left and right tightening bolts 5 are screwed into the internal threaded holes 301.
[0055] (like Figure 8 As shown) the upper and lower reference surfaces 4-1 on one side of the reference surface (ie as shown Figure 7 There are four internal thread holes 301 at both ends of the upper and lower reference surfaces 4-1, and the four internal thread holes 301 of the upper and lower reference surfaces 4-1 are symmetrically arranged at both ends of the same side reference surface. Similarly, four supporting points are used for support, which is firm, reliable and stable.
[0056] The internal threaded holes 301 of the upper and lower reference surfaces 4-1 are screwed and fitted with the upper and lower jacking bolts 4; the internal threaded holes 301 of the left and right reference surfaces 5-1 are screwed and fitted with the left and right jacking bolts 5, and the upper and lower jacking bolts 4 and the left and right jacking bolts 5 are screwed and fitted with the locking nuts 6. Before pre-installation, the locking nuts 6 do not need to be pressed against the outer wall of the positioning beam 3. After the upper and lower jacking bolts 4 and the left and right jacking bolts 5 are adjusted so that the upper and lower reference surfaces 4-1 and the left and right reference surfaces 5-1 are pressed against the inner wall of the square hole 2, the position of the locking nuts 6 is finally locked so that the locking nuts 6 are pressed against the outer wall of the positioning beam 3, the bolt position is locked to prevent the upper and lower jacking bolts 4 and the left and right jacking bolts 5 from moving, and the tooling positioning beam 3 is firmly positioned in the double hole 2, so as to weld the square hole plate 1 and ensure the concentricity of the double hole 2 during the welding process.
[0057] In the above embodiment, further: the upper and lower tightening bolts 4 and the left and right tightening bolts 5 have the same structure, and the same structure means that the pitch and thread structure are exactly the same to ensure the consistency of the number of rotations, thereby ensuring the consistency of operation. The upper and lower tightening bolts 4 and the left and right tightening bolts 5 are respectively composed of a coaxial and integrally formed regular polygonal bolt head and an externally threaded screw. The regular polygonal bolt head is used to facilitate the use of tools for rotation operation. The bolt head and the screw are coaxially integrally formed, and the structural strength is high, meeting the strength requirements of the tooling positioning support structure.
[0058] When using this tool for concentric positioning operations: (combined with Figure 4 ) The aforementioned positioning beam 3 is inserted into the square holes 2 of the two square hole plates 1, and the upper and lower tightening bolts 4 and the left and right tightening bolts 5 are adjusted so that the reference surface on the other side of the upper and lower reference surfaces 4-1 and the reference surface on the other side of the left and right reference surfaces 5-1 are respectively pressed against the inner wall of the square hole 2 to position and correct the concentricity of the two square hole plates 1 and the square holes 2.
[0059] In summary, the present invention solves the technical problem of concentric positioning of square holes of suspended steel track beams during the construction process of the hole-first construction process; the suspended steel track beams are manufactured by the hole-first construction process, and the square holes are first processed on the square hole plates before the square hole plates of the suspended steel track beams are assembled and welded; the concentric positioning tooling of the square holes of the suspended steel track beams is used to control the concentricity of the square holes to meet the concentricity requirements of the square holes of the suspended steel track beams and the columns. And there is no need for large-scale CNC milling machines, and auxiliary tooling is used for positioning, assembly and welding, which has high manufacturing efficiency and greatly reduces economic investment; the structure is simple and easy to manufacture; the positioning and clamping are reliable, and the installation, adjustment and use are convenient; the tooling is reusable, economical and practical, simple, reliable and efficient.
[0060] Each embodiment in this specification is described in a related manner, and the same or similar parts between the embodiments can be referenced to each other, and each embodiment focuses on the differences from other embodiments.
[0061] The above description is only a preferred embodiment of the present invention and is not intended to limit the protection scope of the present invention. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention are included in the protection scope of the present invention.
Claims
1. Suspended steel track beam square hole concentric positioning tooling, characterized by: The tooling comprises a positioning crossbeam (3), upper and lower tightening bolts (4), left and right tightening bolts (5), and locking nuts (6); the positioning crossbeam (3) has upper and lower reference surfaces (4-1) spaced apart and parallel to each other, and left and right reference surfaces (5-1) spaced apart and parallel to each other; the upper and lower reference surfaces (4-1) and the left and right reference surfaces (5-1) are perpendicular to each other; both ends of one side reference surface of the upper and lower reference surfaces (4-1) and both ends of one side reference surface of the left and right reference surfaces (5-1) are respectively provided with internal threaded holes (301) perpendicular to the reference surfaces; the internal threaded holes (301) of the upper and lower reference surfaces (4-1) are screwed and fitted with the upper and lower tightening bolts (4); the left and right reference surfaces (5-1) are screwed together and fitted with the upper and lower tightening bolts (4); The internal threaded hole (301) of the reference surface (5-1) is screwed and fitted to install the left and right tightening bolts (5), and the upper and lower tightening bolts (4) and the left and right tightening bolts (5) are screwed and fitted to install the locking nuts (6); the aforementioned positioning crossbeam (3) is inserted into the square holes (2) of the two square hole plates (1), and the upper and lower tightening bolts (4) and the left and right tightening bolts (5) are respectively fitted to the inner side walls of the square holes (2); the upper and lower tightening bolts (4) and the left and right tightening bolts (5) are adjusted so that the reference surface on the other side of the upper and lower reference surfaces (4-1) and the reference surface on the other side of the left and right reference surfaces (5-1) are respectively close to the inner side walls of the square holes (2) to locate the concentricity of the square holes (2) of the two square hole plates (1); The invention also includes a method for concentrically positioning a square hole of a suspended steel track beam, the method using a concentrically positioning tool for a square hole of a suspended steel track beam, and the method comprising the following steps: S001, processing square holes: processing square holes (2) on the square hole plate (1) according to the size; S002, prepare the tooling: pre-install the upper and lower jacking bolts (4), the left and right jacking bolts (5) and their respective locking nuts (6) on the positioning crossbeam (3) of the suspended steel track beam square hole concentric positioning tooling; S003, pre-assembling the square hole plate: pre-assembling the square hole plate (1) on the suspended steel track beam, and adjusting the relative position of the square hole plate (1) so as to install the square hole concentric positioning tool of the suspended steel track beam into the corresponding square hole (2) of the square hole plate (1); S004. Concentric positioning adjustment: respectively rotate the upper and lower tightening bolts (4) and the left and right tightening bolts (5) outwards so that the upper and lower reference surfaces (4-1) and the left and right reference surfaces (5-1) of the tooling are respectively close to the inner side surface of the square hole (2), and the outer axial end surfaces of the bolt heads of the upper and lower tightening bolts (4) and the left and right tightening bolts (5) are also close to the inner side wall of the square hole (2), and then tighten the locking nut (6) to lock the position of the tooling; S005, welding and fixing: firmly welding the square hole plate (1) and the suspended steel track beam; S006. Disassembling the tool: Loosen the locking nut (6), turn the upper and lower tightening bolts (4) and the left and right tightening bolts (5) inward, and remove the tool from the square hole (2).
2. According to claim 1, the square hole concentric positioning tool for suspended steel track beams is characterized in that: The longitudinal section of the positioning crossbeam (3) is a square structure or an octagonal structure.
3. The square hole concentric positioning tool for suspended steel track beams according to claim 1 or 2, characterized in that: The positioning crossbeam (3) is welded from steel plates to form a square structure or an octagonal structure with a hollow longitudinal cross section, and a reinforcing support plate (302) is provided at the hollow portion of the positioning crossbeam (3).
4. The square hole concentric positioning tool for suspended steel track beam according to claim 1, characterized in that: There are two internal threaded holes (301) formed at both ends of one side reference surface of the left and right reference surfaces (5-1), and the two internal threaded holes (301) of the left and right reference surfaces (5-1) are arranged symmetrically on the same side reference surface center line; there are four internal threaded holes (301) formed at both ends of one side reference surface of the upper and lower reference surfaces (4-1), and the four internal threaded holes (301) of the upper and lower reference surfaces (4-1) are arranged symmetrically on both ends of the same side reference surface.
5. According to claim 1, the square hole concentric positioning tool for suspended steel track beams is characterized in that: The upper and lower tightening bolts (4) and the left and right tightening bolts (5) have the same structure, and the upper and lower tightening bolts (4) and the left and right tightening bolts (5) are respectively composed of a coaxial and integrally formed regular polygonal bolt head and a screw rod.
Citation Information
Patent Citations
Suspension type steel track beam square hole concentric positioning tool
CN216398575U