Debugging platform for chemical processes

By designing a debugging platform that integrates multiple power sources and valves, the problems of optimal power source selection and flow pressure regulation in chemical fluid delivery are solved, and multivariate control of chemical fluid systems and optimal fluid delivery form are realized. In the debugging and engineering application of chemical processes.

CN114063585BActive Publication Date: 2024-12-03AEROSUN CORP
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202111443680.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-11-30
Publication Date
2024-12-03
Estimated Expiration
2041-11-30

AI Technical Summary

Technical Problem

The prior art lacks a comprehensive fluid delivery test platform that adapts to the selection of multiple power sources and flow pressure adjustment, making it difficult to achieve the most cost-effective control method in chemical fluid delivery projects.

Method used

A debugging platform including air compressors, water storage tanks, pumps, heat exchangers and control systems is designed. Through the combination of multiple valves and power sources, a univariate or multiple temperature, flow, pressure, and liquid level is achieved. The variable is controlled with constant value, and different power sources and actuators can be selected to adjust the valve opening or pump frequency in real time to achieve free switching of the fluid system.

Benefits of technology

It has achieved the best choice of multiple power sources for the fluid system, can adjust pressure and flow rate within a wide range, verify the most reasonable form of fluid delivery, and is suitable for the debugging and engineering applications of chemical processes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114063585B_ABST
    Figure CN114063585B_ABST
Patent Text Reader

Abstract

The present invention relates to a debugging platform for chemical process, belonging to the field of fluid conveying control technology. The platform includes an air compressor, a water storage tank, a pump, a heat exchanger and a control system. The air compressor and the water storage tank form gas communication and are provided with an air flow regulating valve and a bypass air pressure regulating valve. The pump contains at least three pumps in parallel and is connected with a first water flow bypass pipe in parallel. The water storage tank and the pump form liquid flow communication. The pump and the heat exchanger form liquid flow communication and are provided with a bypass pressure regulating valve and a water flow pressure regulating valve. The water storage tank is connected to tap water through a water inlet pipe. A second water flow bypass pipe is provided between the water outlet of the pump and the water storage tank. The water flow pressure regulating valve is connected with a third water flow bypass pipe in parallel. A water flow regulating valve and a back pressure valve are sequentially connected in series from the outlet of the heat exchanger to the terminal water outlet. The water flow regulating valve and the back pressure valve are respectively connected with a fourth water flow bypass pipe and a fifth water flow bypass pipe in parallel. The heater, pump, heat exchanger and various valves of the air compressor and the water storage tank are connected with the control system in a control signal. This platform can be used to verify and find the most reasonable fluid delivery form under different power sources for engineering applications.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a debugging platform for a chemical process and belongs to the technical field of fluid transportation control. Background Art

[0002] In actual chemical fluid transportation engineering projects, there is a certain fluid medium in the process flow. In order to achieve a certain process requirement at a certain process node, the medium needs to have strict parameter control requirements at the process node, and the control target may be achieved by different control methods. For example, the simplest one is that the medium flow at a certain node requires a certain fixed value. The power source can be mechanical pump delivery, other high-pressure medium push, set a certain medium liquid level height and rely on gravity self-flow, etc. The flow regulation method can be: (1) set a regulating valve at the node; (2) add a bypass diversion at the rear end of the node, and set a regulating valve on the bypass; (3) do not set a regulating valve by adjusting the power source parameters (such as pumps, changing the pump frequency and speed), but which specific control method is the most economical and efficient is often difficult to clearly judge, and it may even be that some control methods cannot achieve the control target because the control target is more stringent. As far as the applicant knows, there is currently no comprehensive fluid transportation test platform that is suitable for the selection of multiple power sources and their flow and pressure regulation.

[0003] Among the existing technical solutions involving fluid transportation, the Chinese patent application with patent number CN 112377814 A discloses a system for realizing multiple uses of one machine in fluid transportation, so as to achieve the optimal configuration of power sources in a single or multiple fluid systems, and at the same time reduce the number of power sources (or electromechanical equipment) configured in the fluid system, thereby achieving the purpose of saving resources and reducing costs. Although this technology involves fluid transportation, the system has only one power source, and its purpose is to achieve multiple uses of one machine, and the control logic of its flow regulation facility system is only used to select plugs, valves or other flow regulation measures, and does not involve the optimal selection of multiple power sources and valve control and the study of fluid pressure and flow. Summary of the invention

[0004] The technical problem to be solved by the present invention is to verify and find the most reasonable fluid delivery form under different power sources for engineering applications by designing a debugging platform that integrates multiple fluid delivery methods and multiple power sources.

[0005] In order to solve the above technical problems, the technical solution provided by the present invention is a debugging platform for chemical process, which includes an air compressor, a water storage tank, a pump, a heat exchanger and a control system, the air outlet of the air compressor is connected to the air inlet of the water storage tank through an air pipe, the water storage tank is provided with a water inlet, a water outlet, a water return port and a heater, the pump contains at least three pumps in parallel, the pump is connected with a first water flow bypass pipe in parallel, the heat exchanger has a first inlet, a first outlet, a second inlet and a second outlet, the water outlet of the water storage tank is connected to the parallel inlet of the pump through a first water pipe, the parallel outlet of the pump is connected to the first inlet of the heat exchanger through a second water pipe, the first outlet of the heat exchanger is connected to a third water pipe, the air pipe is provided with a series-connected air flow regulating valve and a bypass air pressure regulating valve, the water inlet of the water storage tank is connected to tap water through a water inlet pipe, and the second water pipe is connected from A water bypass pressure regulating valve, a water bypass flow regulating valve and a main water flow pressure regulating valve are sequentially connected in series from the parallel water outlet of the pump to the first inlet of the heat exchanger. One port of each of the water bypass pressure regulating valve and the water bypass flow regulating valve is connected in parallel to the second water pipe, and the other port of each of the water bypass pressure regulating valve and the water bypass flow regulating valve is connected in parallel to the second water flow bypass pipe, and the second water flow bypass pipe is connected to the return water outlet of the water storage tank; the main water flow pressure regulating valve is connected in parallel with a third water flow bypass, and a main water flow regulating valve and a back pressure valve are sequentially connected in series on the third water pipe from the first outlet of the heat exchanger to the end water outlet of the third water pipe, the main water flow regulating valve is connected in parallel with a fourth water flow bypass pipe, and the back pressure valve is connected in parallel with a fifth water flow bypass pipe; the air compressor, the heater of the water storage tank, the pump, the heat exchanger and various valves form a control signal transmission connection with the control system.

[0006] Further, the first inlet of the heat exchanger is a heat source inlet, the first outlet of the heat exchanger is a heat source outlet, the second inlet of the heat exchanger is a cold source inlet, and the second outlet of the heat exchanger is a cold source outlet.

[0007] Furthermore, a manual water supply valve and a program-controlled water supply valve are provided on the water inlet pipe of the water storage tank.

[0008] Furthermore, two air pressure transmitters are provided on the air pipes before and after the air flow pressure regulating valve; a first water pressure transmitter is provided on the first water pipe, a magnetic flap level gauge and a first temperature transmitter are provided on the side wall of the water storage tank, a second water pressure transmitter, a third water pressure transmitter and a second temperature transmitter are provided on the second water pipe, a fourth water pressure transmitter, a third temperature transmitter and a first flow meter are provided on the third water pipe from the first outlet of the heat exchanger to the main water flow regulating valve, a fifth water pressure transmitter is provided on the third water pipe between the main water flow regulating valve and the back pressure valve, and a sixth water pressure transmitter is provided on the third water pipe from the outlet of the main water flow regulating valve to the end water outlet of the third water pipe; the second inlet of the heat exchanger is connected to an external cold source and is provided with a water flow regulating valve, a second flow meter, a fourth temperature transmitter and an inlet cold source pressure transmitter, and the second outlet of the heat exchanger is provided with a fifth temperature transmitter and an outlet cold source pressure transmitter; the transmitters and flow meters form a measurement signal transmission connection with the control system.

[0009] The beneficial effects of the debugging platform for chemical process of the present invention are: single variable constant value control, dual variable simultaneous constant value control, three variable simultaneous constant value control and four variable simultaneous constant value control can be performed on temperature, flow, pressure and liquid level. Further, different power sources, different control objects and different actuators can be selected. The opening of various valves can be controlled in real time by closing or opening the hand valve, or the opening of various valves can be directly set to a fixed value by the control system. The frequency of the variable frequency pump can be controlled in real time by the control system, or the frequency of the variable frequency pump can be directly set to a fixed value, so as to realize the free switching of the fluid system of multiple sub-platforms on the same platform, thereby realizing the debugging of various chemical processes. The debugging platform for chemical process of the present invention integrates multiple fluid delivery methods, realizes the preferential selection of multiple power sources, realizes the delivery of pressure and flow of fluid within a wide range, and can compare various control forms, preferentially select the most reasonable fluid delivery form, and is used for engineering applications through the feasibility verification of the optimal fluid delivery method. BRIEF DESCRIPTION OF THE DRAWINGS

[0010] The debugging platform for chemical process of the present invention is further described below in conjunction with the accompanying drawings.

[0011] Figure 1 This is a flow chart of a debugging platform for a chemical process according to the first embodiment.

[0012] Figure 2 This is a flow chart of the first seed debugging platform of the second embodiment.

[0013] Figure 3 This is a flow chart of the second seed debugging platform of the third embodiment.

[0014] Figure 4 This is a flow chart of the third seed debugging platform of the fourth embodiment. DETAILED DESCRIPTION

[0015] Embodiment 1

[0016] The debugging platform for chemical process of this embodiment has a main fluid system flow diagram as shown in FIG. Figure 1 As shown. The platform includes an air compressor 6 as a power source, a water tank 1 and a pump, a heat exchanger 17 and a control system. The air outlet of the air compressor 6 is connected to the air inlet of the water tank 1 through an air pipe 20. A series-connected air flow regulating valve 9 and a bypass air pressure regulating valve 8 are arranged on the air pipe 20. Two air pressure transmitters 7 are arranged on the front and rear air pipes 20 of the air flow regulating valve 9 and the bypass air pressure regulating valve 8. The water tank 1 is provided with a water inlet, a water outlet and a return water outlet. The water inlet of the water tank 1 is connected to tap water through an inlet pipe. A manual water supply valve 3 and a program-controlled water supply valve 4 are arranged on the inlet pipe. The pump contains three pumps in parallel, namely a fixed-frequency centrifugal pump A, a variable-frequency centrifugal pump B and a variable-frequency plunger pump C. The three pumps are also connected in parallel with a first water flow bypass pipe 28, and a first stop valve 37 is arranged on the first water flow bypass pipe 28. The water outlet of the water storage tank 1 is connected to the parallel inlet of the three pumps through the first water pipe 21, and the parallel outlet of the three pumps is connected to the first inlet (heat source inlet) of the heat exchanger 17 through the second water pipe 22, and the first outlet (heat source outlet) of the heat exchanger 17 is connected to the third water pipe 23. A first water pressure transmitter 24 is provided on the first water pipe 21, and a magnetic flap level gauge 10 and a first temperature transmitter 2 are provided on the side wall of the water storage tank. A second water pressure transmitter 25, a water flow bypass pressure regulating valve 18, a water flow bypass flow regulating valve 19, a main water flow pressure regulating valve 11, a third water pressure transmitter 26 and a second temperature transmitter 27 are sequentially connected in series on the second water pipe 22 between the parallel outlet of the three pumps and the first inlet of the heat exchanger 17. One port of each of the first water bypass pressure regulating valve 18 and the first water bypass flow regulating valve 19 is connected in parallel to the second water pipe 22, and the other ports of each of the first water bypass pressure regulating valve 18 and the second water bypass flow regulating valve 19 are connected in parallel to the second water bypass pipe 29, and the second water bypass pipe 29 is connected to the return water port of the water storage tank 1. The main water flow regulating valve 11 is connected in parallel with the third water bypass pipe 34, and the third water bypass pipe 34 is provided with a second stop valve 38. The fourth water pressure transmitter 30, the third temperature transmitter 31, the first flow meter 12, the main water flow regulating valve 13, the fifth water pressure transmitter 32, the back pressure valve 14 and the sixth water pressure transmitter 33 are sequentially connected in series from the first outlet of the heat exchanger 17 to the end water outlet of the third water pipe 23 (also the end water outlet of this platform). The main water flow regulating valve 13 is connected in parallel with a fourth water flow bypass pipe 35 , the back pressure valve 14 is connected in parallel with a fifth water flow bypass pipe 36 , the fourth water flow bypass pipe 35 is provided with a third stop valve 39 , and the fifth water flow bypass pipe 36 is provided with a fourth stop valve 40 .

[0017] The first inlet of the heat exchanger 17 is the heat source inlet, the first outlet of the heat exchanger 17 is the heat source outlet, the second inlet of the heat exchanger 17 is the cold source inlet, and the second outlet of the heat exchanger 17 is the cold source outlet. The second inlet (cold source inlet) of the heat exchanger 17 is connected to an external cold source and is provided with a water flow regulating valve 15, a second flow meter 16, a fourth temperature transmitter 41 and an inlet cold source pressure transmitter 42; the second outlet (cold source outlet) of the heat exchanger 17 is provided with a fifth temperature transmitter 43 and an outlet cold source pressure transmitter 44.

[0018] Through the setting of the above platform, the functions of each flow path of the main fluid system of the platform are analyzed as follows:

[0019] 1. For the storage tank 1, there are 3 input branches and 1 output branch. The 3 input branches are the tap water input branch (water inlet pipe), the air input branch (air pipe 20) and the bypass return input branch (the second water flow bypass pipe 29); the output branch is from the water outlet of the storage tank 1 to the first inlet of the heat exchanger 17 (the first water pipe 21 and the second water pipe 22).

[0020] a. The tap water input branch provides a medium source for the storage tank 1, and has the function of manually or automatically replenishing the liquid level after the medium level drops.

[0021] b. The air input branch provides an air source for the air compressor 6. An air flow bypass is set between the air flow regulating valve 9 and the bypass air pressure regulating valve 8, which has the function of regulating the pressure and flow of the air compressor 6.

[0022] c. The bypass reflux input branch provides a reflux path for the medium after the pump, and has the function of regulating the flow and pressure of the fluid medium in the main pipeline after the pump.

[0023] d. The output branch is the main pipeline of the fluid medium, which provides a source of heat medium for the heat exchanger 17 and has the function of regulating the flow rate and pressure of the fluid medium in the main pipeline.

[0024] 2. For the heat exchanger 17, there are 4 branches, namely, the heat source inlet branch, the heat source outlet branch, the cold source inlet branch, and the cold source outlet branch.

[0025] a. The heat source inlet branch, i.e., the tank output branch, provides a source of heat medium for the heat exchanger 17 and has the function of regulating the flow and pressure of the fluid medium in the main pipeline.

[0026] b. The heat source outlet branch provides an outlet channel for the heat medium of the heat exchanger 17 to be discharged, and has the function of regulating the flow rate and pressure of the fluid medium in the main pipeline.

[0027] c. The cold source inlet branch provides a source of cold medium for the heat exchanger 17 and has the function of regulating the flow rate of the fluid medium in the main pipeline.

[0028] d. The cold source outlet branch provides an outlet channel for the cold medium of the heat exchanger 17 to be discharged.

[0029] Embodiment 2

[0030] This embodiment is the first case of a specific test of a debugging platform for chemical process of embodiment 1, and the test takes the inlet medium pressure and flow of the heat exchanger 17 as the main research object. By cutting off the air input branch (including the air compressor 6, the air flow regulating valve 9, the bypass air pressure regulating valve 8 and the air pipe 20), closing the variable frequency plunger pump C and the first stop valve 37 (cutting off the first water bypass pipe 28), closing the water bypass pressure regulating valve 18 and the water bypass flow regulating valve 19 (cutting off the second water bypass pipe 29), closing the second stop valve 38 (cutting off the third water bypass pipe 34), directly connecting the first inlet (heat source inlet) and the first outlet (heat source outlet) of the heat exchanger 17, closing the third stop valve 39 (cutting off the fourth water bypass pipe 35) and the fourth stop valve 40 (cutting off the fifth water bypass pipe 36), and opening all other valves, a first sub-debugging platform is formed, and the flow chart of the sub-debugging platform is as follows: Figure 2 As shown (by Figure 1 The sub-debugging platform implements the following functions:

[0031] (1) By simply changing the frequency of the variable frequency centrifugal pump B, the flow rate collected in real time by the first flow meter 12 can be accurately controlled.

[0032] (2) When the flow rate collected in real time by the first flow meter 12 exceeds the maximum value of the flow rate that the variable frequency centrifugal pump B can control, the fixed frequency centrifugal pump A is started; when the flow rate collected in real time by the first flow meter 12 does not exceed the maximum value of the flow rate that the variable frequency centrifugal pump B can control, the fixed frequency centrifugal pump A is stopped; and the fixed frequency centrifugal pump A is automatically started and stopped.

[0033] (3) The maximum value of the flow rate collected in real time by the first flow meter 12 under the action of the variable frequency centrifugal pump B is obtained through experiments.

[0034] (4) The maximum value of the first flow meter 12 when the fixed frequency centrifugal pump A is at the maximum frequency and the variable frequency centrifugal pump B acts together is obtained through experiments.

[0035] When using this sub-debugging platform for specific experiments, a PID controller can be constructed, the control object is the flow rate, the target value of the PID controller is the flow rate value that should be collected by the set first flow meter 12, the input value of the PID controller is the flow rate collected in real time by the first flow meter 12, and the output value of the PID controller is converted into a numerical value and used as the frequency input of the variable frequency centrifugal pump B. When the frequency reaches 50Hz and the flow rate collected in real time by the first flow meter 12 is still less than the target value of the PID controller, the fixed frequency centrifugal pump A is started. This experiment can obtain the maximum value of the flow control under the action of the variable frequency centrifugal pump B, and can also obtain the maximum value of the flow rate collected in real time by the first flow meter 12 under the joint action of the variable frequency centrifugal pump B and the maximum frequency of the fixed frequency centrifugal pump A.

[0036] Embodiment 3

[0037] This embodiment is a second case of a test on a debugging platform for a chemical process in the first embodiment. The test is to study the real-time regulation and collection of water flow by the water pressure regulating valve 11 and the first flow meter 12 under the action of gravity when the storage tank 1 is connected to the atmosphere. The second seed debugging platform formed in the second case is similar to the first seed debugging platform in the second embodiment. Its flow chart is as follows Figure 3 As shown (by Figure 1 The second seed debugging platform is the same as the first seed debugging platform of the second embodiment, except that:

[0038] 1) Cut off the tap water input branch (including the water inlet pipe and the manual water supply valve 3 and the program-controlled water supply valve 4 thereon) and open the air input branch (including the air compressor 6, the air flow regulating valve 9, the air pressure regulating valve 8 and the air pipe 20).

[0039] 2) The three parallel pumps are turned off, and only the first stop valve 37 is opened to allow the first water flow bypass pipe 28 to be directly connected to the first water pipe 21 and the second water pipe 22 .

[0040] 3) The main water flow regulating valve 13 is closed and the third stop valve 39 is opened to allow the water flow at the first outlet (heat source outlet) of the heat exchanger 17 to flow directly through the fourth water flow bypass pipe 35 .

[0041] When using the sub-debugging platform for specific experiments, a PID controller can be constructed, the control object is the flow collected in real time by the first flow meter 12, the target value of the PID controller is the flow value that the first flow meter 12 should collect, the input value of the PID controller is the flow collected in real time by the first flow meter 12, and the output value of the PID controller is converted into a numerical value as the opening input of the main water flow pressure regulating valve 11. Under the action of self-gravity or a multiple of self-gravity, the main water flow pressure regulating valve 11 realizes real-time regulation of the flow collected in real time by the first flow meter 12.

[0042] Embodiment 4

[0043] This embodiment is the third case of a test on a debugging platform for a chemical process in the first embodiment. The test is to study the flow value collected in real time by the first flow meter 12 under the action of gravity and the action of the air compressor 6 when the storage tank 1 is connected to the atmosphere. The third sub-debugging platform formed by the third case is similar to the second sub-debugging platform in the third embodiment. Its flow chart is as follows: Figure 4 As shown (by Figure 1 The third seed debugging platform is equivalent to the second seed debugging platform of the third embodiment, except that the main water flow regulating valve 13 is opened and the third stop valve 39 is closed.

[0044] When using the third seed debugging platform for specific experiments: 1) Construct the first PID controller, the control object is the flow collected in real time by the first flow meter 12, the target value of the PID controller is the flow value that the first flow meter 12 has been set to collect, the input value of the PID controller is the flow collected in real time by the first flow meter 12, and the output value of the PID controller is converted into a numerical value and used as the opening input of the gas flow pressure regulating valve 9. 2) Construct the second PID controller, the control object is the flow collected in real time by the first flow meter 12, the target value of the PID controller is the flow value that the first flow meter 12 has been set to collect, the input value of the PID controller is the flow collected in real time by the first flow meter 12, and the output value of the PID controller is converted into a numerical value and used as the opening input of the bypass gas pressure regulating valve 8.

[0045] The above description is only the specific test conditions of three sub-debugging platforms evolved from the debugging platform for chemical process of embodiment 1. For the debugging platform for chemical process of embodiment 1, more sub-debugging platforms with various fluid delivery forms can be evolved through the switching of power source and various valves, so as to adapt to the debugging needs of more chemical processes. The present invention is not limited to this. With the debugging of chemical process of embodiment 1, according to the fluid delivery control logic of the sub-debugging platform that has been formed, the power source, control object or actuator can be added or changed, so as to form various new sub-debugging platforms with new fluid delivery forms and their test methods, which all fall within the protection scope of the present invention.

Claims

1. A debugging platform for chemical processes, Features: The platform includes an air compressor, a water storage tank, a pump, a heat exchanger and a control system. The air outlet of the air compressor is connected to the air inlet of the water storage tank through an air pipe. The water storage tank is provided with a water inlet, a water outlet, a water return port and a heater. The pump contains at least three pumps connected in parallel. The pump is connected in parallel with a first water flow bypass pipe. The heat exchanger has a first inlet, a first outlet, a second inlet and a second outlet. The water outlet of the water storage tank is connected to the parallel inlet of the pump through a first water pipe. The parallel outlet of the pump is connected to the first inlet of the heat exchanger through a second water pipe. The first outlet of the heat exchanger is connected to a third water pipe. The air pipe is provided with a series-connected air flow regulating valve and a bypass air pressure regulating valve. The water inlet of the water storage tank is connected to tap water through a water inlet pipe. The second water pipe is connected from the parallel water outlet of the pump to the first The inlet is sequentially connected in series with a water bypass pressure regulating valve, a water bypass flow regulating valve and a main water flow pressure regulating valve, each of which has one port connected in parallel to a second water pipe, and each of which has another port connected in parallel to a second water flow bypass pipe, and the second water flow bypass pipe is connected to the return water port of the water storage tank; the main water flow pressure regulating valve is connected in parallel with a third water flow bypass, and the third water pipe is sequentially connected in series with a main water flow regulating valve and a back pressure valve from the first outlet of the heat exchanger to the end water outlet of the third water pipe, the main water flow regulating valve is connected in parallel with a fourth water flow bypass pipe, and the back pressure valve is connected in parallel with a fifth water flow bypass pipe; the air compressor, the heater, the pump, the heat exchanger and various valves of the water storage tank are connected to the control system for control signal transmission.

2. The debugging platform for chemical process according to claim 1, Features: The first inlet of the heat exchanger is a heat source inlet, the first outlet of the heat exchanger is a heat source outlet, the second inlet of the heat exchanger is a cold source inlet, and the second outlet of the heat exchanger is a cold source outlet.

3. The debugging platform for chemical process according to claim 1, Features: A manual water supply valve and a program-controlled water supply valve are arranged on the water inlet pipe of the water storage tank.

4. The debugging platform for chemical process according to claim 1, Features: Two air pressure transmitters are arranged on the air pipe before and after the air flow pressure regulating valve; the first water pipe is provided with a first water pressure transmitter, the side wall of the water storage tank is provided with a magnetic flap level gauge and a first temperature transmitter, the second water pipe is provided with a second water pressure transmitter, a third water pressure transmitter and a second temperature transmitter, the third water pipe is provided with a fourth water pressure transmitter, a third temperature transmitter and a first flow meter, the third water pipe is provided with a fifth water pressure transmitter from the first outlet of the heat exchanger to the main water flow regulating valve, the third water pipe between the main water flow regulating valve and the back pressure valve, and the third water pipe is provided with a sixth water pressure transmitter from the outlet of the main water flow regulating valve to the terminal water outlet of the third water pipe; the second inlet of the heat exchanger is connected to an external cold source and is provided with a water flow regulating valve, a second flow meter, a fourth temperature transmitter and an inlet cold source pressure transmitter, and the second outlet of the heat exchanger is provided with a fifth temperature transmitter and an outlet cold source pressure transmitter; the transmitter and the flow meter form a measurement signal transmission connection with the control system.

Citation Information

Patent Citations

  • System capable of serving several purposes with one machine in fluid transportation

    CN112377814A

  • Debugging platform for chemical process

    CN216486119U