Pressure booster for high pressure unloading cracking test of rock and concrete materials

By designing a combination device of a booster air pump and a check valve in geotechnical test, the problem of easy damage to traditional devices is solved, and a booster device without welding points is realized, which improves safety and test reliability.

CN114112714BActive Publication Date: 2024-12-03INST OF ROCK & SOIL MECHANICS CHINESE ACAD OF SCI
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202111493169.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-12-08
Publication Date
2024-12-03
Estimated Expiration
2041-12-08

AI Technical Summary

Technical Problem

Traditional pneumatic booster devices are prone to damage in geotechnical tests, especially when the welded connections are prone to cracking when the alternating stress is high, affecting safety and increasing maintenance costs.

Method used

A booster device is designed to avoid welding points through the combination of a booster air pump and a check valve, and a check valve is used to prevent gas backflow, so as to achieve a gradual increase in air pressure, and automatic control is achieved through pressure sensors and automatic valves. Ensure the accuracy and safety of air pressure.

Benefits of technology

The device has no welding points, which improves reusability and safety, reduces the risk of damage, and achieves more precise air pressure management through automatic control, improving the reliability and safety of the test.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114112714B_ABST
    Figure CN114112714B_ABST
Patent Text Reader

Abstract

The present application specifically relates to a booster device for high-pressure unloading cracking test of rock and concrete materials, which belongs to the field of geotechnical mechanics test, including: a booster air pump, the air outlet of the booster air pump is connected to an air outlet pipe, the air outlet pipe is provided with a one-way valve, and the air outlet pipe is used to connect the booster air pump and the device to be boosted; a gas storage container, the gas storage container is connected to the booster air pump. By setting the booster air pump and the one-way valve, the booster air pump first extracts air from the gas storage container, and then pumps the extracted gas into the device to be boosted through the one-way valve, and then the booster air pump extracts air from the gas storage container again. At this time, due to the action of the one-way valve, the air inlet of the device to be boosted is blocked, so that the gas in the device to be boosted will not flow back to the booster air pump, and then the gas is pumped into the device to be boosted again, and so on. The cycle is repeated many times, so that the air pressure in the device to be boosted gradually increases. Such a setting makes the booster device have no welding points, has good reusability, and is not easy to damage.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of rock and soil mechanics tests, and in particular to a pressurizing device for high-pressure unloading cracking tests of rock and concrete materials. Background Art

[0002] In geotechnical mechanics tests, in order to understand the tensile mechanical properties of rock samples, it is necessary to conduct high-pressure unloading fracture tests on them, that is, to pneumatically pressurize the rock samples to the target high pressure through external force and then quickly release the pressure to fracture using the high pressure difference between the inside and outside of the sample. However, on the one hand, it is difficult to control the pressurization time and air pressure of traditional pneumatic boosters, which affects the test results. On the other hand, the connection form of the pressure-bearing components is cumbersome and the safety factor is not high, which is easy to damage, especially when there are welds in some key connection parts. When the alternating stress is too large, the welds are subjected to excessive bending moments. Once the welds crack, it will cause great losses and threaten the personal safety of the operators. In addition, the complex structural form leads to increased maintenance costs in the later stage. Summary of the invention

[0003] The present application provides a booster device for high-pressure unloading fracture testing of rock and concrete materials, so as to solve the technical problem that the booster device structure in the prior art is easily damaged.

[0004] A pressurizing device for high-pressure unloading cracking test of rock and concrete materials, comprising:

[0005] A booster air pump, wherein the air outlet of the booster air pump is connected to an air outlet pipeline, the air outlet pipeline is provided with a one-way valve, and the air outlet pipeline is used to connect the booster air pump and the device to be boosted;

[0006] An air storage container is connected to the booster air pump.

[0007] Optionally, the booster air pump comprises:

[0008] A reciprocating booster cylinder, wherein the air inlet of the reciprocating booster cylinder is connected to the air storage container, the air outlet of the reciprocating booster cylinder is connected to the air outlet pipeline, and the reciprocating booster cylinder is provided with a control air inlet;

[0009] A control air circuit is used to control the reciprocating motion of the reciprocating booster cylinder. The control air circuit is connected to the control air inlet of the reciprocating booster cylinder. The control air circuit is provided with a pre-boost inlet.

[0010] Optionally, the control air circuit is provided with an automatic valve, which is arranged between the pre-intensification inlet and the reciprocating boosting cylinder, and the air outlet pipe is provided with a pressure sensor, which is arranged between the one-way valve and the device to be boosted, and the automatic valve is communicatively connected to the pressure sensor.

[0011] Optionally, the pressure sensor is provided with a digital display, and the digital display is communicatively connected to the pressure sensor.

[0012] Optionally, the control air circuit is provided with an air doublet, which is used to decompress and filter the air, and the air doublet is arranged between the automatic valve and the pre-increase air inlet.

[0013] Optionally, the control air circuit is provided with a pressure-stabilizing valve, which is used to stabilize the air pressure of the pre-inflation, and the pressure-stabilizing valve is arranged between the air doublet and the automatic valve.

[0014] Optionally, the air outlet pipeline is provided with a manual pressure relief valve, which is used to release the air pressure in the device to be pressurized during emergency shutdown, and the manual pressure relief valve is arranged between the one-way valve and the device to be pressurized.

[0015] Optionally, the air outlet pipeline is provided with a first pressure gauge, which is used to monitor the air pressure in the device to be pressurized when the control air circuit is not powered, and the first pressure gauge is arranged between the one-way valve and the device to be pressurized.

[0016] Optionally, the control air circuit is provided with a manual valve, which is used to open and close the control air circuit urgently, and the manual valve is arranged between the pre-intensification inlet and the reciprocating booster cylinder.

[0017] Optionally, the control air circuit is provided with a second pressure gauge, which is used to detect the air pressure of the control air circuit, and the second pressure gauge is arranged between the pre-increase air inlet and the manual valve.

[0018] The above technical solution provided by the embodiment of the present application has the following advantages compared with the prior art:

[0019] In the embodiment of the present application, a boosting air pump and a one-way valve are provided. The boosting air pump first draws air from the gas storage container, and then pumps the drawn gas into the device to be pressurized through the one-way valve. Then, the boosting air pump draws air from the gas storage container again. At this time, due to the effect of the one-way valve, the air inlet of the device to be pressurized is blocked, so that the gas in the device to be pressurized will not flow back to the boosting air pump. Then, the boosting air pump pumps gas into the device to be pressurized again. This cycle is repeated many times, so that the air pressure in the device to be pressurized gradually increases. With such a configuration, the boosting device has no welding points, has good reusability, and is not easy to be damaged. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the invention and, together with the description, serve to explain the principles of the invention.

[0021] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, for ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative labor.

[0022] Figure 1 A schematic diagram of the structure of a pressure boosting device for high-pressure unloading fracturing test of rock and concrete materials provided in an embodiment of the present application;

[0023] Figure 2 A schematic diagram of the structure of a reciprocating booster cylinder provided in an embodiment of the present application.

[0024] Reference numerals:

[0025] 1-boosting air pump, 11-reciprocating boosting cylinder, 111-driving cylinder body, 1111-driving piston, 1112-left driving chamber, 1113-right driving chamber, 112-pressurized medium cylinder body, 1121-medium piston, 1122-medium chamber, 1123-air chamber, 113-reversing valve, 12-control air circuit, 121-pre-intensification inlet, 122-automatic valve, 123-air duplex, 124-pressure stabilizing valve, 125-manual valve, 126-second pressure gauge, 13-air outlet pipe, 131-pressure sensor, 1311-digital display, 132-manual pressure relief valve, 133-first pressure gauge, 14-check valve, 2-device to be pressurized, 3-gas storage container. DETAILED DESCRIPTION

[0026] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of this application.

[0027] It should be noted that, in this article, relational terms such as "first" and "second" are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.

[0028] The present application provides a pressurizing device for high-pressure unloading fracture testing of rock and concrete materials, comprising:

[0029] A booster air pump 1, wherein the air outlet of the booster air pump 1 is connected to an air outlet pipe 13, wherein the air outlet pipe 13 is provided with a one-way valve 14, and the air outlet pipe 13 is used to connect the booster air pump 1 and the device to be boosted 2;

[0030] The gas storage container 3 is connected to the booster air pump 1.

[0031] By setting the boosting air pump 1 and the one-way valve 14, the boosting air pump 1 first draws air from the gas storage container 3, and then pumps the drawn gas into the device to be pressurized 2 through the one-way valve 14, and then the boosting air pump 1 draws air from the gas storage container 3 again. At this time, due to the action of the one-way valve 14, the air inlet of the device to be pressurized 2 is blocked, so that the gas in the device to be pressurized 2 will not flow back to the boosting air pump 1, and then the boosting air pump 1 pumps gas into the device to be pressurized 2 again, and so on for multiple cycles, so that the air pressure in the device to be pressurized 2 gradually increases. With such a setting, the boosting device has no welding points, has good reusability, and is not easy to be damaged.

[0032] In the embodiment of the present application, the boosting device is used in the unloading fracture test of geotechnical mechanics. The gas storage container 3 is a nitrogen cylinder, which is connected to the boosting air pump 1 through a pipeline. The pipeline is provided with a pressure gauge and a manual valve 125 for detecting the pressure of the output nitrogen and the switch of the gas storage container 3.

[0033] In some embodiments, the booster air pump 1 comprises:

[0034] A reciprocating booster cylinder 11, the air inlet of the reciprocating booster cylinder 11 is connected to the air storage container 3, the air outlet of the reciprocating booster cylinder 11 is connected to the air outlet pipe 13, and the reciprocating booster cylinder 11 is provided with a control air inlet;

[0035] The control air circuit 12 is used to control the reciprocating motion of the reciprocating booster cylinder 11 . The control air circuit 12 is connected to the control air inlet of the reciprocating booster cylinder 11 . The control air circuit 12 is provided with a pre-boost air inlet 121 .

[0036] In the embodiment of the present application, the reciprocating booster cylinder 11 includes:

[0037] A driving cylinder 111, wherein a driving piston 1111 is provided inside the driving cylinder 111, and the driving piston 1111 divides the interior of the driving cylinder 111 into a left driving chamber 1112 and a right driving chamber 1113, and the left driving chamber 1112 and the right driving chamber 1113;

[0038] Two pressurized medium cylinders 112 are respectively arranged at the left and right ends of the driving cylinder 111. A medium piston 1121 is arranged in the pressurized medium cylinder 112. The two medium pistons 1121 are respectively connected to the two sides of the driving piston 1111 through connecting rods. The pressurized medium cylinder 112 is divided into a medium chamber 1122 and an air chamber 1123 by the medium piston 1121. The air chamber 1123 is provided with a through hole so that the air chamber 1123 is connected to the outside of the reciprocating booster cylinder 11, so that the air chamber 1123 maintains air pressure balance with the outside; The medium chamber 1122 is provided with an air inlet and an air outlet, wherein the air inlet is communicated with the air storage container 3, and the air outlet is communicated with the air inlet of the medium chamber 1122 of another pressurized medium cylinder 112, and the air outlet of the medium chamber 1122 of another pressurized medium cylinder 112 is connected to the air outlet pipe 13, wherein a one-way valve 14 is provided between the air inlet of the medium chamber 1122 and the air storage container 3, two one-way valves 14 are provided between the medium chambers 1122 of the two pressurized medium cylinders 112, and a one-way valve 14 is provided between the air outlet of the medium chamber 1122 and the air outlet pipe 13;

[0039] The reversing valve 113 is connected to the control gas circuit 12, and the left driving chamber 1112 and the right driving chamber 1113 are respectively connected to the two gas outlets of the reversing valve 113 through pipelines.

[0040] The air enters the reversing valve 113 through the control air path 12, and the air first enters the left driving chamber 1112, pushing the driving piston 1111 to move to the right, while the air in the right driving chamber 1113 is discharged, and the driving piston 1111 drives the medium pistons 1121 on the left and right sides to move to the right through the connecting rod. Since the area of ​​the driving piston 1111 is larger than the medium piston 1121, the relatively small air pressure in the driving chamber can push the high-pressure nitrogen medium in the medium chamber 1122. At this time, the volume of the medium chamber 1122 in the left pressurized medium cylinder 112 increases, and the medium is sucked from the gas storage container 3, the volume of the air chamber 1123 decreases, and the air is discharged from the air chamber 1123 through the through hole; the volume of the medium chamber 1122 in the right pressurized medium cylinder 112 decreases, and due to the action of the one-way valve 14, the medium is pressed into the device 2 to be pressurized;

[0041] Then the reversing valve 113 switches the control direction of the air path 12, and the air enters the right driving chamber 1113, pushing the driving piston 1111 to move to the left. At the same time, the air in the left driving chamber 1112 is discharged, and the driving piston 1111 drives the medium piston 1121 to move to the left through the connecting rod. At this time, the volume of the medium chamber 1122 in the left pressurized medium cylinder 112 is reduced, and at the same time, the volume of the medium chamber 1122 in the right pressurized medium cylinder 112 is increased. Under the action of the one-way valve 14, the nitrogen medium in the medium chamber 1122 is pressed into the medium chamber 1122 of the right pressurized medium cylinder 112. This cycle allows the reciprocating booster cylinder 11 to continuously inject nitrogen medium into the device 2 to be boosted, thereby increasing the air pressure in the device 2 to be boosted.

[0042] In the embodiment of the present application, the control gas input into the driving cylinder 111 is air. It can be understood that, based on the embodiment of the present application, the gas storage container 3 can also be connected to the control gas circuit 12, and the gas in the gas storage container 3 can be used as the control gas, which is input into the driving cylinder 111 through the control gas circuit 12 to achieve control.

[0043] In some embodiments, the control air circuit 12 is provided with an automatic valve 122, and the automatic valve 122 is arranged between the pre-boost inlet 121 and the reciprocating boost cylinder 11. The air outlet pipe 13 is provided with a pressure sensor 131, and the pressure sensor 131 is arranged between the one-way valve 14 and the device to be boosted 2. The automatic valve 122 is communicatively connected with the pressure sensor 131.

[0044] In the embodiment of the present application, the automatic valve 122 is a solenoid valve, and the air pressure in the device to be pressurized 2 is detected by the pressure sensor 131. When the air pressure reaches the target value, the pressure sensor 131 sends a signal to the automatic valve 122, and the automatic valve 122 automatically closes, and the control air circuit 12 stops injecting air, and the pressurization process stops. This arrangement, on the one hand, makes the air pressure control in the device to be pressurized 2 more accurate, and on the other hand, the automatically controlled pressurization process does not require human operation, which is safer.

[0045] In some embodiments, the pressure sensor 131 is provided with a digital display 1311, and the digital display 1311 is communicatively connected with the pressure sensor 131, so as to facilitate the experimenter to observe and respond in real time.

[0046] In some embodiments, the control air circuit 12 is provided with an air doublet 123, which is used to decompress and filter the air, and is disposed between the automatic valve 122 and the pre-increase air inlet 121. In order to prevent impurities in the air from clogging the pipeline, the air doublet 123 is provided to filter the air first on the one hand, and to stabilize the output air pressure on the other hand.

[0047] In some embodiments, the control air circuit 12 is provided with a pressure-stabilizing valve 124 , and the pressure-stabilizing valve 124 is used to stabilize the air pressure of the pre-inflation. The pressure-stabilizing valve 124 is provided between the air double body 123 and the automatic valve 122 .

[0048] In some embodiments, the air outlet pipe 13 is provided with a manual pressure relief valve 132, which is used to release the air pressure in the device to be pressurized 2 during emergency shutdown, and the manual pressure relief valve 132 is provided between the one-way valve 14 and the device to be pressurized 2. When the equipment is abnormal or the experimenter needs to stop the test immediately, the air pressure in the device to be pressurized 2 can be quickly released by opening the manual pressure relief valve 132 to avoid harm.

[0049] In some embodiments, the outlet pipe 13 is provided with a first pressure gauge 133, and the first pressure gauge 133 is used to monitor the air pressure in the device to be pressurized 2 when the control gas circuit 12 is not powered on. The first pressure gauge 133 is provided between the one-way valve 14 and the device to be pressurized 2. On the one hand, since the pressurizing device needs to be connected to the gas storage container 3 first when in use, and then the control gas circuit 12 can be opened to work. Therefore, during the period from opening the gas storage container 3 to opening the control gas circuit 12, the pressure sensor 131 is not working, but at this time, the air pressure in the device to be pressurized 2 still needs to be monitored. The first pressure gauge 133 is provided, and the air pressure can be roughly monitored when the power is not turned on, so as to prevent the test failure or personnel injury caused by abnormal air pressure. On the other hand, the first pressure gauge 133 that can be used without power supply can display the gas pressure in the device to be pressurized 2 when the power is off or any pressure sensor 131 fails, so as to prevent the test personnel from being injured due to incomplete pressure relief.

[0050] In some embodiments, the control air circuit 12 is provided with a manual valve 125 , and the manual valve 125 is used to perform emergency opening and closing of the control air circuit 12 . The manual valve 125 is provided between the pre-intensification inlet 121 and the reciprocating supercharging cylinder 11 .

[0051] In some embodiments, the control gas circuit 12 is provided with a second pressure gauge 126 , and the second pressure gauge 126 is used to detect the air pressure of the control gas circuit 12 . The second pressure gauge 126 is provided between the pre-increase inlet 121 and the manual valve 125 .

[0052] The foregoing is merely a specific embodiment of the present invention, which enables those skilled in the art to understand or implement the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features claimed herein.

Claims

1. A booster device for high pressure unloading fracture test of rock and concrete materials, characterized in that: include: A booster air pump (1), wherein the air outlet of the booster air pump (1) is connected to an air outlet pipe (13), the air outlet pipe (13) is provided with a one-way valve (14), and the air outlet pipe (13) is used to connect the booster air pump (1) and the device to be boosted (2); An air storage container (3), the air storage container (3) being in communication with the booster air pump (1); The booster air pump (1) comprises: A reciprocating booster cylinder (11), wherein the air inlet of the reciprocating booster cylinder (11) is connected to the air storage container (3), the air outlet of the reciprocating booster cylinder (11) is connected to the air outlet pipeline (13), and the reciprocating booster cylinder (11) is provided with a control air inlet; A control air circuit (12), the control air circuit (12) being used to control the reciprocating motion of the reciprocating booster cylinder (11), the control air circuit (12) being in communication with a control air inlet of the reciprocating booster cylinder (11), and the control air circuit (12) being provided with a pre-boost air inlet (121); The reciprocating booster cylinder (11) comprises: A driving cylinder (111), wherein a driving piston (1111) is provided inside the driving cylinder (111), and the driving piston (1111) divides the interior of the driving cylinder (111) into a left driving chamber (1112) and a right driving chamber (1113); Two pressurized medium cylinder bodies (112) are respectively arranged at the left and right ends of the driving cylinder body (111); a medium piston (1121) is arranged in the pressurized medium cylinder body (112); the two medium pistons (1121) are respectively connected to the two sides of the driving piston (1111) through connecting rods; the pressurized medium cylinder body (112) is divided into a medium chamber (1122) and an air chamber (1123) by the medium piston (1121); the air chamber (1123) is provided with a through hole so that the air chamber (1123) is connected to the outside of the reciprocating pressurizing cylinder (11); the medium chamber (1122) is provided with an air inlet and an air outlet, the air inlet being communicated with the air storage container (3), the air outlet being communicated with the air inlet of the medium chamber (1122) of another pressurized medium cylinder (112), the air outlet of the medium chamber (1122) of another pressurized medium cylinder (112) being connected to an air outlet pipeline (13), wherein a one-way valve (14) is provided between the air inlet of the medium chamber (1122) and the air storage container (3), two one-way valves (14) are provided between the medium chambers (1122) of the two pressurized medium cylinders (112), and a one-way valve (14) is provided between the air outlet of the medium chamber (1122) and the air outlet pipeline (13); A reversing valve (113), the reversing valve (113) being in communication with the control gas path (12), and the left driving chamber (1112) and the right driving chamber (1113) being in communication with two gas outlets of the reversing valve (113) through pipelines respectively; The control air circuit (12) is provided with an automatic valve (122), and the automatic valve (122) is provided between the pre-intensification inlet (121) and the reciprocating supercharging cylinder (11); the air outlet pipeline (13) is provided with a pressure sensor (131), and the pressure sensor (131) is provided between the one-way valve (14) and the device to be pressurized (2); the automatic valve (122) is communicatively connected with the pressure sensor (131); The pressure sensor (131) is provided with a digital display (1311), and the digital display (1311) is communicatively connected with the pressure sensor (131); The control air circuit (12) is provided with an air doublet (123), and the air doublet (123) is used to decompress and filter the air, and the air doublet (123) is arranged between the automatic valve (122) and the pre-increase air inlet (121); The control air circuit (12) is provided with a pressure stabilizing valve (124), and the pressure stabilizing valve (124) is used to stabilize the air pressure of the pre-inflation, and the pressure stabilizing valve (124) is arranged between the air double body (123) and the automatic valve (122); The air outlet pipeline (13) is provided with a manual pressure relief valve (132), and the manual pressure relief valve (132) is used to release the air pressure in the device to be pressurized (2) during emergency shutdown. The manual pressure relief valve (132) is arranged between the one-way valve (14) and the device to be pressurized (2); The gas outlet pipeline (13) is provided with a first pressure gauge (133), and the first pressure gauge (133) is used to monitor the gas pressure in the device to be pressurized (2) when the control gas circuit (12) is not powered, and the first pressure gauge (133) is arranged between the one-way valve (14) and the device to be pressurized (2); The control air circuit (12) is provided with a manual valve (125), and the manual valve (125) is used to open and close the control air circuit (12) in an emergency, and the manual valve (125) is arranged between the pre-intensification inlet (121) and the reciprocating supercharging cylinder (11); The control gas circuit (12) is provided with a second pressure gauge (126), and the second pressure gauge (126) is used to detect the air pressure of the control gas circuit (12). The second pressure gauge (126) is arranged between the pre-intensification inlet (121) and the manual valve (125).

Citation Information

Patent Citations

  • Liquid-flooding gas reciprocating type high-pressure gas automatic supercharging device and method

    CN104265597A

  • Well head apparatus ultra-high pressure gas seal test system

    CN202631201U