Low-voltage distribution Internet of Things interactive function test bench area and its management system

Through flexible configuration of low-voltage distribution IoT test bench area and management system, the problem that traditional test systems are difficult to adapt to changes in low-voltage distribution bench areas is solved, and accurate evaluation of new technologies and new businesses and digital transformation of distribution networks is achieved. .

CN114113834BActive Publication Date: 2024-11-12ELECTRIC POWER RES INST OF STATE GRID ZHEJIANG ELECTRIC POWER COMAPNY +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202111336574.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-11-12
Publication Date
2024-11-12
Estimated Expiration
2041-11-12

AI Technical Summary

Technical Problem

Traditional true test systems are difficult to meet the rapidly changing testing needs of low-voltage distribution station areas, lack flexibility, and it is difficult to comprehensively and effectively test boundary conditions.

Method used

A flexible configuration low-voltage distribution IoT "side-end" interactive function test bench area and its management system are designed, using a series-parallel adjustable topology grid and a topological configuration control system based on PLC and micro circuit breaker. Realize flexible adjustment of the topology, operating conditions and access load of the station area, simulate complex scenarios of multi-level, multi-branch, and multi-domain areas, and visually manage the operation through the management system.

Benefits of technology

It has realized the accurate quantitative evaluation of the edge-end interaction functions of the Internet of Things distribution Internet of Things, new businesses, and new equipment, improved the level of construction and application, and promoted the digital transformation and development of the distribution network.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114113834B_ABST
    Figure CN114113834B_ABST
Patent Text Reader

Abstract

The present invention discloses a low-voltage power distribution Internet of Things interactive function test bench area and its management system. Most of the existing power distribution Internet of Things test systems are based on completely simulating the low-voltage distribution station area structure, that is, a true test system, but the true test system is not effective in actual test applications. The present invention simulates the physical characteristics of the actual area in a semi-true way, generates multiple areas, multiple branches, multi-level complex topology grid structures and multiple operating conditions with one click, flexibly constructs typical distribution network area scenarios and accesses various new intelligent devices and sensing devices, while highly restoring the real low-voltage area operating environment, it has the flexibility and customizability of the laboratory testing platform, and more targetedly conducts accurate quantitative evaluation of the edge-end interactive core functions involved in the new technologies, new services, and new equipment of the power distribution Internet of Things.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of power distribution Internet of Things, and relates to a flexible configuration type low-voltage power distribution Internet of Things "edge-end" interactive function test bench area and a management system thereof. Background Art

[0002] The intelligence of the distribution network is an important foundation for building the energy Internet and a key guarantee for the level of power supply services. Among them, the low-voltage distribution area is the last mile connecting user needs and the smallest operation and management unit of the power grid company. With the rapid development of technologies such as electric vehicles, distributed photovoltaics, interoperable energy storage, and microgrids, as well as the continuous deepening of power market reform, governments, enterprises, and residents have put forward higher requirements for the safety, economy, and adaptability of low-voltage distribution areas.

[0003] Faced with the significant characteristics of low-voltage distribution stations directly facing customers, a wide variety of equipment and large scale, and rapidly changing business application requirements, the traditional distribution network information and automation construction model can no longer meet the high-speed development and transformation needs of the distribution network in the new era. The distribution Internet of Things deeply integrates traditional industrial Internet of Things technology with distribution technology, and realizes comprehensive perception, data fusion and intelligent application of the distribution network through comprehensive interconnection, intercommunication and interoperability between distribution equipment. It has the characteristics of plug-and-play, extensive interconnection and rapid iteration, and will be able to effectively support the continuous improvement of the lean management capabilities of the low-voltage distribution network, as well as the significant improvement of the distribution network operation management and customer service level.

[0004] With the continuous advancement of the construction of new power systems with new energy as the main body and the distribution Internet of Things on the distribution side, the newly-born distribution Internet of Things intelligent terminal devices with various functions and applications are rapidly developing and iterating and widely used. In this context, it is crucial to quickly and effectively quantify the applicability, equipment functions and performance of new technologies and new equipment. To this end, the technical routes of many experimental test systems are more based on completely simulating the structural composition of low-voltage distribution stations, that is, to meet relevant test requirements in the form of true test systems. However, the true system method often has a large investment, a relatively fixed system design composition, and lacks sufficient flexibility. The actual low-voltage distribution station area shows significant combination changes in branches, hierarchical structures, access elements, and operating conditions. This makes the true test system in actual test applications less effective and difficult to fully and effectively test and obtain boundary conditions. Summary of the invention

[0005] Taking into account that the main problem currently faced in the process of building the distribution Internet of Things is the access of various edge-side and terminal intelligent devices, the electrical access also involves the functions of intelligent terminals and a large number of software applications. The purpose of the present invention is to focus on the testing needs of the "edge-end" interaction functions of the distribution Internet of Things substations, and provide a flexible configuration-based distribution Internet of Things "edge-end" interaction function test substation and its management system, provide a low-voltage distribution substation environment that is close to reality and flexible, and realize the flexible adjustment and simulation of the topological structure, operating conditions and access load of the substation environment, thereby meeting the access adaptability and functionality of edge-end devices, as well as the testing needs of edge-end devices interconnection, interoperability and interoperability.

[0006] To achieve the above-mentioned purpose, the technical solution adopted by the present invention is: a low-voltage power distribution Internet of Things interactive function test bench area, which includes a series-parallel adjustable power distribution station area topology grid;

[0007] The series-parallel adjustable distribution area topology grid, each area topology grid includes a distribution transformer side, a line side and a user side;

[0008] The distribution transformer side is connected to the primary and secondary equipment, which is output by the input power supply and connected to the line side through the leakage protection switch for shunting; the primary and secondary equipment include distribution transformers or power simulators, leakage protection switches, intelligent fusion terminals in substations, type I concentrators and several miniature circuit breakers;

[0009] The line side forms multiple levels and multiple outgoing line branches from the leakage protection switch on the distribution transformer side to the end user side, and is connected to the phase-changing switch, intelligent capacitor, SVG dynamic reactive power compensation device, molded case circuit breaker, miniature circuit breaker and branch fault simulation terminal; at the same time, it is connected to the low-voltage monitoring unit to collect the electrical and topological location information of the line side nodes, and interact with the intelligent fusion terminal of the substation area;

[0010] The intelligent fusion terminal of the substation area is used for monitoring the input node information of the substation area, and communicates and interacts with various intelligent terminal devices and sensor units deployed on the substation side through the local communication module; the type I concentrator is used to gather the data collected by the single-phase or three-phase meter on the user side of the substation area;

[0011] The user side is the end of the substation, which is connected to a single-phase or three-phase simulated load, a photovoltaic power generation simulation system, a V2G charging pile simulation system, an interoperable energy storage simulation system, a single-phase or three-phase meter, a type II collector and a low-voltage monitoring unit; the type II collector collects single-phase or three-phase meter data and interacts with the type I concentrator; the low-voltage monitoring unit and the type II collector interact with the substation intelligent fusion terminal at the same time;

[0012] The substation topology grids are connected through intelligent switches at the line-side input nodes; within the substation topology grid, slot-type terminal blocks are set on the distribution transformer side, line side and user side to achieve series or parallel connection of multiple substations and flexible adjustment of the substation topology grid and levels.

[0013] Furthermore, the series-parallel adjustable distribution substation area topology grid is designed according to the principles of multi-level, multi-branch and multi-area; the topology grids of different areas are configured differently for the grid levels, branches and connected power facilities according to the principle of from simple to complex.

[0014] Furthermore, the low-voltage power distribution Internet of Things interactive function test bench area also includes a bench area topology configuration control system based on PLC and miniature circuit breakers;

[0015] The substation area topology configuration control system based on PLC and miniature circuit breakers is composed of a PLC controller and a miniature circuit breaker. The miniature circuit breaker is connected in series or parallel to the levels, branches, terminals and other types of topological access nodes of the distribution substation area topology grid. Through PLC, the grid structure adjustment within the substation area and the remote one-key setting and automatic adjustment of the access and disconnection of charging piles, mutual energy storage, distributed photovoltaics, low-voltage monitoring units and sensing devices are realized.

[0016] Furthermore, the distribution transformer side leads out a wiring slot at the outgoing line.

[0017] The technical solution also adopted in the present invention is: the management system of the above-mentioned low-voltage power distribution Internet of Things interactive function test bench area includes a server host, a hub and a serial port server, which is connected to the V2G charging pile simulation system, the interoperable energy storage simulation system, the photovoltaic power generation simulation system, the power simulator and the branch fault simulation terminal through the communication conversion interface module, based on the .NET platform, C / S software architecture and Access database, adopts multi-threading, multi-tasking concurrent mechanism and GDI+ drawing technology to realize the platform visualization operation management and control of the low-voltage power distribution Internet of Things interactive function test bench area.

[0018] Furthermore, the power supply simulator is used for output simulation of various power supply operating conditions, including normal operating conditions, three-phase imbalance, low voltage, power outage and harmonic output, and is connected to the management system for remote control.

[0019] Furthermore, the branch fault simulation terminal is used to simulate different faults on the line side or the user side, including neutral-live short circuit, live wire short circuit, grounding resistance-ground (or incoming neutral wire), and is connected to the management system for remote control.

[0020] Furthermore, distributed photovoltaics are replaced by a photovoltaic power generation simulation system, which consists of a solar cell array simulator and a photovoltaic simulator, which simulates different solar panel IV curves, simulates thin-film photovoltaic cell curves, simulates standard crystalline silicon photovoltaic cell curves, simulates high-efficiency crystalline silicon photovoltaic cell curves and custom photovoltaic cell curves, and is connected to the management system for remote control.

[0021] Furthermore, the charging pile is replaced by a V2G charging pile simulation system, which consists of a V2G bidirectional charging pile and a bidirectional battery simulator, simulating different types of electric vehicle charging loads connected for charging and V2G power grid interaction behavior characteristics, and connected to the management system for remote control.

[0022] Furthermore, the low-voltage power distribution Internet of Things interactive function test area is connected to a Type I concentrator and an area intelligent fusion terminal on the distribution transformer side, a low-voltage monitoring unit on the line side, and a Type II collector and single-phase and three-phase electricity meters on the user side; the Type I concentrator exchanges information with the single-phase and three-phase electricity meters through the local communication network; the area intelligent fusion terminal is connected to the local network communication through the low-voltage monitoring unit to realize information interaction with the intelligent switch, SVG dynamic reactive power compensation device, phase-changing switch, distributed photovoltaic, interoperable energy storage and charging piles.

[0023] The beneficial effects of the present invention are as follows: The present invention provides a flexible configurable low-voltage distribution Internet of Things "edge-end" interactive function test station and its management system, which simulates the physical characteristics of the actual station in a semi-real way, generates multi-station, multi-branch, multi-level complex topology grid structure and various operating conditions with one click, flexibly constructs typical distribution network station scenes and accesses various new intelligent devices and sensing devices, and while highly restoring the real low-voltage station operating environment, has the flexibility and customizability of a laboratory testing platform, and more specifically carries out accurate quantitative evaluation of the edge-end interactive core functions involved in new technologies, new services, and new equipment of the distribution Internet of Things, thereby improving the construction and application level of the distribution Internet of Things and promoting the transformation and development of the digitalization of the distribution network. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 It is a schematic diagram of the topological network frame of the low-voltage power distribution Internet of Things interactive function test bench area of ​​the present invention;

[0025] Figure 2 It is a schematic diagram of the substation topology configuration control system based on PLC and miniature circuit breaker of the present invention;

[0026] Figure 3 This is a management system architecture diagram of the interactive function test bench area of ​​the present invention;

[0027] Figure 4 It is a schematic diagram of the topological grid of the distribution transformer side of the low-voltage power distribution Internet of Things interactive function test bench area of ​​the present invention;

[0028] Figure 5 It is a schematic diagram of the topological grid of the line side of the low-voltage power distribution Internet of Things interactive function test bench area of ​​the present invention;

[0029] Figure 6 This is a schematic diagram of the topological network on the user side of the low-voltage power distribution Internet of Things interactive function test bench area of ​​the present invention. DETAILED DESCRIPTION

[0030] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.

[0031] On the contrary, the present invention covers any substitution, modification, equivalent method and scheme made on the essence and scope of the present invention as defined by the claims. Further, in order to make the public have a better understanding of the present invention, some specific details are described in detail in the detailed description of the present invention below. Those skilled in the art can fully understand the present invention without the description of these details.

[0032] Example 1

[0033] A low-voltage power distribution Internet of Things interactive function test bench area includes the following parts: a low-voltage power distribution Internet of Things interactive function test bench area topology grid and a bench area topology configuration system based on PLC and miniature circuit breakers.

[0034] The topological grid of the low-voltage distribution Internet of Things interactive function test area is designed according to the principles of multi-level, multi-branch and multi-area; among them, the topological grids of different areas are configured differently for the grid level, branches and connected power facilities according to the principle of from simple to complex. Each area topological grid consists of a distribution transformer side, a line side and a user side. The distribution transformer side forms an outgoing line from the input power supply to the leakage protection switch, and the primary and secondary equipment connected include distribution transformers (or power simulators), leakage protection switches, area intelligent fusion terminals, type I concentrators and several miniature circuit breakers.

[0035] The intelligent fusion terminal in the substation is used to monitor the information of the input nodes in the substation, and communicate and interact with various intelligent terminal devices and sensor units deployed on the substation side through the local communication module; the type I concentrator is used to aggregate the data collected by the single-phase or three-phase meters in the meter box on the user side of the substation.

[0036] The line side forms multiple levels and multiple outgoing line branches from the leakage protection switch on the distribution transformer side to the end user side, and is connected to phase-changing switches, intelligent capacitors, SVG dynamic reactive power compensation devices, molded case circuit breakers, miniature circuit breakers and branch fault simulation terminals; at the same time, it can be connected to the low-voltage monitoring unit to collect the electrical and topological location information of the line side nodes, and interact with the intelligent fusion terminal of the substation area.

[0037] The user side is the end of the substation, which is connected to single-phase or three-phase simulated loads, photovoltaic power generation simulation systems, V2G charging pile simulation systems, interoperable energy storage simulation systems, single-phase or three-phase meters, type II collectors and low-voltage monitoring units. The type II collector collects single-phase or three-phase meter data and interacts with the type I concentrator; the low-voltage monitoring unit and the type II collector interact with the substation intelligent fusion terminal at the same time.

[0038] The substation area topology grid is connected by an intelligent switch at the line side input node; within the substation area topology grid, slot-type terminal blocks are set on the distribution transformer side, line side and user side to realize series or parallel connection of multiple substations and flexible adjustment of the substation area topology grid and level.

[0039] The substation area topology configuration control system based on PLC and miniature circuit breakers is composed of a PLC controller and a miniature circuit breaker; the miniature circuit breaker is connected to the layers, branches, terminals and other types of topological access nodes of the distribution substation area topology grid in series or parallel, and the PLC controller is used to realize the remote one-key setting and automatic adjustment of the grid structure adjustment within the substation area and the access and removal of various new intelligent devices and sensing devices such as charging piles, energy storage, photovoltaics, low-voltage monitoring units, etc.

[0040] Example 2

[0041] A management system for a low-voltage power distribution Internet of Things interactive function test bench area, wherein the low-voltage power distribution Internet of Things interactive function test bench area comprises: a low-voltage power distribution Internet of Things interactive function test bench area topology grid and a bench area topology configuration system based on PLC and miniature circuit breakers.

[0042] The topological grid of the low-voltage distribution Internet of Things interactive function test area is designed according to the principles of multi-level, multi-branch and multi-area; among them, the topological grids of different areas are configured differently for the grid level, branches and connected power facilities according to the principle of from simple to complex. Each area topological grid consists of a distribution transformer side, a line side and a user side. The distribution transformer side forms an outgoing line from the input power supply to the leakage protection switch, and the primary and secondary equipment connected include distribution transformers (or power simulators), leakage protection switches, area intelligent fusion terminals, type I concentrators and several miniature circuit breakers.

[0043] The intelligent fusion terminal in the substation is used to monitor the information of the input nodes in the substation, and communicate and interact with various intelligent terminal devices and sensor units deployed on the substation side through the local communication module; the type I concentrator is used to aggregate the data collected by the single-phase or three-phase meters in the meter box on the user side of the substation.

[0044] The line side forms multiple levels and multiple outgoing line branches from the leakage protection switch on the distribution transformer side to the end user side, and is connected to phase-changing switches, intelligent capacitors, SVG dynamic reactive power compensation devices, molded case circuit breakers, miniature circuit breakers and branch fault simulation terminals; at the same time, it can be connected to the low-voltage monitoring unit to collect the electrical and topological location information of the line side nodes, and interact with the intelligent fusion terminal of the substation area.

[0045] The user side is the end of the substation, which is connected to single-phase or three-phase simulated loads, photovoltaic power generation simulation systems, V2G charging pile simulation systems, interoperable energy storage simulation systems, single-phase or three-phase meters, type II collectors and low-voltage monitoring units. The type II collector collects single-phase or three-phase meter data and interacts with the type I concentrator; the low-voltage monitoring unit and the type II collector interact with the substation intelligent fusion terminal at the same time.

[0046] The substation area topology grid is connected by an intelligent switch at the line side input node; within the substation area topology grid, slot-type terminal blocks are set on the distribution transformer side, line side and user side to realize series or parallel connection of multiple substations and flexible adjustment of the substation area topology grid and level.

[0047] The substation area topology configuration control system based on PLC and miniature circuit breakers is composed of a PLC controller and a miniature circuit breaker; the miniature circuit breaker is connected to the layers, branches, terminals and other types of topological access nodes of the distribution substation area topology grid in series or parallel, and the PLC controller is used to realize the remote one-key setting and automatic adjustment of the grid structure adjustment within the substation area and the access and removal of various new intelligent devices and sensing devices such as charging piles, energy storage, photovoltaics, low-voltage monitoring units, etc.

[0048] The management system of the low-voltage distribution Internet of Things interactive function test bench area is composed of a server host, a hub, and a serial port server. It is connected to the V2G charging pile simulation system, the interoperable energy storage simulation system, the distributed photovoltaic simulation system, the power simulator, and the branch fault simulation terminal through a communication conversion interface module. It is based on the .NET platform, C / S software architecture, and Access database, and adopts multi-threading, multi-tasking concurrency mechanism and GDI+ drawing technology to realize the platform visualization operation management and control of the "edge-end" interactive function test bench area of ​​the distribution Internet of Things.

[0049] The power supply simulator is used for output simulation of various power supply operating conditions, including normal operating conditions, three-phase imbalance, low voltage, power outages and harmonic output, and is connected to the substation management system for remote control.

[0050] The branch fault simulation terminal is used to simulate different faults on the line side or user side, including neutral-live short circuit, live short circuit, grounding resistance-ground (or incoming neutral line), and is connected to the substation test management system for remote control.

[0051] Distributed photovoltaics are replaced by a photovoltaic simulation system, which consists of a solar cell array simulator and a photovoltaic simulator. It can simulate different solar panel IV curves, simulate thin-film photovoltaic cell curves, simulate standard crystalline silicon photovoltaic cell curves, simulate high-efficiency crystalline silicon photovoltaic cell curves, and custom photovoltaic cell curves, etc., and is connected to the station area test management system for remote control.

[0052] The charging pile is replaced by a V2G charging pile simulation system, which consists of a V2G bidirectional charging pile and a bidirectional battery simulator. It can simulate different types of electric vehicle charging loads for charging and V2G power grid interaction behavior characteristics, and connect to the substation test management system for remote control.

[0053] The present invention simulates the physical characteristics of actual substations in a semi-realistic manner, generates multi-substation, multi-branch, multi-level complex topology grid structures and various operating conditions with one click, flexibly constructs typical distribution network substation scenarios and accesses various new intelligent devices and sensing devices, and while highly restoring the real low-voltage substation operating environment, it also has the flexibility and customizability of a laboratory testing platform.

[0054] Example 3

[0055] A management system for a low-voltage power distribution Internet of Things interactive function test bench area, wherein the low-voltage power distribution Internet of Things interactive function test bench area comprises: a low-voltage power distribution Internet of Things interactive function test bench area topology grid and a bench area topology configuration system based on PLC and miniature circuit breakers.

[0056] The low-voltage distribution IoT interactive function test area topology grid consists of three areas, and different areas are designed differently according to multi-level and multi-branch; among them, each area support topology grid consists of distribution transformer side, line side and user side. The three areas of distribution transformer side form an outgoing line from the input power supply to the leakage protection switch, and access primary and secondary equipment including distribution transformer (or power simulator), leakage protection switch, area intelligent fusion terminal, type I concentrator and several miniature circuit breakers; at the same time, the wiring slot is led out at the outgoing line.

[0057] The intelligent fusion terminal in the substation is used to monitor the information of the input nodes in the substation, and communicate and interact with various intelligent terminal devices and sensor units deployed on the substation side through the local communication module; the type I concentrator is used to aggregate the data collected by the single-phase or three-phase meters in the meter box on the user side of the substation.

[0058] The line side is designed as 1 level and 3-4 branch lines. Branch line 1 of substation 1 is connected to an intelligent capacitor, branch line 2 is connected to a phase-changing switch, and branch line 3 is connected to a branch switch (molded case circuit breaker). Branch line 1 of substation 2 is connected to an intelligent capacitor, branch line 2 is connected to an SVG (dynamic reactive power compensation device), branch line 3 is connected to a phase-changing switch, and branch line 4 is connected to a branch switch. Branch line 1 of substation 3 is connected to an intelligent capacitor, branch line 2 is connected to a phase-changing switch, branch line 3 is connected to an SVG, and branch line 4 is connected to a branch switch. At the same time, a branch fault simulation terminal is connected to the input line on the line side.

[0059] Connect to single-phase or three-phase simulated loads, photovoltaic power generation simulation systems, V2G charging pile simulation systems, interoperable energy storage simulation systems, single-phase or three-phase meters, type II collectors and low-voltage monitoring units. Type II collectors collect single-phase or three-phase meter data and exchange data with type I concentrators; low-voltage monitoring units and type II collectors also exchange data with the intelligent fusion terminal of the substation area.

[0060] The substation area topology grid is connected by an intelligent switch at the line side input node; within the substation area topology grid, slot-type terminal blocks are set on the distribution transformer side, line side and user side to realize series or parallel connection of multiple substations and flexible adjustment of the substation area topology grid and level.

[0061] The substation area topology configuration control system based on PLC and miniature circuit breakers is composed of a PLC controller and a miniature circuit breaker; the miniature circuit breaker is connected to the layers, branches, terminals and other types of topological access nodes of the distribution substation area topology grid in series or parallel, and the PLC controller is used to realize the remote one-key setting and automatic adjustment of the grid structure adjustment within the substation area and the access and removal of various new intelligent devices and sensing devices such as charging piles, energy storage, photovoltaics, low-voltage monitoring units, etc.

[0062] The low-voltage distribution Internet of Things interactive function test bench area management system is composed of a server host, a hub, and a serial port server. It is connected to the V2G charging pile simulation system, the interoperable energy storage simulation system, the photovoltaic power generation simulation system, the power simulator, and the branch fault simulation terminal through a communication conversion interface module. It is based on the .NET platform, C / S software architecture, and Access database, and adopts a multi-threaded, multi-tasking concurrent mechanism and GDI+ drawing technology to realize the platform visualization operation management and control of the "edge-end" interactive function test bench area of ​​the distribution Internet of Things.

[0063] The power supply simulator is used for output simulation of various power supply operating conditions, including normal operating conditions, three-phase imbalance, low voltage, power outages and harmonic output, and is connected to the substation management system for remote control.

[0064] The branch fault simulation terminal is used to simulate different faults on the line side or user side, including neutral-live short circuit, live short circuit, grounding resistance-ground (or incoming neutral line), and is connected to the substation test management system for remote control.

[0065] Distributed photovoltaics are replaced by a photovoltaic simulation system, which consists of a solar cell array simulator and a photovoltaic simulator. It can simulate different solar panel IV curves, simulate thin-film photovoltaic cell curves, simulate standard crystalline silicon photovoltaic cell curves, simulate high-efficiency crystalline silicon photovoltaic cell curves, and custom photovoltaic cell curves, etc., and is connected to the station area test management system for remote control.

[0066] The charging pile is replaced by a V2G charging pile simulation system, which consists of a V2G bidirectional charging pile and a bidirectional battery simulator. It can simulate different types of electric vehicle charging loads for charging and V2G power grid interaction behavior characteristics, and connect to the substation test management system for remote control.

[0067] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0068] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the relevant field should understand that the specific implementation methods of the present invention can still be modified or replaced by equivalents. Any modification or equivalent replacement that does not depart from the spirit and scope of the present invention should be covered within the scope of protection of the claims of the present invention.

Claims

1. Low-voltage power distribution Internet of Things interactive function test bench area, characterized by: Including series-parallel adjustable distribution substation area topology grid; The series-parallel adjustable distribution area topology grid, each area topology grid includes a distribution transformer side, a line side and a user side; The distribution transformer side is connected to the primary and secondary equipment, which is output by the input power supply and connected to the line side through the leakage protection switch for shunting; the primary and secondary equipment include distribution transformers or power simulators, leakage protection switches, intelligent fusion terminals in substations, type I concentrators and several miniature circuit breakers; The line side forms multiple levels and multiple outgoing line branches from the leakage protection switch on the distribution transformer side to the end user side, and is connected to the phase-changing switch, intelligent capacitor, SVG dynamic reactive power compensation device, molded case circuit breaker, miniature circuit breaker and branch fault simulation terminal; at the same time, it is connected to the low-voltage monitoring unit to collect the electrical and topological location information of the line side nodes, and interact with the intelligent fusion terminal of the substation area; The intelligent fusion terminal of the substation area is used for monitoring the input node information of the substation area, and communicates and interacts with various intelligent terminal devices and sensor units deployed on the substation side through the local communication module; the type I concentrator is used to gather the data collected by the single-phase or three-phase meter on the user side of the substation area; The user side is the end of the substation, which is connected to a single-phase or three-phase simulated load, a photovoltaic power generation simulation system, a V2G charging pile simulation system, an interoperable energy storage simulation system, a single-phase or three-phase meter, a type II collector and a low-voltage monitoring unit; the type II collector collects single-phase or three-phase meter data and interacts with the type I concentrator; the low-voltage monitoring unit and the type II collector interact with the substation intelligent fusion terminal at the same time; The substation topology grids are connected through intelligent switches at the line-side input nodes; within the substation topology grid, slot-type terminal blocks are set on the distribution transformer side, line side and user side to achieve series or parallel connection of multiple substations and flexible adjustment of the substation topology grid and levels.

2. The low-voltage power distribution Internet of Things interactive function test bench area according to claim 1 is characterized in that: The series-parallel adjustable distribution substation area topology grid is designed according to the principles of multi-level, multi-branch and multi-station area; the topology grids of different stations are configured differently for the grid levels, branches and connected power facilities according to the principle of from simple to complex.

3. The low-voltage power distribution Internet of Things interactive function test bench area according to claim 1 is characterized in that: It also includes a substation topology configuration control system based on PLC and miniature circuit breakers; The substation area topology configuration control system based on PLC and miniature circuit breakers is composed of a PLC controller and a miniature circuit breaker. The miniature circuit breaker is connected in series or parallel to the levels, branches, terminals and other types of topological access nodes of the distribution substation area topology grid. Through PLC, the grid structure adjustment within the substation area and the remote one-key setting and automatic adjustment of the access and disconnection of charging piles, mutual energy storage, distributed photovoltaics, low-voltage monitoring units and sensing devices are realized.

4. The low-voltage power distribution Internet of Things interactive function test bench area according to any one of claims 1 to 3, characterized in that: The distribution transformer side leads out a wiring slot at the outgoing line.

5. The management system of the low-voltage power distribution Internet of Things interactive function test bench area according to any one of claims 1 to 4 is characterized in that: It includes a server host, a hub and a serial port server, which are connected to the V2G charging pile simulation system, the interoperable energy storage simulation system, the photovoltaic power generation simulation system, the power simulator and the branch fault simulation terminal through the communication conversion interface module. It is based on the .NET platform, C / S software architecture and Access database, and adopts multi-threading, multi-tasking concurrency mechanism and GDI+ drawing technology to realize the platform visualization operation management and control of the low-voltage distribution Internet of Things interactive function test bench area.

6. The management system according to claim 5, characterized in that: The power supply simulator is used for output simulation of various power supply operating conditions, including normal operating conditions, three-phase imbalance, low voltage, power outage and line disconnection, and harmonic output, and is connected to a management system for remote control.

7. The management system according to claim 5, characterized in that: The branch fault simulation terminal is used to simulate different faults on the line side or the user side, including neutral-live short circuit, live short circuit, grounding resistance-ground, and is connected to the management system for remote control.

8. The management system according to claim 5, characterized in that: Distributed photovoltaics are replaced by a photovoltaic power generation simulation system, which consists of a solar cell array simulator and a photovoltaic simulator. It simulates different solar panel IV curves, thin-film photovoltaic cell curves, standard crystalline silicon photovoltaic cell curves, high-efficiency crystalline silicon photovoltaic cell curves and custom photovoltaic cell curves, and is connected to the management system for remote control.

9. The management system according to claim 5, characterized in that: The charging pile is replaced by a V2G charging pile simulation system, which consists of a V2G bidirectional charging pile and a bidirectional battery simulator. It simulates different types of electric vehicle charging loads connected for charging and the V2G power grid interaction behavior characteristics, and is connected to the management system for remote control.

10. The management system according to claim 5, characterized in that: The low-voltage distribution Internet of Things interactive function test station area is connected to a Type I concentrator and an area intelligent fusion terminal on the distribution transformer side, a low-voltage monitoring unit on the line side, and a Type II collector and single-phase and three-phase electricity meters on the user side; the Type I concentrator exchanges information with the single-phase and three-phase electricity meters through the local communication network; the area intelligent fusion terminal is connected to the local network communication through the low-voltage monitoring unit to realize information interaction with the intelligent switch, SVG dynamic reactive power compensation device, phase-changing switch, distributed photovoltaic, interoperable energy storage and charging piles.