Coordinated scheduling method, system, device and medium for flexible resources on both sides of source and load
Through the coordinated scheduling of coal-power units and demand response resources, combined with power generation scheduling and deep peak shaving, the problem of insufficient peak shaving capacity of the power system after the increase in the proportion of new energy generation is solved, the wind and photoelectric capacity is reduced, and the power system is improved. Scheduling flexibility and security.
Patent Information
- Application Number
- CN202111269086.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-10-29
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2041-10-29
AI Technical Summary
After the increase in the proportion of new energy power generation, the peak shaving capacity of the power system is insufficient, resulting in waste of wind and photoelectric waste, and the coal-fired power unit is limited and it is difficult to meet the peak shaving demand, affecting the operational safety and stability of the power system.
Through the coordinated scheduling of conventional coal-power units and demand response resources, an alternating optimization model of power generation pre-scheduling, deep peak shaving and formal power generation scheduling are established, and the peak shaving of coal-power units and demand response resources are optimized. Make efforts to reduce the amount of wind and power waste, and improve the dispatch flexibility and effectiveness of the power system.
It effectively solves the problem of insufficient peak shaving in the new power system, reduces the amount of wind and photoelectric waste, improves the flexibility and effectiveness of power system resource scheduling, and enhances the operational safety and stability of the power system.
Smart Images

Figure CN114118706B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power system resource dispatching, and in particular to a coordinated dispatching method, system, computer equipment and storage medium for flexible resources on both sides of a source and a load. Background Art
[0002] With the increasing problems of environmental pollution and fuel resource shortage, new energy power generation technology has been rapidly developed around the world. Driven by the goal of achieving "carbon peak and carbon neutrality", a new power system with new energy as the main body has been promoted in my country. The installed capacity of new energy power generation will continue to increase, and the installed capacity of conventional thermal power will continue to decline. However, the randomness, volatility, and anti-peak characteristics of new energy output can easily lead to difficulties in absorbing power during low periods and insufficient supply capacity during peak periods. At the same time, with the significant increase in the number of extreme weather events, residential and industrial power loads are significantly affected by new energy power supply, and the resulting seasonal peak loads also pose a great challenge to the supply and demand balance of the power system.
[0003] In order to solve the problem of insufficient peak-shaving capacity of the power system after a high proportion of new energy is connected, deeply explore the peak-shaving capacity of the system, and alleviate the dilemma of new energy consumption, many provinces in China have successively carried out deep peak-shaving auxiliary services with coal-fired power units as the main body, that is, when the system negative reserve capacity is insufficient or the load balance constraint during the valley period is not met, the conventional coal-fired power units with adjustment capabilities further adjust their output to control their operation below the minimum stable output, so as to make room for new energy generation. However, this method is only applicable to power generation scheduling scenarios with sufficient flexible adjustment resources such as large-scale gas units, while my country's gas resources are not abundant, and coal-fired power units are limited by the minimum technical output and cannot be started and stopped frequently. In the current context of the increasing proportion of new energy power generation, it is impossible to cope with the challenges of large-scale wind and solar power abandonment and serious lack of peak-shaving capacity of the new power system by only using the method of power generation scheduling. Although deep peak-shaving relying on coal-fired power units can solve the serious lack of peak-shaving capacity of the power system to a certain extent, ignoring the role of demand response in the consumption of new energy and relying only on the adjustment capacity of coal-fired power units will cause a large amount of wind and solar power abandonment. Waste, and it is difficult to truly meet the power peak-shaving needs of the new power system.
[0004] Therefore, there is an urgent need to provide an optimized scheduling method that comprehensively considers the regulation capacity of coal-fired power units and the demand response capacity for new energy, so as to solve the problem of insufficient peak-shaving capacity of new power systems with a high proportion of new energy access, reduce the amount of wind and power abandonment, effectively improve the flexibility and effectiveness of power system resource scheduling, and further enhance the safety and stability of power system operation. Summary of the invention
[0005] The purpose of the present invention is to provide a coordinated scheduling method for flexible resources on both the source and load sides, taking into account the demand response resources as a flexible adjustment resource to ensure the balance of power supply and demand, which can realize the flexible interaction between the source, grid and load. A scheduling model is proposed in which conventional coal-fired power units and demand response resources interact and are alternately optimized in the order of power generation pre-scheduling, deep peak regulation and formal power generation scheduling. By combining power generation scheduling with deep peak regulation, the problem of insufficient peak regulation of new power systems can be solved while reducing the amount of wind and power curtailment, effectively improving the flexibility and effectiveness of power system resource scheduling, and further enhancing the safety and stability of power system operation.
[0006] In order to achieve the above objectives, it is necessary to provide a collaborative scheduling method, system, computer equipment and storage medium for flexible resources on both the source and load sides in response to the above technical problems.
[0007] In a first aspect, an embodiment of the present invention provides a method for coordinated scheduling of flexibility resources on both sides of a source and a load, the method comprising the following steps:
[0008] Obtaining the day-ahead operating parameters of conventional units, deep peak-shaving parameters of coal-fired power units, and deep peak-shaving parameters of demand response resources, and establishing a non-peak-shaving power generation pre-dispatching model based on the day-ahead operating parameters of conventional units;
[0009] According to the non-peak-shaving power generation pre-dispatching model, the peak-shaving demand in each preset time period is obtained;
[0010] According to the peak-shaving demand, the deep peak-shaving parameters of the coal-fired power units and the deep peak-shaving parameters of the demand response resources, a deep peak-shaving model for coordinated optimization of the coal-fired power units and the demand response resources is established;
[0011] According to the deep peak-shaving model, the peak-shaving output of the coal-fired power units participating in the deep peak-shaving in each peak-shaving demand period and the peak-shaving output of the demand response resources are obtained;
[0012] Establishing a formal dispatching model for peak-shaving power generation according to the peak-shaving output of coal-fired power units participating in deep peak-shaving during each peak-shaving demand period and the peak-shaving output of demand response resources;
[0013] According to the peak-shaving power generation formal scheduling model, the corresponding deep peak-shaving result and the day-ahead power generation curve are obtained.
[0014] In a second aspect, an embodiment of the present invention provides a coordinated scheduling system for flexible resources on both sides of a source and a load, the system comprising:
[0015] The first modeling module is used to obtain the day-ahead operating parameters of conventional units, the deep peak-shaving parameters of coal-fired power units and the deep peak-shaving parameters of demand response resources, and establish a non-peak-shaving power generation pre-dispatching model based on the day-ahead operating parameters of conventional units;
[0016] A first calculation module is used to obtain the peak load demand in each preset time period according to the non-peak load generation pre-dispatching model;
[0017] The second modeling module is used to establish a deep peak-shaving model for collaborative optimization of coal-fired power units and demand response resources according to the peak-shaving demand, deep peak-shaving parameters of coal-fired power units and deep peak-shaving parameters of demand response resources;
[0018] The second calculation module is used to obtain the peak-shaving output of the coal-fired power units participating in the deep peak-shaving and the peak-shaving output of the demand response resources in each peak-shaving demand period according to the deep peak-shaving model;
[0019] The third modeling module is used to establish a formal dispatching model for peak-shaving power generation according to the peak-shaving output of coal-fired power units participating in deep peak-shaving during each peak-shaving demand period and the peak-shaving output of demand response resources;
[0020] The third calculation module is used to obtain the corresponding deep peak-shaving result and the day-ahead power generation curve according to the peak-shaving power generation formal scheduling model.
[0021] In a third aspect, an embodiment of the present invention further provides a computer device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the steps of the above method when executing the computer program.
[0022] In a fourth aspect, an embodiment of the present invention further provides a computer-readable storage medium having a computer program stored thereon, wherein the computer program implements the steps of the above method when executed by a processor.
[0023] The above-mentioned application provides a collaborative scheduling method, system, computer equipment and storage medium for flexible resources on both the source and load sides. Through the method, it is achieved by obtaining the day-ahead operating parameters of conventional units, the deep peak-shaving parameters of coal-fired power units and demand response resources, and establishing a non-peak-shaving power generation pre-scheduling model based on this. After calculating the peak-shaving demand for each preset time period, a deep peak-shaving model for collaborative optimization of coal-fired power units and demand response resources is established based on the peak-shaving demand, the deep peak-shaving parameters of coal-fired power units and demand response resources, and after calculating the peak-shaving output of the coal-fired power units participating in the deep peak-shaving and the peak-shaving output of the demand response resources in each peak-shaving demand period, a formal peak-shaving power generation scheduling model is established based on the peak-shaving output of the coal-fired power units participating in the deep peak-shaving and the peak-shaving output of the demand response resources, and the corresponding deep peak-shaving results and the collaborative optimization deep peak-shaving method of the day-ahead power generation curve are calculated. Compared with the prior art, the collaborative dispatching method of the present invention combines power generation dispatching with deep peak regulation by adopting the interactive participation of conventional coal-fired power groups and demand response resources in deep peak regulation, and establishing a dispatching model for alternately optimizing the order of power generation pre-dispatching, deep peak regulation and formal power generation dispatching. It solves the problem of insufficient peak regulation of the new power system while reducing the amount of wind and power curtailment, effectively improving the flexibility and effectiveness of power system resource dispatching, and further enhancing the safety and stability of power system operation. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 Schematic diagram of an application scenario of a method for collaboratively scheduling flexible resources on both sides of a source and a load in an embodiment of the present invention;
[0025] Figure 2 is a schematic diagram of a coordinated dispatching frame in which power generation dispatching and deep peak regulation are alternately connected in an embodiment of the present invention;
[0026] Figure 3 It is a flow chart of a method for collaboratively scheduling flexible resources on both sides of a source and a load in an embodiment of the present invention;
[0027] Figure 4 is a schematic diagram of boundary curves of each time period of a new power system in an embodiment of the present invention;
[0028] Figure 5 Schematic diagram of the pre-dispatching result of non-peak-shaving power generation in the novel power system according to an embodiment of the present invention;
[0029] Figure 6 is a schematic diagram of a clearing result without considering the participation of demand response resources in deep peak regulation in an embodiment of the present invention;
[0030] Figure 7 is a schematic diagram of the clearing result considering the participation of demand response resources in deep peak regulation in an embodiment of the present invention;
[0031] Figure 8It is a schematic diagram of the clearing result of the formal dispatch of deep peak-shaving power generation considering the participation of demand response resources in deep peak-shaving in an embodiment of the present invention;
[0032] Fig. 9 is a structural schematic diagram of a coordinated scheduling system for flexible resources on both sides of source and load in an embodiment of the present invention;
[0033] Fig.10 It is a diagram of the internal structure of a computer device in an embodiment of the present invention. DETAILED DESCRIPTION
[0034] In order to make the purpose, technical scheme and beneficial effects of the present application clearer, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. Obviously, the embodiments described below are part of the embodiments of the present invention and are only used to illustrate the present invention, but are not used to limit the scope of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0035] The collaborative scheduling method of the source-load dual-side flexibility resources provided by the present invention can be applied to Figure 1 The terminal or server shown. The terminal may be, but is not limited to, various personal computers, laptops, smart phones, tablet computers, and portable wearable devices, and the server may be implemented as an independent server or a server cluster composed of multiple servers. The server may adopt the collaborative dispatching method of the source-load dual-side flexibility resources of the present invention to the new power system with a high proportion of new energy access according to the actual operation requirements, according to Figure 2 The coordinated dispatch framework of alternating power generation dispatch and deep peak load regulation shown in the figure is used for optimized dispatch, which can solve the challenges of large-scale wind and solar power abandonment and the serious shortage of flexible peak load regulation resources faced by the current new power system. While reducing the amount of wind and solar power abandoned in the power system, it effectively improves the flexibility and effectiveness of power system resource dispatch, and further enhances the safety and stability of power system operation. The following embodiments will explain in detail the coordinated dispatch method of flexible resources on both sides of the source and load of the present invention.
[0036] In one embodiment, Figure 2 As shown, a coordinated scheduling method for flexible resources on both sides of a source and a load is provided, comprising the following steps:
[0037] S11, obtaining the day-ahead operating parameters of conventional units, the deep peak-shaving parameters of coal-fired power units, and the deep peak-shaving parameters of demand response resources, and establishing a non-peak-shaving power generation pre-dispatching model based on the day-ahead operating parameters of the conventional units;
[0038] Among them, conventional units include coal-fired power units, gas-fired power units and hydropower units, etc. In the embodiment of the present invention, all conventional units in the power system participate in power generation scheduling, and it is necessary to obtain the day-ahead operating parameters of all conventional units in the power system to establish the corresponding non-peak-shaving power generation pre-scheduling model. However, the units participating in deep peak-shaving are only coal-fired power units, and it is only necessary to obtain the deep peak-shaving parameters of the corresponding coal-fired power units and the corresponding demand response resource deep peak-shaving parameters to meet the parameter requirements for deep peak-shaving model modeling. The day-ahead operating parameters of the corresponding conventional units shall be based on the parameters actually required to establish the non-peak-shaving power generation pre-scheduling model, such as the cost coefficient and startup cost of each conventional unit.
[0039] The purpose of establishing a pre-dispatch model for non-peak-shaving power generation without considering the participation of coal-fired power units and demand response resources in deep peak-shaving is to determine the day-ahead peak-shaving demand of the current new power system, that is, the amount of wind and solar power abandoned in the power system. Therefore, the established pre-dispatch model for non-peak-shaving power generation allows the system to abandon wind and solar power when the minimum stable technical output of coal-fired power units is taken as the output lower limit, and the penalty term for abandoning wind and solar power is incorporated into the objective function, resulting in the following pre-dispatch model for non-peak-shaving power generation that meets the first preset constraint condition, and the corresponding objective function is expressed as:
[0040]
[0041] In the formula, T represents the total number of preset time periods; N represents the total number of conventional units; S represents the total number of output sections of conventional units; P i,s,t and C i,s,t They respectively represent the s-th segment output and the s-th segment cost coefficient of the t-th preset period of the ith conventional unit; N represents the startup cost of the i-th conventional unit in the t-th preset period; w represents the total number of wind farms; represents the abandoned wind power output of the w-th wind farm in the t-th preset period; N v Indicates the total number of photovoltaic power plants; represents the abandoned solar power output of the v-th photovoltaic power station in the t-th preset period; α represents the penalty factor for abandoned wind and solar power; M represents the relaxation penalty factor of the line flow constraint and section flow constraint; N l Indicates the total number of lines; They represent the forward power flow relaxation variable and reverse power flow relaxation variable of the lth line respectively; N s Indicates the total number of sections; They represent the forward flow relaxation variable and reverse flow relaxation variable of the sth section respectively.
[0042] The first preset constraint conditions satisfied by the above-mentioned non-peak-shaving power generation pre-dispatching model include:
[0043] 1) Unit constraints, including unit output constraints, unit ramp constraints, and unit minimum continuous start and stop time constraints;
[0044] The unit output constraint means that for each preset time period t, the output of each conventional unit should not exceed its corresponding maximum output upper limit constraint and should not be lower than its corresponding minimum stable technical output. Specifically, the unit output constraint of the i-th conventional unit (i=1,2…,N) is expressed as:
[0045]
[0046]
[0047] Where P i,t represents the output of the ith conventional unit in the tth preset period; α i,t represents the start and stop status of the ith conventional unit in the tth preset period, and α i,t =1 means power on, α i,t =0 means shutdown; and They represent the minimum stable technical output and output upper limit of the ith conventional unit in the tth preset period respectively;
[0048] The unit climbing constraint means that for each preset period t, each conventional unit should meet the corresponding climbing rate requirements of each conventional unit when adjusting the output up or down. Specifically, the unit climbing constraint of the i-th conventional unit (i=1,2…,N) is expressed as:
[0049]
[0050]
[0051] In the formula, and The maximum ramp-up rate and the maximum ramp-down rate of the ith conventional unit in the tth preset period, respectively;
[0052] The minimum continuous start / stop time constraint of the unit refers to the requirement that each conventional unit meet the corresponding minimum continuous start / stop time requirement due to the physical properties and actual operation needs of each conventional unit. Specifically, the minimum continuous start / stop time constraint of the i-th conventional unit (i=1,2…,N) is expressed as:
[0053]
[0054]
[0055] In the formula, and They represent the minimum continuous start-up time and the minimum continuous shutdown time of the i-th conventional unit respectively; and They represent the continuous start-up time and continuous shutdown time of the t-th preset period of the i-th conventional unit, respectively, where,
[0056]
[0057]
[0058] 2) Network constraints, including line flow constraints and section flow constraints;
[0059] The line power constraint means that for each preset period t, the transmission power of each line cannot exceed its corresponding maximum transmission limit. Specifically, the lth line (l = 1, 2 ..., N l ) is expressed as:
[0060]
[0061] In the formula, represents the power transmission limit of the lth line; G l-i N represents the output power transfer distribution factor of the node where the i-th conventional unit is located to the l-th line; T Indicates the total number of contact lines; T j,t G represents the planned power of the jth tie line in the tth preset period; l-j G represents the output power transfer distribution factor of the node where the jth tie line is located to the lth line; l-w G represents the generator output power transfer distribution factor of the node where the w-th wind farm is located to the l-th line; l-v represents the power transfer distribution factor of the generator output of the node where the vth photovoltaic power station is located to the lth line; K represents the total number of nodes in the system; G l-k represents the output power transfer distribution factor of the kth node to the lth line; D k,t represents the bus load value of the kth node in the tth preset period; They represent the forward power flow relaxation variable and reverse power flow relaxation variable of the lth line respectively;
[0062] The section power flow constraint means that for each preset time period t, the transmission power of each section cannot exceed its corresponding maximum transmission limit. Specifically, the section power flow constraint of the sth section (s=1, 2…, Ns) is expressed as:
[0063]
[0064] In the formula, and They represent the minimum and maximum values of the power flow transmission at the s-th section respectively; G s-i N represents the output power transfer distribution factor of the node where the i-th conventional unit is located to the s-th section; T Indicates the total number of contact lines; T j,t G represents the planned power of the jth tie line in the tth preset period; s-j G represents the output power transfer distribution factor of the node where the jth tie line is located to the sth section; s-w G represents the generator output power transfer distribution factor of the node where the w-th wind farm is located to the l-th line; s-v represents the power transfer distribution factor of the generator output from the node where the vth photovoltaic power station is located to the lth line; K is the total number of nodes in the system; G s-k is the output power transfer distribution factor of node k to the s-th section; They represent the forward flow relaxation variable and the reverse flow relaxation variable of the s-th section respectively;
[0065] 3) System constraints, which include system balance constraints, positive reserve constraints, negative reserve constraints and spinning reserve constraints; among which,
[0066] The system balance constraint means that for each preset period t, the sum of the total output of all conventional units, the output of wind and solar energy and the power transmitted by the interconnection line should be equal to the system load. Specifically, the system balance constraint is expressed as:
[0067]
[0068] Where P i,t represents the output of the ith conventional unit in the tth preset period; P w,t represents the maximum power generation capacity of the w-th wind farm in the t-th preset period; P v,t represents the maximum power generation capacity of the v-th photovoltaic power station in the t-th preset period; represents the abandoned wind power output of the w-th wind farm in the t-th preset period; N v Indicates the total number of photovoltaic power plants; N represents the abandoned light output of the v-th photovoltaic power station in the t-th preset period; T Indicates the total number of contact lines; T j,t represents the planned power of the jth tie line in the tth preset period; D t represents the system load in the tth preset period;
[0069] The positive reserve constraint means that for each preset period t, the positive reserve capacity that can be provided by all conventional units must meet the positive reserve capacity demand of the system. Specifically, the positive reserve constraint is expressed as:
[0070]
[0071] In the formula, α i,t represents the start and stop status of the ith conventional unit in the tth preset period, and α i,t =1 means power on, α i,t =0 means shutdown; represents the output upper limit of the ith conventional unit in the tth preset period; represents the system positive spare capacity demand in the t-th preset period;
[0072] The negative reserve constraint means that for each preset period t, the negative reserve capacity that can be provided by all conventional units must meet the negative reserve capacity demand of the system. Specifically, the negative reserve constraint is expressed as:
[0073]
[0074] In the formula, represents the minimum stable technical output of the i-th conventional unit in the t-th preset period; represents the system negative spare capacity demand in the t-th preset period;
[0075] The spinning reserve constraint refers to the sum of the upward adjustment capacity or downward adjustment capacity of each conventional unit in each preset period of time must meet the upward adjustment or downward adjustment spinning reserve demand of actual operation. Specifically, the spinning reserve constraint is expressed as:
[0076]
[0077]
[0078] In the formula, and represent the upper spinning reserve capacity requirement and the lower spinning reserve capacity requirement of the system in the t-th preset period respectively; and They respectively represent the maximum ramp-up rate and the maximum ramp-down rate of the ith conventional unit in the tth preset time period.
[0079] S12, obtaining the peak-shaving demand in each preset time period according to the non-peak-shaving power generation pre-dispatching model;
[0080] Among them, the peak load demand in each preset period is the amount of wind and solar power abandoned in each preset period, which is the optimization variable of the pre-dispatching model without peak load regulation: the abandoned wind output of each wind farm in each preset period The abandoned light output of each photovoltaic power station in each preset period It can be determined according to the optimal solution corresponding to the pre-dispatch model of non-peak-shaving power generation. The pre-dispatch model of non-peak-shaving power generation is a mixed integer linear programming model. In principle, its solution calculation can adopt any method that can obtain its optimal solution. In order to ensure the efficiency of the solution calculation and the accuracy of the optimal solution, this embodiment preferably adopts the GUROBI optimization solver to solve and calculate the pre-dispatch model of non-peak-shaving power generation, and obtain the amount of wind and solar power abandoned in each preset time period, and determine the amount of wind and solar power abandoned in each preset time period as the peak-shaving demand of the power system corresponding to each preset time period. It should be noted that by solving and calculating the pre-dispatch model of non-peak-shaving power generation, the start and stop plans of each conventional unit in each preset time period corresponding to the system power generation dispatch can also be obtained, that is, the corresponding day-ahead unit combination is obtained.
[0081] S13, establishing a deep peak-shaving model for coordinated optimization of coal-fired power units and demand response resources according to the peak-shaving demand, deep peak-shaving parameters of coal-fired power units and deep peak-shaving parameters of demand response resources;
[0082] Among them, the deep peak-shaving model is based on the characteristics of demand response resources that can realize flexible interaction between sources, grids and loads, and can absorb new energy to a certain extent to ensure the balance of power supply and demand. The coal-fired power units in the power system and the demand response resources are coordinated and optimized to establish an optimization scheduling model, in order to determine the optimal peak-shaving output of the coal-fired power units and demand response resources that participate in deep peak-shaving to meet the peak-shaving demand in each peak-shaving demand period through the solution and calculation of the deep peak-shaving model, and effectively reduce the amount of wind and power abandoned in the power system. In addition to knowing the peak-shaving demand in each peak-shaving demand period, the construction of the deep peak-shaving model also requires obtaining the deep peak-shaving parameters corresponding to each coal-fired power unit and each demand response resource, that is, obtaining the deep peak-shaving cost coefficient and minimum stable technical output of the coal-fired power unit, as well as the valley-filling response cost coefficient and maximum responsive capacity of the demand response resource. The corresponding parameters can be reported to the power dispatching agency in advance by each coal-fired power unit and demand response resource for its modeling use.
[0083] After obtaining the peak load demand, deep peak load parameters of coal-fired power units and demand response resources according to the above steps, a deep peak load model that meets the second preset constraint condition can be established. The corresponding objective function is expressed as:
[0084]
[0085] Where T represents the total number of peak demand periods; N c represents the total number of coal-fired power units participating in deep peak regulation; S represents the total number of output segments of coal-fired power units; and They represent the s-th segment down-regulation output and the s-th segment deep peak-shaving cost coefficient of the ith coal-fired power unit in the t-th peak-shaving demand period; N dIndicates the total number of demand response resources participating in deep peak load regulation; and They represent the kth segment valley-filling demand response resource output and valley-filling demand response cost coefficient of the dth demand response resource in the tth peak-shaving demand period; N w represents the total number of wind farms; N represents the abandoned wind output of the w-th wind farm during the t-th peak-shaving demand period; v Indicates the total number of photovoltaic power plants; represents the abandoned solar power output of the v-th PV power station during the t-th peak-shaving demand period; α represents the penalty factor for abandoned wind and solar power.
[0086] The second preset constraint condition satisfied by the objective function of the deep peak shaving model includes:
[0087] 1) Coal-fired power unit constraints, including coal-fired power unit peak load constraints and coal-fired power unit peak load ramp constraints;
[0088] The peak load output constraint of coal-fired power generation units means that the output of each coal-fired power generation unit during the peak load demand period t should not exceed the minimum stable technical output and should not be less than 0. Specifically, the peak load output constraint of coal-fired power generation units is expressed as:
[0089]
[0090]
[0091] In the formula, and They represent the output reduction of the t-th peak-shaving demand period and the s-th segmented output reduction of the ith coal-fired power unit respectively; represents the minimum stable technical output of the ith coal-fired power unit during the tth peak demand period;
[0092] The peak load climbing constraint of coal-fired power generation units refers to that when each coal-fired power generation unit performs deep peak load, it should meet the requirements of the up-climbing rate and down-climbing rate at adjacent moments based on the pre-dispatching results of power generation before the peak load is not shaving. Specifically, the peak load climbing constraint of coal-fired power generation units is expressed as:
[0093]
[0094]
[0095] In the formula, and They respectively represent the output of the t-th preset period and the t-1-th preset period of the i-th coal-fired power generation unit in the day-ahead power generation pre-dispatch result; and They represent the reduced output of the i-th coal-fired power unit in the t-th peak-shaving demand period and the reduced output of the t-1-th peak-shaving demand period respectively; and They represent the maximum ramp-up rate and the maximum ramp-down rate of the ith coal-fired power unit during the tth peak-shaving demand period respectively;
[0096] 2) Demand response resource constraints, which include demand response output constraints and demand response duration constraints;
[0097] The demand response output constraint refers to the upper and lower limit constraints of the demand response output that each demand response resource needs to meet when participating in deep peak load regulation. Specifically, the demand response output constraint is expressed as:
[0098]
[0099]
[0100] In the formula, represents the maximum responsive capacity of the demand response resource in the tth peak demand period; represents the state of the dth demand response resource participating in the demand response in the tth peak demand period, and Express participation, Indicates non-participation;
[0101] The demand response duration constraint refers to the minimum duration and maximum duration constraints that each demand response resource must meet after it is activated. Specifically, the demand response duration constraint is expressed as:
[0102]
[0103] In the formula, and They represent the minimum duration and maximum duration of the d-th demand response resource respectively; represents the demand response duration of the dth demand response resource in the tth peak demand period; where,
[0104]
[0105] 3) Peak load demand constraint means that for the peak load demand period t that requires deep peak load regulation, the sum of the peak load output of coal-fired power units and demand response resources should not be less than the system peak load demand. Specifically, the peak load demand constraint is expressed as:
[0106]
[0107] In the formula, represents the output reduction of the ith coal-fired power unit during the tth peak demand period, represents the valley-filling response output of the d-th demand response resource in the t-th peak demand period; They respectively represent the amount of wind and solar power abandoned in the day-ahead power generation pre-dispatching results.
[0108] Compared with the existing deep peak-shaving model involving only coal-fired power units, the deep peak-shaving model that introduces demand response resources given in this embodiment has fewer constraints and a simpler modeling method. At the same time, due to the climbing constraint, the peak-shaving capacity of coal-fired power units is limited, while demand response resources have obvious peak-shaving effects due to their flexible adjustment characteristics, and can meet the peak-shaving needs of most time periods. Considering the coordinated optimization of coal-fired power units and demand response resources to participate in deep peak-shaving, the peak-shaving capacity of the system will be significantly improved compared to relying solely on coal-fired power units, thereby significantly reducing the amount of wind and solar power abandoned by the system.
[0109] S14. According to the deep peak-shaving model, the peak-shaving output of the coal-fired power units participating in the deep peak-shaving in each peak-shaving demand period and the peak-shaving output of the demand response resources are obtained;
[0110] Among them, after the deep peak-shaving model is established according to the above steps, the optimal solution is calculated to obtain the peak-shaving output of coal-fired power units participating in deep peak-shaving and the peak-shaving output of demand response resources in the corresponding peak-shaving demand periods. It should be noted that the deep peak-shaving model is also a mixed integer linear programming model. In principle, its solution calculation can also adopt any method that can obtain its optimal solution. In order to ensure the efficiency of the solution calculation and the accuracy of the optimal solution, the same solution method as the non-peak-shaving power generation pre-dispatch model is adopted, that is, the GUROBI optimization solver is also used to solve the model to obtain the peak-shaving output of coal-fired power units participating in deep peak-shaving and the peak-shaving output of demand response resources in the corresponding peak-shaving demand periods.
[0111] S15, establishing a formal dispatching model for peak-shaving power generation according to the peak-shaving output of coal-fired power units participating in deep peak-shaving during each peak-shaving demand period and the peak-shaving output of demand response resources;
[0112] Among them, the formal dispatch model of peak-shaving power generation is similar to the pre-dispatching model of non-peak-shaving power generation. It only needs to set the output variables of coal-fired power units participating in deep peak-shaving during the peak-shaving demand period and the output variables of demand response resources in the corresponding objective function and constraints of the pre-dispatching model of non-peak-shaving power generation to fixed outputs, and the corresponding formal dispatch model of peak-shaving power generation can be adjusted. That is, the output of coal-fired power units participating in deep peak-shaving during each peak-shaving demand period and the output of demand response resources are respectively fixed to the corresponding coal-fired power units peak-shaving output and demand response resources peak-shaving output, and a formal dispatch model of peak-shaving power generation that meets the preset constraints is established. The objective function of the formal dispatch model of peak-shaving power generation can be obtained by removing the output variables of coal-fired power units participating in deep peak-shaving during the peak-shaving demand period from the corresponding objective function of the pre-dispatching model of non-peak-shaving power generation, and the objective function is expressed as:
[0113]
[0114] In the formula, Ω t represents the set of conventional units that do not participate in deep peak regulation in the tth preset period; T represents the total number of preset periods; S represents the total number of conventional unit output segments; P i,s,t and C i,s,t They respectively represent the s-th segment output and the s-th segment cost coefficient of the t-th preset period of the ith conventional unit; N represents the startup cost of the i-th conventional unit in the t-th preset period; w represents the total number of wind farms; represents the abandoned wind power output of the w-th wind farm in the t-th preset period; N v Indicates the total number of photovoltaic power plants; represents the abandoned solar power output of the v-th photovoltaic power station in the t-th preset period; α represents the penalty factor for abandoned wind and solar power; M represents the relaxation penalty factor of the line flow constraint and section flow constraint; N l Indicates the total number of lines; They represent the forward power flow relaxation variable and reverse power flow relaxation variable of the lth line respectively; N s Indicates the total number of sections; They represent the forward flow relaxation variable and reverse flow relaxation variable of the sth section respectively.
[0115] The preset constraints corresponding to the above-mentioned peak-shaving power generation formal dispatch model are basically consistent with the first constraint of the non-peak-shaving power generation pre-dispatch model, which includes unit constraints, network constraints, and system balance constraints. The only difference between the two is that the coal-fired power units and demand response resources participating in deep peak-shaving have fixed outputs during the corresponding peak-shaving demand period based on the optimization results corresponding to the deep peak-shaving model, and do not participate in the optimization during the formal dispatch stage of power generation. Specifically, the preset constraints are as follows:
[0116] 1) Unit constraints, including unit output constraints, unit ramp constraints, and unit minimum continuous start and stop time constraints, are consistent with the unit constraints corresponding to the first preset constraint condition of the non-peak-shaving power generation pre-dispatch model in the previous text, and do not need to be modified, and will not be repeated here;
[0117] 2) Network constraints, including line flow constraints and section flow constraints;
[0118] The lth line (l=1,2…,N l ) is expressed as:
[0119]
[0120] The cross-sectional flow constraint of the s-th section (s = 1, 2…, Ns) is expressed as:
[0121]
[0122] 3) System constraints, which include system balance constraints, positive reserve constraints, negative reserve constraints and spinning reserve constraints; among which,
[0123] The system balance constraint is to calculate the output of coal-fired power units and demand response resources participating in deep peak regulation according to the deep peak regulation model, and to obtain the peak regulation output of coal-fired power units and demand response resources. The corresponding values in the formal power generation scheduling model are set as fixed constants without optimization. Specifically, the system balance constraint is expressed as:
[0124]
[0125] In the formula, Π t N represents the set of coal-fired power units participating in deep peak load regulation during the peak load regulation period t; d Indicates the total number of demand response resources participating in deep peak load regulation;
[0126] The positive spare constraint is expressed as:
[0127]
[0128] The negative spare constraint is expressed as:
[0129]
[0130] The spinning reserve constraint is expressed as:
[0131]
[0132]
[0133] It should be noted that the variables represented by the same symbol in the same model have the same corresponding interpretations and can be referenced to each other. For the relevant variables that are not explained in this model, please refer to the relevant descriptions in the non-peak-shaving power generation pre-dispatch model and the deep peak-shaving model, which will not be repeated here.
[0134] S16. According to the peak-shaving power generation formal scheduling model, the corresponding deep peak-shaving result and the day-ahead power generation curve are obtained.
[0135] Among them, the optimization calculation of the formal dispatching model of peak-shaving power generation can be consistent with the solution method of the pre-dispatching model of non-peak-shaving power generation and the deep peak-shaving model in the previous article, and will not be repeated here.
[0136] It should be noted that the above steps S11-S16 of the present invention are executed to coordinate the scheduling of flexible resources on both sides of the source and the load, that is, the optimization and solution are carried out in sequence by adopting the methods of pre-scheduling of non-peak-shaving power generation, deep peak-shaving, and formal scheduling of deep peak-shaving power generation, and the optimization result of the previous step is used as the boundary condition of the next step, until the final deep peak-shaving result and the alternating optimization model of the date power generation scheduling curve are obtained to perform optimization scheduling once a day, which can effectively connect the power generation scheduling system and the deep peak-shaving system, make full use of the flexibility adjustment capabilities on both sides of the source and the load, and minimize the system's abandoned wind and solar power.
[0137] The embodiment of the present application proposes a method for demand response resources to participate in deep peak regulation in a scenario with a high proportion of new energy access, combines power generation scheduling with deep peak regulation, and makes full use of the flexibility and regulation capabilities on both the source and load sides. While minimizing the amount of wind and solar power abandoned in the system, it solves the problem of insufficient peak regulation in the new power system, effectively improves the flexibility and effectiveness of power system resource scheduling, and further enhances the safety and stability of power system operation.
[0138] In order to further verify that the coordinated scheduling method of flexible resources on both sides of the source and the load provided by the present invention has the above technical effects, the following method is used to perform relevant example analysis:
[0139] 1) Grid simulation operation boundary
[0140] Based on the operating data of Yunnan power grid, the operating scenario of a high proportion of wind and solar renewable energy connected to Yunnan power grid was simulated. By calling the GUROBI solver, the power generation dispatching results and deep peak regulation results of Yunnan power grid on a certain operating day were obtained.
[0141] The power grid operation boundary of the simulation example is as follows: Figure 4As shown in the figure, the system load and the external power both show a "double peak and double valley" distribution trend. Nighttime and noontime are valley periods, which easily lead to low overall unit output. At the same time, due to the anti-peaking characteristics of wind power and photovoltaic power, especially at noon, the photovoltaic output is generally at the maximum value of the day, while the system load and external power output are transferred to the valley output at this time. Limited by the minimum output and minimum start-up and shutdown time of coal-fired power units, the overall peak-shaving demand of the system is high during this period, which is prone to wind and power abandonment. In this example, the available installed capacity of conventional units is 52715MW, including 178 hydropower units with an installed capacity of 38095MW and 35 coal-fired units with an installed capacity of 14620MW; the maximum load of the system is 17008MW, the maximum external power is 18723MW, and it contains 2 identical wind farms with a maximum total output of 8294MW, and 1 photovoltaic power station with a maximum output of 3806MW.
[0142] 2) Results of pre-dispatching without peak-shaving generation
[0143] In the pre-dispatch phase without peak-shaving generation, the coal-fired power units and demand response resources are not considered to participate in peak-shaving, and the result is Figure 5 The pre-dispatch results shown are: the total amount of wind and solar power abandoned throughout the day is 2605.25MWh, and the maximum wind and solar power abandoned during the day is 1400MW, which occurs in the 32nd period. Figure 5 It can be seen that the periods of wind and solar power abandonment in the power system are mainly concentrated in the morning and noon when the net load starts to climb from the trough or turns from the peak to the trough. The reason is that when the net load of the power system starts to climb from the trough, due to the climbing constraints of conventional units, in order to meet the load supply during the peak period, it is necessary to increase the output of the units in advance for several periods, which will cause the wind and solar energy in some trough periods to be unable to be fully absorbed; when the net load of the power system turns from the peak to the trough, due to the climbing constraints of conventional units, the output cannot be reduced quickly, so only wind and solar power can be abandoned without starting deep peak regulation.
[0144] 3) Deep peak regulation results
[0145] On the basis of the above-mentioned pre-dispatching results of non-peak-shaving power generation, coal-fired power units and demand response resources participate in deep peak-shaving optimization calculations. In order to verify the effect of introducing demand response resources to participate in deep peak-shaving optimization, the deep peak-shaving without considering demand response resources and considering demand response were verified, and the results were as follows: Figure 6 and Figure 7 The deep peaking result is shown in Figure 2. Figure 6It can be seen that when only coal-fired power units participate in deep peak regulation, the system cannot be flexibly adjusted during the net load valley period due to the climbing constraints of coal-fired power units, and there will still be a large peak regulation gap. The peak regulation gap for the whole day is 1639.75MWh, accounting for 63% of the peak regulation demand. The maximum peak regulation gap is 750MW, which occurs in the 58th period. Figure 7 It can be seen that because demand response resources are not affected by ramp constraints, the adjustment method is more flexible and can effectively fill the peak-shaving gap by filling the valley during the valley period. In this case, the peak-shaving bid of demand response resources is 2252MWh, accounting for 86.4% of the peak-shaving demand, and the maximum peak-shaving bid output is 1088MW, which occurs in the 32nd period.
[0146] 5) Official dispatch results of deep peak load regulation
[0147] Based on the above deep peak regulation results, the output of coal-fired power units during the fixed peak regulation period and the demand response output are used to conduct formal dispatch of deep peak regulation power generation. The output of coal-fired power units participating in deep peak regulation during the formal dispatch of power generation is as follows: Figure 8 As shown. Compared with the pre-dispatch results of non-peak-shaving power generation, the output of coal-fired power units in the formal dispatch results of deep peak-shaving power generation is generally reduced at night. The main reason is that the deep peak-shaving of coal-fired power units is mostly concentrated at night, and the deep peak-shaving amount of some coal-fired power units is just the minimum stable technical output. Affected by the minimum start-up and shutdown time constraints of coal-fired power units, the units need to remain shut down in each period before the start of deep peak-shaving. Therefore, the output of coal-fired power units in the formal dispatch stage at night is significantly lower than the results of pre-dispatch. In addition, after considering demand response, the peak-shaving demand at night is mainly met by demand response resources, and the peak-shaving amount of coal-fired power units is lower than that of the peak-shaving amount without considering the demand response scenario. Therefore, during the night period, the output of coal-fired power units under the demand response scenario is relatively higher.
[0148] It should be noted that although the steps in the above flowchart are shown in sequence according to the arrows, these steps are not necessarily executed in the order indicated by the arrows. Unless otherwise specified in this document, there is no strict order restriction for the execution of these steps, and these steps can be executed in other orders.
[0149] In one embodiment, Fig. 9 As shown, a coordinated scheduling system for flexible resources on both sides of a source and a load is provided, and the system includes:
[0150] The first modeling module 1 is used to obtain the day-ahead operating parameters of conventional units, the deep peak-shaving parameters of coal-fired power units and the deep peak-shaving parameters of demand response resources, and establish a non-peak-shaving power generation pre-dispatching model based on the day-ahead operating parameters of the conventional units;
[0151] A first calculation module 2 is used to obtain the peak load demand in each preset time period according to the non-peak load generation pre-scheduling model;
[0152] The second modeling module 3 is used to establish a deep peak-shaving model for collaborative optimization of coal-fired power units and demand response resources according to the peak-shaving demand, deep peak-shaving parameters of coal-fired power units and deep peak-shaving parameters of demand response resources;
[0153] The second calculation module 4 is used to obtain the peak-shaving output of the coal-fired power units participating in the deep peak-shaving and the peak-shaving output of the demand response resources in each peak-shaving demand period according to the deep peak-shaving model;
[0154] The third modeling module 5 is used to establish a peak-shaving power generation formal scheduling model according to the peak-shaving output of the coal-fired power units participating in the deep peak-shaving in each peak-shaving demand period and the peak-shaving output of the demand response resources;
[0155] The third calculation module 6 is used to obtain the corresponding deep peak-shaving result and the day-ahead power generation curve according to the peak-shaving power generation formal scheduling model.
[0156] It should be noted that the specific limitations of the collaborative scheduling system for flexible resources on both the source and load sides can be found in the limitations of the collaborative scheduling method for flexible resources on both the source and load sides mentioned above, and will not be repeated here. Each module in the above-mentioned collaborative scheduling system for flexible resources on both the source and load sides can be implemented in whole or in part through software, hardware, and a combination thereof. The above-mentioned modules can be embedded in or independent of the processor in the computer device in the form of hardware, or can be stored in the memory of the computer device in the form of software, so that the processor can call and execute the operations corresponding to the above modules.
[0157] Fig.10 FIG. 1 shows an internal structure diagram of a computer device in an embodiment, and the computer device may specifically be a terminal or a server. Fig.10 As shown, the computer device includes a processor, a memory, a network interface, a display and an input device connected through a system bus. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system and a computer program. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The network interface of the computer device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, a collaborative scheduling method for flexible resources on both sides of the source and the load is implemented. The display screen of the computer device can be a liquid crystal display screen or an electronic ink display screen, and the input device of the computer device can be a touch layer covered on the display screen, or a button, trackball or touchpad set on the computer device shell, or an external keyboard, touchpad or mouse, etc.
[0158] It can be understood by those skilled in the art that Fig.10 The structure shown in the figure is only a block diagram of a part of the structure related to the present application scheme, and does not constitute a limitation on the computer device to which the present application scheme is applied. The specific computing device may include more or fewer components than those shown in the figure, or combine certain components, or have the same component arrangement.
[0159] In one embodiment, a computer device is provided, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the steps of the above method are implemented when the processor executes the computer program.
[0160] In one embodiment, a computer-readable storage medium is provided, on which a computer program is stored, and when the computer program is executed by a processor, the steps of the above method are implemented.
[0161] In summary, the embodiments of the present invention provide a method, system, computer device and storage medium for coordinated scheduling of flexible resources on both sides of the source and the load. The coordinated scheduling method for flexible resources on both sides of the source and the load realizes that, without considering the participation of coal-fired power units and demand response resources in deep peak regulation, the peak regulation demand of the power system is determined by directly performing non-peak regulation power generation pre-scheduling based on the minimum stable technical output of the coal-fired power units and the constraint conditions that allow the system to abandon wind and solar power, and then, based on the determined peak regulation demand and the deep peak regulation parameters corresponding to the flexible resources on both sides of the source and the load, the deep peak regulation optimization of the entire network is carried out to obtain the corresponding output of the coal-fired power units and demand response resources participating in deep peak regulation during the corresponding peak regulation period. The deep peak-shaving output of the coal-fired power units and demand response resources participating in deep peak-shaving in each peak-shaving period is fixed as the corresponding boundary conditions, and deep peak-shaving power generation is formally dispatched to obtain the publishable deep peak-shaving results and the technical solution of the day-ahead power generation curve. By adopting the interactive participation of conventional coal-fired power units and demand response resources in deep peak-shaving, a dispatching model is established for alternately optimizing the order of power generation pre-dispatching, deep peak-shaving and formal power generation dispatching. This combines power generation dispatching with deep peak-shaving, solves the problem of insufficient peak-shaving of new power systems, reduces the amount of wind and power curtailment, effectively improves the flexibility and effectiveness of power system resource dispatching, and further enhances the safety and stability of power system operation.
[0162] Each embodiment in this specification is described in a progressive manner, and the same or similar parts of each embodiment can be directly referred to each other, and each embodiment focuses on the differences from other embodiments. In particular, for the system embodiment, since it is basically similar to the method embodiment, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiment. It should be noted that the technical features of the above-mentioned embodiments can be combined arbitrarily. In order to make the description concise, all possible combinations of the technical features in the above-mentioned embodiments are not described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0163] The above-mentioned embodiments only express several preferred implementation modes of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the invention patent. It should be pointed out that, for ordinary technicians in the technical field, several improvements and substitutions can be made without departing from the technical principles of the present invention, and these improvements and substitutions should also be regarded as the protection scope of the present application. Therefore, the protection scope of the patent of the present application shall be based on the protection scope of the claims.
Claims
1. A collaborative scheduling method for flexible resources on both sides of source and load. It is characterized in that The method comprises the following steps: Obtaining the day-ahead operating parameters of conventional units, deep peak-shaving parameters of coal-fired power units, and deep peak-shaving parameters of demand response resources, and establishing a non-peak-shaving power generation pre-dispatching model based on the day-ahead operating parameters of conventional units; According to the non-peak-shaving power generation pre-dispatching model, the peak-shaving demand in each preset time period is obtained; According to the peak-shaving demand, the deep peak-shaving parameters of the coal-fired power units and the deep peak-shaving parameters of the demand response resources, a deep peak-shaving model for coordinated optimization of the coal-fired power units and the demand response resources is established; According to the deep peak-shaving model, the peak-shaving output of the coal-fired power units participating in the deep peak-shaving in each peak-shaving demand period and the peak-shaving output of the demand response resources are obtained; Establishing a formal dispatching model for peak-shaving power generation according to the peak-shaving output of coal-fired power units participating in deep peak-shaving during each peak-shaving demand period and the peak-shaving output of demand response resources; According to the peak-shaving power generation formal dispatching model, the corresponding deep peak-shaving result and the day-ahead power generation curve are obtained; in, The step of establishing a pre-dispatching model for non-peak-shaving power generation according to the day-ahead operating parameters of the conventional unit comprises: Under the first preset constraint condition, the non-peak-shaving power generation pre-dispatching model is constructed according to the following objective function: In the formula, T represents the total number of preset time periods; N represents the total number of conventional units; S represents the total number of output sections of conventional units; P i,s,t and C i,s,t They represent the s-th segment output and the s-th segment cost coefficient of the t-th preset period of the ith conventional unit respectively; N represents the startup cost of the ith conventional unit in the tth preset period; w represents the total number of wind farms; represents the abandoned wind power output of the w-th wind farm in the t-th preset period; N v Indicates the total number of photovoltaic power plants; represents the abandoned solar power output of the v-th photovoltaic power station in the t-th preset period; α represents the penalty factor for abandoned wind and solar power; M represents the relaxation penalty factor of the line flow constraint and section flow constraint; N l Indicates the total number of lines; They represent the forward power flow relaxation variable and reverse power flow relaxation variable of the lth line respectively; N s Indicates the total number of sections; They represent the forward flow relaxation variable and the reverse flow relaxation variable of the s-th section respectively; The deep peak regulation parameters of the coal-fired power generation unit include the deep peak regulation cost coefficient and the minimum stable technical output of the coal-fired power generation unit; the deep peak regulation parameters of the demand response resource include the valley filling response cost coefficient and the maximum responsive capacity of the demand response resource; The step of establishing a deep peak-shaving model for collaborative optimization of coal-fired power units and demand response resources according to the peak-shaving demand, the deep peak-shaving parameters of coal-fired power units and the deep peak-shaving parameters of demand response resources comprises: Under the second preset constraint condition, the deep peak shaving model is constructed according to the following objective function: Where T represents the total number of peak demand periods; N c represents the total number of coal-fired power units participating in deep peak regulation; S represents the total number of output segments of coal-fired power units; and They represent the s-th segment down-regulation output and the s-th segment deep peak-shaving cost coefficient of the ith coal-fired power unit in the t-th peak-shaving demand period; N d Indicates the total number of demand response resources participating in deep peak load regulation; and They represent the kth segment valley-filling demand response resource output and valley-filling demand response cost coefficient of the dth demand response resource in the tth peak-shaving demand period; N w represents the total number of wind farms; N represents the abandoned wind output of the w-th wind farm during the t-th peak-shaving demand period; v Indicates the total number of photovoltaic power plants; represents the abandoned solar output of the v-th PV power station during the t-th peak-shaving demand period; α represents the penalty factor for abandoned wind and solar power; The step of establishing a formal dispatching model for peak-shaving power generation according to the peak-shaving output of coal-fired power units participating in deep peak-shaving during each peak-shaving demand period and the peak-shaving output of demand response resources comprises: The output of coal-fired power units participating in deep peak regulation in each peak regulation demand period and the output of demand response resources are fixed as the corresponding peak regulation output of coal-fired power units and the peak regulation output of demand response resources, respectively, and the formal dispatching model of peak regulation power generation that meets the preset constraints is established; the objective function of the formal dispatching model of peak regulation power generation is expressed as: In the formula, Ω t represents the set of conventional units that do not participate in deep peak regulation in the tth preset period; T represents the total number of preset periods; S represents the total number of conventional unit output segments; P i,s,t and C i,s,t They represent the s-th segment output and the s-th segment cost coefficient of the t-th preset period of the ith conventional unit respectively; N represents the startup cost of the ith conventional unit in the tth preset period; w represents the total number of wind farms; represents the abandoned wind power output of the w-th wind farm in the t-th preset period; N v Indicates the total number of photovoltaic power plants; represents the abandoned solar power output of the v-th photovoltaic power station in the t-th preset period; α represents the penalty factor for abandoned wind and solar power; M represents the relaxation penalty factor of the line flow constraint and section flow constraint; N l Indicates the total number of lines; They represent the forward power flow relaxation variable and reverse power flow relaxation variable of the lth line respectively; N s Indicates the total number of sections; They represent the forward flow relaxation variable and reverse flow relaxation variable of the sth section respectively.
2. The coordinated scheduling method for flexible resources on both sides of source and load as claimed in claim 1, It is characterized in that The first preset constraint condition includes unit constraint, network constraint and system constraint; The unit constraints include unit output constraints, unit climbing constraints, and unit minimum continuous start and stop time constraints; The unit output constraint of the i-th conventional unit (i=1,2…,N) is expressed as: Where P i,t represents the output of the ith conventional unit in the tth preset period; α i,t represents the start and stop status of the ith conventional unit in the tth preset period, and α i,t =1 means power on, α i,t =0 means shutdown; and They represent the minimum stable technical output and output upper limit of the ith conventional unit in the tth preset period respectively; The unit climbing constraint of the i-th conventional unit (i=1,2…,N) is expressed as: In the formula, and The maximum ramp-up rate and the maximum ramp-down rate of the ith conventional unit in the tth preset period, respectively; The minimum continuous start-stop time constraint of the i-th conventional unit (i=1,2…,N) is expressed as: In the formula, and They represent the minimum continuous start-up time and the minimum continuous shutdown time of the i-th conventional unit respectively; and They represent the continuous start-up time and continuous shutdown time of the tth preset period of the i-th conventional unit, respectively, where, The network constraints include line flow constraints and section flow constraints; wherein, The lth line (l=1,2…,N l ) is expressed as: Where P l max represents the power transmission limit of the lth line; G l-i N represents the output power transfer distribution factor of the node where the i-th conventional unit is located to the l-th line; T Indicates the total number of contact lines; T j,t G represents the planned power of the jth tie line in the tth preset period; l-j G represents the output power transfer distribution factor of the node where the jth tie line is located to the lth line; l-w G represents the generator output power transfer distribution factor of the node where the w-th wind farm is located to the l-th line; l-v represents the power transfer distribution factor of the generator output of the node where the vth photovoltaic power station is located to the lth line; K represents the total number of nodes in the system; G l-k represents the output power transfer distribution factor of the kth node to the lth line; D k,t represents the bus load value of the kth node in the tth preset period; They represent the forward power flow relaxation variable and reverse power flow relaxation variable of the lth line respectively; The cross-sectional flow constraint of the s-th section (s = 1, 2…, Ns) is expressed as: In the formula, and They represent the minimum and maximum values of the power flow transmission at the s-th section respectively; G l-i N represents the output power transfer distribution factor of the node where the i-th conventional unit is located to the s-th section; T Indicates the total number of contact lines; T j,t G represents the planned power of the jth tie line in the tth preset period; s-j G represents the output power transfer distribution factor of the node where the jth tie line is located to the sth section; s-w G represents the generator output power transfer distribution factor of the node where the w-th wind farm is located to the l-th line; s-v represents the power transfer distribution factor of the generator output from the node where the vth photovoltaic power station is located to the lth line; K is the total number of nodes in the system; G s-k is the output power transfer distribution factor of node k to the s-th section; They represent the forward flow relaxation variable and the reverse flow relaxation variable of the s-th section respectively; The system constraints include system balance constraints, positive reserve constraints, negative reserve constraints and spinning reserve constraints; wherein, The system equilibrium constraint is expressed as: Where P i,t represents the output of the ith conventional unit in the tth preset period; P w,t represents the maximum power generation capacity of the w-th wind farm in the t-th preset period; P v,t represents the maximum power generation capacity of the v-th photovoltaic power station in the t-th preset period; represents the abandoned wind power output of the w-th wind farm in the t-th preset period; N v Indicates the total number of photovoltaic power plants; N represents the abandoned light output of the v-th photovoltaic power station in the t-th preset period; T Indicates the total number of contact lines; T j,t represents the planned power of the jth tie line in the tth preset period; D t represents the system load in the tth preset period; The positive spare constraint is expressed as: In the formula, α i,t represents the start and stop status of the ith conventional unit in the tth preset period, and α i,t =1 means power on, α i,t =0 means shutdown; represents the output upper limit of the ith conventional unit in the tth preset period; represents the system positive spare capacity demand in the t-th preset period; The negative spare constraint is expressed as: In the formula, represents the minimum stable technical output of the i-th conventional unit in the t-th preset period; represents the system negative spare capacity demand in the t-th preset period; The spinning reserve constraint is expressed as: In the formula, and represent the upper spinning reserve capacity requirement and the lower spinning reserve capacity requirement of the system in the t-th preset period respectively; and They respectively represent the maximum ramp-up rate and the maximum ramp-down rate of the ith conventional unit in the tth preset time period.
3. The coordinated scheduling method for flexible resources on both sides of source and load as claimed in claim 1, It is characterized in that The step of obtaining the peak load demand in each preset time period according to the non-peak load generation pre-scheduling model comprises: The non-peak-shaving power generation pre-dispatching model is solved by using the GUROBI optimization solver to obtain the amount of wind and solar power abandoned in each preset time period; According to the amount of wind and solar power abandoned in each preset time period, the peak load demand corresponding to each preset time period is obtained.
4. The coordinated scheduling method for flexible resources on both sides of source and load as claimed in claim 1, It is characterized in that The second preset constraint condition includes coal-fired power unit constraint, demand response resource constraint and peak load demand constraint; The coal-fired power unit constraints include coal-fired power unit peak load constraints and coal-fired power unit peak load ramp constraints; The peak load output constraint of coal-fired power generation units is expressed as: In the formula, and They represent the output reduction of the t-th peak-shaving demand period and the s-th segmented output reduction of the ith coal-fired power unit respectively; represents the minimum stable technical output of the ith coal-fired power unit during the tth peak demand period; The peak load climbing constraint of the coal-fired power unit is expressed as: In the formula, and They respectively represent the output of the t-th preset period and the t-1-th preset period of the i-th coal-fired power generation unit in the day-ahead power generation pre-dispatch result; and They represent the reduced output of the i-th coal-fired power unit in the t-th peak-shaving demand period and the reduced output of the t-1-th peak-shaving demand period respectively; and They represent the maximum ramp-up rate and the maximum ramp-down rate of the ith coal-fired power unit during the tth peak-shaving demand period respectively; The demand response resource constraints include demand response output constraints and demand response duration constraints; wherein, The demand response output constraint is expressed as: In the formula, represents the maximum responsive capacity of the demand response resource in the tth peak demand period; represents the state of the dth demand response resource participating in the demand response in the tth peak demand period, and Express participation, Indicates non-participation; The demand response duration constraint is expressed as: In the formula, and They represent the minimum duration and maximum duration of the d-th demand response resource respectively; represents the demand response duration of the dth demand response resource in the tth peak demand period; where, The peak load demand constraint is expressed as: In the formula, represents the output reduction of the ith coal-fired power unit during the tth peak demand period, represents the valley-filling response output of the dth demand response resource in the tth peak demand period; They respectively represent the amount of wind and solar power abandoned in the day-ahead power generation pre-dispatching results.
5. A coordinated dispatching system for flexible resources on both sides of source and load, It is characterized in that The system comprises: The first modeling module is used to obtain the day-ahead operating parameters of conventional units, the deep peak-shaving parameters of coal-fired power units and the deep peak-shaving parameters of demand response resources, and establish a non-peak-shaving power generation pre-dispatching model based on the day-ahead operating parameters of conventional units; A first calculation module is used to obtain the peak load demand in each preset time period according to the non-peak load generation pre-scheduling model; The second modeling module is used to establish a deep peak-shaving model for collaborative optimization of coal-fired power units and demand response resources according to the peak-shaving demand, deep peak-shaving parameters of coal-fired power units and deep peak-shaving parameters of demand response resources; The second calculation module is used to obtain the peak-shaving output of the coal-fired power units participating in the deep peak-shaving and the peak-shaving output of the demand response resources in each peak-shaving demand period according to the deep peak-shaving model; The third modeling module is used to establish a formal dispatching model for peak-shaving power generation according to the peak-shaving output of the coal-fired power units participating in deep peak-shaving during each peak-shaving demand period and the peak-shaving output of demand response resources; A third calculation module is used to obtain the corresponding deep peak-shaving result and the day-ahead power generation curve according to the peak-shaving power generation formal scheduling model; in, The step of establishing a pre-dispatching model for non-peak-shaving power generation according to the day-ahead operating parameters of the conventional unit comprises: Under the first preset constraint condition, the non-peak-shaving power generation pre-dispatching model is constructed according to the following objective function: In the formula, T represents the total number of preset time periods; N represents the total number of conventional units; S represents the total number of output sections of conventional units; P i,s,t and C i,s,t They represent the s-th segment output and the s-th segment cost coefficient of the t-th preset period of the ith conventional unit respectively; N represents the startup cost of the ith conventional unit in the tth preset period; w represents the total number of wind farms; represents the abandoned wind power output of the w-th wind farm in the t-th preset period; N v Indicates the total number of photovoltaic power plants; represents the abandoned solar power output of the v-th photovoltaic power station in the t-th preset period; α represents the penalty factor for abandoned wind and solar power; M represents the relaxation penalty factor of the line flow constraint and section flow constraint; N l Indicates the total number of lines; They represent the forward power flow relaxation variable and reverse power flow relaxation variable of the lth line respectively; N s Indicates the total number of sections; They represent the forward flow relaxation variable and the reverse flow relaxation variable of the s-th section respectively; The deep peak regulation parameters of the coal-fired power generation unit include the deep peak regulation cost coefficient and the minimum stable technical output of the coal-fired power generation unit; the deep peak regulation parameters of the demand response resource include the valley filling response cost coefficient and the maximum responsive capacity of the demand response resource; The step of establishing a deep peak-shaving model for collaborative optimization of coal-fired power units and demand response resources according to the peak-shaving demand, the deep peak-shaving parameters of coal-fired power units and the deep peak-shaving parameters of demand response resources comprises: Under the second preset constraint condition, the deep peak shaving model is constructed according to the following objective function: Where T represents the total number of peak demand periods; N c represents the total number of coal-fired power units participating in deep peak regulation; S represents the total number of output segments of coal-fired power units; and They represent the s-th segment down-regulation output and the s-th segment deep peak-shaving cost coefficient of the ith coal-fired power unit in the t-th peak-shaving demand period; N d Indicates the total number of demand response resources participating in deep peak load regulation; and They represent the kth segment valley-filling demand response resource output and valley-filling demand response cost coefficient of the dth demand response resource in the tth peak-shaving demand period; N w represents the total number of wind farms; N represents the abandoned wind output of the w-th wind farm during the t-th peak-shaving demand period; v Indicates the total number of photovoltaic power plants; represents the abandoned solar output of the v-th PV power station during the t-th peak-shaving demand period; α represents the penalty factor for abandoned wind and solar power; The step of establishing a formal dispatching model for peak-shaving power generation according to the peak-shaving output of coal-fired power units participating in deep peak-shaving during each peak-shaving demand period and the peak-shaving output of demand response resources comprises: The output of coal-fired power units participating in deep peak regulation in each peak regulation demand period and the output of demand response resources are fixed as the corresponding peak regulation output of coal-fired power units and the peak regulation output of demand response resources, respectively, and the formal dispatching model of peak regulation power generation that meets the preset constraints is established; the objective function of the formal dispatching model of peak regulation power generation is expressed as: In the formula, Ω t represents the set of conventional units that do not participate in deep peak regulation in the tth preset period; T represents the total number of preset periods; S represents the total number of conventional unit output segments; P i,s,t and C i,s,t They represent the s-th segment output and the s-th segment cost coefficient of the t-th preset period of the ith conventional unit respectively; N represents the startup cost of the ith conventional unit in the tth preset period; w represents the total number of wind farms; represents the abandoned wind power output of the w-th wind farm in the t-th preset period; N v Indicates the total number of photovoltaic power plants; represents the abandoned solar power output of the v-th photovoltaic power station in the t-th preset period; α represents the penalty factor for abandoned wind and solar power; M represents the relaxation penalty factor of the line flow constraint and section flow constraint; N l Indicates the total number of lines; They represent the forward power flow relaxation variable and reverse power flow relaxation variable of the lth line respectively; N s Indicates the total number of sections; They represent the forward flow relaxation variable and reverse flow relaxation variable of the sth section respectively.
6. A computer device comprising a memory, a processor and a computer program stored in the memory and executable on the processor, It is characterized in that When the processor executes the computer program, the steps of the method according to any one of claims 1 to 4 are implemented.
7. A computer-readable storage medium having a computer program stored thereon, It is characterized in that When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 4 are implemented.