Non-stop power supply system and control method for mobile electrochemical energy storage station

Through the mobile electrochemical energy storage station system, the combination of electrochemical energy storage and diesel generator sets is used to achieve uninterrupted power supply and efficient power management in remote scenarios, solving the noise and emission problems of traditional diesel generator sets, and improving the site Arrangement flexibility and implementation efficiency.

CN114123461BActive Publication Date: 2024-11-12CGGC-UNPOWER CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202111317241.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-11-09
Publication Date
2024-11-12
Estimated Expiration
2041-11-09

AI Technical Summary

Technical Problem

There is a lack of effective modular, efficient and flexible continuous power supply systems in remote maneuvering scenarios. Traditional diesel generator sets lead to noise and emission problems, and the heating method is difficult to adapt to on-site demand, so it is impossible to achieve stable and continuous standardized power supply.

Method used

Using a mobile electrochemical energy storage station system, the electrochemical energy storage system is divided into two groups. Through the coordinated control of the energy management system, the diesel generator set is used as a charging unit to achieve rapid switching in milliseconds, ensuring no power outage and allowing Energy storage modules are used off-site and quickly set up stations.

Benefits of technology

It realizes uninterrupted power supply in remote environments, reduces the operating time of diesel generator sets, improves on-site layout flexibility and implementation efficiency, reduces costs, and meets the power requirements in high maneuverability and emergency situations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114123461B_ABST
    Figure CN114123461B_ABST
Patent Text Reader

Abstract

The invention discloses a mobile electrochemical energy storage station non-stop power supply system and a control method; the system comprises: an energy storage power supply vehicle group and a diesel generator vehicle; the control method adopts the energy storage system grouping periodic seamless switching charging and discharging, adopts the non-charging energy storage group peak shaving to optimize the charging process, and randomly optimizes the energy scheduling strategy according to the different states of the diesel generator set. The advantages of the invention are: providing a mobile station non-stop power supply system for areas far away from the energy pipeline network; the sound and smoke control can intervene in the emergency stop of the charging unit at any time, and the station power supply is uninterrupted; the optimized control realizes the minimization of the operation time of the diesel generator set; the energy storage module vehicle can be replaced off-site; all power supply vehicles are fully distributed and universal to take electricity; flexible and mobile modular rapid station; all output electrified energy can simplify the energy pipeline network and improve mobility; after changing the control method, it can be used in common scenarios such as power grid, main use of diesel generator sets, and independent use of diesel generator vehicles to improve asset efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to a mobile electrochemical energy storage station without power outage system and control method, specifically a continuous power supply system with mobility in non-grid areas constructed by modularly connecting an electrochemical energy storage power supply vehicle group and a diesel generator vehicle and supporting control technology, belonging to the field of electrochemical energy storage application and new energy control. Background Art

[0002] Electrochemical energy storage is widely used in new energy stations, multi-energy complementary smart microgrids, power system peak regulation, auxiliary frequency regulation, industrial parks, emergency power supply systems, UPS power supply systems and emergency power supply vehicles, but there is a lack of sufficient research on the establishment of mobile power supply systems far away from energy pipelines. The main problem faced by scenarios such as electricity use in remote places and heating and insulation of on-site equipment is the problem of continuous energy supply. The power supply vehicle scenario with mobile requirements is different from the remote living island area. The remote living island area can solve the problem of continuous power supply by building a certain scale of photovoltaic and / or wind power as the main energy source, matching a certain scale of energy storage system, or adding diesel generator sets as auxiliary backup power supply. However, the economic and feasibility of renewable energy such as wind and solar as the main energy source for application scenarios such as remote mobile power supply vehicles are very low. For power supply vehicles, the most that can be considered is to use the body resources and configure auxiliary small-scale photovoltaic storage systems to improve the overall energy efficiency of power supply vehicles.

[0003] Remote mobile scenes are characterized by remote geography, complex terrain, and flexible tasks. They are far away from resource areas such as municipal power and energy pipelines, and the site has high requirements for thermal power supply methods and mobility. Traditional technologies mostly use diesel generators and fuel-fired thermal equipment to supply electricity and heat to construction sites or camps. The main problem is that it is difficult to standardize energy supply equipment, the general applicability is poor, the energy supply method is single and scattered, and there is a lack of modular, efficient and flexible station assembly capabilities, which cannot achieve a stable and continuous standardized power supply system mechanism; energy use at any time is inevitably accompanied by operating noise and smoke from fuel-fired generators, which does not meet the site's special control requirements for the environment and emergencies, and lacks buffering and resilience for special emergencies. For remote construction sites, it is impossible to coordinate the time periods for noise and emissions, and it is difficult to arrange the distance of power supplies; the heating method and thermal facility pipelines are difficult to adapt to the requirements of efficient mobility on site, and the overall energy utilization efficiency of thermal equipment and power generation equipment is poor.

[0004] The development of new energy and electrochemical energy storage technology makes it possible to upgrade the energy supply system for this type of application scenario. Under the special constraints of the scenario, the new energy supply structure can use the electrochemical energy storage system as the main power supply; change the traditional application mode and control method of diesel generator sets; use energy storage to achieve the coordination of continuous energy use and random control of diesel generators in special situations; electrify terminal energy use, and replace multiple complex pipelines and networks with a single power line mobile layout; and achieve safe, reliable and sustainable energy security through combined power station control strategies and operation logic innovations. Summary of the invention

[0005] The purpose of the present invention is to provide a mobile electrochemical energy storage station without power outage system and control method. The system divides the electrochemical energy storage system into two groups of units for group control, with a diesel generator set as the charging unit; each group of energy storage units has several operating modes such as charging, standby, main discharge operation, and emergency continued discharge operation. The two groups of energy storage units are connected and switched between different operating modes according to the optimized logic process, and millisecond-level rapid switching is adopted between power sources; the overall station is coordinated and controlled by the energy management system to achieve uninterrupted power supply and the shortest noise and smoke exhaust time. According to the terrain distribution conditions, some energy storage modules in the energy storage unit can be used separately away from the station, moved to dispersed locations to supply power to interruptible loads, and moved back to the station for charging and recovery, and can be used alternately without affecting the continuous power supply of the station.

[0006] The technical solution of the present invention is:

[0007] Non-stop power supply system and control method for mobile electrochemical energy storage station.

[0008] A mobile electrochemical energy storage station non-stop power supply system includes an energy storage power supply vehicle and a diesel generator vehicle, wherein the energy storage power supply vehicle includes a first energy storage power supply vehicle, a second energy storage power supply vehicle, a third energy storage power supply vehicle, and a fourth energy storage power supply vehicle; the first energy storage power supply vehicle and the second energy storage power supply vehicle constitute an energy storage group A logic unit, and the third energy storage power supply vehicle and the fourth energy storage power supply vehicle constitute an energy storage group B logic unit; each of the energy storage power supply vehicles includes an energy storage and conversion system ESS, a power distribution system and an output system; the diesel generator vehicle includes a diesel generator set, a fast switching switch STS, an energy storage parallel cabinet, an output system and an energy management system EMS.

[0009] The energy storage and conversion system ESS is connected to the power distribution system for bidirectional control. The power distribution system is connected to the output system via power cables. The output system extends to provide users with power extraction interfaces. The output system is composed of a terminal distribution box and an output socket panel electrically connected by a connecting line group.

[0010] The diesel generator set supplies power to the energy storage parallel cabinet through a fast switching switch STS. The energy storage parallel cabinet is connected to the output system via a power cable. The output system provides a user power supply interface. The busbar of the energy storage parallel cabinet is fixedly connected to the fast power plug-in socket group through a circuit breaker and a cable. Each energy storage power supply vehicle corresponds to a fast connection socket group. The working power supply of the energy management system EMS is taken from the starting battery system of the diesel generator set, or a DC disk is configured to be charged by the non-stop busbar of the energy storage parallel cabinet.

[0011] The energy storage power supply vehicle group and the diesel generator vehicle: the power distribution system busbar of each energy storage power supply vehicle is connected to the one-way fast power socket group of the diesel generator vehicle through the vehicle reel cable and circuit breaker, and the power is bidirectionally controlled;

[0012] The diesel generator set and the fast transfer switch STS are both connected to the energy management system EMS for communication; there are internal communication connections between the energy storage power supply vehicle and the energy storage switching system ESS within the same energy storage unit group, that is, between the energy storage and conversion system and the energy storage and conversion system, and between the energy storage and conversion system and the energy storage and conversion system; the working power supply of the energy management system EMS is taken from the power battery of the diesel generator set, or a DC disk is configured to be charged by the non-stop busbar of the energy storage parallel cabinet.

[0013] The control method of the above-mentioned mobile electrochemical energy storage station non-stop power supply system is as follows:

[0014] In the main process, energy storage unit group A and group B switch in turn to perform main discharge operation to power the system. When any energy storage unit group is in the main discharge operation state, the energy storage vehicle modules in the unit group share the load evenly through internal communication; the diesel generator set is used to charge and store energy in the energy storage unit, and all switching operations are millisecond-level rapid switching of power electronics, so as to ensure that the system can operate without power outages. In areas without city power and resources, the power supply and endurance of the entire station are guaranteed by fuel energy replenishment; the capacity configuration satisfies that the unit charging time is sufficiently less than the average load-carrying operation time of the unit main discharge, and the main discharge operation unit automatically maintains to the SOC lower limit setting value, and will not switch to a high SOC value priority because other units are fully charged; the fully charged unit enters standby mode, the diesel generator unit switches to another unit for main discharge operation with load, the diesel generator unit automatically shuts down, and the main process cycles periodically to ensure that the two groups of units are used evenly in turn.

[0015] Each branch process is used to assist in the optimization of the main process and the handling of various abnormal or fault conditions; during unit charging, another group of units is used for peak shaving to adjust the diesel power to fully utilize and the fastest charging process, and at the same time avoid the peak shaving unit from reverse charging the charging unit group; after the unit charging is completed, if the other unit is detected to be unavailable, the diesel generator set switches to the charging completion unit to enter the main discharge operation; the unit main discharge to the low limit value controls the diesel generator set to start, if the diesel generator set is unavailable, then detect the availability of another unit, if available, switch to another energy storage unit for main discharge, if unavailable, the main discharge unit continues to discharge to the low limit value and stops, any low limit value energy storage unit and continues to detect the diesel generator set until the diesel generator set is available and starts running, entering the energy storage unit charging process.

[0016] The details are as follows:

[0017] 1. Group cycle master control: The energy storage management system EMS collects station data through communication, and coordinates and controls the energy dispatch of the station system through status feedback and control instructions; when the station is put into operation, the energy storage management system EMS automatically detects the status of the two energy storage unit groups A and B, takes group A as the priority group, controls the available energy storage units to perform the main discharge operation, and the system enters the cycle process control; when both the energy storage units A and B do not meet the conditions, the alarm prompts manual processing and checks the status of the diesel generator set;

[0018] 2. Group charge and discharge switching main process cycle: When any energy storage unit group is in the main discharge operation state, the other energy storage unit group is in the standby state. When the SOC of the main discharge operation unit group is less than or equal to the lower limit setting value of 30%, the diesel generator set is started, and the main discharge energy storage unit group is quickly switched to the diesel generator set through the fast switching switch. The main discharge unit group is converted to the charging operation mode, and the diesel generator set charges it while running with the user load. When the SOC reaches the upper limit setting value of 90&, the charging is stopped. At the same time, according to the available status of another group of energy storage units, it is determined which energy storage unit group the main discharge operation is switched to. When the other unit group is available, it is switched to the other unit group first, which is the normal main process mode; when the other group is not available, it is switched back to the charged energy storage unit group for the main discharge operation, which is a branch process; the energy storage unit group is charged at a higher rate and discharged at the rated rate to match the average load demand, reducing the start-up and charging operation time of the diesel generator set;

[0019] 3. Flexible and controllable uninterrupted power supply of diesel generator: When the diesel generator set is in the charging operation state, if there is a special situation at any time that requires emergency shutdown of the diesel generator set, manual intervention can be performed for temporary emergency shutdown, and the system will automatically enter the branch process, start the main discharge operation of the available energy storage unit, maintain continuous power supply of the system, and enter the main process cycle at the same time; when the special emergency situation is released and the diesel generator set recovers the available signal state, the energy management system controls the system switching operation according to the main process judgment rules, and the control process does not affect the need for continuous power supply;

[0020] 4. Peak-shaving optimization branch of charging process: During the charging period of any energy storage unit group, the energy management system EMS detects and analyzes the power of the diesel generator set and the unit charging power, and determines whether to put the other unit on standby into peak-shaving according to whether the other unit is available. When the user load is large and exceeds the set value P2, the other unit will be put into peak-shaving operation at one time to take over the load, so as to fully ensure that the diesel generator power is fast-charged for the charging unit; once entering the peak-shaving process, when the peak-shaving unit reversely charges the charging unit, that is, Pg-Pa or Pg-Pb is less than 0, the peak-shaving unit reduces the output power; when the difference between the diesel generator power and the charging unit power, that is, Pg-Pa or Pg-Pb exceeds P1, the peak-shaving unit increases the output power to fully ensure that the diesel generator power is fast-charged for the charging unit, thereby optimizing the capacity of the diesel generator so as not to be over-designed, and minimizing the operating time of the diesel generator set of the group station, and ensuring the full continuity of the charging and discharging journey of each energy storage unit group in each cycle;

[0021] 5. Diesel generator unavailable branch: When any energy storage unit group is in the main discharge operation state, the other energy storage unit group is in the standby state. When the SOC of the main discharge operation unit group is less than or equal to the lower limit setting value of 30%, the diesel generator set is started; if the diesel generator set fails to start or the unit fault alarm is issued at this time, it is detected whether the other energy storage unit group is available and whether its SOC reserve is sufficient; if it is available and the SOC reserve is not less than the set value of 35%, it is switched to this unit group for main discharge operation; otherwise, the original main discharge operation unit group continues to discharge until the SOC set lower limit value is 10%, the discharge is stopped and the unit SOC low alarm is issued; if it is detected at any time during the continued discharge that another unit group is restored to be available, it will automatically switch to the main discharge operation of the other unit group; when any energy storage unit group has a low SOC alarm, as long as the diesel generator set is detected to be available, the unit will be started to charge the energy storage unit group and enter the normal main process.

[0022] 6. Charging unit: The diesel generator set does not use emergency backup power supply or common power supply, but uses a charging unit. A group of diesel generator sets controls multiple energy storage unit modules. The automatic start condition of the diesel generator set is that the state of charge SOC of any energy storage unit group is less than or equal to the lower limit setting value of 30%, including the occurrence of SOC reaching 10% low alarm; the automatic shutdown exit condition of the diesel generator set is that the A and B energy storage unit groups have the main discharge operation conditions and have switched to the main discharge operation and standby mode; the output of the diesel generator set is seamlessly switched with the energy storage system ESS through the fast switching switch STS.

[0023] 7. Use of energy storage modules off-site: In some on-site load layouts, according to the power demand of the intermittent loads at dispersed locations, any one of the charged energy storage vehicle modules or two modules in a group of units can be separated from the station and moved to a designated dispersed location for separate use. After use, the module will be returned to the station for charging and replaced with other fully charged modules in the station to continue use at the dispersed location. During the separation and dispersed use process, the station energy management system EMS will detect and determine the availability of the energy storage unit group and adopt the corresponding logical branch function process to ensure that the station system can still maintain uninterrupted power supply operation.

[0024] 8. Fully distributed universal power supply: Each energy storage power supply vehicle and diesel generator vehicle is equipped with an output system power supply interface. After the station is assembled, the power distribution system busbars and output systems of each power supply vehicle are connected together through power cables and circuit breakers, forming a non-stop busbar system under the control of the station cycle process. The power supply socket interface of any power supply vehicle can be used by users for universal plug-in without distinction, adapting to various complex situations on site, making on-site layout more flexible and convenient;

[0025] 9. Rapid station assembly: The diesel generator set and energy storage system adopt the power vehicle type and the fast power plug-in technology to realize the movable modular power station assembly. The modules are replaceable to meet the requirements of rapid mobility, flexibility and reliability.

[0026] 10. Application scenario switching: In common application scenarios where the operation of diesel generator sets is not restricted by special control requirements, the control method of the energy storage backup power station is adopted when the system connection structure remains unchanged, that is, the diesel generator set is used as the common main power source, and each energy storage system ESS is used as an uninterrupted endurance and peak-shaving energy storage power source. In a power grid environment, the emergency power station control method can be adopted, by adding an ATS conversion switch to connect the city power as the main power source, the diesel generator set as the backup power source, and the energy storage system ESS as the system fault endurance and peak-shaving backup power source.

[0027] The beneficial effects of the present invention are:

[0028] (1) In remote environments far away from energy pipelines, an uninterrupted power supply system is realized to meet the application scenarios with high mobility and high material and energy consumption in remote areas;

[0029] (2) Under the premise of ensuring uninterrupted power supply, the diesel generator set is flexible and controllable in emergency situations, and can be stopped or restored at any time. The system automatically detects and returns to the main process;

[0030] (3) The energy storage system is the direct main power supply, and the operating time of the diesel generator set is minimized through group cycle and charging peak load optimization technology;

[0031] (4) The energy storage module vehicle can be used alternately away from the station, and the power supply vehicle has a fully distributed universal power supply function, allowing for more flexible and convenient on-site arrangement and layout;

[0032] (5) Flexible and modularized station assembly can be quickly implemented to improve on-site implementation efficiency;

[0033] (6) All forms of electrical energy are output, and terminal energy consumption is uniformly electrified, avoiding the construction of multiple energy pipelines in complex terrain and cold conditions in mobile scenarios, reducing costs and improving mobility;

[0034] (7) The system structure remains unchanged, and the control method is modified to meet the switching of other application scenarios, including scenarios where the power grid is available, scenarios where diesel generator sets are used as the main unit, and scenarios where diesel generator trucks are used independently, etc., which can expand the scope of adaptation and improve asset efficiency.

[0035] The present invention is aimed at modular station assembly, and monitors the station assembly status through the energy management system, determines the nodes to control the operation logic process, and realizes safe and reliable non-stop operation under various circumstances. The present invention has the functions of energy storage unit group cycle master control, group charge and discharge switching main process cycle, uninterrupted power supply diesel generator flexible control function, charging process peak load optimization branch, diesel generator unit unavailable branch function, charging unit function, energy storage module off-site use function, fully distributed universal power supply function, fast station assembly and application scenario switching.

[0036] The present invention will be further described below in conjunction with the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] Figure 1 This is a structural schematic diagram of a non-stop power supply system for a mobile electrochemical energy storage station according to an embodiment of the present invention;

[0038] Figure 2 This is a control flow chart of an embodiment of the present invention (energy storage unit group A);

[0039] Figure 3 This is a control flow chart of an embodiment of the present invention (energy storage unit group B). DETAILED DESCRIPTION

[0040] The preferred embodiments of the present invention are described below. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present invention, and are not used to limit the present invention.

[0041] Example 1

[0042] like Figure 1 As shown, a mobile electrochemical energy storage station non-stop power supply system includes an energy storage power supply vehicle and a diesel generator vehicle 5, wherein the energy storage power supply vehicle includes a first energy storage power supply vehicle 1, a second energy storage power supply vehicle 2, a third energy storage power supply vehicle 3, and a fourth energy storage power supply vehicle 4; the first energy storage power supply vehicle 1 and the second energy storage power supply vehicle 2 constitute an energy storage A group logic unit, and the third energy storage power supply vehicle 3 and the fourth energy storage power supply vehicle 4 constitute an energy storage B group logic unit; each of the energy storage power supply vehicles includes an energy storage and conversion system ESS (respectively 1.1, 2.1, 3.1, 4.1), a power distribution system (respectively 1.2, 2.2, 3.2, 4.2) and an output system (respectively 1.3, 2.3, 3.3, 4.3); the diesel generator vehicle 5 includes a diesel generator set 5.1, a fast switching switch STS5.2, an energy storage cabinet 5.3, an output system 5.4 and an energy management system EMS5.5.

[0043] The specific connection relationship is as follows:

[0044] The energy storage power supply vehicle: the energy storage and conversion systems ESS1.1, 2.1, 3.1, and 4.1 are respectively connected to the power distribution systems 1.2, 2.2, 3.2, and 4.2 for bidirectional control; the power distribution systems 1.2, 2.2, 3.2, and 4.2 are respectively connected to the output systems 1.3, 2.3, 3.3, and 4.3 via power cables; the output systems 1.3, 2.3, 3.3, and 4.3 are respectively extended to provide users with power extraction interfaces; the output system is composed of a terminal distribution box and an output socket panel electrically connected through a connecting line group.

[0045] The diesel generator car: the diesel generator set 5.1 supplies power to the energy storage parallel cabinet 5.3 through the fast switching switch STS5.2, the energy storage parallel cabinet 5.3 is connected to the output system 5.4 via a power cable, and the output system 5.4 provides a user power supply interface. The busbar of the energy storage parallel cabinet 5.3 is fixedly connected to the fast power plug-in socket group through a circuit breaker and a cable, and each of the energy storage power supply cars corresponds to a fast connection socket group; the working power supply of the energy management system EMS5.5 is taken from the starting battery system of the diesel generator set 5.1, or a DC disk is configured to be charged by the non-stop busbar of the energy storage parallel cabinet.

[0046] The energy storage power supply vehicle groups 1, 2, 3, 4 and the diesel generator vehicle 5: the power distribution system busbars of each energy storage power supply vehicle 1, 2, 3, 4 are respectively connected to the one-way fast power socket group of the diesel generator vehicle 5 through the vehicle reel cable and circuit breaker, and the power is bidirectionally controlled;

[0047] The energy storage and conversion systems ESS1.1, 2.1, 3.1, 4.1, diesel generator set 5.1, and fast switching switch STS5.2 are all connected to the energy management system EMS5.5 for communication; the energy storage power supply vehicles and energy storage switching systems ESS within the same energy storage unit group, that is, the energy storage and conversion system 1.1 and the energy storage and conversion system 2.1, and the energy storage and conversion system 3.1 and the energy storage and conversion system 4.1, are all internally connected for communication; the working power supply of the energy management system EMS5.5 is taken from the power battery of the diesel generator set, or a DC disk is configured to be charged by the non-stop busbar of the energy storage parallel cabinet.

[0048] The energy management system EMS5.5 includes 1 master controller (general control unit), 4 slave controllers and 1 host computer; they are connected to each other to form an energy management cabinet, and are equipped with external communication interfaces and input and output interfaces; the energy management cabinet collects equipment operation and status data, the industrial computer monitors system operation and can provide communication control instructions to the master controller, the master controller manages all slave controllers and the unit controller of the diesel generator unit 5.1, and each slave controller controls an energy storage power supply vehicle. A high-end configuration of the energy management system EMS5.5 can be selected: the master and slave controllers use the DEIF ASC-4Battery automatic sustainable controller, and the product is equipped with the special software of Multi-line 2 Utility Software (Version 3.50.1); the host computer selects the industrial computer and installs the same application software.

[0049] like Figure 2 and Figure 3 As shown, the control method of the above-mentioned mobile electrochemical energy storage station non-stop power supply system is as follows:

[0050] In the main process, energy storage unit group A (the first energy storage power supply car 1 and the second energy storage power supply car 2) and group B (the third energy storage power supply car 3 and the fourth energy storage power supply car 4) are switched in turn to perform main discharge operation to supply power to the system. When any energy storage unit group is in the main discharge operation state, the energy storage vehicle modules in the unit group share the load evenly through internal communication; the diesel generator set 5.1 is used to charge and store energy for the energy storage unit, and all switching operations are millisecond-level rapid switching of power electronics, so as to ensure that the system can operate without power outages. In areas without city power and resources, the power supply endurance of the entire station is guaranteed by fuel energy replenishment; the capacity configuration satisfies that the unit charging time is sufficiently less than the average load-carrying operation time of the unit main discharge, and the main discharge operation unit automatically maintains to the SOC lower limit setting value, and will not switch to the SOC high value priority because other units are fully charged; the fully charged unit enters standby mode, the diesel generator unit switches to another unit for main discharge operation with load, the diesel generator unit automatically shuts down, and the main process cycles periodically to ensure that the two groups of units are used evenly in turn.

[0051] Each branch process is used to assist in the optimization of the main process and the handling of various abnormal or fault conditions; during unit charging, another group of units is used for peak shaving to adjust the diesel power to fully utilize and the charging process to be the fastest, and at the same time avoid the peak shaving unit from reverse charging the charging unit group; after the unit charging is completed, if the other unit is detected to be unavailable, the diesel generator set switches to the charging completion unit to enter the main discharge operation; the unit main discharge to the low limit value controls the start of the diesel generator set. If the diesel generator set is unavailable (start failure or failure), the availability of another unit is detected. If available, it switches to another energy storage unit for main discharge. If unavailable, the main discharge unit continues to discharge to the low limit value and stops. Any low limit value energy storage unit continues to detect the diesel generator set until the diesel generator set is available and starts running, and enters the energy storage unit charging process.

[0052] The details are as follows:

[0053] 1. Group cycle master control: The energy storage management system EMS5.5 collects group station data through communication, and coordinates and controls the energy dispatch of the group station system through status feedback and control instructions; when the group station is put into operation, the energy storage management system EMS5.5 automatically detects the status of the two energy storage unit groups A and B, takes group A as the priority group, controls the available energy storage units to perform the main discharge operation, and the system enters the cycle process control; when both the energy storage units A and B do not meet the conditions, the alarm prompts manual processing and checks the status of the diesel generator unit 5.1;

[0054] 2. Group charge-discharge switching main process loop: When any energy storage unit group (Group A or Group B) is in the main discharge operation state, the other energy storage unit group is in the standby state. When the SOC of the main discharge operation unit group is less than or equal to the lower limit setting value of 30%, start the diesel generator set 5.1 to run. Through the fast switching switch 5.2, quickly switch from the main discharge energy storage unit group to the diesel generator set 5.1. The main discharge unit group switches to the charging operation mode. The diesel generator set 5.1 charges it while running with the user load. When the SOC reaches the upper limit setting value of 90%, stop charging. At the same time, according to the available state of the other energy storage unit group, determine which energy storage unit group the main discharge operation switches to. When the other unit group is available, give priority to switching to the other unit group, which is the normal main process mode; when the other group is unavailable, switch back to the charged energy storage unit group for main discharge operation, which is the branch process; the energy storage unit group charges at a higher rate and discharges at the rated rate to match the average load demand, reducing the start-up and charging operation time of the diesel generator set.

[0055] 3. Flexible and controllable uninterrupted power supply of the diesel generator: During the charging operation state of the diesel generator set 5.1, if a special situation requires the emergency shutdown of the diesel generator set 5.1 at any time, manual intervention can be used for temporary emergency stop. The system will automatically enter the branch process, start the available energy storage unit for main discharge operation, maintain continuous power supply to the system, and at the same time enter the main process loop; when the special emergency situation is released and the diesel generator set 5.1 resumes the available signal state, the energy management system 5.5 controls the system switching operation according to the main process determination rules, and the control process does not affect the need for continuous power supply and power consumption.

[0056] 4. Peak shaving and optimization branch of the charging process: During the charging of any energy storage unit group (Group A or Group B), the energy management system EMS5.5 detects and analyzes according to the power of the diesel generator set 5.1 and the unit charging power. According to whether the other unit group is available, determine whether to put the standby other unit group into peak shaving. When the user load (Pg - Pa or Pg - Pb) is larger and exceeds the set value P2, the other unit group will be put into peak shaving operation at one time to undertake the load, so as to fully ensure that the diesel power is used for fast charging of the charging unit; once entering the peak shaving process, when the peak shaving unit recharges the charging unit, that is, Pg - Pa or Pg - Pb is less than 0, the peak shaving unit reduces the output power; when the difference between the diesel power and the charging unit power, that is, Pg - Pa or Pg - Pb exceeds P1 (P1 << P2), the peak shaving unit increases the output power, so as to fully ensure that the diesel power is used for fast charging of the charging unit, thereby optimizing the capacity of the diesel generator 5.1 so that it is not designed too large, minimizing the running time of the diesel generator set 5.1 in the group station as much as possible, and ensuring the full continuity of the charge-discharge process of each energy storage unit group in each cycle.

[0057] 5. Diesel generator unavailable branch: When any energy storage unit group (group A or group B) is in the main discharge operation state, the other energy storage unit group is in the standby state. When the SOC of the main discharge operation unit group is less than or equal to the lower limit setting value of 30%, the diesel generator set 5.1 is started to run; if the diesel generator set 5.1 fails to start or the unit fault alarm is issued at this time, it is detected whether the other energy storage unit group is available and whether the SOC reserve is sufficient; if it is available and the SOC reserve is not less than the set value of 35%, it is switched to this unit group for main discharge operation; otherwise, the original main discharge operation unit group continues to discharge until the SOC set lower limit value is 10%, the discharge stops and the unit SOC low alarm is issued; if it is detected at any time during the continued discharge that another unit group is restored to be available, it will automatically switch to the main discharge operation of the other unit group; when the SOC low alarm is issued for any energy storage unit group, as long as it is detected that the diesel generator set 5.1 is available, the unit is started to charge the energy storage unit group and enter the normal main process.

[0058] 6. Charging unit: The diesel generator set 5.1 does not use emergency backup power or common power, but uses a charging unit. A set of diesel generator sets 5.1 controls multiple energy storage unit modules 1, 2, 3, and 4; the automatic start condition of the diesel generator set 5.1 is that the state of charge SOC of any energy storage unit group is less than or equal to the lower limit setting value of 30%, including the occurrence of a low alarm when the SOC reaches 10%; the automatic shutdown exit condition of the unit 5.1 is that the energy storage unit groups A and B have the main discharge operation conditions and have switched to the main discharge operation and standby mode. The output of the diesel generator set 5.1 is seamlessly switched with the energy storage system ESS1.1, 2.1, 3.1, and 4.1 through the fast switching switch STS5.2.

[0059] 7. Use of energy storage modules off-site: In some on-site load layouts, according to the power demand of the intermittent loads at dispersed locations, any charged energy storage vehicle module 1, 2, 3, 4 or two modules in a group of units can be separated from the station and moved to a designated dispersed location for separate use. After use, the module will be returned to the station for charging and replaced with other fully charged modules in the station for continued use at the dispersed location. During the separation and dispersed use process, the station energy management system EMS5.5 will detect and determine the availability of the energy storage unit group (Group A or Group B), and adopt the corresponding logical branch function process to ensure that the station system can still maintain uninterrupted power supply operation.

[0060] 8. Fully distributed universal power supply: Each energy storage power supply vehicle 1, 2, 3, 4 and diesel generator vehicle 5 is equipped with an output system power supply interface. After the station is assembled, the power distribution system busbars and output systems of each power supply vehicle are connected together through power cables and circuit breakers, forming a non-stop busbar system under the control of the station assembly cycle process. The power supply socket interface of any power supply vehicle can be used by users for universal plug-in without distinction, adapting to various complex situations on site, making the on-site layout more flexible and convenient;

[0061] 9. Rapid station assembly: The diesel generator set and energy storage system adopt the power vehicle type and the fast power plug-in technology to realize the movable modular power station assembly. The modules are replaceable to meet the requirements of rapid mobility, flexibility and reliability.

[0062] 10. Application scenario switching: In common application scenarios where the operation of diesel generator set 5.1 is not restricted by special control requirements, the control method of the energy storage backup power station is adopted when the system connection structure remains unchanged, that is, the diesel generator set 5.1 is used as the common main power source, and each energy storage system ESS1, 2, 3, and 4 is used as an uninterrupted endurance and peak-shaving energy storage power source. In a power grid environment, the emergency power station control method can be adopted, by adding an ATS conversion switch to connect the city power as the main power source, the diesel generator set 5.1 as the backup power source, and the energy storage systems ESS1, 2, 3, and 4 as system fault endurance and peak-shaving backup power sources.

Claims

1. A control method for a mobile electrochemical energy storage station without power outage system, characterized in that: In the main process, energy storage unit group A and group B switch in turn to perform main discharge operation to power the system. When any energy storage unit group is in the main discharge operation state, the energy storage vehicle modules in the unit group share the load evenly through internal communication; the diesel generator set is used to charge and store energy in the energy storage unit, and all switching operations are millisecond-level fast switching of power electronics, thereby ensuring that the system is powered on without power outages. In areas without city power and resources, fuel energy replenishment is used to ensure the power supply and endurance of the entire station; the main process cycle of group charging and discharging switching: when any energy storage unit group is in the main discharge operation state, the other energy storage unit group is in standby state. When the SOC of the main discharge operation unit group is less than When it is equal to the lower limit setting value of 30%, the diesel generator set is started, and the main discharge energy storage unit group is quickly switched to the diesel generator set through the fast switching switch. The main discharge unit group is converted to the charging operation mode, and the diesel generator set charges it while running with the user load. When the SOC reaches the upper limit setting value of 90%, the charging is stopped. At the same time, according to the available status of another group of energy storage units, it is determined which energy storage unit group the main discharge operation is switched to. When the other unit group is available, it is switched to the other unit group first, which is the normal main process mode; when the other group is not available, it is switched back to the charged energy storage unit group for the main discharge operation, which is a branch process; The energy storage unit group is charged at a higher rate and discharged at a rated rate to match the average load demand, reducing the starting and charging operation time of the diesel generator set.

2. The control method of a mobile electrochemical energy storage station non-stop power supply system according to claim 1, characterized in that: Each branch process is used to assist in the optimization of the main process and the handling of various abnormal or fault conditions; during unit charging, another group of units is used for peak shaving to adjust the diesel power to fully utilize and the charging process to be the fastest, and at the same time avoid the peak shaving unit from reverse charging the charging unit group; after the unit charging is completed, if the other unit is detected to be unavailable, the diesel generator set switches to the charging completion unit to enter the main discharge operation; when the unit main discharge reaches the low limit, the diesel generator set is controlled to start. If the diesel generator set is unavailable, the availability of another unit is detected. If available, it is switched to another energy storage unit for main discharge. If unavailable, the main discharge unit continues to discharge to the low limit and stops. When any energy storage unit group has a low SOC alarm, the diesel generator set is continuously detected until the diesel generator set is available and starts running, and the energy storage unit charging process is entered.

3. The control method of a mobile electrochemical energy storage station non-stop power supply system according to claim 1 is characterized in that: It is characterized in that it specifically includes the following steps: (1) Group cycle master control: The energy storage management system EMS collects station data through communication, and coordinates and controls the energy dispatch of the station system through status feedback and control instructions; when the station is put into operation, the energy storage management system EMS automatically detects the status of the two energy storage unit groups A and B, takes group A as the priority group, controls the available energy storage units to perform the main discharge operation, and the system enters the cycle process control; when both the energy storage units A and B do not meet the conditions, an alarm prompts manual processing and checks the status of the diesel generator set; (2) Group charge and discharge switching main process cycle: When any energy storage unit group is in the main discharge operation state, the other energy storage unit group is in the standby state. When the SOC of the main discharge operation unit group is less than or equal to the lower limit setting value of 30%, the diesel generator set is started and the main discharge energy storage unit group is quickly switched to the diesel generator set through the fast switching switch. The main discharge unit group is converted to the charging operation mode, and the diesel generator set charges it while running with the user load. When the SOC reaches the upper limit setting value of 90%, the charging is stopped. At the same time, according to the available status of the other energy storage unit group, it is determined which energy storage unit group the main discharge operation is switched to. When the other unit group is available, it is switched to the other unit group first, which is the normal main process mode; when the other unit group is not available, it is switched back to the charged energy storage unit group for the main discharge operation, which is a branch process; the energy storage unit group is charged at a higher rate and discharged at the rated rate to match the average load demand, thereby reducing the start-up and charging operation time of the diesel generator set; (3) Flexible and controllable uninterrupted power supply of diesel generator: When the diesel generator set is in the charging operation state, if a special situation occurs at any time and the diesel generator set needs to be shut down urgently, manual intervention can be performed for temporary emergency stop. The system will automatically enter the branch process and start the main discharge operation of the available energy storage unit to maintain continuous power supply to the system, while entering the main process cycle; when the special emergency situation is released and the diesel generator set recovers the available signal state, the energy management system controls the system switching operation according to the main process judgment rules, and the control process does not affect the need for continuous power supply; (4) Peak-shaving optimization branch of charging process: During the charging period of any energy storage unit group, the energy management system EMS detects and analyzes the power of the diesel generator set and the unit charging power, and determines whether to put the other unit on standby into peak-shaving according to whether the other unit is available. When the user load is large and exceeds the set value P2, the other unit will be put into peak-shaving operation at one time to take over the load, so as to fully ensure that the diesel generator power can charge the charging unit quickly; once entering the peak-shaving process, when the peak-shaving unit reversely charges the charging unit, that is, Pg-Pa or Pg-Pb is less than 0, the peak-shaving unit reduces the output power; when the difference between the diesel generator power and the charging unit power, that is, Pg-Pa or Pg-Pb exceeds P1, the peak-shaving unit increases the output power, so as to fully ensure that the diesel generator power can charge the charging unit quickly, thereby optimizing the capacity of the diesel generator so as not to be over-designed, and minimizing the operating time of the diesel generator set of the group station, and ensuring the full continuity of the charging and discharging journey of each energy storage unit group in each cycle; (5) Diesel generator unavailable branch: When any energy storage unit group is in the main discharge operation state, the other energy storage unit group is in the standby state. When the SOC of the main discharge operation unit group is less than or equal to the lower limit setting value of 30%, the diesel generator set is started; if the diesel generator set fails to start or the unit fault alarm is issued at this time, it is detected whether the other energy storage unit group is available and whether the SOC reserve is sufficient; if it is available and the SOC reserve is not less than the set value of 35%, it is switched to this unit group for main discharge operation; otherwise, the original main discharge operation unit group continues to discharge until the SOC set lower limit value is 10%, the discharge is stopped and the unit SOC low alarm is issued; if it is detected at any time during the continued discharge that another unit group is restored to be available, it will automatically switch to the main discharge operation of the other unit group; when the SOC low alarm of any energy storage unit group is issued, as long as it is detected that the diesel generator set is available, the unit will be started to charge the energy storage unit group and enter the normal main process; (6) Charging unit: The diesel generator set does not use emergency backup power supply or common power supply, but uses charging unit mode. A group of diesel generator sets controls multiple energy storage unit modules. The automatic start condition of the diesel generator set is that the state of charge SOC of any energy storage unit group is less than or equal to the lower limit setting value of 30%, including the occurrence of SOC reaching 10% low alarm; the automatic shutdown exit condition of the diesel generator set is that the A and B energy storage unit groups have the main discharge operation conditions and have switched to the main discharge operation and standby mode; the output of the diesel generator set is seamlessly switched with the energy storage system ESS through the fast switching switch STS; (7) Use of energy storage modules off-site: In some on-site load layouts, according to the power demand of the intermittent loads at dispersed locations, any one of the charged energy storage vehicle modules or two modules in a group of units can be separated from the station and moved to a designated dispersed location for separate use. After use, the module is returned to the station for charging and replaced with other fully charged modules in the station to continue use at the dispersed location. During the separation and dispersed use process, the station energy management system EMS will detect and determine the availability of the energy storage unit group and adopt the corresponding logical branch function process to ensure that the station system can still maintain uninterrupted power supply operation. (8) Fully distributed universal power supply: Each energy storage power supply vehicle and diesel generator vehicle is equipped with an output system power supply interface. After the station is assembled, the power distribution system busbars and output systems of each power supply vehicle are connected together through power cables and circuit breakers, forming a non-stop busbar system under the control of the station assembly cycle process. The power supply socket interface of any power supply vehicle can be used by users for universal plug-in without distinction, adapting to various complex situations on site, making on-site layout more flexible and convenient; (9) Rapid station assembly: The diesel generator set and energy storage system adopt the power vehicle type and adopt the fast power plug-in technology to realize the mobile modular power station. The modules are replaceable to meet the requirements of rapid mobility, flexibility and reliability. (10) Application scenario switching: In ordinary application scenarios where the operation of diesel generator sets is not restricted by special control requirements, the control method of the energy storage backup power station is adopted when the system connection structure remains unchanged, that is, the diesel generator set is used as the normal main power source, and each energy storage system ESS is used as an uninterrupted endurance and peak-shaving energy storage power source; in an environment with a power grid, the emergency power station control method can be adopted, by adding an ATS conversion switch to connect the city power as the main power source, the diesel generator set as the backup power source, and the energy storage system ESS as the system fault endurance and peak-shaving backup power source.