A supporting structure for replacing a curtain wall and a method of using the same

Through a curtain wall replacement support structure including support frame, support fixture and support components, the problems of safety hazards and real-time monitoring data acquisition during curtain wall replacement are solved, and the rapid, safe replacement and real-time health monitoring of curtain walls are realized, improving the Construction safety and service life.

CN114165070BActive Publication Date: 2025-02-11GUANGZHOU ANDSUN CURTAIN WALL CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202111582679.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-12-22
Publication Date
2025-02-11
Estimated Expiration
2041-12-22

AI Technical Summary

Technical Problem

When replacing fixed fixtures in the existing curtain wall, the cable is subjected to excessive tensile stress for a long time, resulting in the anchor breakage, posing a major safety hazard. At the same time, the problem of temporary fixation and the difficulty of obtaining safe real-time monitoring data.

Method used

A support structure for replacing the curtain wall, including a support frame, support fixture and support assembly, can realize rapid and safe fixing and replacement of the curtain wall through the removable design of the support fixture and the support assembly and the support assembly. . At the same time, sensors are installed for real-time monitoring to obtain stress and deformation data of ropes and curtain walls.

Benefits of technology

It solves the problem of temporary fixation of curtain walls, realizes rapid and safe replacement of curtain walls, monitors the health data and safety status of curtain walls in real time, improves construction safety and the stability of curtain walls, and extends the service life.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114165070B_ABST
    Figure CN114165070B_ABST
Patent Text Reader

Abstract

The present invention discloses a supporting structure for replacing a curtain wall and a method for using the same, belonging to the technical field of curtain walls. The present invention comprises a structure for replacing old stainless steel fixtures of a curtain wall by means of a supporting frame, a supporting fixture, a bracket assembly and other components, thereby solving the problem of temporary fixation of existing curtain walls, allowing the curtain wall body to be quickly and safely fixed and the old fixtures to be replaced, facilitating installation and disassembly, and monitoring the safety status of the curtain wall around the clock, thereby realizing visual management of curtain wall renovation construction, curtain wall health and maintenance.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of curtain walls, and in particular to a supporting structure for replacing a curtain wall and a use method thereof. Background Art

[0002] With the increasing height of domestic buildings in recent years, the architectural shapes have become more and more diverse; at the same time, in order to pursue more lighting and a wider field of view, the size of the glass panels in the lighting area has also become larger and larger; this has also brought many problems, such as the installation and maintenance of large glass. With the rise of large-span and large-space architectural designs in railway stations, airports, large public places, and high-end commercial buildings, the transparency and lightness of cable curtain walls are increasingly favored by designers. After several years or more than ten years of operation and use, problems with cable curtain wall components have gradually emerged. When the existing curtain wall is replaced with a fixing fixture, because the front cross cable bears the constant load of the glass curtain wall, the ultimate safety hazard is that the cable is subjected to excessive tensile stress for a long time, causing the cable anchor to break, causing a major safety hazard. There is a problem of temporary fixation during the replacement of large-scale curtain walls, and it is difficult to measure the force and deformation data in real time. In order to meet market demand, this application proposes a construction process for repairing and replacing cable curtain wall components, which can overcome the problems of temporary reinforcement, disassembly and installation of existing curtain walls, and difficulty in obtaining safety real-time monitoring data. Summary of the invention

[0003] In view of the above-mentioned problems, the present invention proposes a supporting structure for replacing a curtain wall and a method for using the same.

[0004] In order to achieve the above-mentioned purpose, the present invention adopts the following technical solutions:

[0005] A supporting structure for replacing a curtain wall, comprising a supporting frame, a supporting fixing member, and a supporting assembly, wherein the supporting fixing member comprises a supporting block, a supporting block, an outer protective block, a vertical cable mounting block A, a first vertical cable rope, a vertical cable mounting block B, a transverse cable mounting block, a transverse cable rope, a transverse cable locking block, a vertical cable mounting block C, a second vertical cable rope, and a vertical cable mounting block D, wherein the supporting block is fixedly arranged on the supporting block, the outer protective block is detachably installed on the outer side of the supporting block, and the curtain wall body is installed and placed on the supporting block between the supporting block and the outer protective block, the vertical cable mounting block A is fixedly arranged on the inner side of the supporting block, the first vertical cable rope is detachably fixed to the vertical cable mounting block A through the vertical cable mounting block B, the transverse cable mounting block is fixedly arranged on the outer side of the vertical cable mounting block B, the transverse cable rope is detachably installed and fixed to the transverse cable mounting block through the transverse cable locking block, the vertical cable mounting block C is fixedly arranged on the outer side of the transverse cable mounting block, and the second vertical cable rope is detachably installed and fixed to the vertical cable mounting block C through the vertical cable mounting block D;

[0006] The supporting assembly includes a first cross beam, a second cross beam, a truss, a lifting member and an adsorption member. The truss is connected and fixed to the first cross beam and the second cross beam. The truss is fixedly installed at the bottom of the first cross beam and the second cross beam. The top of the first vertical rope and the second vertical rope are installed and fixed on the first cross beam. The lifting member and the adsorption member are installed and fixed on the truss.

[0007] Preferably, the lifting member includes a lifting cross bar and a supporting block, the lifting cross bar is detachably mounted on the truss, the supporting block is installed at the front end of the lifting cross bar, and the supporting block is used to support the curtain wall body; the adsorption member includes an adsorption cross bar and an electric suction cup, the adsorption cross bar is detachably mounted on the truss, the electric suction cup is installed at the end of the adsorption cross bar, and the electric suction cup is used to adsorb the curtain wall body.

[0008] Preferably, the bottom of the second vertical rope and one end of the horizontal rope are both connected with a rope force buffer device, and the rope force buffer device is an adjustable anchor.

[0009] Preferably, the supporting structure replaces the curtain wall by the following method:

[0010] (1) Fixing the curtain wall body: first install the first crossbeam and the second crossbeam, assemble and fix the truss on the side close to the curtain wall body, and fix the curtain wall body in the horizontal and vertical directions through the adsorption member and the supporting member, so that the curtain wall body is fixed;

[0011] (2) Connecting the curtain wall body: Fix and then install the support block on the inside of the curtain wall body, support the bottom of the curtain wall body, install the outer protection block on the outside of the curtain wall body and connect it detachably to the support block;

[0012] (3) Installing the cables: including installing the first vertical cable, the second vertical cable and the horizontal cable, first installing the first vertical cable between the vertical cable mounting block A and the vertical cable mounting block B, detachably connecting the vertical cable mounting block A and the vertical cable mounting block B, then installing the horizontal cable on the horizontal cable mounting block, detachably connecting the horizontal cable locking block to the horizontal cable mounting block to fix the horizontal cable, then installing the second vertical cable on the cable force buffer device, installing the second vertical cable between the vertical cable mounting block C and the vertical cable mounting block D, and detachably connecting the vertical cable mounting block C and the vertical cable mounting block D;

[0013] (4) Real-time monitoring of cable network safety: Sensors are installed on the curtain wall body, cables and support components. The output end of the sensor is connected to the input end of the collector, the output end of the collector is connected to the input end of the network, the output end of the network is connected to the input end of the client-data collection, the output end of the network is also connected to the input end of the server, the output end of the server is connected to the input end of the multi-function module, and the output end of the multi-function module is connected to the input end of the multi-client synchronous display.

[0014] Among them, the multifunctional module includes the functions of online calculation of monitoring indicators, real-time viewing of performance indicators, online evaluation, real-time grasp of structural status, synchronous early warning, and automatic triggering of early warning information.

[0015] Due to the adoption of the above technical solution, the beneficial effects of the present invention are:

[0016] (1) The structure of the curtain wall replacement of the present invention solves the problem of temporary fixing of the curtain wall, so that the curtain wall body can be quickly and safely fixed and the old fixture can be replaced, which is convenient for installation and disassembly.

[0017] (2) The present invention can grasp the health data of the curtain wall in real time, monitor the safety status of the curtain wall around the clock, and realize visual management of curtain wall renovation construction, curtain wall health and maintenance.

[0018] (3) The present invention can measure its stress and deformation data in real time, and provide warnings on the safety status of cables and curtain walls during replacement and maintenance, thereby improving construction safety, improving the stability of the curtain wall after replacement and the uniformity of internal stress, and extending the service life of the curtain wall and fixing fixtures. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 : A schematic structural diagram of the present invention.

[0020] Figure 2 : The structural schematic diagram of A in the present invention.

[0021] Figure 3 : The structural schematic diagram of B in the present invention.

[0022] Figure 4 : A schematic structural diagram of the structure of the supporting fixing member of the present invention.

[0023] Figure 5 : A three-dimensional exploded view of the supporting fixing member of the present invention.

[0024] Figure 6 : A schematic structural diagram of the support assembly of the present invention.

[0025] Figure 7 :The present invention Figure 6 Schematic diagram of the structure at C in the middle.

[0026] Figure 8 : A schematic diagram of the structure of the lifting member and the adsorption member of the present invention.

[0027] In the figure: 02, supporting fixing parts, 201, supporting block, 202, supporting block, 203, outer protection block, 204, vertical cable mounting block A, 205, first vertical cable rope, 206, vertical cable mounting block B, 207, horizontal cable mounting block, 208, horizontal cable rope, 209, horizontal cable locking block, 210, vertical cable mounting block C, 211, second vertical cable rope, 212, vertical cable mounting block D, 03, supporting assembly, 301, first cross beam, 302, second cross beam, 303, truss, 304, lifting member, 341, lifting cross bar, 342, supporting block, 305, adsorption member, 351, adsorption cross bar, 352, electric suction cup, 04, curtain wall body, 05, cable force buffer device. DETAILED DESCRIPTION

[0028] To make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in combination with the embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0029] Example:

[0030] A supporting structure for replacing a curtain wall comprises a supporting frame 01, a supporting fixture 02, and a supporting assembly 03. The supporting fixture 02 comprises a supporting block 201, a supporting block 202, an outer protective block 203, a vertical cable mounting block A204, a first vertical cable rope 205, a vertical cable mounting block B206, a transverse cable mounting block 207, a transverse cable rope 208, a transverse cable locking block 209, a vertical cable mounting block C210, a second vertical cable rope 211, and a vertical cable mounting block D212. The supporting block 202 is fixedly arranged on the supporting block 201, and the outer protective block 203 is detachably installed on the outer side of the supporting block 201. The curtain wall body 04 is installed and placed on the supporting block 202 between the supporting block 201 and the outer protective block 203. The vertical cable mounting block A204 is fixedly arranged on the inner side of the supporting block 201. The first vertical cable rope 205 is detachably fixed to the vertical cable mounting block A204 through the vertical cable mounting block B206. A horizontal cable mounting block 207 is fixedly provided on the outside, and a horizontal cable rope 208 is detachably mounted and fixed on the horizontal cable mounting block 207 through a horizontal cable locking block 209. A vertical cable mounting block C210 is fixedly provided on the outside of the horizontal cable mounting block 207, and a second vertical cable rope 211 is detachably mounted and fixed on the vertical cable mounting block C210 through a vertical cable mounting block D212;

[0031] The supporting assembly 03 includes a first beam 301, a second beam 302, a truss 303, a lifting member 304 and an adsorption member 305. The truss 303 is connected and fixed to the first beam 301 and the second beam 302. The truss 303 is fixedly installed at the bottom of the first beam 301 and the second beam 302. The top of the first vertical rope 205 and the second vertical rope 211 are fixedly installed on the first beam 301. The lifting member 304 and the adsorption member 305 are fixedly installed on the truss 303.

[0032] In this embodiment, the lifting member 304 includes a lifting cross bar 341 and a supporting block 342. The lifting cross bar 341 can be detachably installed on the truss 303. A supporting block 342 is installed at the front end of the lifting cross bar 341, and the supporting block 342 is used to support the curtain wall body 04; the adsorption member 305 includes an adsorption cross bar 351 and an electric suction cup 352. The adsorption cross bar 351 can be detachably installed on the truss 303. An electric suction cup 352 is installed at the end of the adsorption cross bar 351. The electric suction cup 352 is used to absorb the curtain wall body 04. The electric suction cup 352 can ensure that the curtain wall body 04 is not affected by the replacement of the cable component. In order to further reduce the settlement of the glass panel, an adjustable lifting cross bar 341 is also provided.

[0033] In this embodiment, a more optimal setting is that the bottom of the second vertical cable 211 and one end of the horizontal cable 208 are both connected with a cable force buffer device 05, which is an adjustable anchor. The adjustable anchor is preset and fixed on the ground, and finally connected to the second vertical cable 211. When the cable is loose or overloaded, the cable preload is automatically compensated to ensure the safety of the entire curtain wall. When the cable is subjected to live load (mainly typhoon), the cable force buffer device 05 compensates for the change in the length of the cable caused by the change in the shape of the cable (string shape) through the compression spring (the cable force buffer device 05 is the compression spring inside the adjustable anchor), and the internal force of the cable is controlled within the design range. After the live load disappears, the spring of the cable force buffer device 05 is stretched back to its original state, the cable tension is restored, and the length of the horizontal cable 208 does not increase due to creep or creep.

[0034] In this embodiment, the supporting structure replaces the curtain wall by the following method:

[0035] (1) Fixing the curtain wall body: first install the first crossbeam and the second crossbeam, assemble and fix the truss on the side close to the curtain wall body, and fix the curtain wall body in the horizontal and vertical directions through the adsorption member and the supporting member, so that the curtain wall body is fixed.

[0036] (2) Connect the curtain wall body: Fix and then install the support block on the inside of the curtain wall body, support the bottom of the curtain wall body, install the outer protection block on the outside of the curtain wall body and connect it to the support block in a detachable manner.

[0037] (3) The old stainless steel rigging on the curtain wall body was dismantled: First, the existing vertical cables were unloaded. Before unloading, the connection between the unloaded vertical cables and the clamps was checked one by one to see if they were disconnected. Then the rope tension was unloaded by 30% each time. During unloading, the changes in the internal forces of other load ropes should be closely observed. The glue joints of the curtain wall body in the column where the unloaded rope is located and the two adjacent columns should be observed with a width observation scale. The changes in the position of the curtain wall body and the glue joint width should be observed. In the key areas determined by simulation analysis, the crack observation instrument should be used to observe the changes in the glue joint width in real time.

[0038] (4) Remove the vertical cable after unloading starting from the bottom. After removing the connecting bolts between the anchor head and the ear plate, tie the traction rope. After the top anchor head and the lifting hook are firmly fixed, remove the connecting bolts. Control the electric hoist to slowly descend. At the same time, pull the traction rope at the lower end to ensure that the steel cable does not touch the glass panel during the descent process.

[0039] (5) Installing the rope: First, before the rope is officially lifted, the thread engagement of the adjusting end of the rope should be checked. When the rope is in a stress-free state, the thread engagement should be smooth. If not, the cause should be found and eliminated. When installing the rope, the rope with a small diameter should be straightened against the direction of the rope before being lifted. The rope with a large diameter should be placed on the rope drum first, and then the rope drum should be rotated while being lifted. The lifting speed of the rope should be synchronized with the rotation speed of the rope drum to ensure that the rope is lifted in a natural state. It is forbidden to directly lift the rope vertically when the rope is not opened. If the rope is in a spiral state when it is lifted, the rope lifting should be stopped immediately, and the rope lifting can be continued only after the rope drum is rotated until the rope is in a natural state. When lifting, appropriate protective measures should be taken for the anchors at both ends, and the protective layer outside the rope should not fall off or be damaged.

[0040] (6) The specific installation of the rope includes installing the first vertical cable, the second vertical cable and the horizontal cable. First, install the first vertical cable between the vertical cable mounting block A and the vertical cable mounting block B. After the vertical cable mounting block A and the vertical cable mounting block B are detachably connected and firmly connected, the horizontal cable is installed on the horizontal cable mounting block. The horizontal cable locking block is detachably connected to the horizontal cable mounting block to fix the horizontal cable. Then, the second vertical cable is installed on the cable force buffer device. The second vertical cable is installed between the vertical cable mounting block C and the vertical cable mounting block D. The vertical cable mounting block C and the vertical cable mounting block D are detachably connected. It should be noted that the cable is prestressed and tensioned in 4 steps. Finally, re-tighten the clamp, apply thread tightening glue to the threaded part of the pin screw and tighten the screw with a torque of 3N·m.

[0041] (7) Real-time monitoring of cable network safety: Sensors are installed on the curtain wall body, cables and support components. The output end of the sensor is connected to the input end of the collector, the output end of the collector is connected to the input end of the network, the output end of the network is connected to the input end of the client-data collection, the output end of the network is also connected to the input end of the server, the output end of the server is connected to the input end of the multi-function module, and the output end of the multi-function module is connected to the input end of the multi-client synchronous display.

[0042] Among them, the multifunctional module includes the functions of online calculation of monitoring indicators, real-time viewing of performance indicators, online evaluation, real-time grasp of structural status, synchronous early warning, and automatic triggering of early warning information.

[0043] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A supporting structure for replacing a curtain wall, characterized in that: The invention comprises a supporting fixture (02) and a supporting assembly (03), wherein the supporting fixture (02) comprises a supporting block (201), a supporting block (202), an outer protective block (203), a vertical cable mounting block A (204), a first vertical cable rope (205), a vertical cable mounting block B (206), a horizontal cable mounting block (207), a horizontal cable rope (208), a horizontal cable locking block (209), a vertical cable mounting block C (210), a second vertical cable rope (211) and a vertical cable mounting block D (212), wherein the supporting block (202) is fixedly arranged on the supporting block (201), and the outer protective block (203) is detachably installed on the supporting block (201). On the outside of the support block (201), the curtain wall body (04) is installed and placed on the support block (202) between the support block (201) and the outer protective block (203); the vertical cable mounting block A (204) is fixedly provided on the inner side of the support block (201); the first vertical cable rope (205) is detachably fixed to the vertical cable mounting block A (204) via the vertical cable mounting block B (206); the horizontal cable mounting block (207) is fixedly provided on the outside of the vertical cable mounting block B (206); the horizontal cable rope (208) is detachably fixed to the horizontal cable mounting block via the horizontal cable locking block (209). (207), the vertical cable mounting block C (210) is fixedly arranged on the outer side of the horizontal cable mounting block (207), and the second vertical cable rope (211) is detachably mounted and fixed on the vertical cable mounting block C (210) through the vertical cable mounting block D (212); the support assembly (03) comprises a first crossbeam (301), a second crossbeam (302), a truss (303), a supporting member (304) and an adsorption member (305), the truss (303) is connected and fixed to the first crossbeam (301) and the second crossbeam (302), and the truss (303) is fixedly installed on the first crossbeam (301) and the second crossbeam (302). The bottom of the crossbeam (302), the tops of the first vertical cable (205) and the second vertical cable (211) are fixedly mounted on the first crossbeam (301), the supporting member (304) and the adsorption member (305) are fixedly mounted on the truss (303), the supporting member (304) comprises a supporting crossbar (341) and a supporting block (342), the supporting block (342) is used to support the curtain wall body (04), and the adsorption member (305) is used to adsorb the curtain wall body (04); the bottom of the second vertical cable (211) and one end of the cross cable (208) are both connected with a cable force buffer device (05).

2. The supporting structure for replacing a curtain wall according to claim 1, characterized in that: The lifting cross bar (341) is detachably mounted on the truss (303), and the supporting block (342) is mounted on the front end of the lifting cross bar (341); the adsorption component (305) comprises an adsorption cross bar (351) and an electric suction cup (352), and the adsorption cross bar (351) is detachably mounted on the truss (303), and the electric suction cup (352) is mounted on the end of the adsorption cross bar (351), and the electric suction cup (352) is used to adsorb the curtain wall body (04).

3. The supporting structure for replacing a curtain wall according to claim 1, characterized in that: The cable force buffer device (05) is an adjustable anchor.

4. The method for using the supporting structure of a curtain wall according to any one of claims 1 to 3, characterized in that: The supporting structure replaces the curtain wall by the following method: (1) Fixing the curtain wall body: first install the first crossbeam and the second crossbeam, assemble and fix the truss on the side close to the curtain wall body, and fix the curtain wall body in the horizontal and vertical directions through the adsorption member and the supporting member, so that the curtain wall body is fixed; (2) Connecting the curtain wall body: The support block is installed on the inner side of the curtain wall body, the support block supports the bottom of the curtain wall body, and the outer protection block is installed on the outer side of the curtain wall body and detachably connected to the support block; (3) Installing the cables: including installing the first vertical cable, the second vertical cable and the horizontal cable. First, install the first vertical cable between the vertical cable mounting block A and the vertical cable mounting block B. After the vertical cable mounting block A and the vertical cable mounting block B are detachably connected and firmly connected, install the horizontal cable on the horizontal cable mounting block. The horizontal cable locking block is detachably connected to the horizontal cable mounting block to fix the horizontal cable. Then, install the second vertical cable on the cable force buffer device. Install the second vertical cable between the vertical cable mounting block C and the vertical cable mounting block D. The vertical cable mounting block C and the vertical cable mounting block D are detachably connected. (4) Real-time monitoring of cable net safety: Sensors are installed on the curtain wall body, cables and support components. The output end of the sensor is connected to the input end of the collector, the output end of the collector is connected to the input end of the network, the output end of the network is connected to the input end of the client-data collection, the output end of the network is also connected to the input end of the server, the output end of the server is connected to the input end of the multi-function module, and the output end of the multi-function module is connected to the input end of the multi-client synchronous display.

5. The method for using the supporting structure for replacing a curtain wall according to claim 4, characterized in that: The multifunctional module includes the functions of online calculation of monitoring indicators, real-time viewing of performance indicators, online evaluation, real-time grasp of structural status, synchronous early warning, and automatic triggering of early warning information.

Citation Information

Patent Citations

  • Supporting structure for replacing curtain wall

    CN216665124U