Installation method of main equipment of reactor primary circuit
By pre-assembling the container module and top module of the reactor first-circuit main equipment in the equipment assembly plant, the installation problems of traditional installation methods when the equipment spacing is small and the installation space is limited, and higher accuracy and efficiency are achieved. Suitable for installation of compact reactors.
Patent Information
- Application Number
- CN202111298142.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-11-04
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2041-11-04
AI Technical Summary
The installation method of the first circuit main equipment of the traditional land nuclear power plant reactor is not suitable for occasions where equipment spacing is small and installation space is limited. The installation accuracy requirements are high and the content is complex.
The reactor pressure vessel, the reactor component, the steam generator, and the main pump pump housing are pre-assembled into container modules, the reactor pressure vessel top cover, control rod driving mechanism, and the stack top structure are pre-assembled into stack top modules, and are in the equipment assembly plant Assemble and adjust, and then ship to the site for final installation.
It improves installation accuracy and efficiency, overcomes the problem of difficulty in installation independently in a site with limited installation space, and is especially suitable for the installation of compact reactor one-loop main equipment.
Smart Images

Figure CN114171224B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of installation of key equipment in nuclear power plants, and more specifically, relates to a method for installing primary circuit main equipment of a reactor. Background Art
[0002] At present, the primary circuit main equipment of traditional land-based nuclear power plant reactors mostly adopts a loop design. During installation, individual equipment is transported to the final assembly plant for installation separately. After installation, the equipment is connected by on-site welding of main pipelines.
[0003] However, for some occasions with limited space (for example, compact layout equipment reactors), the equipment spacing of the reactor primary circuit main equipment is small, there are many interfaces between the equipment, the installation accuracy requirements are high, the installation content is complex, and the on-site installation and construction conditions are limited. Therefore, the traditional installation method of the primary circuit main equipment of the land nuclear power plant reactor is not applicable.
[0004] In view of this, it is indeed necessary to provide a method for installing the main equipment of the primary circuit of a reactor, which can be applicable to the installation of the main equipment of the primary circuit of a reactor with small equipment spacing and limited installation space. Summary of the invention
[0005] The purpose of the present invention is to overcome at least one defect in the prior art and provide a method for installing the main equipment of the primary circuit of a reactor, which can be applied to the installation of the main equipment of the primary circuit of a reactor with small equipment spacing and limited installation space.
[0006] In order to achieve the above object, the present invention provides a method for installing a primary circuit main device of a reactor, which comprises the following steps:
[0007] S1) pre-assembling the reactor pressure vessel and the reactor internals, the inner casing, the steam generator, and the main pump casing into a vessel module, and pre-assembling the reactor pressure vessel top cover, the control rod drive mechanism, and the reactor top structure into a reactor top module;
[0008] S2) Install the main equipment bracket and stabilizer bracket;
[0009] S3) hoisting the container module onto the main equipment support, adjusting the position of the container module, and installing the container module on the main equipment support; and
[0010] S4) installing a pressurizer on the pressurizer bracket, connecting a main pump motor and hydraulic components to a pump casing of the main pump, and installing the stack top module on the container module.
[0011] According to one embodiment of the method for installing the primary equipment of the reactor primary loop of the present invention, step S1) pre-assembling the container module includes: sequentially hoisting the reactor pressure vessel, the main pump casing and the steam generator onto the adjustment stand and adjusting their positions, and then butt welding the steam generator and the reactor pressure vessel pipe nozzle, butt welding the main pump pipe nozzle and the reactor pressure vessel pipe nozzle, and performing stainless steel cladding on the inner wall of the pipe nozzle.
[0012] According to an embodiment of the method for installing the primary circuit main equipment of a reactor of the present invention, in step S1), in the pre-assembled container module, before the lower head of the reactor pressure vessel is welded, the guide ring cavity assembly is hoisted into the reactor pressure vessel for initial fixation.
[0013] According to an embodiment of the method for installing the primary circuit main equipment of a reactor of the present invention, when welding the container module, the guide ring cavity assembly is lowered to the bottom of the reactor pressure vessel and fixed.
[0014] According to one embodiment of the method for installing the primary equipment of a reactor primary circuit of the present invention, step S1) pre-assembling the container module comprises: hanging the inner sleeve into the reactor pressure vessel for trial installation, measuring the axial and circumferential positions and then processing and repairing, and installing the seal.
[0015] According to one embodiment of the method for installing the primary equipment of a reactor primary circuit of the present invention, step S1) pre-assembling the container module includes: splitting the in-core shielding assembly into individual shielding blocks outside the reactor pressure vessel, and the shielding blocks are successively hoisted into the reactor pressure vessel and assembled into a whole inside the reactor pressure vessel, and then fixedly connected to the upper and lower parts of the reactor pressure vessel respectively through supporting key pins.
[0016] According to one embodiment of the method for installing the primary equipment of a reactor primary circuit of the present invention, in step S1), in a pre-assembled container module, the in-core components include an upper in-core component and a lower in-core component. First, the lower in-core component is hoisted for multiple times to complete the gap repair and measurement at the outlet nozzle of the hanging basket and the lower radial support key, and the installation of the lower in-core component is completed. Then, the upper in-core component is hoisted for multiple times to complete the alignment of the upper in-core component and the lower in-core component and the related gap distance inspection, and then the installation of the in-core component is completed.
[0017] According to one embodiment of the method for installing the primary equipment of a reactor primary circuit of the present invention, step S1) pre-assembling the top module includes: installing the control rod drive mechanism on the top cover of the reactor pressure vessel, and installing the central part insulation layer on the top cover of the reactor pressure vessel in conjunction with the top structure ventilation enclosure on the top cover of the reactor pressure vessel.
[0018] According to one embodiment of the method for installing the primary equipment of the reactor primary circuit of the present invention, step S4) of installing the pressurizer includes: hoisting the upper horizontal support of the pressurizer to the installation position and welding it to fix it, installing a skirt adjustment plate on the pressurizer bracket, hoisting the pressurizer to the installation position, and locking the pressurizer and the pressurizer bracket with bolts.
[0019] According to one embodiment of the method for installing the main equipment of the primary circuit of a reactor of the present invention, step S4) of installing the pressurizer further comprises: pre-installing and connecting a plurality of sections of surge pipes on the pressurizer, and performing welding and water pressure testing on the surge pipes themselves after fitting the length of the pipe sections according to the distance between the steam generator and the pressurizer; after the water pressure test is passed, the surge pipes are respectively welded and connected to the pressurizer and the hot section nozzle of the steam generator.
[0020] Compared with the prior art, in the reactor primary circuit main equipment installation method of the present invention, the reactor pressure vessel and the in-core components, the inner casing, the steam generator, and the main pump casing are pre-assembled into a container module in the equipment assembly plant, and the reactor pressure vessel top cover, the control rod drive mechanism, and the stack top structure are pre-assembled into a stack top module in the equipment assembly plant. Then the container module and the stack top module are transported to the installation site to complete the final installation. This can not only make full use of the existing plant conditions of the equipment assembly plant and improve the installation accuracy and efficiency, but also overcome the problem that the reactor primary circuit main equipment is difficult to install independently at a site with limited installation space. The method is particularly suitable for the installation of compact reactor primary circuit main equipment. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] The following is a detailed description of the reactor primary circuit main equipment installation method and its technical effects in conjunction with the accompanying drawings and specific embodiments, wherein:
[0022] Figure 1 The present invention is a schematic flow chart of the method for installing the primary circuit main equipment of a reactor.
[0023] Figure 2 The present invention is a schematic structural diagram of a reactor primary loop main equipment assembled by using the reactor primary loop main equipment installation method of the present invention.
[0024] In the figure:
[0025] 10--reactor pressure vessel; 100--core internal components; 102--inner casing; 104--core shield assembly; 106--guide ring cavity assembly; 108--core top structure; 110--control rod drive mechanism; 20--steam generator; 30--main pump; 40--pressurizer; 400--surge tube; 50--main equipment bracket; 60--pressurizer bracket. DETAILED DESCRIPTION
[0026] In order to make the invention purpose, technical solution and technical effect of the present invention clearer, the present invention is further described in detail below in conjunction with the accompanying drawings and specific implementation methods. It should be understood that the specific implementation methods described in this specification are only for explaining the present invention, not for limiting the present invention.
[0027] Please follow Figure 1 As shown, the present invention provides a method for installing a primary circuit main device of a reactor, which comprises the following steps:
[0028] S1) pre-assembling the reactor pressure vessel and the reactor internals 100, the inner casing 102, the steam generator 20, and the main pump casing into a vessel module, and pre-assembling the reactor pressure vessel top cover, the control rod drive mechanism 110, and the reactor top structure 108 into a reactor top module;
[0029] S2) installing the main equipment bracket 50 and the voltage stabilizer bracket 60;
[0030] S3) hoisting the container module onto the main equipment support 50, adjusting the position of the container module, and installing the container module on the main equipment support 50; and
[0031] S4) Install the pressurizer 40 on the pressurizer bracket 60, connect the main pump motor and hydraulic components to the main pump casing, and install the stack top module on the container module.
[0032] Specifically, step S1) pre-assembling the container module comprises:
[0033] Before welding the lower head of the reactor pressure vessel 10 , the guide ring cavity assembly 106 is hoisted into the reactor pressure vessel 10 for initial fixation. At this time, the upper and lower flanges of the guide ring cavity assembly 106 are fixed to the inner wall of the reactor pressure vessel 10 by pins.
[0034] The reactor pressure vessel 10, the main pump casing and the steam generator 20 are hoisted onto a special adjustment platform in sequence. The adjustment platform is provided with an adjustment device for adjusting the position of the equipment, and the adjustment device is connected to the support key of the outer wall of the equipment; the six degrees of freedom of a single equipment are adjusted to ensure the horizontality and elevation of the reference installation surface of the reactor pressure vessel 10 and the centering of the equipment pipe; after the adjustment is completed, the steam generator 20 and the pipe nozzle of the reactor pressure vessel 10 are butt-welded, the pipe of the main pump 30 and the pipe nozzle of the reactor pressure vessel 10 are butt-welded, and the inner wall of the pipe is clad with stainless steel to form the reactor pressure vessel 10, the main pump 30 and the steam generator 20 as a whole, wherein when the container is welded as a whole, the guide ring cavity assembly 106 is lowered to the bottom of the reactor pressure vessel 10 and fixed.
[0035] The assembled container overall equipment system pipelines are welded and plugged, and the main pump casing, the control rod drive mechanism sealing shell of the top cover, and the stack test pipe are sealed with mechanical structures. In order to ensure the safety of nuclear power operation in the later stage, it is necessary to carry out the primary side overall water pressure test, check the leakage of the primary side welds, and measure the stress and deformation of key parts.
[0036] The supporting foundation of the main equipment bracket 50 is formed by welding plates, and the upper supporting seat of the supporting foundation cooperates with the external supporting key of the equipment. After the main container module is hydrostatically tested, the container module and the reactor main equipment bracket 50 are pre-installed and debugged.
[0037] At this time, the guide ring cavity assembly 106 at the lower part of the reactor pressure vessel 10 is moved to the installation position, the upper and lower flange fixing pins are installed, and the upper and lower sealing members are welded to complete the final installation of the guide ring cavity assembly 106.
[0038] The inner sleeve 102 is hoisted into the reactor pressure vessel for trial installation, and the axial and circumferential positions are measured and then processed and repaired. After the repair, the seal is installed for final installation.
[0039] The in-core shielding assembly 104 is split into individual shielding blocks outside the container, and the shielding blocks are hoisted into the reactor pressure vessel 10 in sequence. After being assembled into a whole inside the reactor pressure vessel 10, they are connected and fixed with the upper and lower supporting key pins of the reactor pressure vessel 10.
[0040] Before installation, the internals 100 are divided into two parts: the upper internals and the lower internals. When the container module is pre-assembled, first, the lower internals are hoisted for multiple times to complete the gap repair and measurement of the basket outlet nozzle and the lower radial support key, and finally install the lower internals; then, the upper internals are hoisted for multiple times to complete the upper and lower centering and related gap distance inspections, and finally install the internals 100.
[0041] Specifically, step S1) pre-assembling the stack top module includes:
[0042] The control rod drive mechanism 110 is first installed on the reactor pressure vessel top cover assembly, the hook assembly is hoisted into the sealing shell and installed in place, the drive rod travel sleeve is hoisted in and connected with the thread on the sealing shell, a small Ω sealing weld is applied to the welding connection, and after the welding is qualified, a single-tube water pressure test of the rod drive mechanism is carried out, and then the coil assembly and the rod position detector, limit nut and anti-loosening washer are installed.
[0043] The insulation layer of the center part of the reactor pressure vessel top cover is installed on the reactor pressure vessel top cover in conjunction with the ventilation enclosure of the top structure 108, and the enclosure is bolted to the top cover support platform. The lower hanger is connected to the reactor pressure vessel top cover by pins. Subsequently, other ventilation components, impact-resistant support devices, cable trays, upper hangers, etc. are installed to complete the assembly of the top module.
[0044] It can be understood that the pre-assembly of the container module and the pre-assembly of the stack top module in step S1) can be carried out simultaneously or successively in the equipment assembly plant; in addition, the installation of the main equipment bracket and the stabilizer bracket in step S2) can be carried out before, after or simultaneously with the pre-assembly of the container module and the pre-assembly of the stack top module.
[0045] Specifically, S2) installing the main equipment support 50 and the pressurizer support 60 includes: hoisting the main equipment support 50 and the separate pressurizer support 60 into the reactor compartment and welding and fixing them.
[0046] Specifically, S3) hoisting the container module onto the main equipment bracket 50, adjusting the position of the container module, and installing the container module on the main equipment bracket 50 includes: hoisting the container module onto the main equipment bracket 50 of the reactor compartment, hoisting the support key onto the support seat, adjusting the thickness of the horizontal adjustment plate of the support seat, the thickness of the side adjustment plate, and completing the adjustment of the final installation position of the container module.
[0047] Specifically, S4) installing the pressurizer 40 on the pressurizer bracket 60 and installing the stack top module on the container module includes: hoisting the upper horizontal support of the pressurizer 40 to the installation position and welding and fixing it, installing the skirt seat adjustment plate on the pressurizer bracket 60, hoisting the pressurizer 40 to the installation position, and using bolts to lock and connect the pressurizer 40 and the pressurizer bracket 60. Subsequently, adjust the distance between the adjustable stop block and the pressurizer 40 to ensure lateral support.
[0048] The multi-section surge pipe 400 is pre-installed and connected on the pressurizer 40. After the length of the pipe section is adjusted according to the distance between the steam generator 20 and the pressurizer 40, the surge pipe 400 itself is welded and hydraulically tested. After the hydraulic test is passed, the surge pipe 400 is welded and connected to the pressurizer 40 and the hot section nozzle of the steam generator 20. Subsequently, the surge pipe support platform and damper are installed, and their angles and lengths are rotated to adjust to complete the surge pipe support installation.
[0049] Specifically, S4) connecting the main pump motor and hydraulic components to the main pump casing includes: hoisting the main pump motor and hydraulic components onto the main pump casing respectively, installing seals, and mechanically fixing them to the pump casing flange with bolts. The hydraulic components mainly include impellers and guide vanes.
[0050] Please refer to Figure 2As shown, it is a schematic structural diagram of a compact arrangement of the primary circuit main equipment of the reactor assembled by the installation method of the primary circuit main equipment of the reactor of the present invention, which mainly includes a reactor pressure vessel 10, a steam generator 20, a main pump 30, a pressurizer 40, and a reactor main equipment bracket 50. The main equipment is centered on the reactor pressure vessel 10, and the steam generator 20 and the main pump 30 are arranged symmetrically. The reactor pressure vessel 10 and the steam generator 20, and the reactor pressure vessel 10 and the main pump 30 are directly connected through equipment pipes, and there is no pipeline connection between the steam generator 20 and the main pump 30.
[0051] An inner sleeve 102 is arranged inside the equipment pipe, and a guide annular cavity assembly 106 is arranged inside the reactor pressure vessel 10, forming a two-way flow channel inside the equipment, so as to realize the circulation of reactor coolant in one loop. The straight pipe section on one side of the inner sleeve 102 is mechanically connected with the guide annular cavity assembly 106, and the other side is in a socket-and-socket fit with the equipment elbow. The pressurizer 40 is connected to the hot section annular cavity of the steam generator 20 through a surge tube 400. The main equipment is installed on the main equipment bracket 50 through an external support key.
[0052] It should be noted that the reactor primary-loop main equipment assembled by the reactor primary-loop main equipment installation method of the present invention is basically the same in structure as the existing reactor primary-loop main equipment, except for the specific installation process. Therefore, this manual will not further describe in detail the various equipment or specific components involved in the reactor primary-loop main equipment.
[0053] In combination with the above detailed description of the implementation mode of the present invention, it can be seen that, compared with the prior art, in the installation method of the reactor primary loop main equipment of the present invention, the reactor pressure vessel 10 and the in-core components 104, the inner sleeve 102, the steam generator 20, and the main pump casing are pre-assembled into a container module in the equipment assembly plant, and the reactor pressure vessel top cover, the control rod drive mechanism 110, and the stack top structure 108 are pre-assembled into a stack top module in the equipment assembly plant, and then the container module and the stack top module are transported to the installation site to complete the final installation. This can not only make full use of the existing plant conditions of the equipment assembly manufacturer and improve the installation accuracy and efficiency, but also overcome the problem that the reactor primary loop main equipment cannot be independently installed at a site with limited installation space, and is particularly suitable for the installation of compact reactor primary loop main equipment.
[0054] According to the above principles, the present invention can also make appropriate changes and modifications to the above embodiments. Therefore, the present invention is not limited to the specific embodiments disclosed and described above, and some modifications and changes to the present invention should also fall within the scope of protection of the claims of the present invention. In addition, although some specific terms are used in this specification, these terms are only for the convenience of description and do not constitute any limitation to the present invention.
Claims
1. A method for installing primary equipment of a reactor primary circuit, characterized in that: The following steps are involved: S1) pre-assembling the reactor pressure vessel and the reactor internals, the inner sleeve, the steam generator, and the main pump casing into a container module, and pre-assembling the reactor pressure vessel top cover, the control rod drive mechanism, and the reactor top structure into a reactor top module, wherein the pre-assembling of the container module comprises: sequentially hoisting the reactor pressure vessel, the main pump casing, and the steam generator onto an adjustment stand and adjusting their positions, then butt-welding the steam generator and the reactor pressure vessel pipe nozzle, butt-welding the main pump pipe nozzle and the reactor pressure vessel pipe nozzle, and cladding the inner wall of the pipe nozzle with stainless steel; S2) Install the main equipment bracket and stabilizer bracket; S3) hoisting the container module onto the main equipment support, adjusting the position of the container module, and installing the container module on the main equipment support; and S4) installing a pressurizer on the pressurizer bracket, connecting a main pump motor and hydraulic components to a pump casing of the main pump, and installing the stack top module on the container module.
2. The method for installing the primary circuit main equipment of a reactor according to claim 1, characterized in that: Step S1) In the pre-assembled container module, before the lower head of the reactor pressure vessel is welded, the guide ring cavity assembly is hoisted into the reactor pressure vessel for initial fixation.
3. The method for installing the primary circuit main equipment of a reactor according to claim 2, characterized in that: When welding the container module, the guide ring cavity assembly is lowered to the bottom of the reactor pressure vessel and fixed.
4. The method for installing the primary circuit main equipment of a reactor according to claim 1, characterized in that: Step S1) pre-assembling the container module includes: hanging the inner sleeve into the reactor pressure vessel for trial installation, measuring the axial and circumferential positions, performing processing and repair, and installing sealing components.
5. The method for installing the primary circuit main equipment of a reactor according to claim 1, characterized in that: Step S1) pre-assembling the container module includes: splitting the in-core shielding assembly outside the reactor pressure vessel into individual shielding blocks, the shielding blocks are sequentially hoisted into the reactor pressure vessel and assembled into a whole inside the reactor pressure vessel, and then fixedly connected to the upper and lower parts of the reactor pressure vessel respectively through supporting key pins.
6. The method for installing the primary circuit main equipment of a reactor according to claim 1, characterized in that: Step S1) In the pre-assembled container module, the internals include an upper internal and a lower internal. First, the lower internal is hoisted for several times to complete the gap repair and measurement at the basket outlet nozzle and the lower radial support key, and the installation of the lower internal is completed. Then, the upper internal is hoisted for several times to complete the alignment of the upper and lower internals and the inspection of the relevant gap distances, and then the installation of the internal is completed.
7. The method for installing the primary circuit main equipment of a reactor according to claim 1, characterized in that: Step S1) pre-assembling the reactor top module includes: installing the control rod drive mechanism on the reactor pressure vessel top cover, and installing the central part insulation layer on the reactor pressure vessel top cover in conjunction with the reactor top structure ventilation enclosure on the reactor pressure vessel top cover.
8. The method for installing the primary circuit main equipment of a reactor according to claim 1, characterized in that: Step S4) The voltage stabilizer installation includes: hoisting the upper horizontal support of the voltage stabilizer to the installation position and welding it to fix it, installing a skirt adjustment plate on the voltage stabilizer bracket, hoisting the voltage stabilizer to the installation position, and locking and connecting the voltage stabilizer and the voltage stabilizer bracket with bolts.
9. The method for installing the primary circuit main equipment of a reactor according to claim 8, characterized in that: Step S4) The installation of the pressurizer further includes: pre-installing and connecting multiple sections of surge pipes on the pressurizer, and welding and water pressure testing the surge pipes themselves after fitting the length of the pipe sections according to the distance between the steam generator and the pressurizer. After the water pressure test is passed, the surge pipes are respectively welded and connected to the pressurizer and the hot section nozzle of the steam generator.