Material tray flow control method and equipment

Through the automatic control system and machine operation, the automatic and orderly flow of pallets is realized, which solves the problems of inefficiency and confusion caused by manual handling and improves production efficiency and accuracy.

CN114275486BActive Publication Date: 2024-10-22INDUSTICS COM
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202111591777.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-12-23
Publication Date
2024-10-22
Estimated Expiration
2041-12-23

AI Technical Summary

Technical Problem

In the existing technology, the operation of pallets relies on manual handling, which is subjective and inefficient. It is especially difficult to control in complex situations, resulting in inefficient operation of material pallets between processes and easily causing confusion.

Method used

Using the pallet flow control method and equipment, the control system issues pallet transfer instructions, detects the status of the work station, automatically controls the pallet flow speed and temporary storage station, and uses machine operation to replace manual handling to achieve automatic and orderly transfer of pallets.

Benefits of technology

It improves the speed and production efficiency of materials moving between workstations, reduces the labor intensity of operators, and improves the efficiency and accuracy of pallet operation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114275486B_ABST
    Figure CN114275486B_ABST
Patent Text Reader

Abstract

The present disclosure provides a method for controlling the flow of pallets with materials, comprising: a control system sends a pallet transfer instruction to a first station; the first station receives the instruction and pushes the pallet into a transmission device; the control system detects the state of the second station, and if the second station is in a state of material, the control system controls the pallet to transfer to a temporary storage station; if the second station is in an empty state, the control system controls the pallet to transfer to the second station; the second station receives the pallet; the second station sends a feedback signal to the control system, and the pallet transfer is completed. The present disclosure also provides a device for controlling the flow of pallets with materials, comprising: a pallet, a station, a feedback device arranged on the station, a transmission device arranged between the stations, and a control device. The pallet flow control method and system disclosed in the present disclosure utilize machine operation to replace manual handling, thereby reducing the labor intensity of personnel and improving the efficiency and accuracy of pallet operation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present disclosure relates to the field of intelligent processing, and in particular to a method and device for controlling the flow of a pallet with material. Background Art

[0002] Pallet is a medium that transforms static goods into dynamic goods, a movable cargo platform. In actual production and processing, pallet operation can not only significantly improve the loading and unloading effect, but its implementation has also changed the form of warehouse buildings, the structure of ships, the loading and unloading facilities of railways and other modes of transportation, and the management organization. With the increasing sophistication of production equipment, the increasing degree of automation, the increasing planning of production and the gradual advancement of management methods, the work of handling between processes and supplying materials and semi-finished products to the production line has become increasingly important. Pallet operation is an effective means to quickly improve handling efficiency and order the material flow process.

[0003] However, in the prior art, the movement of pallets mostly relies on manual handling or manually controlled mechanical handling. The manual participation method is highly subjective and the manual judgment time is relatively long, resulting in low efficiency in the operation of material pallets between processes. When encountering complex situations, it is more likely to cause confusion, and its operation is even more difficult to control. Summary of the invention

[0004] In view of this, the purpose of the present invention is to propose a method for controlling the flow of pallets with materials, which can intelligently regulate the production and processing of the entire production line, realize the automatic and orderly flow of pallets with materials, increase the speed of material movement between workstations, and improve production efficiency.

[0005] The purpose of the present disclosure is to provide a material pallet flow control device, which utilizes machine operation to replace manual handling, reduces the labor intensity of operators, and improves production efficiency.

[0006] Based on the above objectives, the present disclosure provides a method for controlling the flow of a pallet with material, comprising:

[0007] The control system issues a tray transfer command to the first station;

[0008] The first station receives the instruction and pushes the tray into the transmission device;

[0009] The control system detects the state of the second station. If the second station is in a state of having material, the control system controls the pallet flow speed and / or controls the pallet to be transferred to the temporary storage station; if the second station is in a state of having no material, the control system controls the pallet to be transferred to the second station;

[0010] The second station receives the pallet;

[0011] The second station sends a feedback signal to the control system, and the pallet flow is completed.

[0012] Furthermore, the first station receives the instruction and the step of pushing the tray into the transmission device includes:

[0013] The first station receives a pallet transfer out instruction from the control system;

[0014] The first station confirms whether the pallet can be transferred out;

[0015] If the first station confirms that it can be transferred out, the tray is pushed into the transmission device, and a tray transfer completion signal is returned to the control system;

[0016] If the first station confirms that the pallet cannot be transferred out, the first station returns the information that the pallet cannot be transferred out to the control system, solves the factors that make the pallet cannot be transferred out, and waits for the control system to issue a pallet transfer instruction again;

[0017] Repeat the above steps until the first station tray is rotated out.

[0018] Furthermore, the control system controls the pallet flow speed and / or controls the pallet to be transferred to a temporary storage station, including:

[0019] The second station is in a state of having material and cannot receive the pallet, and the second station feeds back a signal that it cannot receive the pallet to the control system;

[0020] The control system receives a signal from the second station indicating that the pallet cannot be received, and controls the transmission device to enter a slow-moving state and move toward the temporary storage station or the second station;

[0021] or,

[0022] The control system receives a signal from the second station indicating that the pallet cannot be received, and controls the transmission mechanism to enter a fast-moving state and move toward the temporary storage station.

[0023] Furthermore, the method for controlling the flow of the pallet with material also includes the step of transferring the pallet with material from the temporary storage station:

[0024] The control system detects that the second station is in an empty material state and the processing task of the first station is not completed, and the control system controls the temporary storage station pallet to be transferred to the second station;

[0025] The control system detects that the second station is in an empty material state and the processing task of the first station has been completed. The control system controls the pallet of the temporary storage station to be transferred to the second station first, and the pallet of the first station enters the temporary storage station and waits for the next operation;

[0026] or,

[0027] The control system detects that the second station is in an empty state and the processing task of the first station has been completed. The control system controls the pallet of the first station to be transferred to the second station first.

[0028] Furthermore, the method for controlling the flow of pallets with materials also includes the step that after the second station receives the pallet, the second station calls the process information to adjust the shape of the pallet:

[0029] After receiving the pallet, the second station sends a process information call request signal to the control system;

[0030] The control system receives a process information calling request signal sent by the second workstation, and sends process information to the second workstation;

[0031] The second station receives the process information, analyzes the optimal processing shape of the pallet, and adjusts the shape of the pallet;

[0032] The second workstation sends a feedback signal indicating that the tray reception is completed to the control system.

[0033] Based on the same inventive concept, the present disclosure also provides a material tray flow control device, including:

[0034] Pallet, a platform for placing materials;

[0035] At least three workstations for processing materials on pallets and temporarily storing pallets;

[0036] A feedback device provided on the workstation, used to feed back processing information of the workstation and the real-time status of the pallet;

[0037] A transmission device disposed between the workstations, used to receive commands from the control device to realize the flow of pallets between different workstations;

[0038] The control device is used to control the workstation and the transmission device, determine whether the pallet is circulated, and determine the flow direction of the pallet.

[0039] Furthermore, the workstation is configured as follows:

[0040] Receiving a pallet transfer instruction or a pallet receiving instruction issued by a control device;

[0041] After receiving the instruction, confirm whether the pallet transfer or receiving conditions are met;

[0042] If the pallet transfer or receiving conditions are met, the pallet is pushed out to the transmission device or received from the transmission device, and a pallet transfer completion or pallet receiving completion signal is returned to the control device; after receiving the pallet, the pallet shape is adjusted to facilitate processing;

[0043] If the pallet transfer or receiving conditions are not met, a signal is returned to the control device to resolve the factors that do not meet the pallet transfer or receiving conditions, and wait for the control device to issue a pallet transfer instruction or a pallet receiving instruction again.

[0044] Further, the control device is configured to:

[0045] Receive production plans and generate production instructions;

[0046] Issue production instructions to pallets, workstations and transmission devices;

[0047] Receive feedback signals from processing pallets, workstations and transmission devices in real time, and control material processing and pallet operation processes in combination with production data;

[0048] Provide real-time feedback of production progress data and display it to administrators.

[0049] Further, the transmission device is configured as follows:

[0050] Receive instructions from the control device and translate them into executable commands internally;

[0051] Receive the pallet at the designated station according to the instruction, and send a pallet receiving completion signal to the control device after receiving the pallet;

[0052] The pallet is transferred to the designated workstation according to the instructions, and a pallet transfer completion signal is sent to the control device.

[0053] Furthermore, the tray comprises:

[0054] A driving mechanism drives the pallet to move at a specified speed between workstations along a specified path according to the instructions of the control device;

[0055] The data transmission mechanism receives the instruction from the control device and sends a feedback signal to the control device.

[0056] It can be seen from the above that the technical solution provided by the present disclosure has the following significant beneficial effects:

[0057] The disclosed method for controlling the flow of pallets with materials can intelligently regulate the production and processing of the entire production line, realize the automatic and orderly flow of pallets with materials, increase the speed of material movement between workstations, and improve production efficiency.

[0058] The material pallet circulation control device disclosed in the present invention utilizes machine operation to replace manual handling, thereby reducing the labor intensity of operators and improving the efficiency and accuracy of pallet operation. BRIEF DESCRIPTION OF THE DRAWINGS

[0059] In order to more clearly illustrate the technical solutions in the present disclosure or related technologies, the drawings required for use in the embodiments or related technical descriptions are briefly introduced below. Obviously, the drawings described below are only embodiments of the present disclosure. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0060] Figure 1 It is a flow chart of a method for controlling the flow of a pallet with materials according to an embodiment of the present disclosure;

[0061] Figure 2 It is a schematic diagram of a material tray flow control device according to an embodiment of the present disclosure;

[0062] Figure 3 A flow chart of transferring a pallet from a workstation according to an embodiment of the present disclosure;

[0063] Figure 4 This is a flow chart of transferring a pallet into a workstation according to an embodiment of the present disclosure. DETAILED DESCRIPTION

[0064] In order to make the objectives, technical solutions and advantages of the present disclosure more clearly understood, the present disclosure is further described in detail below in combination with specific embodiments and with reference to the accompanying drawings.

[0065] It should be noted that, unless otherwise defined, the technical terms or scientific terms used in the embodiments of the present disclosure should be understood by people with ordinary skills in the field to which the present disclosure belongs. The "first", "second" and similar words used in the embodiments of the present disclosure do not indicate any order, quantity or importance, but are only used to distinguish different components. "Including" or "comprising" and similar words mean that the elements or objects appearing before the word cover the elements or objects listed after the word and their equivalents, without excluding other elements or objects. "Connect" or "connected" and similar words are not limited to physical or mechanical connections, but can include electrical connections, whether direct or indirect. "Up", "down", "left", "right" and the like are only used to indicate relative positional relationships. When the absolute position of the described object changes, the relative positional relationship may also change accordingly.

[0066] In order to solve the problem that the pallet cannot be automatically circulated during production, a method for controlling the circulation of a pallet with material is proposed in the present disclosure. The process is as follows: Figure 1 As shown, it includes: the control system sends a tray transfer instruction to the first station;

[0067] The first station receives the instruction and pushes the tray into the transmission device;

[0068] The control system detects the state of the second station. If the second station is in a state of having material, the control system controls the pallet flow speed and / or controls the pallet to be transferred to the temporary storage station; if the second station is in a state of having no material, the control system controls the pallet to be transferred to the second station;

[0069] The second station receives the pallet;

[0070] The second station sends a feedback signal to the control system, and the pallet flow is completed.

[0071] The present invention discloses a control system to automatically control the flow path of the pallets with materials, combines the information equipment of each workstation, communicates data information in real time, gets rid of manual intervention, and reduces the burden on personnel; the intelligent control also makes the flow faster, improving the efficiency of the flow of pallets with materials.

[0072] In the present disclosure, the issuance and reception of instructions may be transmitted in the form of digital signals or electrical signals.

[0073] Specifically, the above-mentioned method for controlling the flow of pallets with materials includes: the control system sends a digital signal to the first workstation to give an instruction for the pallet to be turned out.

[0074] The first station receives the instruction, converts the instruction into an executable command, starts the internal device of the station, and pushes the pallet into the transmission device. In this step, multiple PLCs are arranged inside the first station, and the PLC receives the instruction issued by the control system and translates the instruction into a recognizable command. After the PLC recognizes the command, it sends a signal to control the operation of the station device according to the instruction, completes the instruction action, and transfers the pallet into the transmission device. After the internal device of the station completes the action, it returns a feedback signal of the completion of the action to the PLC. After the PLC receives the feedback signal that all actions are successfully completed, the PLC returns a task completion signal to the control system. Through the real-time data interaction between the control system and the PLC in the first station, the control system can detect the station status in real time.

[0075] Since the first station and the second station have different processing tasks to complete and different time to complete the processing tasks, it is uncertain whether there is material in the second station when the first station transfers out the pallet. Therefore, before the pallet is transferred to the second station, the control system needs to detect the status of the second station to confirm whether the second station meets the conditions for the pallet to be transferred in.

[0076] The control system sends a station status detection signal to the second station. After the PLC inside the second station receives the signal, the control station internal sensor starts to detect whether the station is in a state with material or a state without material. The sensor detects that the second station is in a state with material, and the sensor feeds back a signal to the PLC that the station is in a state with material. The PLC sends a feedback signal to the control system that the station is in a state with material and cannot receive the pallet transfer. The control system controls the transportation speed of the pallet and / or transfers the pallet to a temporary storage station; the sensor detects that the second station is in a state without material, and the sensor feeds back a signal to the PLC that the station is in a state without material. The PLC sends a feedback signal to the control system that the station is in a state without material and can receive the pallet transfer. After receiving the feedback, the control system controls the pallet to transfer to the second station; the second station receives the pallet, and the second station performs subsequent processing.

[0077] After receiving the pallet at the second workstation, a Done transport end signal needs to be sent to the control system to end the transport and complete the pallet flow.

[0078] The above-mentioned method for controlling the flow of pallets with materials can realize the automatic operation of pallets on the production line, use the control system to detect and control the production line, and unify the scheduling, thereby reducing the labor intensity of the staff and improving work efficiency.

[0079] In order to enable the first station to automatically push the tray into the transmission device more smoothly, in a further embodiment, the first station receives an instruction and the step of pushing the tray into the transmission device includes:

[0080] The first station receives a pallet transfer out instruction from the control system;

[0081] The first station confirms whether the pallet can be transferred out;

[0082] If the first station confirms that it can be transferred out, the tray is pushed into the transmission device, and a tray transfer completion signal is returned to the control system;

[0083] If the first station confirms that the pallet cannot be transferred out, the first station returns the information that the pallet cannot be transferred out to the control system, solves the factors that make the pallet cannot be transferred out, and waits for the control system to issue a pallet transfer instruction again;

[0084] Repeat the above steps until the first station tray is rotated out.

[0085] Specifically, after the first workstation receives the pallet transfer signal sent by the control device, the first workstation needs to confirm whether the pallet meets the pallet transfer condition. The basis for judging the pallet transfer condition is whether the processing task of the first workstation is completed. If the processing task is completed, it can be transferred out. If the processing task is not completed, it cannot be transferred out and waits for the next transfer. Before transferring the pallet, the control system determines whether the pallet meets the transfer condition. This step can prevent the transfer of pallets with unfinished processing tasks, avoid the interruption of processing tasks, resulting in the need for secondary processing of products or direct scrapping of products, and reduce processing efficiency.

[0086] In a feasible implementation manner, the control system controls the pallet flow speed and / or controls the pallet to be transferred to a temporary storage station, including:

[0087] The second station is in a state of having material and cannot receive the pallet, and the second station feeds back a signal that it cannot receive the pallet to the control system;

[0088] The control system receives a signal from the second station indicating that the pallet cannot be received, and controls the transmission device to enter a slow-moving state and move toward the temporary storage station or the second station;

[0089] or,

[0090] The control system receives a signal from the second station indicating that the pallet cannot be received, and controls the transmission mechanism to enter a fast-moving state and move toward the temporary storage station.

[0091] Since the processing time required for the first station and the second station is different, there is often a time difference between the first station transferring the pallet out and the second station receiving the pallet. The pallet can be moved between the first station and the second station by extending the transfer time on the transfer device or transferring the pallet to the temporary storage station, or by combining the two, to offset the time difference between the stations.

[0092] When the pallet has been transferred from the first station to the transmission device, and the second station is in a state of having material and cannot receive the pallet, the second station sends a feedback signal to the control system indicating that the pallet cannot be received. After receiving the feedback signal from the second station, the control system controls the transmission device to operate in a slow-moving state, thereby increasing the transportation time of the pallet on the transmission mechanism.

[0093] In a parallel implementation, the control system controls the transmission device to enter a fast-moving state and move to the temporary storage station, thereby improving the operating efficiency of the transmission device and avoiding excessive pallets on the transmission device, which may cause congestion on the production line. The control device controls the pallet to be transferred to the temporary storage station, and after the second station is vacant, the pallet is transferred from the temporary storage station to the second station for processing.

[0094] In a feasible implementation manner, the method for controlling the flow of loaded pallets further includes the step of transferring the loaded pallets at the temporary storage station:

[0095] The control system detects that the second station is in an empty material state and the processing task of the first station is not completed, and the control system controls the temporary storage station pallet to be transferred to the second station;

[0096] The control system receives a signal from the second station indicating that the pallet cannot be received, and controls the transmission device to enter a slow-moving state and move toward the temporary storage station or the second station;

[0097] or,

[0098] The control system receives a signal from the second station indicating that the pallet cannot be received, and controls the transmission mechanism to enter a fast-moving state and move toward the temporary storage station.

[0099] Specifically, in this embodiment, several temporary storage stations are provided on the production line. The processing time required for each process is different. When transferring from the first station to the second station, it cannot be guaranteed that the second station is always in a state where there is no pallet and can directly receive a new pallet. Therefore, several temporary storage stations are provided as a buffer to prevent the accumulation of pallets on the transport device, while ensuring the connection between the two actions of completing the processing task, transferring out the pallet, and receiving the next pallet. When the pallet of the second station is transferred out and is in an empty state, the control system controls the transfer of the pallet. If the pallet of the first station is being processed and cannot be transferred out, the control system controls the transfer of the pallet of the temporary storage station to the second station. If the pallets of multiple temporary storage stations can be transferred to the second station, the transfer order of the pallets is determined according to the time when the pallets enter the temporary storage station, and the pallets that are transferred into the temporary storage station first are transferred out of the temporary storage station and enter the second station first.

[0100] If the pallet at the first station is processed and confirmed to be transferred to the second station, and the temporary storage station also has pallets that can be transferred to the second station, it involves the priority judgment of the first station pallet and the temporary storage station pallet to the second station. Optionally, the control system can transfer the first station pallet to the second station first, or transfer the temporary storage station pallet to the second station.

[0101] In a further embodiment, the method for controlling the flow of pallets with materials further includes the step of the second station calling process information to adjust the shape of the pallet after the second station receives the pallet:

[0102] After receiving the pallet, the second station sends a process information call request signal to the control system;

[0103] The control system receives a process information calling request signal sent by the second workstation, and sends process information to the second workstation;

[0104] The second station receives the process information, analyzes the optimal processing shape of the pallet, and adjusts the shape of the pallet;

[0105] The second workstation sends a feedback signal indicating that the tray reception is completed to the control system.

[0106] Specifically, in actual production, a production line is equipped with multiple workstations, and due to different products and production plans, the process information of different workpieces at different workstations is different. In order to reduce the error rate during processing and ensure the continuation of production activities, the workstations need to update the process information in real time. After the second workstation receives the pallet, it sends a process information call request signal to the control system, calls the process information of the current pallet, and performs processing and production based on this. After receiving the signal from the second workstation, the control system sends the process information to the second workstation based on the processing status of the pallet at the second workstation and the production plan.

[0107] After receiving the process information, the second station displays the relevant information to the staff. In actual processing, the processing position of the staff is fixed, but the size of the materials on the pallet is different, and the placement direction is also different. In addition, during the processing, the same material needs to be processed at different positions, which requires the staff to manually adjust the pallet according to the processing requirements to find the shape of the pallet that is convenient for processing. There are certain safety hazards and the manual adjustment is inefficient. In this embodiment, the station can control the pallet to rise and fall in a direction perpendicular to the workbench. The station can also control the pallet to be lifted separately on all sides, so that an angle is formed between the pallet and the plane of the workbench, so that the pallet is tilted; such as tilting forward 5-45 degrees, which is convenient for processing the pallet with materials. At the same time, the station can control the pallet to rotate on the workbench; such as rotating up to 180 degrees, so that the workers can work efficiently and effectively in the right position. The original shape of the pallet when it is transferred to the second station is not necessarily the optimal processing shape, and the second station needs to adjust the shape of the pallet. After receiving the process information, the second station analyzes the optimal processing shape of the pallet in combination with the processing position of the staff. Taking the position of the staff as the reference point, find the most convenient tilt angle, rotation angle and processing height of the pallet for the staff to process.

[0108] After determining the optimal processing shape of the pallet, the detection device on the workstation is activated to detect the original shape of the pallet, and the pallet is adjusted to the optimal processing shape by adjusting the direction and angle of the pallet. After the pallet shape adjustment is completed, the second workstation sends a pallet processing completion signal to the control system.

[0109] Based on the same inventive concept, corresponding to any of the above-mentioned embodiments and methods, the present disclosure also provides the following Figure 4 As shown, a material tray flow control system includes:

[0110] The control module controls the flow of pallets and adjusts the pallet operation process according to the feedback signals received in real time;

[0111] The transmission module realizes the flow of pallets between workstations according to the received instructions, and feeds back the flow information to the control module in real time;

[0112] The receiving module receives and transfers out the pallet according to the instructions issued by the control module, and interacts with the control module in real time to feedback the receiving and transferring process information.

[0113] For the convenience of description, the above system is described by dividing the functions into various modules. Of course, when implementing the present disclosure, the functions of each module can be implemented in the same or multiple software and / or hardware.

[0114] The device of the above-mentioned embodiment is used to implement the corresponding material tray flow control method in any of the above-mentioned embodiments, and has the beneficial effects of the corresponding method embodiments, which will not be repeated here.

[0115] Based on the same inventive concept, corresponding to any of the above-mentioned embodiments and methods, the present disclosure also provides the following Figure 2 An embodiment of a material tray flow control device shown includes:

[0116] Pallet, a platform for placing materials;

[0117] At least three workstations are used to process the materials on the pallet and temporarily store the pallet. This embodiment includes a first workstation 101, a second workstation 102, and a temporary storage workstation 103;

[0118] A feedback device provided on the workstation, used to feed back processing information of the workstation and the real-time status of the pallet;

[0119] The transmission device 104 disposed between the workstations is used to receive commands from the control device 105 to realize the flow of the pallet between different workstations;

[0120] The control device 105 is used to control the workstation and the transmission device 104, determine whether the tray is circulated, and determine the circulation direction of the tray.

[0121] In this embodiment, the pallet is a movable loading platform for carrying materials; the control device controls the flow of the pallet between workstations, thereby realizing the flow of materials between workstations, eliminating the need for manual handling of materials, reducing the labor intensity of operators, and improving product processing efficiency.

[0122] The workstation is the basic production unit, where personnel, equipment, raw materials and tools are arranged for production and assembly. One workstation completes one process, and by splitting and refining the process and rationally designing the distribution of workstations, processing efficiency can be improved.

[0123] In a further embodiment, the workstation is configured as follows:

[0124] Receiving a tray transfer instruction or a tray receiving instruction issued by the control device 105;

[0125] After receiving the instruction, confirm whether the pallet transfer or receiving conditions are met;

[0126] If the pallet transfer or receiving conditions are met, the pallet is pushed out to the transmission device 104 or received from the transmission device 104, and a pallet transfer completion or pallet receiving completion signal is returned to the control device 105; after receiving the pallet, the pallet shape is adjusted to facilitate processing;

[0127] If the tray transfer out or receiving condition is not met, a signal is returned to the control device 105 to resolve the factors that do not meet the tray transfer out or receiving condition, and wait for the control device 105 to issue a tray transfer out instruction or a tray receiving instruction again.

[0128] like Figure 3 As shown, the specific operation of transferring the pallet out of the workstation includes: the workstation receives the signal sent by the control device 105, the workstation pallet lifting cylinder rises, the workstation middle position lifting cylinder rises, and the workstation middle position left blocking cylinder rises; at the same time, the detection device set inside the workstation starts to work, the workstation pallet lifting cylinder rises to the position signal ON, the middle position lifting cylinder rises to the position signal ON, and the workstation middle position left blocking cylinder rises to the position signal ON; after the internal detection device of the workstation sends various in-position signals, the workstation conveying motor starts in reverse rotation, and the motor corresponding to the workstation middle position starts in forward rotation; at the same time, the workstation pallet detection in-position signal OFF, the workstation middle position pallet left detection in-position signal ON, and the workstation middle position pallet right detection in-position signal ON; thereafter, the workstation conveying motor is reversed and turned off, and the motor corresponding to the middle position is turned off in forward rotation; after 0.5s, the workstation middle position left blocking cylinder descends, and the workstation corresponding main conveying blocking cylinder rises; at the same time, the middle position left blocking cylinder descends to the position signal ON, and the workstation corresponding main conveying blocking cylinder rises to the position ON; at the same time, the conveying chain motor on the transmission device 104 starts in forward rotation, and the pallet leaves the workstation.

[0129] like Figure 4 As shown, the specific operation content of receiving the pallet at the workstation includes: receiving the control information sent by the control device 105, the pallet sensor 1 corresponding to the middle position of the workstation is in place ON, and the pallet sensor 2 corresponding to the middle position of the workstation is in place ON; the lifting cylinder corresponding to the middle position of the workstation rises, and the lifting cylinder of the workstation rises; at the same time, the lifting cylinder corresponding to the middle position of the workstation rises in place ON, and the lifting cylinder of the workstation rises ON; the motor corresponding to the middle position of the workstation starts forward, and the workstation motor starts forward; at the same time, the pallet detection in place signal of the workstation is ON; the motor corresponding to the middle position of the workstation is turned off in the forward direction, and the workstation motor is turned off in the forward direction; after 0.5s, the lifting cylinder corresponding to the middle position of the workstation descends, and the lifting cylinder of the workstation descends; the lifting cylinder corresponding to the middle position of the workstation descends in place signal ON, and the lifting cylinder of the workstation descends in place signal ON; the process of receiving the pallet at the workstation is completed, and a Done signal is sent to the control device 105.

[0130] In a further specific embodiment, the control device 105 is configured to:

[0131] Receive production plans and generate production instructions;

[0132] Sending production instructions to the pallet, workstation and transmission device 104;

[0133] Receive feedback signals from processing trays, workstations and transmission devices 104 in real time, and control material processing and tray operation processes in combination with production data;

[0134] Provide real-time feedback of production progress data and display it to administrators.

[0135] The control device 105 coordinates the entire production line and can serve as a window for the production line to connect with the outside world, more intuitively reflecting the operating status of the entire production line and facilitating management personnel to quickly grasp the operating status of the production line.

[0136] Specifically, during the production process, the control device 105 detects the entire production line in real time and displays the production line status to the management personnel, helping the management personnel to intuitively understand the operation status of the production line and make immediate adjustments. When production adjustments are required, the staff can directly input and modify information through the input device.

[0137] In a further embodiment, the transmission device 104 is configured to:

[0138] Receive instructions from the control device 105 and translate them into executable commands internally;

[0139] Receive the pallet at the designated station according to the instruction, and send a pallet receiving completion signal to the control device 105 after receiving the pallet;

[0140] The tray is transferred to the designated workstation according to the instruction, and a tray transfer completion signal is sent to the control device 105 .

[0141] The transmission device 104 ensures that the pallets can be directly and efficiently transferred between different workstations, thereby improving production efficiency.

[0142] In a feasible implementation manner, the workstation and the transmission device 104 are also provided with an error reporting module, which immediately reports error information to the control device 105 when an error occurs in the operation of the tray.

[0143] Specifically, in this embodiment, the triggering method of the error reporting module is a triggering method that combines system triggering and manual triggering. On the one hand, regarding the handling of emergencies on the production line. The device 105 monitors the operating status of the entire production line in real time. If the material on the pallet slips or the pallet deviates from the track on the transmission device 104, the sensor on the production line immediately transmits a signal to the control device 105, and the control device 105 sends a notification signal to the management personnel and shuts down the production line. On the other hand, regarding the handling of product processing errors. If the personnel on the production line find that an error has occurred in the processing of the preceding process during the processing, the error reporting module is triggered at the workstation, and the pallet is transferred back to the preceding workstation, or the workpiece to be processed is classified as scrap and arranged to be offline. The setting of the error reporting module can effectively handle emergencies on the production line and increase the safety of production activities.

[0144] In a further embodiment, the tray comprises:

[0145] A driving mechanism, according to the instruction of the control device 105, drives the tray to move between the workstations along a specified path at a specified speed;

[0146] The data transmission mechanism receives the instruction from the control device 105 and sends a feedback signal to the control device 105 .

[0147] Specifically, during production and processing, a driving mechanism can be installed on the pallet to drive the pallet to operate on the production line. The operation of the pallet no longer relies on the transmission device 104, but directly receives the command of the control device 105 to circulate between workstations, so that multiple pallets can operate at the same time, thereby improving the operation efficiency.

[0148] All articles and references disclosed in this disclosure, including patent applications and publications, are incorporated herein by reference for various purposes. The term "consisting essentially of ... " describing a combination should include determined elements, compositions, parts or steps and other elements, compositions, parts or steps that do not substantially affect the basic novel features of the combination. The combination of elements, compositions, parts or steps described here using the terms "comprising" or "including" also contemplates the implementation method consisting essentially of these elements, compositions, parts or steps. Here, by using the term "may", it is intended to illustrate that any attribute described that "may" includes is optional. Multiple elements, compositions, parts or steps can be provided by a single integrated element, composition, part or step. Alternatively, a single integrated element, composition, part or step can be divided into separate multiple elements, compositions, parts or steps. The disclosure "one" or "one" used to describe an element, composition, part or step is not said to exclude other elements, compositions, parts or steps.

[0149] Each embodiment in this specification is described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the embodiments can be referred to each other. The above embodiments are only for illustrating the technical concept and features of the present disclosure, and their purpose is to enable people familiar with this technology to understand the content of the present disclosure and implement it accordingly, and they cannot be used to limit the scope of protection of the present disclosure. Any equivalent changes or modifications made according to the spirit of the present disclosure should be included in the scope of protection of the present disclosure.

Claims

1. A method for controlling the flow of a tray with material, comprising: The control system issues a tray transfer command to the first station; The first station receives the instruction and pushes the tray into the transmission device; The control system detects the state of the second station. If the second station is in a state of having material, the control system controls the pallet flow speed and / or controls the pallet to be transferred to the temporary storage station; if the second station is in a state of having no material, the control system controls the pallet to be transferred to the second station; The second station receives the pallet; The second station sends a feedback signal to the control system, and the pallet flow is completed; The method for controlling the flow of pallets with materials also includes the step of the second station calling process information to adjust the shape of the pallet after the second station receives the pallet: After receiving the pallet, the second station sends a process information call request signal to the control system; The control system receives a process information calling request signal sent by the second workstation, and sends process information to the second workstation; The second station receives the process information, analyzes the optimal processing form of the pallet, and adjusts the pallet form; including: taking the position of the staff as a reference point, finding the inclination angle, rotation angle, and processing height of the pallet that are most convenient for the staff to process; The second station sends a feedback signal indicating that the tray reception is completed to the control system; The first station and the second station have different processing tasks to complete and different times to complete the processing tasks. When the first station transfers out the pallet, it is uncertain whether the second station has materials. The processing time required by the first station is different from that of the second station, and there is a time difference between the first station transferring out the pallet and the second station receiving the pallet; The steps of the control system controlling the pallet circulation speed and / or controlling the pallet to be transferred to the temporary storage station include: The second station is in a state of having material and cannot receive the pallet, and the second station feeds back a signal that it cannot receive the pallet to the control system; The control system receives a signal from the second station indicating that the pallet cannot be received, and controls the transmission device to enter a slow-moving state and move toward the temporary storage station or the second station; or, The control system receives a signal from the second station indicating that the pallet cannot be received, and controls the transmission device to enter a fast-moving state and move toward the temporary storage station; The method for controlling the flow of pallets with materials also includes the step of transferring the pallets with materials from the temporary storage station: The control system detects that the second station is in an empty material state and the processing task of the first station is not completed, and the control system controls the temporary storage station pallet to be transferred to the second station; The control system detects that the second station is in an empty material state and the processing task of the first station has been completed. The control system controls the pallet of the temporary storage station to be transferred to the second station first, and the pallet of the first station enters the temporary storage station and waits for the next operation; or, The control system detects that the second station is in an empty state and the processing task of the first station has been completed. The control system controls the pallet of the first station to be transferred to the second station first.

2. The method for controlling the flow of pallets with materials according to claim 1, characterized in that: The first station receives the instruction and pushes the tray into the transmission device, comprising: The first station receives a pallet transfer out instruction from the control system; The first station confirms whether the pallet can be transferred out; If the first station confirms that it can be transferred out, the tray is pushed into the transmission device, and a tray transfer completion signal is returned to the control system; If the first station confirms that the pallet cannot be transferred out, the first station returns the information that the pallet cannot be transferred out to the control system, solves the factors that make the pallet cannot be transferred out, and waits for the control system to issue a pallet transfer instruction again; Repeat the above steps until the first station tray is rotated out.

3. A material tray flow control device, used to execute the material tray flow control method according to any one of claims 1-2, characterized in that: include: Pallet, a platform for placing materials; At least three workstations for processing materials on pallets and temporarily storing pallets; A feedback device provided on the workstation, used to feed back processing information of the workstation and the real-time status of the pallet; A transmission device disposed between the workstations, used to receive commands from the control device to realize the flow of pallets between different workstations; The control device is used to control the workstation and the transmission device, determine whether the pallet is circulated, and determine the flow direction of the pallet.

4. The material tray flow control device according to claim 3 is characterized in that: The workstations are configured as follows: Receiving a pallet transfer instruction or a pallet receiving instruction issued by a control device; After receiving the instruction, confirm whether the pallet transfer or receiving conditions are met; If the pallet transfer or receiving conditions are met, the pallet is pushed out to the transmission device or received from the transmission device, and a pallet transfer completion or pallet receiving completion signal is returned to the control device; after receiving the pallet, the pallet shape is adjusted to facilitate processing; If the pallet transfer or receiving conditions are not met, a signal is returned to the control device to resolve the factors that do not meet the pallet transfer or receiving conditions, and wait for the control device to issue a pallet transfer instruction or a pallet receiving instruction again.

5. The material tray flow control device according to claim 3 is characterized in that: The control device is configured to: Receive production plans and generate production instructions; Issue production instructions to pallets, workstations and transmission devices; Receive feedback signals from processing pallets, workstations and transmission devices in real time, and control material processing and pallet operation processes in combination with production data; Provide real-time feedback of production progress data and display it to administrators.

6. The material tray flow control device according to claim 3 is characterized in that: The transmission device is configured as follows: Receive instructions from the control device and translate them into executable commands internally; Receive the pallet at the designated station according to the instruction, and send a pallet receiving completion signal to the control device after receiving the pallet; The pallet is transferred to the designated workstation according to the instructions, and a pallet transfer completion signal is sent to the control device.

7. The material tray flow control device according to claim 3 is characterized in that: The tray comprises: A driving mechanism drives the pallet to move at a specified speed between workstations along a specified path according to the instructions of the control device; The data transmission mechanism receives the instruction from the control device and sends a feedback signal to the control device.