A rapid construction structure and construction method for a dam climbing gallery

Through the door-shaped structure of prefabricated reinforced concrete horizontal corridors, slope climbing stairs and corridors and cement mortar joint connection, the problem of slow construction progress in slope climbing position during concrete dam construction is solved, and rapid construction and shortened construction period are achieved Effect.

CN114411615BActive Publication Date: 2024-11-05CHINA WATER CONSERVANCY & HYDROPOWER NO 9 ENG BUREAU CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210193170.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-02-28
Publication Date
2024-11-05
Estimated Expiration
2042-02-28

AI Technical Summary

Technical Problem

During the construction of concrete dams, the construction progress of corridors at slope slopes is slow, and the existing method requires cast-in-place technology to lead to delays in construction periods.

Method used

Prefabricated reinforced concrete horizontal corridors, slope stairs and corridors are connected through cement mortar joints to form a door-shaped structure, prefabricated molds are built and cast, and on-site hoisting and splicing are avoided by traditional cast-in-place method mold installation and on-site casting. .

Benefits of technology

It greatly improves construction efficiency, shortens construction period, avoids the problems of mortar leakage and excessive gaps, and achieves rapid construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114411615B_ABST
    Figure CN114411615B_ABST
Patent Text Reader

Abstract

The invention discloses a rapid construction structure and construction method of a dam climbing gallery, including a prefabricated horizontal gallery, a prefabricated climbing staircase, and a prefabricated climbing gallery. The prefabricated climbing staircase is provided with an inclined portion and a horizontal portion, the horizontal portion is respectively connected to the two ends of the inclined portion, and reserved grooves are provided on both sides of the inclined portion. The prefabricated horizontal gallery and the prefabricated climbing gallery are in a gate-shaped structure, the top and bottom of the prefabricated horizontal gallery are parallel to the horizontal plane, and there is an angle between the top and bottom of the prefabricated climbing gallery and the horizontal plane. The lower part of the prefabricated horizontal gallery is installed on the horizontal part, and the lower part of the prefabricated climbing gallery is installed and inserted into the reserved groove. The beneficial effect of the invention is that by using prefabricated processed prefabricated horizontal gallery, prefabricated climbing staircase, and prefabricated climbing gallery, only hoisting and caulking are required to complete the construction during on-site construction, avoiding the problem of needing to set up molds in the traditional cast-in-place method, greatly improving the efficiency of construction and shortening the construction period.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of engineering construction, and in particular relates to a rapid construction structure and a construction method for a dam climbing gallery. Background Art

[0002] During the construction of concrete dams, corridors are usually laid out for grouting and inspection of the dam body. Currently, corridors are usually spliced ​​by multiple prefabricated corridors, and most of the structures are gate-shaped corridors. When encountering structures at the slope position, there are generally two ways to deal with the corridor: 1. Cast-in-place; 2. Prefabricate the inclined straight section and cast-in-place at the joint. Both methods require the use of cast-in-place technology. The cast-in-place form requires the climbing stairs and corridors to undergo processes such as steel bar installation, formwork installation, concrete pouring, and waiting for age. The dam construction period is tight and the progress requirements are high. The existing method is easy to restrict the progress of the project and cause delays in the construction period. Therefore, a fast construction structure for the dam climbing corridor is needed. The entire structure is prefabricated. At the same time, all traditional gate-shaped corridors are adjusted to prefabricated rectangular corridors. Prefabrication planning can be carried out in advance to speed up the progress of the project at the climbing corridor. Summary of the invention

[0003] In order to solve the above technical problems, the present invention provides a rapid construction structure and construction method for a dam climbing gallery, which can solve the problem of slow construction progress in the prior art.

[0004] The present invention is achieved through the following technical solutions.

[0005] The present invention provides a rapid construction structure for a dam climbing gallery, comprising a prefabricated horizontal gallery, a prefabricated climbing staircase, and a prefabricated climbing gallery. The prefabricated climbing staircase is provided with an inclined portion and a horizontal portion, the horizontal portion is respectively connected to two ends of the inclined portion, and reserved grooves are provided on both sides of the inclined portion. The prefabricated horizontal gallery and the prefabricated climbing gallery are in a gate-shaped structure, the top and bottom of the prefabricated horizontal gallery are parallel to the horizontal plane, and there is an angle between the top and bottom of the prefabricated climbing gallery and the horizontal plane, the lower part of the prefabricated horizontal gallery is installed on the horizontal part, and the lower part of the prefabricated climbing gallery is installed and inserted into the reserved groove.

[0006] The prefabricated horizontal corridor, prefabricated climbing stairs and prefabricated climbing corridor are all prefabricated reinforced concrete parts, and the connections between the prefabricated horizontal corridor, prefabricated climbing stairs and prefabricated climbing corridor are filled with cement mortar.

[0007] The top and bottom of the prefabricated climbing gallery are parallel to the inclined portion.

[0008] The length of the reserved groove is the same as the length of the inclined portion, and the length of the prefabricated climbing corridors after being spliced ​​together is the same as the length of the reserved groove.

[0009] A step is arranged on one side of the prefabricated climbing staircase, the width of the reserved groove is the same as the thickness of the prefabricated climbing gallery, and the depth of the reserved groove is 10 cm to 15 cm.

[0010] The construction method of the dam climbing gallery rapid construction structure is characterized by comprising the following steps:

[0011] S1. Build prefabricated molds for the prefabricated horizontal corridor, prefabricated climbing stairs, and prefabricated climbing corridor respectively;

[0012] S2, arranging steel bars in the prefabricated mold and performing casting molding;

[0013] S3, demoulding and curing to obtain the prefabricated parts, and transporting the prefabricated parts to the construction site;

[0014] S4, hoisting of prefabricated climbing stairs;

[0015] S5, hoisting of prefabricated horizontal corridor;

[0016] S6. Hoisting of prefabricated climbing corridor.

[0017] The prefabricated mold of the prefabricated climbing stairs in S1 includes a base plate, a template A, a template B, a template C, a template D, a template E, and a template F. The template A and the template C are respectively hinged to the two ends of the template B, and the template D and the template F are respectively hinged to the two ends of the template E. The template A is fixedly connected to the template D, and the template C is fixedly connected to the template F. The template A, the template B, the template C, the template D, the template E, and the template F are all connected to the base plate through a pressing plate.

[0018] The template E has sliding plates at both ends, the template D and the template F are hinged to the sliding plates respectively, the sliding plates are slidably connected to the ends of the template E, and locking screws are provided between the sliding plates and the template E.

[0019] The hinges at both ends of the template B and the template E are covered with a waterproof adhesive layer.

[0020] The bottom plate is evenly distributed with a plurality of threaded holes, and the pressing plate is connected to the threaded holes by fixing bolts.

[0021] The beneficial effects of the present invention are: by using prefabricated horizontal corridors, prefabricated climbing stairs, and prefabricated climbing corridors, only hoisting and caulking are required to complete the construction during on-site construction, avoiding the problem of setting up molds in traditional cast-in-place methods, greatly improving construction efficiency and shortening construction period. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 It is a schematic diagram of the structure of the present invention;

[0023] Figure 2 It is a structural diagram of a prefabricated climbing staircase;

[0024] Figure 3 It is a structural diagram of the prefabricated climbing gallery;

[0025] Figure 4 It is a structural schematic diagram of a prefabricated mold for a prefabricated climbing staircase;

[0026] Figure 5 is a schematic diagram of the outer side of template B;

[0027] Figure 6 is a schematic diagram of the structure of the sliding plate;

[0028] Figure 7 It is a schematic diagram of the structure inside the template B;

[0029] In the figure: 1-prefabricated horizontal corridor, 2-prefabricated climbing stairs, 3-prefabricated climbing corridor, 4-inclined part, 5-horizontal part, 6-reserved groove, 7-bottom plate, 8-formwork A, 9-formwork B, 10-formwork C, 11-formwork D, 12-formwork E, 13-formwork F, 14-pressing plate, 15-sliding plate. DETAILED DESCRIPTION

[0030] The technical solution of the present invention is further described below, but the scope of protection claimed is not limited to the description.

[0031] like Figures 1 to 7 As shown, a rapid construction structure of a dam climbing gallery comprises a prefabricated horizontal gallery 1, a prefabricated climbing staircase 2 and a prefabricated climbing gallery 3. The prefabricated climbing staircase 2 is provided with an inclined portion 4 and a horizontal portion 5. The horizontal portion 5 is respectively connected to the two ends of the inclined portion 4. Reserved grooves 6 are provided on both sides of the inclined portion 4. The prefabricated horizontal gallery 1 and the prefabricated climbing gallery 3 are in a gate-shaped structure. The top and bottom of the prefabricated horizontal gallery 1 are parallel to the horizontal plane, and the top and bottom of the prefabricated climbing gallery 3 have an angle with the horizontal plane. The lower part of the prefabricated horizontal gallery 1 is installed on the horizontal portion 5, and the lower part of the prefabricated climbing gallery 3 is installed and inserted into the reserved groove 6.

[0032] During construction, after the prefabricated horizontal corridor 1, the prefabricated climbing stairs 2, and the prefabricated climbing corridor 3 are transported to the site, the construction can be completed quickly through hoisting, avoiding the problem of setting up molds in traditional cast-in-place methods, greatly improving construction efficiency and shortening construction period.

[0033] The prefabricated horizontal gallery 1, prefabricated climbing stairs 2, and prefabricated climbing gallery 3 are all prefabricated reinforced concrete parts. The joints between the prefabricated horizontal gallery 1, prefabricated climbing stairs 2, and prefabricated climbing gallery 3 are filled with cement mortar to prevent mortar from leaking into the gallery during the later pouring construction of the dam.

[0034] The top and bottom of the prefabricated climbing gallery 3 are parallel to the inclined portion 4, so that after the prefabricated climbing gallery 3 is spliced, the prefabricated climbing gallery 3 can be extended along the prefabricated climbing staircase 2, so that the prefabrication construction of the climbing gallery can be carried out at one time.

[0035] The length of the reserved groove 6 is the same as that of the inclined portion 4, and the length of the prefabricated climbing corridors 3 after being spliced ​​together is the same as that of the reserved groove 6, so that the prefabricated climbing corridors 3 can be stuck in the reserved groove 6 after splicing, forming a ready-made corridor to avoid excessive gaps that affect subsequent dam pouring.

[0036] A step is provided on one side of the prefabricated climbing staircase 2. The width of the reserved groove 6 is the same as the thickness of the prefabricated climbing corridor 3, and the depth of the reserved groove 6 is 10 cm to 15 cm, so that the prefabricated climbing corridor 3 can be stuck in the reserved groove 6 after splicing, forming a ready-made corridor to avoid excessive gaps that affect the subsequent dam pouring.

[0037] The construction method of the dam climbing gallery rapid construction structure is characterized by comprising the following steps:

[0038] S1. Build prefabricated molds for prefabricated horizontal corridors, prefabricated climbing stairs, and prefabricated climbing corridors respectively, and make molds for required prefabricated parts according to the design drawings.

[0039] S2. Arrange steel bars in the prefabricated mold and cast them. The steel bars can enhance the strength of the prefabricated parts and increase their service life.

[0040] S3, demoulding and curing to obtain the prefabricated parts, and transporting the prefabricated parts to the construction site;

[0041] S4, hoisting of prefabricated climbing stairs;

[0042] S5, hoisting of prefabricated horizontal corridor;

[0043] S6. Prefabricated climbing corridor hoisting, after all prefabrication, on-site splicing, thus avoiding the need for on-site pouring of existing corridors, resulting in long construction period and low efficiency.

[0044] The prefabricated mold of the prefabricated climbing stairs in S1 includes a base plate 7, a template A8, a template B9, a template C10, a template D11, a template E12, and a template F13. The template A8 and the template C10 are respectively hinged to the two ends of the template B9, and the template D11 and the template F13 are respectively hinged to the two ends of the template E12. The template A8 is fixedly connected to the template D11, and the template C10 is fixedly connected to the template F13. The template A8, the template B9, the template C10, the template D11, the template E12, and the template F13 are all connected to the base plate 7 through a pressing plate 14. By splicing multiple templates, a casting mold for the prefabricated climbing stairs 2 is formed, which is convenient for the casting of the polar prefabricated climbing stairs 2. At the same time, the angles at both ends of the mold can be fine-tuned, which is convenient for the production of prefabricated climbing stairs 2 with different angles.

[0045] The template E12 is provided with sliding plates 15 at both ends, and the template D11 and the template F13 are respectively hinged to the sliding plates 15. The sliding plates 15 are slidably connected to the ends of the template E12, and locking screws are provided between the sliding plates 15 and the template E12. The angles of the two ends of the prefabricated climbing stairs can be slightly adjusted to meet the production requirements of prefabricated parts with different slopes. After the angles at both ends of the prefabricated mold change, the sliding plates 15 and the template E12 slide relative to each other, so that the two ends of the prefabricated mold can be rotated 10° to produce prefabricated climbing stairs 2 with different inclination angles.

[0046] The hinges at both ends of the template B9 and the template E12 are covered with a waterproof adhesive layer. The waterproof adhesive layer adopts the commercially available roof waterproof adhesive tape. The waterproof adhesive layer can seal the gap to prevent cement slurry from flowing out during pouring.

[0047] The bottom plate 7 is evenly distributed with a plurality of threaded holes, and the pressing plate 14 is connected to the threaded holes by fixing bolts, and each template is fixed to the bottom plate 7 by the pressing plate 14 for easy pouring.

Claims

1. A rapid construction structure for a dam climbing gallery, characterized in that: The invention comprises a prefabricated horizontal corridor (1), a prefabricated climbing staircase (2), and a prefabricated climbing corridor (3). The prefabricated climbing staircase (2) is provided with an inclined portion (4) and a horizontal portion (5). The horizontal portion (5) is respectively connected to the two ends of the inclined portion (4). A reserved groove (6) is provided on both sides of the inclined portion (4). The prefabricated horizontal corridor (1) and the prefabricated climbing corridor (3) are in a gate-shaped structure. The top and bottom of the prefabricated horizontal corridor (1) are parallel to the horizontal plane. The prefabricated climbing staircase (2) is provided with an inclined portion (4) and a horizontal portion (5). The horizontal portion (5) is respectively connected to the two ends of the inclined portion (4). A reserved groove (6) is provided on both sides of the inclined portion (4). The top and bottom of the corridor (3) form an angle with the horizontal plane; the lower part of the prefabricated horizontal corridor (1) is installed on the horizontal part (5), and the lower part of the prefabricated climbing corridor (3) is installed and inserted into the reserved groove (6); the top and bottom of the prefabricated climbing corridor (3) are parallel to the inclined part (4); the length of the reserved groove (6) is the same as the length of the inclined part (4), and the length of the prefabricated climbing corridors (3) after being spliced ​​together is the same as the length of the reserved groove (6).

2. A dam climbing gallery rapid construction structure as claimed in claim 1, characterized in that: The prefabricated horizontal gallery (1), the prefabricated climbing stairs (2), and the prefabricated climbing gallery (3) are all prefabricated reinforced concrete parts, and the joints between the prefabricated horizontal gallery (1), the prefabricated climbing stairs (2), and the prefabricated climbing gallery (3) are filled with cement mortar.

3. A dam climbing gallery rapid construction structure as claimed in claim 1, characterized in that: One side of the prefabricated climbing staircase (2) is provided with a step, the width of the reserved groove (6) is the same as the thickness of the prefabricated climbing gallery (3), and the depth of the reserved groove (6) is 10 cm to 15 cm.

4. A construction method for a dam climbing gallery rapid construction structure according to any one of claims 1 to 3, characterized in that it comprises the following steps: S1. Build prefabricated molds for the prefabricated horizontal corridor, prefabricated climbing stairs, and prefabricated climbing corridor respectively; S2, arranging steel bars in the prefabricated mold and performing casting molding; S3, demoulding and curing to obtain the prefabricated parts, and transporting the prefabricated parts to the construction site; S4, hoisting of prefabricated climbing stairs; S5, hoisting of prefabricated horizontal corridor; S6, hoisting of prefabricated climbing gallery; S7. After grouting and curing of the joints, subsequent construction of the dam is carried out.

5. The construction method of a dam climbing gallery rapid construction structure as claimed in claim 4, characterized in that: The prefabricated mold of the prefabricated climbing stairs in S1 comprises a base plate (7), a template A (8), a template B (9), a template C (10), a template D (11), a template E (12), and a template F (13); the template A (8) and the template C (10) are respectively hinged to the two ends of the template B (9); the template D (11) and the template F (13) are respectively hinged to the two ends of the template E (12); the template A (8) is fixedly connected to the template D (11); the template C (10) is fixedly connected to the template F (13); and the template A (8), the template B (9), the template C (10), the template D (11), the template E (12), and the template F (13) are all connected to the base plate (7) via a pressing plate (14).

6. The construction method of a dam climbing gallery rapid construction structure as claimed in claim 5, characterized in that: The template E (12) is provided with sliding plates (15) at both ends, the template D (11) and the template F (13) are respectively hinged to the sliding plates (15), the sliding plates (15) are slidably connected to the ends of the template E (12), and locking screws are provided between the sliding plates (15) and the template E (12).

7. The construction method of a dam climbing gallery rapid construction structure as claimed in claim 5, characterized in that: The hinges at both ends of the template B (9) and the template E (12) are covered with a waterproof adhesive layer.

8. The construction method of a dam climbing gallery rapid construction structure as claimed in claim 5, characterized in that: A plurality of threaded holes are evenly distributed on the bottom plate (7), and the pressing plate (14) is connected to the threaded holes via fixing bolts.