Over-break and under-break control construction method of mechanical partial tunnel excavation

Through the combination of laser guidance guide and tunnel palm surface projection device, precise over-excavation control of mechanical excavation tunnels is achieved, solving construction progress and quality problems and reducing costs.

CN114412474BActive Publication Date: 2024-11-26中国建设基础设施有限公司 +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202111606837.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-12-24
Publication Date
2024-11-26
Estimated Expiration
2041-12-24

AI Technical Summary

Technical Problem

The over-under-excavation control of mechanical excavation tunnels has progress and quality problems during the construction process, resulting in increased construction costs and excessive over-filling of concrete.

Method used

Using a laser guided directional instrument and tunnel palm surface projection device, the laser control point and projected palm surface image provide real-time reference information for segment excavation profiles, and accurately control the circumferential and longitudinal over-under-digging amount of the tunnel.

Benefits of technology

The progress and quality of tunnel over-under-excavation construction has been improved, the excavation costs have been reduced, and unnecessary over-filling concrete costs have been avoided.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114412474B_ABST
    Figure CN114412474B_ABST
Patent Text Reader

Abstract

The present invention discloses a construction method for controlling overbreak and underbreak of a mechanically partially excavated tunnel, which projects laser control points and laser control lines on a tunnel excavation section by setting a laser guidance pointing instrument, and projects a tunnel face image on the tunnel excavation section by setting a tunnel face projection device, wherein the laser control lines can facilitate the control of the circumferential overbreak and underbreak of the tunnel, and the tunnel face image and the laser control points can be used to accurately and conveniently control the longitudinal overbreak and underbreak, thereby improving the construction progress and quality of the tunnel overbreak and underbreak.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to an over-excavation and under-excavation control construction method for mechanically divided tunnel excavation, belonging to the technical field of tunnel construction. Background Art

[0002] In recent years, with the economic growth and the acceleration of urbanization, my country has built various underwater tunnels with a total length of 10,000 kilometers. The main methods of building underwater tunnels include shield method, immersed tube method and mining method. Among them, the mining method has its unique advantages over other methods - low cost, especially for shorter tunnels, its economic benefits are more obvious. For mechanically excavated mining tunnels, how to control their over-excavation and under-excavation is an urgent problem to be solved.

[0003] The construction control of tunnel over-break and under-break not only directly affects the construction progress, safety and quality, but also increases the excavation cost. More importantly, it causes the cost of excessive overfilling concrete. Therefore, in view of the characteristics of mechanical tunnel excavation, the present invention proposes a mechanical excavation tunnel over-break and under-break control construction method using a laser guidance pointer and a tunnel face projection device to form a timely and accurate reference information of the partial excavation contour. Summary of the invention

[0004] In view of the above problems, the present invention provides a construction method for controlling over-break and under-break of a mechanically partially excavated tunnel, which can provide real-time and accurate contour reference information of the tunnel partial excavation, so as to control the over-break and under-break in the circumferential and longitudinal directions of the tunnel, thereby improving the construction progress and quality of the tunnel over-break and under-break.

[0005] In order to achieve the above object, the present invention adopts the following technical solutions:

[0006] The over-excavation and under-excavation control construction method of mechanical partial excavation tunnel comprises the following steps:

[0007] Step S1: according to the data of the circumferential over-break and under-break of the next excavated tunnel, the axial over-break and under-break and the outer contour line of the tunnel face, a plurality of laser guidance pointing instruments are arranged in the tunnel, and the positions of the laser guidance pointing instruments are measured and controlled at the same time, so that the laser guidance pointing instruments can emit laser signals along the tunnel excavation direction, thereby projecting laser control points and laser control lines on the tunnel excavation section, and making the laser control points distributed on the outer contour line of the tunnel face of the next excavated tunnel and making the laser control lines reflect the circumferential over-break and under-break of the next excavated tunnel;

[0008] Step S2: installing a tunnel face projection device in the tunnel, the tunnel face projection device can project a tunnel face image on the tunnel excavation section along the excavation direction, and the projection outer contour line of the tunnel face image is the same as the tunnel face outer contour line of the next excavation part of the tunnel;

[0009] Step S3: measuring the initial image distance of the tunnel face image projected on the tunnel excavation section after the tunnel face projection device is installed and the spatial position of the tunnel face projection device, and calculating the projection angle and focal length of the tunnel face projection device according to the excavation step of the next excavated tunnel, so that the projection of the tunnel face projection device satisfies the following conditions: when the image distance of the tunnel face projection device is the sum of the excavation step and the initial image distance, the projection outer contour line of the tunnel face image projected on the tunnel excavation section at the image distance coincides with the laser control point of step S1;

[0010] Step S4: adjusting the tunnel face projection device according to the projection angle and focal length calculated in step S3, so that the tunnel face projection device projects the tunnel face image onto the tunnel excavation section in real time;

[0011] Step S5: excavating the tunnel according to the established construction plan, controlling the circumferential over-break and under-break by laser control lines during the excavation process, and controlling the axial over-break and under-break by projected tunnel face images;

[0012] Step S6: When the projected outer contour line of the tunnel face image coincides with the laser control point, the excavation of this part of the tunnel is completed, and the support structure construction of this section of the tunnel can be carried out;

[0013] Step S7: Repeat steps S1 to S6 to excavate the next part until the tunnel is excavated through.

[0014] As a specific technical solution, in step S1, the number of laser guidance pointing devices set is 7 to 11.

[0015] As a specific technical solution, in step S2, the tunnel face projection device is connected to the face image input terminal, and the face image is input into the face image input terminal, and then the face image is transmitted to the tunnel face projection device through the face image input terminal for projection.

[0016] As a specific technical solution, in step S2, the palm face image input terminal is a computer or a smart phone.

[0017] As a specific technical solution, in step S2, the installation position of the tunnel face projection device is controlled so that its initial image distance is 2 to 4 m.

[0018] As a specific technical solution, in step S2, the tunnel face projection device is installed on the tunnel centerline; in step S3, the projection angle is 0°.

[0019] As a specific technical solution, in step S2, the palm face image includes a projection outer contour line and a plurality of projection inner contour lines that are perpendicular to each other and arranged in a grid shape.

[0020] As a specific technical solution, the laser control points and laser control lines are displayed in different colors from the projected outer contour line of the tunnel face image.

[0021] As a specific technical solution, in step S3, the spatial position of the tunnel face projection device is measured by a total station.

[0022] Beneficial effects of the present invention: The present invention projects laser control points and laser control lines on the tunnel excavation section by setting a laser guidance pointer, and projects the tunnel face image on the tunnel excavation section by setting a tunnel face projection device, wherein the laser control line can facilitate the control of the circumferential over-break and under-break of the tunnel, and the tunnel face image and the laser control point can be used to accurately and conveniently control the longitudinal over-break and under-break, thereby improving the construction progress and quality of the tunnel over-break and under-break. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 Schematic diagram before the next excavation section of the tunnel is constructed;

[0024] Figure 2 It is a schematic diagram of the tunnel in the excavation state for the next excavation part;

[0025] Figure 3 It is a schematic diagram when the next excavation part of the tunnel reaches the excavation step;

[0026] Figure 4 for Figure 1 Schematic diagram of the display of laser control points, laser control lines and face images on the tunnel excavation section;

[0027] Figure 5 for Figure 3 Schematic diagram of the display of laser control points, laser control lines and face images on the tunnel excavation section;

[0028] The meanings of the symbols in the above figure are: 1-tunnel face projection device, 11-face image, 1101-projection outer contour line, 1102-projection inner contour line, 2-laser guidance pointing instrument, 21-laser control point, 22-laser control line, 3-face image input terminal, 4-next part of the tunnel to be excavated, 5-part of the tunnel that has been excavated, 6-face outer contour line. DETAILED DESCRIPTION

[0029] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0030] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", "third", etc., are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.

[0031] Example

[0032] For the construction method of controlling overbreak and underbreak in mechanically excavated tunnels, please refer to Figures 1 to 5 , which comprises the following steps:

[0033] Step S1: according to the data of the circumferential over-break and under-break of the next excavated tunnel, the axial over-break and under-break and the outer contour line 6 of the tunnel face, a plurality of laser guidance pointing instruments 2 are arranged in the tunnel, and the positions of the laser guidance pointing instruments 2 are measured and controlled at the same time, so that the laser guidance pointing instruments 2 can emit laser signals along the tunnel excavation direction, thereby projecting laser control points 21 and laser control lines 22 on the tunnel excavation section, and making the laser control points 21 distributed on the outer contour line 6 of the tunnel face of the next excavated tunnel and making the laser control lines 22 reflect the circumferential over-break and under-break of the next excavated tunnel;

[0034] By the above method, the laser control point 21 projected by the laser guidance pointing device 2 shows the outer contour line 6 of the tunnel face of the next excavation part, and the length of the laser control line 22 projected on the tunnel excavation section shows the circumferential over-excavation and under-excavation of the next excavation part of the tunnel;

[0035] Step S2: A tunnel face projection device 1 is installed at the center line of the tunnel vault. The tunnel face projection device 1 can project a face image 11 on the tunnel excavation section along the excavation direction. The projection outer contour line 1101 of the face image 11 is the same as the shape of the face outer contour line 6 of the next excavation part of the tunnel. During the excavation process, the face image 11 will be projected on the current tunnel excavation section in real time.

[0036] Step S3: measuring the initial image distance of the tunnel face image 11 projected on the tunnel excavation section after the tunnel face projection device 1 is installed (i.e., the distance between the projected tunnel face image 11 and the tunnel face projection device 1 along the tunnel centerline, which can also be considered as the distance between the tunnel excavation section and the tunnel face projection device 1 along the tunnel centerline before excavation), and measuring the spatial position of the tunnel face projection device 1 at the same time, and calculating the projection angle and focal length of the tunnel face projection device 1 according to the excavation step of the next excavated part of the tunnel, so that the projection of the tunnel face projection device 1 meets the following conditions:

[0037] When the image distance of the tunnel face projection device 1 is the sum of the excavation step distance and the initial image distance, the projection outer contour line 1101 of the tunnel face image 11 projected on the tunnel excavation section at the image distance coincides with the laser control point 21 of step S1 (i.e., coincides with the display position of the laser control point 21 of step S1 on the tunnel excavation section at the image distance); it can also be understood that when the next excavation part of the tunnel reaches the excavation step distance (i.e., when the excavation of the next excavation part of the tunnel is completed), the projection outer contour line 1101 of the tunnel face image 11 projected on the current tunnel excavation section coincides with the laser control point 21 of step S1; and the laser control points 21 are evenly distributed on the tunnel face outer contour line 6 of the next excavation part of the tunnel, then the projection outer contour line 1101 of the tunnel face image 11 will coincide with the tunnel face outer contour line 6;

[0038] Since the projection outer contour line 1101 of the tunnel face image 11 projected by the tunnel face projection device 1 is the same shape as the tunnel face outer contour line 6 of the next excavation part of the tunnel, the projection outer contour line 1101 of the tunnel face image 11 is actually in equal proportion to the tunnel face outer contour line 6. Then, according to the convex lens imaging principle, the above conditions can be achieved by adjusting the projection angle and focal length of the tunnel face projection device 1. The method of calculating the projection angle and focal length by the initial image distance, the spatial position of the tunnel face projection device 1 and the excavation step distance of the next excavation part of the tunnel will not be repeated here.

[0039] Step S4: adjusting the tunnel face projection device 1 according to the projection angle and focal length calculated in step S3, so that the tunnel face projection device 1 projects the tunnel face image 11 onto the tunnel excavation section in real time;

[0040] Step S5: excavating the tunnel according to the established construction plan, controlling the circumferential over-break and under-break by the laser control line 22 during the excavation process, and controlling the axial over-break and under-break by the projected tunnel face image 11;

[0041] For the control of the annular over-break and under-break, since the length of the laser control line 22 shows the annular over-break and under-break of the next excavated part of the tunnel (the over-break and under-break in the radial direction of the tunnel section), the annular over-break and under-break should be ensured to be the same as the coverage area of ​​the laser control line 22 during the excavation process;

[0042] For the control of axis over-break and under-break, if the projected outer contour line 1101 of the tunnel face image 11 is within the laser control point 21, it means that the excavation step has not been reached and excavation can continue; when the projected outer contour line 1101 of the tunnel face image 11 coincides with the laser control point 21, it means that the excavation step has been reached and the excavation of the current part of the tunnel should be stopped. This can more conveniently and accurately control the longitudinal over-break and under-break (over-break and under-break along the tunnel centerline), eliminating the intermittent construction process of repeated measurements and improving the excavation efficiency;

[0043] Step S6: When the excavation reaches the point where the projection outer contour line 1101 of the tunnel face image 11 coincides with the laser control point 21, the excavation of this part of the tunnel is completed, and the construction of the support structure of this section of the tunnel can be carried out;

[0044] Step S7: Repeat steps S1 to S6 to excavate the next part until the tunnel is excavated through.

[0045] In order to enable the laser guidance pointer 2 to project a suitable number of laser control points 21 and laser control lines 22 so as to accurately control the over-break and under-break amount, further, in a preferred embodiment, in step S1, the number of laser guidance pointers 2 set is 7 to 11.

[0046] Furthermore, in a preferred embodiment, in step S2, the tunnel face projection device 1 is connected to the face image input terminal 3, and the face image 11 is input into the face image input terminal 3, and then the face image 11 is transmitted to the tunnel face projection device 1 through the face image input terminal 3 for projection.

[0047] Furthermore, in a preferred embodiment, in step S2, the face image input terminal 3 is a computer or a smart phone, and the face image input terminal 3 can be connected to the tunnel face projection device 1 via wire or wireless to achieve the transmission of the face image 11 data.

[0048] In order to ensure that the tunnel face image 11 projected by the tunnel face projection device 1 is clear and bright, further, in a preferred embodiment, the installation position of the tunnel face projection device 1 is controlled in step S2 so that its initial image distance is 2 to 4 m.

[0049] Furthermore, in a preferred embodiment, in step S2, the tunnel face projection device 1 is installed on the tunnel centerline; in step S3, the projection angle of the tunnel face projection device 1 is 0° (i.e., the projection direction is along the tunnel centerline); at this time, it is only necessary to calculate and adjust the focal length based on the initial image distance and the excavation step distance of the next excavated part of the tunnel, thereby facilitating the installation and adjustment of the tunnel face projection device 1 to speed up the construction progress.

[0050] Further, in a preferred embodiment, see Figure 4 and Figure 5 The tunnel face image 11 includes a projection outer contour line 1101 and a plurality of mutually perpendicular projection inner contour lines 1102 arranged in a grid shape; in this way, it is possible to judge whether the tunnel face is excavated flat by whether the inner contour line 1102 is projected straight on the tunnel excavation section, or to judge whether the tunnel face projection device 1 has a large displacement, such as a change in the projection angle during the construction process.

[0051] In order to facilitate the distinction between different projected marks, further, in a preferred embodiment, the laser control point 21 and the laser control line 22 are displayed in different colors from the projected outer contour line 1101 of the palm face image 11; for example, the laser control point 21 and the laser control line 22 may be displayed in red, while the projected outer contour line 1101 of the palm face image 11 may be displayed in green, and the projected inner contour line 1102 of the palm face image 11 may be displayed in yellow.

[0052] Furthermore, in a preferred embodiment, in step S3, the spatial position of the tunnel face projection device 1 is measured by a total station.

Claims

1. Over-excavation and under-excavation control construction method for mechanical partial tunnel excavation, Features The steps include: Step S1: according to the data of the circumferential over-break and under-break of the tunnel of the next excavation part, the axial over-break and under-break and the outer contour line (6) of the tunnel face, a plurality of laser guidance pointing instruments (2) are arranged in the tunnel, and the positions of the laser guidance pointing instruments (2) are measured and controlled at the same time, so that the laser guidance pointing instruments (2) can emit laser signals along the tunnel excavation direction, thereby projecting laser control points (21) and laser control lines (22) on the tunnel excavation section, and making the laser control points (21) distributed on the outer contour line (6) of the tunnel face of the next excavation part, and making the laser control lines (22) reflect the circumferential over-break and under-break of the tunnel of the next excavation part; Step S2: installing a tunnel face projection device (1) in the tunnel, the tunnel face projection device (1) can project a tunnel face image (11) on the tunnel excavation section along the excavation direction, and the projection outer contour line (1101) of the tunnel face image (11) is the same as the shape of the tunnel face outer contour line (6) of the next excavation part of the tunnel; Step S3: measuring the initial image distance of the tunnel face image (11) projected on the tunnel excavation section after the tunnel face projection device (1) is installed and the spatial position of the tunnel face projection device (1), and calculating the projection angle and focal length of the tunnel face projection device (1) according to the excavation step of the next excavated tunnel section, so that the projection of the tunnel face projection device (1) satisfies the following conditions: when the image distance of the tunnel face projection device (1) is the sum of the excavation step and the initial image distance, the projection outer contour line (1101) of the tunnel face image (11) projected on the tunnel excavation section at the image distance coincides with the laser control point (21) of step S1; Step S4: adjusting the tunnel face projection device (1) according to the projection angle and focal length calculated in step S3, so that the tunnel face projection device (1) projects the tunnel face image (11) onto the tunnel excavation section in real time; Step S5: excavating the tunnel according to the established construction plan, controlling the circumferential over-break and under-break through the laser control line (22) during the excavation process, and controlling the axial over-break and under-break through the projected tunnel face image (11); Step S6: When the excavation reaches the point where the projected outer contour line (1101) of the tunnel face image (11) coincides with the laser control point (21), the excavation of the tunnel is completed, and the construction of the support structure of the tunnel can be carried out; Step S7: Repeat steps S1 to S6 to excavate the next part until the tunnel is excavated through.

2. The over-excavation and under-excavation control construction method of mechanically divided tunnel excavation as claimed in claim 1, Features In the step S1, the number of laser guidance pointing devices (2) provided is 7 to 11.

3. The over-excavation and under-excavation control construction method of mechanically divided tunnel excavation as claimed in claim 1, Features In step S2, the tunnel face projection device (1) is connected to the face image input terminal (3), and the face image (11) is input into the face image input terminal (3). Then, the face image (11) is transmitted to the tunnel face projection device (1) through the face image input terminal (3) for projection.

4. The over-excavation and under-excavation control construction method of mechanically divided tunnel excavation as claimed in claim 3, Features In step S2, the palm face image input terminal (3) is a computer or a smart phone.

5. The over-excavation and under-excavation control construction method of mechanically divided tunnel excavation as claimed in claim 1, Features In the step S2, the installation position of the tunnel face projection device (1) is controlled so that its initial image distance is 2 to 4 m.

6. The over-excavation and under-excavation control construction method of mechanically divided tunnel excavation as claimed in claim 5, Features In the step S2, the tunnel face projection device (1) is installed on the tunnel centerline; in the step S3, the projection angle is 0°.

7. The over-excavation and under-excavation control construction method of mechanically divided tunnel excavation as claimed in claim 1, Features In the step S2, the face image (11) includes a projection outer contour line (1101) and a plurality of projection inner contour lines (1102) which are perpendicular to each other and arranged in a grid shape.

8. The over-excavation and under-excavation control construction method of mechanically divided tunnel excavation as claimed in claim 1, Features The laser control point (21) and the laser control line (22) are displayed in different colors from the projected outer contour line (1101) of the tunnel face image (11).

9. The over-excavation and under-excavation control construction method of mechanically divided tunnel excavation as claimed in any one of claims 1 to 8, Features In step S3, the spatial position of the tunnel face projection device (1) is measured by a total station.