Intelligent method and system for rapid plugging of dam breaches
Through edge calculation and modular sealing body combined with vector drive device, the problem of low efficiency of dam gap sealing is solved, and the rapid and intelligent sealing of dam gaps is achieved, ensuring safety in flood disasters.
Patent Information
- Application Number
- CN202111603196.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-12-24
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2041-12-24
AI Technical Summary
The existing dam gap sealing method is inefficient, has small adaptability conditions and low artificial intelligence level, which makes it difficult to quickly and effectively seal in flood disasters, causing crises and major losses.
Using edge calculation to predict the evolution law of gaps, assemble the modular hexahedral hollow sealed box sealing body, combine the vector drive device and perception device to monitor and adjust the sealing body posture and position in real time, so as to quickly attach the dam gap and pass the water inlet valve And ventilation valve controls the stability of the sealing body.
The rapid and intelligent sealing of dam gaps has been achieved, the efficiency and stability of sealing are improved, and the safety of human life and property has been ensured.
Smart Images

Figure CN114417461B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of water conservancy projects, and in particular relates to a method and a system for quickly plugging a dam breach. Background Art
[0002] Dams refer to buildings and structures that prevent water from flowing, usually made of earth, stone or concrete. Dams are under high water pressure. When heavy rains or floods occur, the water level and flow rate suddenly increase, resulting in a gap in the dam. When a gap occurs in the dam, if it cannot be sealed in time, the flood will submerge the downstream industrial and agricultural production and transportation facilities, and even endanger people's lives and safety, causing heavy losses. With the development of economy and society, equipment and facilities and population density increase, and the consequences of dam gaps are more serious. At present, when the dam breaks or breaches occur, sandbags or earthbags are used to block it, but this is only applicable when the initial flow rate of the hidden danger is small, and such a blocking method is time-consuming, labor-intensive, and inefficient. It cannot be blocked in the shortest time, causing the hidden danger to expand and endangering human life, health and property safety. Because the on-site environmental conditions are mostly complex, it is difficult to find a large amount of blocking materials and transport them to the site for blocking in a short period of time. At the same time, due to the strong scouring of the flood, the breach expands rapidly, making it more difficult to block. Therefore, how to achieve the rapid blocking of the dam gap has become a practical problem that needs to be solved urgently. Summary of the invention
[0003] In view of the practical problems that the gap plugging methods in the current prior art are low in efficiency, small adaptability to flow velocity conditions and low level of artificial intelligence, the present invention discloses a dam gap rapid plugging method and a plugging system.
[0004] To achieve the above object, the technical solution of the present invention is as follows:
[0005] A method for quickly plugging a dam breach comprises the following steps:
[0006] Step 1: Collection of dam structure, materials, gap data, and hydrological parameters
[0007] Obtain relevant parameters of dam structure and materials; measure the gap size, gap depth and flow field parameters related to water flow and sediment content;
[0008] Step 2: Use edge computing to calculate the geometric size of the breach and its evolution law based on the breach evolution model, and quantitatively predict the width and depth change curve of the breach;
[0009] Step 3: Based on the time it takes for the model to be transported to the gap and assembled, predict the location, shape and geometric dimensions of the gap in the dam after that time, and determine the geometric dimensions of the plugging body assembled on site based on the size of the gap and the rectangular area corresponding to the full coverage of the gap being greater than 20%;
[0010] Step 4: transport the modular hexahedral hollow sealing cage to a relatively low flow velocity range upstream of the gap and assemble it into an integral plugging body; the plugging body comprises a plurality of sealing cages assembled and bitten into each other, each sealing cage having a rigid shell that is sealed and hollow inside, and each having a water inlet valve and a vent valve that can be controlled; the plugging system driving device uses a deflectable propeller or a pump jet to achieve vector drive;
[0011] Step 5: A sensing device, a communication device or a communication line, a power supply device or a communication line and a driving device are installed on the blocking body to form a blocking system; and a driving device is installed at the vertex of the lower surface of the downstream end and the position where the lower surface of the upstream end of the blocking system is always underwater.
[0012] Step 6: The assembled plugging system is a rigid body floating on the water surface. It relies on its own driving device and the water flow to quickly move to the upstream of the gap. When it reaches the appropriate position upstream of the gap, the front sealing cage valve is controlled to open from front to back in sequence, so that the front end of the plugging body begins to sink in the water, and the driving device on the plugging body is coordinated to adjust the overall posture and speed of the plugging body.
[0013] Step 7: When the entire plugging system is close to the upstream of the breach, its front end gradually sinks and then transforms to an upright state. Under the action of water flow, buoyancy and gravity, the plugging body is attached to the upstream of the breach of the dam. At this time, the ventilation or water inlet valve of the underwater cage is closed and sand and gravel are thrown downstream of the plugging body to stabilize it.
[0014] Step eight, monitor the stability of the entire plugging device in real time, obtain the stability state of the entire gap and report it through the communication device.
[0015] Furthermore, the parameters in step one are collected and obtained by using an unmanned aerial vehicle equipped with visible light imaging video equipment, infrared imaging equipment, and multi-band radar, and a ship / underwater submersible with multi-beams on the surface and underwater; the dam structure, material, geometry and mechanical parameters are obtained through historical data or on-site inspections.
[0016] Furthermore, in the step five, the sensing device includes a blocking body positioning, posture, and vibration sensor, an underwater video probe and its acquisition device; the communication device is used to realize wired and wireless communication between the anchored ship, the shore vehicle or the remote center, wherein the wired communication device is used to transmit underwater video images, and the wireless communication device is installed on the upstream side of the blocking body, so as to ensure that after the blocking body is partially immersed in water, the communication antenna can be exposed above the water surface of the entire blocking device after tilting; the power supply device is used to provide power to the instruments and equipment on the blocking body and the driving device, and adopts at least one of the self-contained battery power supply and long-distance cable power supply; the driving device adopts a deflectable propeller or a pump jet to realize vector drive.
[0017] Furthermore, the sensor of the sensing device in step five is installed in the middle of four edges of the entire blocking body above the water surface, and the underwater video probe is installed on the upper and lower surfaces of the downstream end of the blocking body.
[0018] Furthermore, when the valve is opened in step six, the water inlet valve and the ventilation valve in the same cage are opened at the same time, and the valve is opened by bursting micro-explosion or controlled by a solenoid valve.
[0019] Furthermore, in step six, the water inlet valve and the ventilation valve of the sealed cage located above the water surface are kept closed after being erected.
[0020] Furthermore, in step six, the driving device, the water inlet valve and the ventilation valve are controlled by remote control or autonomous edge computing.
[0021] Furthermore, in the step seven, the box cage sealing valve and the ventilation valve that have not entered the sealing body are both in a closed state. When the sealing body is applied to the upper wall of the notch, one of the box cage sealing valve and the ventilation valve that have entered the notch is closed to form a water baffle to keep the sealing body from leaking.
[0022] The present invention also provides a system for rapid plugging of dam breaches, comprising a number of sealing cages connected in sequence, each of which has a sealed rigid shell and is provided with a water inlet valve and a ventilation valve; the plugging system as a whole is a rectangular body, and a vector drive device is installed on the lower surface; a sensing device, a control, a communication and a power supply device are installed on the plugging body, and the sensing device includes a plugging body positioning, posture, and vibration sensor, an underwater video probe and its acquisition device.
[0023] Furthermore, the water inlet valve and the ventilation valve are arranged on the upper and lower surfaces opposite to each other of the sealing cage.
[0024] Furthermore, the driving device includes a propeller and a motor or a pump-jet driving device.
[0025] The beneficial effects of the present invention are:
[0026] The rapid plugging method for the dam gap adopted by the present invention adopts on-site monitoring of the gap structure and water flow parameters, combines the mechanics and geometric parameters of the dam material to calculate the gap evolution trend, and determines the size of the plugging body and the assembly position of the plugging body according to the time condition. The plugging body adopts a hexahedral hollow box cage to modularly assemble at the place where the flow velocity is small upstream of the gap, and then adopts vector propulsion combined with the drag force of the water flow to approach the gap from the upstream. Through the gradual opening of the valve and the propulsion of the driving device, the plugging body is gradually erected and the upstream end is above the water surface while the downstream end is sunk to the upstream side of the underwater gap. According to the position and posture data collected in real time, the valve and the driving device are controlled by edge computing or wired refinement so that the plugging body is tightly attached to the upstream dam wall of the gap under the combined action of the water flow and self-drive, and then the ventilation or water inlet valve of the underwater box cage is closed and sand and gravel are thrown downstream of the plugging body for stability. In addition, the stability of the entire plugging device can be monitored in real time through the tilt and vibration sensors, and the stable state of the entire gap can be inferred thereby. Thus, intelligent rapid plugging of the dam gap is realized. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 A flow chart of the method for rapidly sealing a dam breach provided by the present invention.
[0028] Figure 2 Schematic diagram of the overall structure of the assembled plugging body.
[0029] Figure 3 This is a schematic diagram of the modular sealed cage structure.
[0030] Figure 4 This is a schematic diagram of the change in the posture of the sealing body after water enters the gap.
[0031] List of Figure Symbols:
[0032] 0-sealing body, 1-modular sealing cage, 2-sensing device, 3-driving device, 4-dam gap, 5-water surface, 6-sealing valve, 7-housing, 8-buckle, 9-ventilation valve, 10-underwater camera. DETAILED DESCRIPTION
[0033] The technical solution provided by the present invention will be described in detail below in conjunction with specific embodiments. It should be understood that the following specific implementation methods are only used to illustrate the present invention and are not used to limit the scope of the present invention.
[0034] The intelligent method for rapid plugging of dam breaches provided by the present invention has the following process: Figure 1 As shown, the following steps are included:
[0035] Step 1: Collection and collection of dam structure, materials, gap data, and hydrological parameters
[0036] The relevant parameters of the dam structure and materials in the database should be read in advance. Use drones, surface unmanned ships, ships / underwater submersibles with multi-beams on the surface and underwater, or underwater robots to carry lidar, visible light imaging video equipment, infrared imaging equipment, and video flow measurement, and use video recognition and other methods in combination with historical data to obtain the upstream wall and gap geometric parameters, the porosity and mechanics of the materials around the gap, the water level upstream and downstream of the gap, the flow field, sediment content and other related parameters;
[0037] Step 2: Edge computing is used to calculate the geometric size of the breach and its evolution law based on the breach evolution model (existing public technology, published by Chen Shengshui et al. in "Science China") combined with the soil characteristics of the dam and the joint characteristics of the dam, and quantitatively predict the width and depth change curve of the breach.
[0038] Step 3: Based on the time before the model is transported to the gap and assembled, predict the location, shape and geometric dimensions of the gap in the dam after that time, and determine the geometric dimensions of the plugging body assembled on site based on the size of the gap and the rectangular area corresponding to the full coverage of the gap greater than 20%. Figure 2 As shown, the blocking module includes a plurality of modular sealing cages 1, which can be connected and assembled by a plurality of metal modular sealing cages 1 according to size requirements.
[0039] Step four, transport the modular sealing cages by car or ship to a relatively low flow rate range upstream of the gap, and assemble them into an overall plugging system by water operations according to the size of the gap. The plugging system includes a number of sealing cages that are assembled in sequence, vibration and edge inclination sensors, positioning sensors (including inertial navigation or GNSS), data acquisition control and wireless / wired communication devices, vector drive and control devices, related power supplies and cables. The data acquisition control and wireless communication device, related power supply and positioning GNSS antenna are installed at the upstream end of the assembled plugging body, which is always above the water surface. The vibration and edge inclination sensors are installed on the four edges of the upper surface of the plugging hexahedron. Figure 2 , 3As shown, each modular sealed cage 1 is a hexahedron with a sealed rigid shell 7 (preferably made of metal), which is hollow inside and has a large flip control valve at the lower end. The plastic sealing valve 6 is used in the figure, which can control the bursting micro-explosion or electromagnetic control to open and close. A plastic ventilation valve 9 is arranged on the opposite side of the plastic sealing valve 6. The plastic ventilation valve 9 is usually closed, and can also be opened synchronously with the plastic sealing valve 6 by micro-control charging or electromagnetic valve control. The opening of the ventilation opening is conducive to water entering the cage from the opposite sealing valve. The speed and posture of the overall plugging body entering the water can be achieved through different valve combinations and corresponding opening and closing controls. The modular sealed cages 1 can be connected to form a whole plugging body 0 through a columnar buckle 8 (the buckle can be replaced by other conventional connectors). A vector drive and control device 3 can be installed on the modular sealed cage 1. The vector drive and control device 3 is controlled by a motor with a battery, which can adjust the posture and speed of the plugging body to ensure that it is applied on the gap. The installation position of the vector drive and control device 3 should be reserved on the modular sealed cage 1. The vector drive and control device is installed underwater after tilting, that is, the lower surface of the downstream end of the blocking body and the lower surface of the upstream side of the blocking body, and the cable is used to connect the battery and the drive device. The vector drive and control device 3 can use a deflectable propeller or a pump jet to achieve vector drive, and can be wireless / wireless remote control, or can be autonomously controlled. The control can adopt observation control, tracking control, fuzzy control or intelligent control, and the intelligent control algorithm can adopt the reinforcement learning or enhanced learning algorithm disclosed in the prior art. The plastic sealing valve 6 and the plastic ventilation valve 9 can both adopt a valve structure, and its material can be selected according to needs. Each valve can be controlled to open by remote control. The present invention can adopt remote or on-site control methods to build a control computer or data center to monitor the entire movement and change process of the blocking body, and control the timely action of the drive device and valve therein. The blocking body can be powered by a wire or a battery, which can be selected according to needs.
[0040] Step five, after the entire blocking body 0 is assembled, a sensing device 2 including GNSS (using online RTK or PPP algorithm), vibration, tilt (three-axis gravity acceleration sensor, electrolyte inclinometer, etc.) and other positioning and inertial attitude sensors (including electronic compass, sub-intensity meter or gyroscope), as well as an underwater video probe and its acquisition device are installed in the middle of the four longest edges above the water surface of the entire blocking body. The antenna of the sensing device can be exposed above the water surface of the entire blocking device after tilting, and at least the position, attitude and vibration mode of the blocking body can be obtained. In particular, when satellite positioning is adopted, the antenna must be exposed to the water surface. In order to increase the flexibility of the present invention, an underwater positioning device using inertial navigation positioning or video image SLAM positioning can also be used. In this example, the overall inclination angle of the anti-blocking body is measured by the inclination sensor, and the position is obtained by the upper GNSS monitoring device. The underwater video probe is installed on the upper and lower surfaces of the downstream end of the blocking body. In this example, the underwater video probe adopts an underwater camera 10 with a pan-tilt head, one on each of the upper and lower surfaces of the blocking body, Figure 2 The middle and lower surfaces are not drawn. When the plugging body floats horizontally, the lower surface can observe the underwater situation and provide information for the control body movement; when the plugging body is erected, the upper and lower underwater dynamics of the water retaining structure can be intuitively displayed. The communication device is used to realize wired and wireless communication between the anchored ship, the onshore vehicle or the remote center, among which the wired communication device is used to transmit underwater video images, and the wireless communication device is installed on the upstream side of the plugging body, so as to ensure that the communication antenna can be exposed above the water surface of the entire plugging device after the plugging body is partially immersed in the water; the power supply device is used for the power of the instruments and equipment on the plugging body and the driving device. The former is powered by a built-in battery, and the latter is powered by a long-distance cable. At the same time, the driving device is installed at the vertex of the lower surface of the downstream end of the plugging system and the position where the lower surface of the upstream end is always underwater. The driving device uses a deflectable propeller or pump jet to achieve vector drive. The driving propeller or pump jet motor has high power and consumes a lot of power. If the plugging body is small or the distance is short, a battery can be used. It is best to use wired power supply for a larger plugging body. The wired cable can be very long. Since the power consumption of the instrument is limited, dual power supply can be achieved by using batteries and wired methods at the same time.
[0041] Step 6: The assembled plugging body is a rigid body, floating on the water surface, and moves quickly to the upstream of the gap by driving its own motor and the water flow of the gap. The position and inclination angle of the plugging body can be obtained in real time through the sensing device. According to the mathematical model of the interaction between floating objects and water flow on the water surface (existing public technology, Wu Shiqiang et al. published in "Progress in Water Conservancy and Hydropower Science and Technology"), real-time simulation is realized to display the actual position, posture and distance of the plugging body from the gap at the control site (this function is optional). When the position upstream of the gap is appropriate, the propeller is used to adjust the posture of the entire device, and at the same time, the front end (the end close to the gap in the dam is the front end, and the end away from the gap in the dam is the rear end) is controlled to open the sealing cage valves from front to back in sequence (the plastic sealing valve is blown open with a controllable trace explosive or the solenoid valve controls the butterfly valve to open. The sealing valve and the ventilation valve in the same sealing cage are opened at the same time to ensure smooth water inflow), so that the front end begins to enter water and sink, and most of the plugging body is below the water surface and its position and size are guaranteed to be conducive to blocking the gap. At the same time, according to the calculation results, the propeller is used to continuously adjust the water entry posture and speed of the entire plugging. After the drone collects on-site images and the sensors are used to obtain the real-time position and posture of the entire device, the control process of the propeller and valve opening in the entire device can also be realized by manual control. The process of the posture change of the entire device after water enters is as follows. Figure 4 As shown, the entire plugging body starts in a horizontal state. First, the water inlet below the sealing cage near the gap and the air inlet above are opened at the same time. After water enters near the gap, it gradually transforms to an upright state. When the entire plugging body is close to the gap in the water and is close to a self-supporting state, only the water inlet of the plugging body below the water surface is opened. At this time, a part of the entire device remains above the water surface 5, and the water inlet and ventilation of the upper cage are kept closed. The water inlet valve and the ventilation valve are controlled by remote control or autonomous edge computing. The propeller can also be propelled by water jet, using a deflectable direction to form a thrust vector. When deploying the propeller, the position should be calculated to ensure that the thrust propeller or nozzle is below the water surface when it floats upright.
[0042] Step seven, when the whole sealing system is close to the upstream of the gap, its front end gradually sinks and then transforms into an upright state, so that the whole sealing body after assembly is just attached longitudinally to the upstream of the gap 4 of the dam under the action of water flow, buoyancy and gravity to achieve the gap blocking. At this time, the sealing valve and the vent valve of the box cage that has not entered the water in the sealing body are both in a closed state, and one of the sealing valves and the vent valve of the box cage that has entered the water is closed to form a water baffle to keep the sealing body watertight and stable as a whole. At the same time, steel cages, sand and stone bags and other materials are quickly thrown in the downstream of the whole sealing system to stabilize the reinforcement part of the gap. During the attachment process, ensure that a part of the sealing body is located above and higher than the highest static water level upstream of the gap to ensure that water no longer flows out from the upper part of the sealing body after the gap is blocked, and also ensure that the wireless communication device on it works normally.
[0043] Step eight, monitor the stability of the entire plugging device in real time through the tilt and vibration sensors, infer the stability of the entire gap, and report it through the communication device.
[0044] It should be noted that the above content only illustrates the technical idea of the present invention and cannot be used to limit the protection scope of the present invention. For ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications all fall within the protection scope of the claims of the present invention.
Claims
1. A method for quickly plugging a dam breach. It is characterized in that The steps include: Step 1: Collect the dam structure, materials, gaps, and hydrological parameters. Obtain relevant parameters of dam structure and materials; monitor the location, shape, size and depth of the gap; obtain relevant parameters of water level changes, flow field and sediment content upstream and downstream of the gap; Step 2: Calculate the geometric size of the breach and its evolution law according to the breach evolution model, quantitatively predict the width, shape and depth change curve of the breach, and modify the model and calculation parameters in real time according to the measured data; Step 3: Based on the time it takes for the model to be transported to the gap and assembled, predict the location, shape and geometric dimensions of the gap in the dam after that time, and determine the geometric dimensions of the plugging body assembled on site based on the size of the gap and the rectangular area corresponding to the full coverage of the gap being greater than 20%; Step 4: transport the modular hexahedral hollow sealing cage to a relatively low flow velocity range upstream of the gap and assemble it into an integral plugging body; the plugging body comprises a plurality of sealing cages assembled and bitten into each other, each sealing cage having a rigid shell that is sealed and hollow inside, and each having a water inlet valve and a vent valve that can be controlled to move; Step 5: A sensing device, a communication device or a communication line, a power supply device or a communication line and a driving device are installed on the blocking body to form a blocking system; and a driving device is installed at the vertex of the lower surface of the downstream end and the position where the lower surface of the upstream end of the blocking system is always underwater. Step 6: The assembled plugging system is a horizontal rigid body floating on the water surface. It relies on its own driving device and the water flow to quickly move to the upstream of the gap. When it reaches the appropriate position upstream of the gap, the front sealing cage valve is controlled to open from front to back in sequence, so that the front end of the plugging body begins to sink in the water, and the driving device on the plugging body is coordinated to adjust the overall posture and speed of the plugging body; Step 7: When the entire plugging system is close to the upstream of the breach, its front end gradually sinks and then transforms to an upright state. Under the action of water flow, buoyancy and gravity, the plugging body is attached to the upstream of the breach of the dam. At this time, the ventilation or water inlet valve of the underwater cage is closed and sand and gravel are thrown downstream of the plugging body to stabilize it. Step eight, monitor the stability of the entire plugging device in real time, obtain the stability state of the entire gap and report it through the communication device.
2. The method for rapidly plugging a dam breach according to claim 1, It is characterized in that In the step 1, the parameters are collected and obtained by using an unmanned aerial vehicle equipped with visible light imaging video equipment, infrared imaging equipment, multi-band radar, and a ship or underwater submersible with multi-beams on the surface or underwater; the dam structure, material, geometry and mechanical parameters are obtained through historical data or on-site inspections.
3. The method for rapidly plugging a dam breach according to claim 1, It is characterized in that In step 5, the sensing device includes a blocking body positioning sensor, a posture sensor, a vibration sensor, an underwater video probe and a collection device thereof; the communication device is used to realize wired and wireless communication between the anchored ship, the onshore vehicle or the remote center, wherein the wired communication device is used to transmit underwater video images, and the wireless communication device is installed on the upstream side of the blocking body, so as to ensure that after the blocking body is partially immersed in water, the communication antenna can be exposed above the water surface of the entire blocking device after tilting; The power supply device is used to provide power for the instruments and equipment on the plugging body and the driving device, and adopts at least one of the self-contained battery power supply and long-distance cable power supply; the driving device adopts a deflectable propeller or pump jet to achieve vector drive.
4. The method for rapidly plugging a dam breach according to claim 3, It is characterized in that The sensor of the sensing device in step five is installed in the middle of the four edges of the entire blocking body above the water surface, and the underwater video probe is installed on the upper and lower surfaces of the downstream end of the blocking body.
5. The method for rapidly plugging a dam breach according to claim 1, It is characterized in that When the valve is opened in step six, the water inlet valve and the ventilation valve in the same cage are opened at the same time, and the valve is opened by bursting micro-explosion or controlled by a solenoid valve.
6. The method for rapidly plugging a dam breach according to claim 1, It is characterized in that In step six, the driving device, the water inlet valve and the ventilation valve are controlled by remote control or autonomous edge computing.
7. The method for rapidly plugging a dam breach according to claim 1, It is characterized in that In the step seven, the box cage sealing valve and the ventilation valve that have not entered the sealing body are both in a closed state. When the sealing body is applied to the upper wall of the notch, one of the box cage sealing valve and the ventilation valve that have entered the notch is closed to form a water baffle to keep the sealing body from leaking.
Citation Information
Patent Citations
Underwater suspended and drifted plugging construction method for high heads
CN102383397A
Method for rapidly plugging dike breach
CN102493401A
A device for evaluating pressure water effect is crack shutoff effect down
CN208206745U
Apparatus for protection of rubber dam
KR200187341Y1