A method, device and storage medium for deep peak regulation control of SHATR mode of thermal power unit

Through the SHATR mode deep peak-shaving control method, the output of the thermal power unit is adjusted, and the problem of difficulty in absorbing new energy is solved, achieving maximum consumption of new energy and stable operation of the power grid.

CN114421480BActive Publication Date: 2024-12-03NORTHWEST BRANCH OF STATE GRID POWER GRID CO +2
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202111522816.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-12-14
Publication Date
2024-12-03
Estimated Expiration
2041-12-14

AI Technical Summary

Technical Problem

In the case of large-scale development of new energy and the growth of installed capacity, the peak shaving capacity of thermal power units is insufficient, resulting in the power grid peak shaving and abandonment of electricity, unable to effectively absorb new energy electricity, and a transmission bottleneck problem of power transmission is caused.

Method used

The SHATR mode deep peak-shaving control method is adopted to obtain the regional control deviation value and preset static threshold value, divide the control interval, determine the corresponding control strategy, adjust the output according to the deviation of the actual output and the planned power generation value of the unit, and realize output control. Adjust the depth peak shaving of the belt.

Benefits of technology

Through adaptive control strategies, the consumption of new energy power is maximized, regional frequency stability and smooth operation of contact line exchange is maintained, solving the problem of insufficient peak shaving capability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114421480B_ABST
    Figure CN114421480B_ABST
Patent Text Reader

Abstract

The present invention discloses a deep peak regulation control method, device and storage medium of a SHATR mode of a thermal power unit. The method comprises obtaining a regional control deviation value ACE and comparing it with a preset static threshold value, dividing the interval to which the regional control deviation value ACE belongs; determining a control strategy according to the interval to which the ACE belongs; obtaining the actual output of the unit and the output control adjustment band range, and performing deep peak regulation control according to the control strategy; the present invention can use the SHATR control strategy, according to the deviation of the regional control deviation ACE in different control areas, within the adjustment limit range of the unit, to adaptively control the actual output of the unit, participate in deep peak regulation, maintain regional frequency stability and smooth operation of interconnection line exchange, and realize maximum consumption of new energy.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a method, a device and a storage medium for deep peak regulation control in a SHATR mode of a thermal power unit, and belongs to the technical field of power systems. Background Art

[0002] In recent years, my country has actively promoted the development of new energy, and each province has formulated a large-scale new energy development plan. With the large-scale centralized development of new energy and the continuous growth of installed capacity, the problem of new energy consumption has become increasingly prominent in the context of the slowdown in the growth rate of electricity consumption in today's society, which is mainly manifested in the phenomenon of "peak-shaving and power abandonment" when the power transmission encounters the "power transmission bottleneck" of the channel and the peak-shaving capacity is insufficient. Summary of the invention

[0003] The purpose of the present invention is to overcome the deficiencies in the prior art and to provide a method, device and storage medium for deep peak regulation control in the SHATR mode of a thermal power unit, which can calculate and generate a unit output control adjustment band according to the different control areas of the interval where the tie line deviation is located, and according to the deviation between the actual output of the unit and the power generation plan value, adopt an appropriate control strategy to participate in deep peak regulation to adjust the output of the unit, so as to maximize the consumption of new energy.

[0004] To achieve the above object, the present invention is implemented by adopting the following technical solutions:

[0005] In a first aspect, the present invention provides a method for controlling deep peak load in a SHATR mode of a thermal power plant, comprising:

[0006] Obtaining the regional control deviation value ACE and comparing it with the preset static threshold value, and dividing the regional control deviation value ACE into the interval;

[0007] Determine the control strategy according to the interval to which ACE belongs;

[0008] Obtain the actual output of the unit and the output control adjustment band range, and perform deep peak regulation control according to the control strategy;

[0009] Wherein, obtaining the output control adjustment band range includes:

[0010] Obtain the planned power generation value of the unit and the rated capacity of the unit to calculate the planned regulation band range;

[0011] The output control regulation range is calculated based on the inherent regulation range of the unit and the planned regulation range.

[0012] Optionally, the upper limit of the planned adjustment band is:

[0013] LFCMXSK=SK_VAL+SK_BAND

[0014] The lower limit of the planned adjustment band is:

[0015] LFCMNSK=SK_VAL-SK_BAND

[0016] Wherein, SK_VAL is the planned power generation value of the unit, SK_BAND is the planned bandwidth value, and the planned bandwidth value is set to 7.5% of the rated capacity of the unit.

[0017] Optionally, the upper limit of the output control adjustment band is:

[0018] LFCMX=MIN(LFCMXNSK, LFCMXSK)

[0019] The lower limit of the output control adjustment band is:

[0020] LFCMN=MAX(LFCMNNSK,LFCMNSK)

[0021] Among them, LFCMXNSK is the upper limit of the unit's inherent adjustment range, and LFCMXSK is the upper limit of the planned adjustment band; LFCMNNSK is the lower limit of the unit's inherent adjustment range, and LFCMXSK is the lower limit of the planned adjustment band.

[0022] Optionally, the interval to which the regional control deviation value ACE belongs includes a dead zone, a normal zone, a sub-emergency zone and an emergency zone; the control strategy includes the control strategy of the regional control deviation ACE in the dead zone, the control strategy of the regional control deviation ACE in the normal adjustment zone, the control strategy of the regional control deviation ACE in the sub-emergency zone, the control strategy of the regional control deviation ACE in the emergency zone and the control strategy of the thermal power unit participating in the peak-shaving control in the SHATR mode.

[0023] Optionally, the control strategy of the regional control deviation ACE in the dead zone includes:

[0024] The regional regulation demand is zero, and the actual output of the unit is not adjusted actively;

[0025] The tie line deviation is positive in the dead zone:

[0026] If the unit meets the preset conditions for enabling the planned regulation band, the planned regulation band is enabled;

[0027] The units whose actual output is negative relative to the planned power generation value and whose actual output is within the output control adjustment band will not be operated;

[0028] From the units whose actual output is positively biased relative to the power generation plan value and whose actual output is outside the output control regulation band, select the unit with the largest deviation between the actual output and the power generation plan value, and return to the output control regulation band with a preset small step size;

[0029] The tie line deviation is negative in the dead zone:

[0030] If the unit meets the preset conditions for enabling the planned regulation band, the planned regulation band is enabled;

[0031] The units whose actual output is positively biased relative to the planned power generation value and whose actual output is within the output control adjustment band will not be operated;

[0032] From the units whose actual output is negatively biased relative to the power generation plan value and whose actual output is outside the output control adjustment band, select the unit with the largest deviation between the actual output and the power generation plan value, and return to the output control adjustment band with a preset small step size.

[0033] Optionally, the control strategy of the regional control deviation ACE in the normal adjustment area includes:

[0034] The tie line deviation is positive within the normal adjustment area:

[0035] If the unit meets the preset conditions for enabling the planned regulation band, the planned regulation band is enabled;

[0036] The units whose actual output is positively deviated from the planned power generation value and are within the output control adjustment band participate in the allocation of regional adjustment demand. The unit sequence is generated from large to small according to the deviation between the actual output and the planned power generation value. The adjustment amount is borne by each unit sequence, and the borne adjustment amount does not exceed the preset adjustment step of the unit, and the actual output of the unit after adjustment does not exceed the lower limit of the output control adjustment band;

[0037] The units whose actual output is negatively biased relative to the planned power generation value and are outside the output control regulation band do not participate in the regional regulation demand allocation;

[0038] The tie line deviation is positive within the normal adjustment area:

[0039] If the unit meets the preset conditions for enabling the planned regulation band, the planned regulation band is enabled;

[0040] The units whose actual output is negatively biased relative to the planned power generation value and are within the output control adjustment band participate in the regional adjustment demand allocation, and the unit sequence is generated from small to large according to the deviation between the actual output and the planned power generation value. The adjustment amount is borne by each unit in the unit sequence, and the borne adjustment amount does not exceed the preset adjustment step of the unit, and the actual output of the unit after adjustment does not exceed the upper limit of the output control adjustment band;

[0041] The units whose actual output is positively biased relative to the planned power generation value and are outside the output control regulation band do not participate in the regional regulation demand allocation.

[0042] Optionally, the control strategy of the regional control deviation ACE in the secondary emergency area includes:

[0043] The deviation of the tie line is positive in the secondary emergency area:

[0044] The planned regulation belt is not enabled. All units participate in the regional regulation demand allocation. The unit sequence is generated from large to small according to the deviation between the actual output and the power generation plan value. The regulation amount is borne by each unit in the unit sequence. The borne regulation amount does not exceed the preset regulation step of the unit, and the actual output of the unit after regulation does not exceed the lower limit of the unit's inherent regulation range.

[0045] The deviation of the contact line is negative in the secondary emergency area:

[0046] The planned regulation belt is not enabled, and all units participate in the regional regulation demand allocation. The unit sequence is generated from small to large according to the deviation between the actual output and the power generation plan value. The adjustment amount is borne by each unit in the unit sequence. The borne adjustment amount does not exceed the preset adjustment step of the unit, and the actual output of the unit after adjustment does not exceed the upper limit of the unit's inherent regulation range.

[0047] Optionally, the control strategy of the regional control deviation ACE in the emergency area includes:

[0048] The deviation of the tie line is positive in the emergency zone:

[0049] The planned regulation belt is not enabled. All units participate in the regional regulation demand allocation. The unit sequence is generated from large to small according to the deviation between the actual output and the power generation plan value. The regulation amount is borne by each unit in the unit sequence. The borne regulation amount does not exceed the preset emergency regulation step of the unit, and the actual output of the unit after regulation does not exceed the lower limit of the unit's inherent regulation range.

[0050] The deviation of the contact line is negative in the emergency area:

[0051] The planned regulation belt is not enabled, and all units participate in the regional regulation demand allocation. The unit sequence is generated from small to large according to the deviation between the actual output and the power generation plan value, and the adjustment amount is borne by each unit in the unit sequence. The borne adjustment amount does not exceed the preset emergency adjustment step of the unit, and the actual output of the unit after adjustment does not exceed the upper limit of the unit's inherent adjustment range.

[0052] Optionally, the unit meets the preset planned regulation band activation conditions: the unit control strategy is SHATR mode, and the unit inherent regulation range and the planned regulation band have an intersection.

[0053] In a second aspect, the present invention provides a SHATR mode deep peak regulation control device for a thermal power unit, the device comprising:

[0054] An interval division module is used to obtain the area control deviation value ACE and compare it with a preset static threshold value to divide the area control deviation value ACE into intervals;

[0055] A mode determination module is used to determine the control strategy according to the interval to which the ACE belongs;

[0056] The peak load control module is used to obtain the actual output of the unit and the output control adjustment band range, and perform deep peak load control according to the control strategy;

[0057] Wherein, obtaining the output control adjustment band range includes:

[0058] Obtain the planned power generation value of the unit and the rated capacity of the unit to calculate the planned regulation band range;

[0059] The output control regulation range is calculated based on the inherent regulation range of the unit and the planned regulation range.

[0060] In a third aspect, the present invention provides a SHATR mode deep peak regulation control device for a thermal power unit, comprising a processor and a storage medium;

[0061] The storage medium is used to store instructions;

[0062] The processor is used to operate according to the instructions to execute the steps of any of the methods described above.

[0063] In a fourth aspect, the present invention provides a computer-readable storage medium having a computer program stored thereon, which implements the steps of any of the above methods when executed by a processor.

[0064] Compared with the prior art, the present invention has the following beneficial effects:

[0065] The present invention provides a method, device and storage medium for deep peak regulation control in SHATR mode of a thermal power unit. Based on AGC technology, a planned regulation band that takes into account the power generation plan of the unit is integrated into the AUTO mode, aiming at the deviation of the interconnection line in different control areas; the power generation plan of the thermal power unit is used to adaptively generate the planned regulation band, and in combination with the AUTO mode of the thermal power unit, the SHATR control strategy is used to adaptively control the actual output of the unit within the regulation limit of the unit according to the deviation of the regional control deviation ACE in different control areas, participate in deep peak regulation, maintain regional frequency stability and smooth operation of interconnection line exchange, and realize the maximum consumption of new energy. BRIEF DESCRIPTION OF THE DRAWINGS

[0066] Figure 1 It is a flow chart of a deep peak regulation control method of a thermal power unit in SHATR mode provided by an embodiment of the present invention;

[0067] Figure 2 It is a schematic diagram of a strategy for a tie line deviation to be positive within a dead zone provided by an embodiment of the present invention;

[0068] Figure 3 It is a schematic diagram of a strategy for a tie line deviation that is negatively biased in a dead zone provided by an embodiment of the present invention;

[0069] Figure 4 It is a schematic diagram of a strategy for a tie line deviation to be positive within a normal adjustment area provided by an embodiment of the present invention;

[0070] Figure 5 It is a schematic diagram of a strategy for a tie line deviation that is negatively biased within a normal adjustment area provided by an embodiment of the present invention;

[0071] Figure 6 It is a schematic diagram of a strategy for a tie line deviation in a secondary emergency area provided by an embodiment of the present invention;

[0072] Figure 7 It is a schematic diagram of a strategy for a tie line deviation that is negative in a secondary emergency area provided by an embodiment of the present invention;

[0073] Figure 8 It is a schematic diagram of a strategy for a tie line deviation in an emergency zone provided by an embodiment of the present invention;

[0074] Fig. 9 It is a schematic diagram of a strategy for a tie line deviation that is negative in an emergency zone provided by an embodiment of the present invention;

[0075] The markings in the figure are:

[0076] P sk is the planned power generation value of the unit, P skmx Indicates the upper limit of the planned adjustment range, P skmn Indicates the lower limit of the planned adjustment range, P mx Indicates the upper limit of the unit's inherent adjustment range, P mn Indicates the lower limit of the unit's inherent regulation range; A and B are units whose actual output operating points are higher than the upper limit of the planned regulation band, C and D are units whose actual output operating points are within the planned regulation band, and E and F are units whose actual output operating points are lower than the lower limit of the planned regulation band. DETAILED DESCRIPTION

[0077] The present invention will be further described below in conjunction with the accompanying drawings. The following embodiments are only used to more clearly illustrate the technical solution of the present invention, and cannot be used to limit the protection scope of the present invention.

[0078] Embodiment 1:

[0079] like Figure 1 As shown, the present invention provides a deep peak regulation control method of a thermal power unit in a SHATR mode, comprising:

[0080] (1) Obtain the regional control deviation value ACE and compare it with the preset static threshold value to divide the regional control deviation value ACE into intervals.

[0081] (2) Determine the control strategy based on the interval to which ACE belongs.

[0082] (3) Obtain the actual output of the unit and the output control adjustment band range, and perform deep peak control according to the control strategy.

[0083] The acquisition of the output control adjustment range includes:

[0084] Obtain the planned power generation value of the unit and the rated capacity of the unit to calculate the planned regulation band range;

[0085] The output control regulation range is calculated based on the inherent regulation range of the unit and the planned regulation range.

[0086] Specifically, the upper limit of the planned adjustment band is:

[0087] LFCMXSK=SK_VAL+SK_BAND

[0088] The lower limit of the planned adjustment band is:

[0089] LFCMNSK=SK_VAL-SK_BAND

[0090] Among them, SK_VAL is the planned power generation value of the unit, SK_BAND is the planned bandwidth value, and the planned bandwidth value is set to 7.5% of the rated capacity of the unit.

[0091] The upper limit of the output control adjustment band is:

[0092] LFCMX=MIN(LFCMXNSK, LFCMXSK)

[0093] The lower limit of the output control adjustment band is:

[0094] LFCMN=MAX(LFCMNNSK,LFCMNSK)

[0095] Among them, LFCMXNSK is the upper limit of the unit's inherent adjustment range, and LFCMXSK is the upper limit of the planned adjustment band; LFCMNNSK is the lower limit of the unit's inherent adjustment range, and LFCMXSK is the lower limit of the planned adjustment band.

[0096] Specifically, the intervals to which the regional control deviation value ACE belongs include dead zone, normal zone, sub-emergency zone and emergency zone; the control strategies include the control strategy of regional control deviation ACE in the dead zone, the control strategy of regional control deviation ACE in the normal regulation zone, the control strategy of regional control deviation ACE in the sub-emergency zone, the control strategy of regional control deviation ACE in the emergency zone and the control strategy of thermal power units participating in peak load regulation in SHATR mode.

[0097] 1. Regional control deviation ACE's control strategies in the dead zone include:

[0098] The regional regulation demand is zero, and the actual output of the unit is not adjusted actively;

[0099] like Figure 2 As shown, the tie line deviation is positive in the dead zone:

[0100] If the unit meets the preset conditions for enabling the planned regulation band, the planned regulation band is enabled;

[0101] The units whose actual output is negative relative to the planned power generation value and whose actual output is within the output control adjustment band will not be operated;

[0102] From the units whose actual output is positively biased relative to the power generation plan value and whose actual output is outside the output control regulation band, select the unit with the largest deviation between the actual output and the power generation plan value, and return to the output control regulation band with a preset small step size;

[0103] like Figure 3 As shown, the tie line deviation is negative in the dead zone:

[0104] If the unit meets the preset conditions for enabling the planned regulation band, the planned regulation band is enabled;

[0105] The units whose actual output is positively biased relative to the planned power generation value and whose actual output is within the output control adjustment band will not be operated;

[0106] From the units whose actual output is negatively biased relative to the power generation plan value and whose actual output is outside the output control adjustment band, select the unit with the largest deviation between the actual output and the power generation plan value, and return to the output control adjustment band with a preset small step size.

[0107] 2. Regional Control Deviation ACE control strategies in the normal regulation area include:

[0108] like Figure 4 As shown, the tie line deviation is positive in the normal regulation area:

[0109] If the unit meets the preset conditions for enabling the planned regulation band, the planned regulation band is enabled;

[0110] The units whose actual output is positively deviated from the planned power generation value and are within the output control adjustment band participate in the regional adjustment demand allocation. The unit sequence is generated from large to small according to the deviation between the actual output and the planned power generation value. The adjustment amount is borne by each unit in the unit sequence, and the adjustment amount does not exceed the preset adjustment step of the unit, and the actual output of the unit after adjustment does not exceed the lower limit of the output control adjustment band;

[0111] The units whose actual output is negatively biased relative to the planned power generation value and are outside the output control regulation band do not participate in the regional regulation demand allocation;

[0112] like Figure 5 As shown, the tie line deviation is positive in the normal regulation area:

[0113] If the unit meets the preset conditions for enabling the planned regulation band, the planned regulation band is enabled;

[0114] The units with negative actual output relative to the planned power generation value and within the output control adjustment band participate in the regional adjustment demand allocation, and the unit sequence is generated from small to large according to the deviation between the actual output and the planned power generation value. The adjustment amount is borne by each unit in the unit sequence, and the adjustment amount does not exceed the preset adjustment step of the unit, and the actual output of the unit after adjustment does not exceed the upper limit of the output control adjustment band;

[0115] The units whose actual output is positively biased relative to the planned power generation value and are outside the output control regulation band do not participate in the regional regulation demand allocation.

[0116] 3. Regional Control Deviation ACE's control strategies in the secondary emergency area include:

[0117] like Figure 6 As shown, the tie line deviation is positive in the secondary emergency area:

[0118] The planned regulation belt is not enabled. All units participate in the regional regulation demand allocation. The unit sequence is generated from large to small according to the deviation between the actual output and the power generation plan value. The regulation amount is borne by each unit in the unit sequence. The borne regulation amount does not exceed the preset regulation step of the unit, and the actual output of the unit after regulation does not exceed the lower limit of the unit's inherent regulation range.

[0119] like Figure 7 As shown, the tie line deviation is negative in the secondary emergency area:

[0120] The planned regulation belt is not enabled, and all units participate in the regional regulation demand allocation. The unit sequence is generated from small to large according to the deviation between the actual output and the power generation plan value. The regulation amount is borne by each unit in the unit sequence, and the regulation amount does not exceed the preset regulation step of the unit. The actual output of the unit after adjustment does not exceed the upper limit of the unit's inherent regulation range.

[0121] 4. Regional Control Deviation ACE's control strategies in the emergency area include:

[0122] like Figure 8 As shown, the tie line deviation is positive in the emergency area:

[0123] The planned regulation belt is not enabled. All units participate in the regional regulation demand allocation. The unit sequence is generated from large to small according to the deviation between the actual output and the power generation plan value. The regulation amount is borne by each unit in the unit sequence. The borne regulation amount does not exceed the preset emergency regulation step of the unit, and the actual output of the unit after regulation does not exceed the lower limit of the unit's inherent regulation range.

[0124] like Fig. 9 As shown, the tie line deviation is negative in the emergency area:

[0125] The planned regulation belt is not enabled, and all units participate in the regional regulation demand allocation. The unit sequence is generated from small to large according to the deviation between the actual output and the power generation plan value. The regulation amount is borne by each unit in the unit sequence, and the regulation amount does not exceed the preset emergency regulation step of the unit. The actual output of the unit after adjustment does not exceed the upper limit of the unit's inherent regulation range.

[0126] Among them, the unit meets the preset conditions for activating the planned regulation band: the unit control strategy is SHATR mode, and the unit's inherent regulation range has an intersection with the planned regulation band.

[0127] Embodiment 2:

[0128] The embodiment of the present invention provides a SHATR mode deep peak regulation control device for a thermal power unit, comprising:

[0129] An interval division module is used to obtain the area control deviation value ACE and compare it with a preset static threshold value to divide the area control deviation value ACE into intervals;

[0130] A mode determination module is used to determine the control strategy according to the interval to which the ACE belongs;

[0131] The peak load control module is used to obtain the actual output of the unit and the output control adjustment band range, and perform deep peak load control according to the control strategy;

[0132] The acquisition of the output control adjustment range includes:

[0133] Obtain the planned power generation value of the unit and the rated capacity of the unit to calculate the planned regulation band range;

[0134] The output control regulation range is calculated based on the inherent regulation range of the unit and the planned regulation range.

[0135] Embodiment three:

[0136] Based on the first embodiment, the embodiment of the present invention provides a deep peak regulation control device of a thermal power unit in a SHATR mode, including a processor and a storage medium;

[0137] The storage medium is used to store instructions;

[0138] The processor is used to operate according to the instructions to execute the steps according to the above method.

[0139] Embodiment 4:

[0140] Based on the first embodiment, the present invention provides a computer-readable storage medium on which a computer program is stored, and when the program is executed by a processor, the steps of the above method are implemented.

[0141] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.

[0142] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0143] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0144] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process in the computer or other programmable device. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0145] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the technical principles of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.

Claims

1. A deep peak regulation control method for a thermal power unit in SHATR mode, characterized in that: include: Obtaining the regional control deviation value ACE and comparing it with the preset static threshold value, and dividing the regional control deviation value ACE into the interval; Determine the control strategy according to the interval to which ACE belongs; Obtain the actual output of the unit and the output control adjustment band range, and perform deep peak regulation control according to the control strategy; Wherein, obtaining the output control adjustment band range includes: Obtain the planned power generation value of the unit and the rated capacity of the unit to calculate the planned regulation band range; The output control regulation range is calculated based on the inherent regulation range of the unit and the planned regulation range; Wherein, the interval to which the divided regional control deviation value ACE belongs includes an emergency zone; the control strategy includes a control strategy of the regional control deviation ACE in the emergency zone; The control strategy of the regional control deviation ACE in the emergency area includes: The deviation of the tie line is positive in the emergency zone: The planned regulation belt is not enabled. All units participate in the regional regulation demand allocation. The unit sequence is generated from large to small according to the deviation between the actual output and the power generation plan value. The regulation amount is borne by each unit in the unit sequence. The borne regulation amount does not exceed the preset emergency regulation step of the unit, and the actual output of the unit after regulation does not exceed the lower limit of the unit's inherent regulation range. The deviation of the contact line is negative in the emergency area: The planned regulation belt is not enabled, and all units participate in the regional regulation demand allocation. The unit sequence is generated from small to large according to the deviation between the actual output and the power generation plan value, and the adjustment amount is borne by each unit in the unit sequence. The borne adjustment amount does not exceed the preset emergency adjustment step of the unit, and the actual output of the unit after adjustment does not exceed the upper limit of the unit's inherent adjustment range.

2. A method for deep peak regulation control in SHATR mode of a thermal power unit according to claim 1, characterized in that: The upper limit of the planned adjustment band is: LFCMXSK=SK_VAL+SK_BAND The lower limit of the planned adjustment band is: LFCMNSK=SK_VAL-SK_BAND Wherein, SK_VAL is the planned power generation value of the unit, SK_BAND is the planned bandwidth value, and the planned bandwidth value is set to 7.5% of the rated capacity of the unit.

3. A method for deep peak regulation control of a thermal power unit in SHATR mode according to claim 1, characterized in that: The upper limit of the output control adjustment band is: LFCMX=MIN(LFCMXNSK, LFCMXSK) The lower limit of the output control adjustment band is: LFCMN=MAX(LFCMNNSK,LFCMNSK) Among them, LFCMXNSK is the upper limit of the unit's inherent adjustment range, and LFCMXSK is the upper limit of the planned adjustment band; LFCMNNSK is the lower limit of the unit's inherent adjustment range, and LFCMXSK is the lower limit of the planned adjustment band.

4. A method for deep peak regulation control in SHATR mode of a thermal power unit according to claim 1, characterized in that: The interval to which the regional control deviation value ACE belongs also includes a dead zone, a normal zone, and a sub-emergency zone; the control strategy also includes a control strategy of the regional control deviation ACE in the dead zone, a control strategy of the regional control deviation ACE in the normal regulation zone, a control strategy of the regional control deviation ACE in the sub-emergency zone, and a control strategy of thermal power units participating in peak load regulation in SHATR mode.

5. A method for deep peak regulation control in SHATR mode of a thermal power unit according to claim 4, characterized in that: The control strategy of the regional control deviation ACE in the dead zone includes: The regional regulation demand is zero, and the actual output of the unit is not adjusted actively; Tie line deviation is positive in the dead zone: If the unit meets the preset conditions for enabling the planned regulation band, the planned regulation band is enabled; The units whose actual output is negative relative to the planned power generation value and whose actual output is within the output control adjustment band will not be operated; From the units whose actual output is positively biased relative to the power generation plan value and whose actual output is outside the output control regulation band, select the unit with the largest deviation between the actual output and the power generation plan value, and return to the output control regulation band with a preset small step size; The tie line deviation is negative in the dead zone: If the unit meets the preset conditions for enabling the planned regulation band, the planned regulation band is enabled; The units whose actual output is positively biased relative to the planned power generation value and whose actual output is within the output control adjustment band will not be operated; From the units whose actual output is negatively biased relative to the power generation plan value and whose actual output is outside the output control adjustment band, select the unit with the largest deviation between the actual output and the power generation plan value, and return to the output control adjustment band with a preset small step size.

6. A method for deep peak regulation control in SHATR mode of a thermal power plant according to claim 4, characterized in that: The control strategy of the regional control deviation ACE in the normal adjustment area includes: The tie line deviation is positive within the normal adjustment area: If the unit meets the preset conditions for enabling the planned regulation band, the planned regulation band is enabled; The units whose actual output is positively deviated from the planned power generation value and are within the output control adjustment band participate in the allocation of regional adjustment demand. The unit sequence is generated from large to small according to the deviation between the actual output and the planned power generation value. The adjustment amount is borne by each unit sequence, and the borne adjustment amount does not exceed the preset adjustment step of the unit, and the actual output of the unit after adjustment does not exceed the lower limit of the output control adjustment band; The units whose actual output is negatively biased relative to the planned power generation value and are outside the output control regulation band do not participate in the regional regulation demand allocation; The tie line deviation is positive within the normal adjustment area: If the unit meets the preset conditions for enabling the planned regulation band, the planned regulation band is enabled; The units whose actual output is negatively biased relative to the planned power generation value and are within the output control adjustment band participate in the regional adjustment demand allocation, and the unit sequence is generated from small to large according to the deviation between the actual output and the planned power generation value. The adjustment amount is borne by each unit in the unit sequence, and the borne adjustment amount does not exceed the preset adjustment step of the unit, and the actual output of the unit after adjustment does not exceed the upper limit of the output control adjustment band; The units whose actual output is positively biased relative to the planned power generation value and are outside the output control regulation band do not participate in the regional regulation demand allocation.

7. A method for deep peak regulation control in SHATR mode of a thermal power unit according to claim 4, characterized in that: The control strategy of the regional control deviation ACE in the secondary emergency area includes: The deviation of the contact line is positive in the secondary emergency area: The planned regulation belt is not enabled. All units participate in the regional regulation demand allocation. The unit sequence is generated from large to small according to the deviation between the actual output and the power generation plan value. The regulation amount is borne by each unit in the unit sequence. The borne regulation amount does not exceed the preset regulation step of the unit, and the actual output of the unit after regulation does not exceed the lower limit of the unit's inherent regulation range. The deviation of the contact line is negative in the secondary emergency area: The planned regulation belt is not enabled, and all units participate in the regional regulation demand allocation. The unit sequence is generated from small to large according to the deviation between the actual output and the power generation plan value. The adjustment amount is borne by each unit in the unit sequence. The borne adjustment amount does not exceed the preset adjustment step of the unit, and the actual output of the unit after adjustment does not exceed the upper limit of the unit's inherent regulation range.

8. A method for deep peak regulation control in SHATR mode of a thermal power plant according to claim 5 or 6, characterized in that: The unit meets the preset planned regulation band activation conditions: the unit control strategy is SHATR mode, and the unit's inherent regulation range and the planned regulation band have an intersection.

9. A SHATR mode deep peak regulation control device for a thermal power unit, characterized in that: The device comprises: An interval division module is used to obtain the area control deviation value ACE and compare it with a preset static threshold value to divide the area control deviation value ACE into intervals; A mode determination module is used to determine the control strategy according to the interval to which the ACE belongs; The peak load control module is used to obtain the actual output of the unit and the output control adjustment band range, and perform deep peak load control according to the control strategy; Wherein, obtaining the output control adjustment band range includes: Obtain the planned power generation value of the unit and the rated capacity of the unit to calculate the planned regulation band range; The output control regulation range is calculated based on the inherent regulation range of the unit and the planned regulation range; Wherein, the interval to which the divided regional control deviation value ACE belongs includes an emergency zone; the control strategy includes a control strategy of the regional control deviation ACE in the emergency zone; The control strategy of the regional control deviation ACE in the emergency area includes: The deviation of the tie line is positive in the emergency zone: The planned regulation belt is not enabled. All units participate in the regional regulation demand allocation. The unit sequence is generated from large to small according to the deviation between the actual output and the power generation plan value. The regulation amount is borne by each unit in the unit sequence. The borne regulation amount does not exceed the preset emergency regulation step of the unit, and the actual output of the unit after regulation does not exceed the lower limit of the unit's inherent regulation range. The deviation of the contact line is negative in the emergency area: The planned regulation belt is not enabled, and all units participate in the regional regulation demand allocation. The unit sequence is generated from small to large according to the deviation between the actual output and the power generation plan value, and the adjustment amount is borne by each unit in the unit sequence. The borne adjustment amount does not exceed the preset emergency adjustment step of the unit, and the actual output of the unit after adjustment does not exceed the upper limit of the unit's inherent adjustment range.

10. A SHATR mode deep peak regulation control device for a thermal power unit, characterized in that: including processor and storage medium; The storage medium is used to store instructions; The processor is configured to operate according to the instructions to execute the steps of the method according to any one of claims 1-8.

11. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the program is executed by a processor, the steps of the method according to any one of claims 1 to 8 are implemented.

Citation Information

Patent Citations

  • Electric energy storage control method and device of energy storage system

    CN111276987A

  • Automatic power generation control method and system

    CN112467760A