By disconnecting the pulse power supply and the second electric field, the high-frequency power supply is installed on the second electric field to run, the cause of the fault is judged and repaired, the problem of high spark rate of the high-frequency power supply is solved, and rapid judgment and temporary The treatment improves dust removal efficiency and feasibility of electric field maintenance.

CN114428195BActive Publication Date: 2024-12-03DATANG SHAANXI POWER GENERATION CO LTD XIAN THERMAL POWER PLANT
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202111561484.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-12-16
Publication Date
2024-12-03
Estimated Expiration
2041-12-16

AI Technical Summary

Technical Problem

In the existing electro-dust removal technology, the sudden increase in the electric field spark rate carried by high-frequency power supplies leads to a decrease in dust removal efficiency, and it is impossible to accurately judge the power supply failure and the electric field failure, resulting in a long shutdown and maintenance time, affecting the unit load.

Method used

Provide a method for determining faults of electric dust removal electric field and emergency treatment. By disconnecting the pulse power supply and the second electric field, the high-frequency power supply is mounted on the second electric field to run, and the cause of the fault is judged, and without affecting the unit load. Carry out repairs.

Benefits of technology

Quickly determine the reasons for the electric field dust removal indicators not meeting the standards, avoid blindly replacing the power control board, reduce economic losses, improve dust removal efficiency, avoid exceeding the amount of dust, and smoothly repairing the faulty electric field without reducing the load.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114428195B_ABST
    Figure CN114428195B_ABST
Patent Text Reader

Abstract

The present application discloses a method for distinguishing and handling electric field faults of an electrostatic precipitator, including: placing a high-frequency power supply on a first electric field for operation; placing a pulse power supply on a second electric field for operation; when a dust removal index fails to meet the standard in the first electric field, disconnecting the pulse power supply from the second electric field, placing the high-frequency power supply on the second electric field for operation; judging whether the second electric field can operate normally; if the second electric field can operate normally, determining that the cause of the fault is an abnormality in the first electric field; if the second electric field cannot operate normally, determining that the cause of the fault is an abnormality in the high-frequency power supply. When a fault occurs in the first electric field, the high-frequency power supply is placed on the second electric field for operation, and after the maintenance is completed, it is connected back to the original state. The method disclosed in the present application can be used to quickly determine the reason why the dust removal index of the first electric field fails to meet the standard, and to repair the first electric field that has a fault without affecting the load of the unit.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of electrostatic precipitator technology in electric fields, and in particular to a method for identifying and emergency handling faults in electrostatic precipitator electric fields. Background Art

[0002] At present, most thermal power plants use a combination of high-frequency power supply and pulse power supply to operate the electrostatic precipitator. The electric field carried by the high-frequency power supply undertakes nearly 87% of the dust removal tasks of each unit. The purpose of the pulse power supply is to remove fine dust particles. It consumes low power, but the efficiency is also low, accounting for only 13% of the dust removal. The electric field strength carried by the pulse power supply is low, resulting in lower dust removal efficiency, but the internal operation of the electric field is good. In the case of a sudden increase in the spark rate of the electric field carried by the high-frequency power supply, the spark rate has exceeded the standard when the secondary current is low, and effective dust removal cannot be achieved. There are two main causes of the fault: 1. Power supply failure; 2. Internal fault of the electrostatic precipitator electric field. However, the two causes of the fault cannot be accurately judged. When it is determined that there is a fault inside the electric field carried by the high-frequency power supply, it is necessary to wait for the unit to shut down before handling the fault. Due to the high proportion of high-frequency power supply dust removal, once an electric field is shut down, the internal structure of the field is complex and the processing time is long, which affects the unit load. Summary of the invention

[0003] The present application provides an electrostatic precipitator electric field fault identification and emergency treatment method, which can quickly determine the reason why the dust removal index of the first electric field does not meet the standard; when it is determined that there is a fault inside the first electric field, the faulty first electric field can be repaired without affecting the load of the unit.

[0004] In a first aspect, the present application provides a method for determining an electric field fault of an electrostatic precipitator, comprising:

[0005] The high frequency power source is mounted on the first electric field and operated;

[0006] The pulse power source is carried on the second electric field to operate;

[0007] When the dust removal index fails to meet the standard in the first electric field, the connection between the pulse power supply and the second electric field is disconnected, and the high-frequency power supply is mounted on the second electric field for operation;

[0008] determining whether the second electric field can operate normally;

[0009] If the second electric field can operate normally, it is determined that the cause of the fault is abnormality of the first electric field;

[0010] If the second electric field cannot operate normally, it is determined that the cause of the fault is abnormality of the high-frequency power supply.

[0011] The above method can be used to quickly determine the reasons why the electric field dust removal indicators do not meet the standards, avoiding the economic losses caused by blindly replacing the power control board.

[0012] As an optional implementation example, the high-frequency power supply is operated on the second electric field, including:

[0013] S1: Change the power-off vibration mode of the high-frequency power supply and the pulse power supply to the power-off vibration mode respectively;

[0014] S2: shut down the high-frequency power supply and the pulse power supply respectively, and switch the isolation switch of the first electric field and the isolation switch of the second electric field to the grounding position;

[0015] S3: connect the first electric field and the second electric field to temporary grounding wires respectively, and remove the high-voltage lead wire of the first electric field and the high-voltage lead wire of the second electric field respectively;

[0016] S4: connecting a high-voltage lead of a high-frequency power supply to one end of the wall bushing, and connecting the other end of the wall bushing to the second electric field;

[0017] S5: After the wiring work is completed, remove the temporary grounding wire;

[0018] S6: The isolating switch of the high-frequency power supply is closed to the working position to supply power to the second electric field.

[0019] As an optional implementation example, determining whether the second electric field can operate normally includes:

[0020] After the high-frequency power supply is started, the voltage is gradually increased. When the current is set to the first preset value, there is no abnormality in the voltage and current values ​​of the second electric field and the spark rate is lower than the rated value; when the current is increased to the rated value of the high-frequency power supply, it is observed that there is no abnormality in the voltage and current values ​​of the second electric field, and the second electric field operates normally.

[0021] As an optional implementation example, one end of the temporary grounding wire bonded to the first electric field is connected to the high-voltage lead of the first electric field, and the other end of the temporary grounding wire bonded to the first electric field is connected to the first grounding flat iron;

[0022] It should be noted that one end of the temporary grounding wire for the second electric field is connected to the high voltage lead of the second electric field, and the other end of the temporary grounding wire for the second electric field is connected to the second grounding flat iron.

[0023] In a second aspect, the present application further provides an emergency treatment method for an electrostatic precipitator electric field fault. After determining that the first electric field is abnormal by using any of the electrostatic precipitator electric field fault identification methods described in the first aspect, the following treatment is performed:

[0024] The high frequency power source is mounted on the first electric field and operated;

[0025] The pulse power source is carried on the second electric field to operate;

[0026] Disconnect the high-frequency power supply from the first electric field; connect the high-frequency power supply to the second electric field;

[0027] Inspect the first electric field; after eliminating the abnormality, remove the connection between the high-frequency power supply and the second electric field; and connect the high-frequency power supply to the first electric field, and connect the pulse power supply to the second electric field.

[0028] As an optional implementation example, disconnecting the high-frequency power supply from the first electric field and connecting the high-frequency power supply to the second electric field includes:

[0029] C1: Change the power-off vibration mode of the high-frequency power supply and the pulse power supply to the power-off vibration mode respectively;

[0030] C2: Shut down the high-frequency power supply and pulse power supply respectively, and switch the isolation switches of the first electric field and the second electric field to the grounding position;

[0031] C3: connect temporary grounding wires to the first electric field and the second electric field respectively, and remove the high-voltage lead wire of the first electric field and the high-voltage lead wire of the second electric field respectively;

[0032] C4: Connect one end of the high-voltage lead of the high-frequency power supply to the high-frequency power supply isolation switch, and the other end of the high-voltage lead of the high-frequency power supply is connected to one end of the damping resistor; the other end of the damping resistor is connected to one end of the wall bushing, and the other end of the wall bushing is connected to the second electric field;

[0033] C5: After all wiring work is completed, remove the temporary grounding wires of the first and second electric fields;

[0034] C6: Close the isolation switch corresponding to the high-frequency power supply to the working position to supply power to the second electric field.

[0035] It should be noted that in order to effectively absorb the high-order harmonic components of the secondary circuit of the high-frequency power supply, prevent the output circuit from resonating, and effectively protect the high-frequency power supply, a damping resistor must be set at one end of the high-frequency power supply.

[0036] As an optional implementation example, a supporting device is arranged under the high-voltage lead between the first electric field and the second electric field, and the supporting device is used to support the high-voltage lead of the high-frequency power supply so that the high-voltage lead of the high-frequency power supply is away from the top surface of the first electric field and the second electric field.

[0037] It should be noted that the supporting device includes: channel steel and insulating porcelain bottle; the channel steel is welded to the top surface of the second electric field, and one end of the insulating porcelain bottle is fixedly connected to the steel channel.

[0038] As an optional implementation example, the supporting device is used to keep the high-voltage leads of the high-frequency power supply at the same horizontal height.

[0039] It should be noted that the technical effects of the electrostatic precipitator electric field fault identification and emergency treatment method provided by this application are as follows:

[0040] 1. Quickly identify the cause of high spark rate of high-frequency power supply in electrostatic precipitator, avoid blind replacement of power supply control board and reduce economic losses;

[0041] 2. When it is determined that the electric field inside the electrostatic precipitator fails, temporary treatment can be carried out, which can not only improve the dust removal effect of the electrostatic precipitator, but also avoid excessive dust;

[0042] 3. Smoothly repair the faulty electric field without reducing the load. BRIEF DESCRIPTION OF THE DRAWINGS

[0043] Figure 1 This is a schematic diagram of the application of the high-frequency power supply equipped with a second electric field. DETAILED DESCRIPTION

[0044] In order to make the purpose, technical solutions and advantages of this application clearer, the technical solutions in this application will be clearly and completely described below in conjunction with the drawings in this application. Obviously, the described embodiments are part of the embodiments of this application, not all of them. Based on the embodiments in this application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0045] The present application provides a method for distinguishing electric field faults of an electrostatic precipitator, comprising:

[0046] The high frequency power source is mounted on the first electric field and operated;

[0047] The pulse power source is carried on the second electric field to operate;

[0048] When the dust removal index fails to meet the standard in the first electric field, the connection between the pulse power supply and the second electric field is disconnected, and the high-frequency power supply is carried on the second electric field for operation;

[0049] determining whether the second electric field can operate normally;

[0050] If the second electric field can operate normally, it is determined that the cause of the fault is abnormality of the first electric field;

[0051] If the second electric field cannot operate normally, it is determined that the cause of the fault is abnormality of the high-frequency power supply.

[0052] The above method can be used to quickly determine the reasons why the electric field dust removal indicators do not meet the standards, avoiding the economic losses caused by blindly replacing the power control board.

[0053] As an optional implementation example, the above-mentioned operation of the high-frequency power supply on the second electric field includes:

[0054] S1: Change the power-off vibration mode of the high-frequency power supply and the pulse power supply to the power-off vibration mode respectively;

[0055] S2: shut down the high-frequency power supply and the pulse power supply respectively, and switch the isolation switch of the first electric field and the isolation switch of the second electric field to the grounding position;

[0056] S3: connect the first electric field and the second electric field to temporary grounding wires respectively, and remove the high-voltage lead wire of the first electric field and the high-voltage lead wire of the second electric field respectively;

[0057] S4: connecting a high-voltage lead of a high-frequency power supply to one end of the wall bushing, and connecting the other end of the wall bushing to the second electric field;

[0058] S5: After the wiring work is completed, remove the temporary grounding wire;

[0059] S6: The isolating switch of the high-frequency power supply is closed to the working position to supply power to the second electric field.

[0060] As an example, in the above step S4, the high-voltage lead of the high-frequency power supply is connected to one end of the wall bushing through an insulated wire, and the insulated wire is suspended in the air using insulating material to maintain a distance between the wire and the top surface of the electric field and between the wire and the cabinet to prevent abnormal discharge.

[0061] As an optional implementation example, determining whether the second electric field can operate normally includes:

[0062] After the high-frequency power supply is started, the voltage is gradually increased. When the current is set to 200mA, there is no abnormality in the voltage and current values ​​of the second electric field and the spark rate is less than 5spm; when the current is increased to 600mA, it is observed that there is no abnormality in the voltage and current values ​​of the second electric field, and the second electric field operates normally.

[0063] As an optional implementation example, one end of the temporary grounding wire bonded to the first electric field is connected to the high-voltage lead of the first electric field, and the other end of the temporary grounding wire bonded to the first electric field is connected to the first grounding flat iron;

[0064] It should be noted that one end of the temporary grounding wire for the second electric field is connected to the high voltage lead of the second electric field, and the other end of the temporary grounding wire for the second electric field is connected to the second grounding flat iron.

[0065] The present application also provides an emergency treatment method for an electric precipitator electric field fault. After the first electric field abnormality is determined by using the electric precipitator electric field fault identification method described in any of the above embodiments, the following treatment is performed:

[0066] The high frequency power source is mounted on the first electric field and operated;

[0067] The pulse power source is carried on the second electric field to operate;

[0068] Disconnect the high-frequency power supply from the first electric field; connect the high-frequency power supply to the second electric field;

[0069] Inspect the first electric field; after eliminating the abnormality, remove the connection between the high-frequency power supply and the second electric field; and connect the high-frequency power supply to the first electric field, and connect the pulse power supply to the second electric field.

[0070] As an alternative implementation example, Figure 1 As shown, the above-mentioned disconnection between the high-frequency power supply and the first electric field and the connection between the high-frequency power supply and the second electric field includes:

[0071] C1: Change the power-off vibration mode of the high-frequency power supply and the pulse power supply to the power-off vibration mode respectively;

[0072] C2: Shut down the high-frequency power supply and pulse power supply respectively, and switch the isolation switches of the first electric field and the second electric field to the grounding position;

[0073] C3: connect temporary grounding wires to the first electric field and the second electric field respectively, and remove the high-voltage lead wire of the first electric field and the high-voltage lead wire of the second electric field respectively;

[0074] C4: Determine the high-voltage lead path, fix the insulating porcelain bottle on the lead path to support the high-voltage lead, pass the high-voltage lead for the test through the flame-retardant insulating CPVC casing, heat and shrink the casing at the elbow, and wrap it with insulating tape; put a section of insulating epoxy tube on both ends of the CPVC casing, weld the angle iron frame support on the top surface of the electric field, drill holes on the isolation knife switch cabinets of the first and second electric fields with a drill bit, and the drilling angle is about 15 degrees along the vertical direction. Extend the CPVC casing into the isolation knife switch cabinet; connect one end of the high-voltage lead of the high-frequency power supply to the high-frequency power supply isolation knife switch, and the other end of the high-voltage lead of the high-frequency power supply is connected to one end of the damping resistor; the other end of the damping resistor is connected to one end of the wall bushing, and the other end of the wall bushing is connected to the second electric field;

[0075] C5: After all wiring work is completed, remove the temporary grounding wires of the first and second electric fields;

[0076] C6: Close the isolation switch corresponding to the high-frequency power supply to the working position to supply power to the second electric field.

[0077] After the high-frequency power supply is started, the voltage is gradually increased. When the current is set to 200mA, there is no abnormality in the voltage and current values ​​of the second electric field and the spark rate is less than 5spm; when the current is increased to 600mA, it is observed that there is no abnormality in the voltage and current values ​​of the second electric field, and the second electric field operates normally.

[0078] It should be noted that in step C4, one end of the high-frequency power supply is connected to the damping resistor. In order to effectively absorb the high-order harmonic components of the secondary circuit of the high-frequency power supply, prevent the output circuit from resonating, and effectively protect the high-frequency power supply, a damping resistor must be set at one end of the high-frequency power supply.

[0079] It should be noted that the punching angle in step C4 is about 15 degrees to prevent the CPVC pipe from bending.

[0080] As an optional implementation example, a support device is provided below the high-voltage lead between the first electric field and the second electric field, and the support device is used to support the high-voltage lead of the high-frequency power supply so that the high-voltage lead of the high-frequency power supply is away from the top surface of the first electric field and the second electric field;

[0081] It should be noted that the supporting device includes: channel steel and insulating porcelain bottle; the channel steel is welded to the top surface of the second electric field, and one end of the insulating porcelain bottle is fixedly connected to the steel channel.

[0082] As an optional implementation example, the supporting device is used to keep the high-voltage leads of the high-frequency power supply at the same horizontal height.

[0083] It should be noted that the purpose of maintaining the same horizontal height is to keep a distance between the wire and the top surface of the electric field and between the wire and the cabinet to prevent abnormal discharge.

[0084] The technical effects of the electrostatic precipitator electric field fault identification and emergency treatment method provided by this application are as follows:

[0085] 1. Quickly identify the cause of high spark rate of high-frequency power supply in electrostatic precipitator, avoid blind replacement of power control board and reduce economic losses.

[0086] 2. When it is determined that there is an electric field failure inside the electrostatic precipitator, temporary treatment can be carried out, which can not only improve the dust removal effect of the electrostatic precipitator, but also avoid excessive dust.

[0087] 3. Smoothly repair the faulty electric field without reducing the load.

[0088] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any person skilled in the art who is familiar with the present technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.

Claims

1. A method for identifying electric field faults in electrostatic precipitators. It is characterized in that include: The high frequency power source is mounted on the first electric field and operated; The pulse power supply is mounted on a second electric field for operation; wherein the second electric field carried by the pulse power supply is used to remove dust from the same unit in combination with the first electric field carried by the high-frequency power supply; When the first electric field fails to meet the dust removal index, disconnecting the pulse power supply from the second electric field, and operating the high-frequency power supply on the second electric field; Determining whether the second electric field can operate normally; If the second electric field can operate normally, determining that the fault cause is the abnormality of the first electric field; If the second electric field cannot operate normally, determining that the fault cause is abnormality of the high-frequency power supply; wherein the high-frequency power supply is mounted on the second electric field for operation, comprises: S1: respectively modifying the power-off vibration mode of the high-frequency power supply and the pulse power supply to the power-off vibration mode; S2: shutting down the high-frequency power supply and the pulse power supply respectively, and switching the isolation switch of the first electric field and the isolation switch of the second electric field to the grounding position; S3: connect the first electric field and the second electric field to temporary grounding wires respectively, and remove the high-voltage lead wire of the first electric field and the high-voltage lead wire of the second electric field respectively; S4: connecting the high-voltage lead of the high-frequency power supply to one end of the wall bushing, and connecting the other end of the wall bushing to the second electric field; S5: After the wiring work is completed, the temporary grounding wire is removed; S6: The isolation switch of the high-frequency power supply is closed to the working position to supply power to the second electric field.

2. The determination method according to claim 1, It is characterized in that The determining whether the second electric field can operate normally includes: After the high-frequency power supply is started, the voltage is gradually increased. When the current is set to a first preset value, there are no abnormalities in the voltage and current values ​​of the second electric field and the spark rate is lower than the rated value; when the current is increased to the rated value of the high-frequency power supply, it is observed that there are no abnormalities in the voltage and current values ​​of the second electric field, and the second electric field operates normally.

3. According to the identification method of claim 1, It is characterized in that One end of the temporary grounding wire connected to the first electric field is connected to the high-voltage lead of the first electric field, and the other end of the temporary grounding wire connected to the first electric field is connected to the first grounding flat iron; One end of the temporary grounding wire for the second electric field connection is connected to the high voltage lead of the second electric field, and the other end of the temporary grounding wire for the second electric field connection is connected to the second grounding flat iron.

4. An emergency treatment method for electric field failure of electrostatic precipitator, It is characterized in that After the first electric field abnormality is determined by using the electric precipitator electric field fault determination method as described in any one of claims 1 to 3, the following processing is performed: The high frequency power source is mounted on the first electric field and operated; The pulse power source is carried on the second electric field to operate; Disconnecting the high-frequency power source from the first electric field; connecting the high-frequency power source to the second electric field; inspecting the first electric field; After eliminating the abnormality, the connection between the high-frequency power supply and the second electric field is removed; and the high-frequency power supply is connected to the first electric field, and the pulse power supply is connected to the second electric field.

5. The processing method according to claim 4, It is characterized in that The method of disconnecting the high-frequency power source from the first electric field and connecting the high-frequency power source to the second electric field comprises: C1: respectively modifying the power-off vibration mode of the high-frequency power supply and the pulse power supply to the power-off vibration mode; C2: shut down the high-frequency power supply and the pulse power supply respectively, and switch the isolation switches of the first electric field and the second electric field to the grounding position; C3: connect temporary grounding wires to the first electric field and the second electric field respectively, and remove the high-voltage lead wire of the first electric field and the high-voltage lead wire of the second electric field respectively; C4: Connect one end of the high-voltage lead of the high-frequency power supply to the high-frequency power supply isolation switch, and the other end of the high-voltage lead of the high-frequency power supply is connected to one end of the damping resistor; the other end of the damping resistor is connected to one end of the wall bushing, and the other end of the wall bushing is connected to the second electric field; C5: After all wiring work is completed, the temporary grounding wires of the first electric field and the second electric field are removed; C6: Close the isolation switch corresponding to the high-frequency power supply to the working position to supply power to the second electric field.

6. The processing method according to claim 5, It is characterized in that A support device is provided below the high-voltage lead between the first electric field and the second electric field, and the support device is used to support the high-voltage lead of the high-frequency power supply so that the high-voltage lead of the high-frequency power supply is away from the top surface of the first electric field and the second electric field; The supporting device comprises: a channel steel and an insulating porcelain bottle; the channel steel is welded to the top surface of the second electric field, and one end of the insulating porcelain bottle is fixedly connected to the steel channel.

7. The processing method according to claim 6, It is characterized in that The supporting device is used to keep the high-voltage leads of the high-frequency power supply at the same horizontal height.