A tile unit for wall paving, a wall connector and a wall tile installation structure

By opening a storage groove on the back of the tiles and pasting the clamping members therein, the problem of tiles pasting and falling off is solved, the installation safety and decoration efficiency are improved, and the transportation efficiency and cost of the tiles unit are optimized.

CN114439173BActive Publication Date: 2024-12-24ZHEJIANG YASHA DECORATION
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202210047033.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-01-17
Publication Date
2024-12-24
Estimated Expiration
2042-01-17

AI Technical Summary

Technical Problem

In the installation of traditional wall tiles, magnesium oxide powder is present on the back of the tiles, which is easy to fall off after being pasted, which poses safety hazards, and the installation process is cumbersome, which affects the decoration efficiency and transportation efficiency.

Method used

Open a storage groove on the back of the tiles, and stick the clamping members into the groove to ensure a small amount of magnesium oxide powder in the groove, prevent the components from falling off, and drying before leaving the factory, reducing on-site installation time and waiting for drying time, and allowing the tiles unit to be stacked and transported .

Benefits of technology

Effectively prevent the clamped members from falling off, improve installation safety and decoration efficiency, reduce transportation space and reduce transportation costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114439173B_ABST
    Figure CN114439173B_ABST
Patent Text Reader

Abstract

The present invention discloses a tile unit for wall paving, a wall connector and a wall tile installation structure, comprising a tile and a clamping member, a receiving groove is provided on the top and / or bottom of the back of the tile, and the clamping member is pasted on the inner wall of the receiving groove, so that the clamping member is located in the receiving groove and forms a plug-in groove in the receiving groove, and the notch of the plug-in groove is arranged toward the outside of the receiving groove. The receiving groove is arranged on the back of the tile by slotting, which ensures that there is no or only a small amount of magnesium oxide powder in the receiving groove, so that the clamping member can be installed in the receiving groove by pasting, effectively preventing the clamping member from falling off the inner wall of the receiving groove at a later time, reducing the risk of the tile falling from the wall, and effectively ensuring safety. Before the tile unit leaves the factory, the clamping member can be pasted into the receiving groove in advance and dried, which saves the assembly time of the wall tile installation structure at the decoration site and improves the decoration efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a tile unit for wall paving, a wall connector and a wall tile installation structure, and belongs to the field of wall installation. Background Art

[0002] Traditional wall tile installation is done by sticking them to the wall or leveling pieces using tile adhesive. Due to the production process of the tiles themselves, there is a certain amount of magnesium oxide powder on the back of the tiles. The back of the tiles need to be cleaned before pasting, otherwise the tiles will easily fall off after pasting, creating a safety hazard. Summary of the invention

[0003] The technical problem to be solved by the present invention is to overcome the deficiencies of the prior art and provide a wall paving tile unit, a wall connector and a wall tile installation structure.

[0004] To solve the above technical problems, the present invention adopts the following technical solutions:

[0005] A tile unit for wall paving includes a tile and a clamping component. A receiving groove is provided on the top and / or bottom of the back of the tile. The clamping component is adhered to the inner wall of the receiving groove so that the clamping component is located in the receiving groove and forms an insertion groove in the receiving groove. The notch of the insertion groove is arranged toward the outside of the receiving groove.

[0006] The beneficial effects of the present invention are:

[0007] A receiving groove is set on the back of the tile by grooving, which ensures that there is no or only a small amount of magnesium oxide powder in the receiving groove. Therefore, the clip-on component can be installed in the receiving groove by pasting, which effectively prevents the clip-on component from falling off the inner wall of the receiving groove at a later time, reduces the risk of the tile falling from the wall, and effectively ensures safety.

[0008] Before the tile unit leaves the factory, the clip-on components can be pasted into the receiving groove and dried in advance. After the glue is dry, the tile unit can be shipped from the factory. There is no need to paste the clip-on components again at the decoration site, and accordingly there is no need to wait for the glue to dry at the decoration site. This saves the assembly time of the wall tile installation structure at the decoration site and improves the decoration efficiency.

[0009] The receiving groove can effectively prevent the clip-on components from being exposed on the outside of the tile, so that different tile units can be stacked on top of each other during transportation, and the clip-on components of any tile unit will not affect or damage other adjacent tile units, thereby reducing the overall space occupied by the tile units during transportation. In the same size of vehicle transportation space, more tile units can be transported at a time, thereby improving the transportation efficiency of the tile units and reducing transportation costs.

[0010] The clamping component of the present invention includes an adhesive plate, a clamping plate and a component connecting plate. The edges of the adhesive plate and the clamping plate are fixed by the component connecting plate. The adhesive plate and the clamping plate are respectively located on both sides of the component connecting plate. The adhesive plate is adhesively fixed to the inner wall of the accommodating groove. The plug-in groove is formed by the inner wall of the accommodating groove, the clamping plate and the component connecting plate. The edge of the adhesive plate fits the top inner wall or the bottom inner wall of the accommodating groove.

[0011] The clamping component of the present invention includes an adhesive plate, a clamping plate and a component connecting plate. The edges of the adhesive plate and the clamping plate are fixed by the component connecting plate. The adhesive plate and the clamping plate are located on the same side of the component connecting plate. The adhesive plate is adhesively fixed to the inner wall of the accommodating groove. The plug-in groove is formed by the adhesive plate, the clamping plate and the component connecting plate. An adjustment gap is left in the vertical direction between the component connecting plate and the inner wall of the accommodating groove.

[0012] A wall connector is used to install a tile unit for wall paving on a wall, comprising a base plate and a plug-in board, wherein the edge of the plug-in board is fixed on the surface of the base plate, and the rear edge of the base plate extends upward or downward to form a wall connector.

[0013] The plug-in board of the present invention comprises two pieces, namely an upper plug-in board and a lower plug-in board. The bottom edge of the upper plug-in board is fixed on the upper surface of the base plate, and the top edge of the lower plug-in board is fixed on the lower surface of the base plate.

[0014] The plug board of the present invention is located in the middle of the base plate.

[0015] The upper plug board and the lower plug board of the present invention are located in the same plane, and the thickness of the substrate located at the front side of the upper plug board is smaller than the thickness of the substrate located at the rear side of the upper plug board.

[0016] The plug board, the base plate and the wall connection plate of the present invention are surrounded to form a component groove, and the component groove is used for clamping the clamping component.

[0017] The wall connection plate of the present invention is formed by extending upward from the rear edge of the base plate, and a screw hole is arranged on the top of the wall connection plate.

[0018] A wall tile installation structure comprises a tile unit for wall paving and a wall connector. A plug-in plate is plugged into a plug-in slot, and the wall connector is fixed on the wall.

[0019] Other features and advantages of the present invention will be disclosed in detail in the following specific embodiments and drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] The present invention will be further described below in conjunction with the accompanying drawings:

[0021] Figure 1 This is a schematic diagram of the main structure of a tile unit for wall paving in Example 1 of the present invention;

[0022] Figure 2 for Figure 1 The enlarged structural diagram at A in the middle;

[0023] Figure 3 This is a schematic diagram of the main structure of the wall tile installation structure in Example 1 of the present invention;

[0024] Figure 4 for Figure 3 The enlarged structural diagram at B in the middle;

[0025] Figure 5 It is a partial enlarged structural schematic diagram of a tile unit for wall paving in Example 2 of the present invention;

[0026] Figure 6 It is a partial enlarged structural schematic diagram of the wall tile installation structure in Example 2 of the present invention;

[0027] Figure 7 It is a schematic diagram of the main structure of the wall connecting parts in Examples 1 and 2 of the present invention. DETAILED DESCRIPTION

[0028] The technical solutions of the embodiments of the present invention are explained and described below in conjunction with the drawings of the embodiments of the present invention, but the following embodiments are only preferred embodiments of the present invention, not all. Based on the embodiments in the implementation mode, other embodiments obtained by those skilled in the art without creative work are all within the protection scope of the present invention.

[0029] In the following description, terms such as "inside", "outside", "up", "down", "left", "right", etc. that indicate directions or positional relationships are only used to facilitate the description of the embodiments and simplify the description, and do not indicate or imply that the referred device or element must have a specific direction, be constructed and operate in a specific direction. Therefore, it should not be understood as a limitation of the present invention.

[0030] Embodiment 1:

[0031] See also Figure 1-4 7. The present embodiment provides a wall tile installation structure, including a wall paving tile unit and a wall connector 2, wherein the wall paving tile unit and the wall connector 2 are transported to the decoration site respectively, and the wall paving tile unit and the wall connector 2 are assembled at the decoration site to form a wall tile installation structure, and the wall connector 2 is installed on the wall 3, so that the wall paving tile unit can be laid on the wall 3 through the wall connector 2. Conventionally, in the present embodiment, a leveling member 4 is arranged between the wall connector 2 and the wall 3, and the wall connector 2 is installed on the wall 3 through the leveling member 4.

[0032] Generally speaking, the number of wall paving tile units and wall connectors 2 is the same, and the wall paving tile units are installed on the wall 3 through the corresponding wall connectors 2. However, in particular, in this embodiment, the number of wall paving tile units is at least two, and the number of wall connectors 2 is one less than the number of wall paving tile units. All wall paving tile units are arranged in sequence along the vertical direction, and a wall connector 2 is arranged between each two adjacent wall paving tile units, so that the two adjacent wall paving tile units are connected through the wall connector 2.

[0033] For the sake of convenience, this embodiment only includes two wall paving tile units, and the corresponding wall connection member 2 has one. In this embodiment, the wall paving tile unit is a standard part, and all the wall paving tile units laid on the same wall 3 have similar or completely the same structure. Now, one of the wall paving tile units is used as a representative to explain its specific structure.

[0034] The wall paving tile unit comprises a tile 11 and two clamping components 12 .

[0035] The top and bottom of the back side of the tile 11 are both provided with receiving grooves 111 , wherein the thickness of the tile 11 may be slightly increased during the production process to ensure the mechanical strength of the tile 11 at the receiving grooves 111 .

[0036] As a specific form of a clip-on component 12, the clip-on component 12 of this embodiment includes an adhesive plate 121, a clip-on plate 122 and a component connecting plate 123. The component connecting plate 123 is in a perpendicular state to the tile 11. The adhesive plate 121 and the clip-on plate 122 are in a vertical state. The edge of the adhesive plate 121 is fixed to the front edge of the component connecting plate 123. The edge of the clip-on plate 122 is fixed to the rear edge of the component connecting plate 123. The adhesive plate 121 and the clip-on plate 122 form an integrated structure through the component connecting plate 123.

[0037] The adhesive plate 121 is adhered and fixed to the inner wall of the receiving groove 111 , and the adhesive plate 121 ensures the adhesive area between the clamping member 12 and the inner wall of the receiving groove 111 , thereby ensuring the connection strength between the clamping member 12 and the inner wall of the receiving groove 111 .

[0038] The ceramic tile 11 of this embodiment is produced by the existing process, so a large amount of magnesium oxide powder still remains on the back of the ceramic tile 11, but the receiving groove 111 is subsequently formed by cutting and grooving the back of the ceramic tile 11, ensuring that there is no or only a small amount of magnesium oxide powder in the receiving groove 111. Therefore, the adhesive plate 121 is not easy to fall off after being pasted to the inner wall of the receiving groove 111, which increases the connection stability and connection life of the clamping member 12 and the inner wall of the receiving groove 111, reduces the risk of the ceramic tile 11 falling from the wall 3, and effectively ensures safety.

[0039] In this embodiment, the adhesive plate 121 and the clamping plate 122 are respectively located on the upper and lower sides of the component connecting plate 123. Specifically, in the clamping component 12 at the bottom of the tile 11, the adhesive plate 121 is located above the component connecting plate 123, and the clamping plate 122 is located below the component connecting plate 123; in the clamping component 12 at the top of the tile 11, the adhesive plate 121 is located below the component connecting plate 123, and the clamping plate 122 is located above the component connecting plate 123. Correspondingly, the inner wall of the accommodating groove 111, the clamping plate 122 and the component connecting plate 123 are surrounded to form a plug-in groove 1111, wherein the notch of the plug-in groove 1111 at the top of the tile 11 faces upward, and the notch of the plug-in groove 1111 at the bottom of the tile 11 faces downward, that is, the notches of the two plug-in grooves 1111 on the same tile 11 are both set toward the outside of the accommodating groove 111. It is worth noting that in the receiving groove 111 at the top of the tile 11, the bottom edge of the adhesive plate 121 is attached to the bottom inner wall of the receiving groove 111, and in the receiving groove 111 at the bottom of the tile 11, the top edge of the adhesive plate 121 is attached to the top inner wall of the receiving groove 111, so that in any receiving groove 111, the clamping member 12 can be installed and positioned by the adhesive plate 121, thereby ensuring the installation accuracy of the tile unit for subsequent wall paving. In addition, by means of the installation and positioning function of the clamping member 12, it can be ensured that the clamping member 12 is located in the receiving groove 111 when there is no excessive deviation in the size specifications of the clamping member 12, and correspondingly, the plug-in groove 1111 is also located in the receiving groove 111.

[0040] The pasting of the adhesive plate 121 to the inner wall of the receiving groove 111 and the glue drying process are completed before the wall paving tile unit leaves the factory. Therefore, the installation process of the clamping component 12 is omitted at the decoration site, and there is no need to wait for the glue to dry, which effectively saves the assembly time of the wall paving tile unit at the decoration site and improves the decoration efficiency.

[0041] In addition, since the clamping member 12 is confined in the accommodating groove 111, a large number of wall paving tile units can be stacked on each other during factory transportation, and the clamping member 12 of any wall paving tile unit will not support and damage other adjacent wall paving tile units, thereby making the spatial arrangement of the wall paving tile units during transportation more reasonable, thereby reducing the overall space occupied by the wall paving tile units during transportation. In the same size of vehicle transportation space, more wall paving tile units can be transported at a time, thereby improving the transportation efficiency of the wall paving tile units and reducing transportation costs.

[0042] The wall connection piece 2 includes a base plate 23 and a plug-in board, the edge of the plug-in board is fixed on the surface of the base plate 23, and the rear edge of the base plate 23 extends upward or downward to form a wall connection plate 24. The plug-in board is plugged into the corresponding plug-in groove 1111 to complete the connection between the wall connection piece 2 and the tile unit for wall paving. Screw holes are provided on the wall connection plate 24 for fixing by screws 31 and leveling pieces 4, and then fixed to the wall 3 by the leveling pieces 4.

[0043] In this embodiment, in order to enable the wall connector 2 to be connected to two wall paving tile units, there are two plug-in boards, namely an upper plug-in board 21 and a lower plug-in board 22. The upper plug-in board 21 and the lower plug-in board 22 are both perpendicular to the base plate 23. During use, the base plate 23 is in a horizontal state, and correspondingly, the upper plug-in board 21 and the lower plug-in board 22 are both in a vertical state and are parallel or approximately parallel to the tile 11. The bottom edge of the upper plug-in board 21 is fixed to the upper surface of the base plate 23, and the top edge of the lower plug-in board 22 is fixed to the lower surface of the base plate 23, so that the wall connector 2 forms an integrated structure.

[0044] For two adjacent wall paving tile units, the upper plug-in plate 21 is plugged into the bottom plug-in groove 1111 of the upper tile 11, and the lower plug-in plate 22 is plugged into the top plug-in groove 1111 of the lower tile 11, so as to connect the two upper and lower adjacent wall paving tile units together through the wall connector 2. The bottom edge of the clamping plate 122 at the bottom of the upper tile 11 is pressed on the upper surface of the base plate 23, and the lower surface of the base plate 23 is pressed on the top edge of the clamping plate 122 at the top of the lower tile 11, so as to fix the relative positions of the two adjacent tiles 11 in the vertical direction and minimize the distance between the two tiles 11.

[0045] Preferably, the upper plug-in board 21 and the lower plug-in board 22 are located in the same plane, so when the upper plug-in board 21 and the lower plug-in board 22 are connected, the front faces of the two tiles 11 can be roughly in the same plane, ensuring the flatness of the tiles 11 laid on the wall 3.

[0046] Considering the actual production process, when the edges of the upper and lower clamping plates 122 are pressed on the same base plate 23, there should be a certain gap between the two adjacent tiles 11 as a clearance space to prevent the two tiles 11 from colliding and being damaged during installation. Of course, for the purpose of decoration effect, the space of this gap should not be too large. Accordingly, the tiles 11 also have higher dimensional accuracy requirements during the production process.

[0047] In order to appropriately reduce the dimensional accuracy requirements of the tiles 11, the upper plug-in board 21 and the lower plug-in board 22 are located in the middle position of the base plate 23 in this embodiment. Therefore, when the upper plug-in board 21 and the lower plug-in board 22 are connected, the front edge of the base plate 23 is located in the gap between two adjacent tiles 11. At this time, even if the gap between the two tiles 11 is large, it can be filled through the front edge of the base plate 23, ensuring the decoration effect.

[0048] Likewise, there is a gap between the front edge of the base plate 23 and two adjacent tiles 11 to prevent the base plate 23 from damaging the edges of the tiles 11 .

[0049] Since the snap-in plate 122 is located in the receiving groove 111, when the edge of the snap-in plate 122 is pressed on the portion of the base plate 23 located on the rear side of the upper plug-in plate 21 (which is also the rear side of the lower plug-in plate 22), the portion of the base plate 23 located on the rear side of the upper plug-in plate 21 may just be outside the receiving groove 111, or a portion of it may enter the receiving groove 111. The size of the gap between the two tiles 11 actually depends on the thickness of the portion of the base plate 23 located on the rear side of the upper plug-in plate 21. In other words, the size of the gap between the two tiles 11 can be adjusted by changing the design size of the portion of the base plate 23 located on the rear side of the upper plug-in plate 21.

[0050] Accordingly, in order to prevent the portion of the substrate 23 located on the front side of the upper plug board 21 (which is also the front side of the lower plug board 22) from contacting the edge of the tile 11, it is necessary to reduce the thickness of the portion of the substrate 23 located on the front side of the upper plug board 21, so that the thickness of the substrate 23 located on the front side of the upper plug board 21 is less than the thickness of the substrate 23 located on the rear side of the upper plug board 21. In addition, the reduction in the thickness of the substrate 23 located on the front side of the upper plug board 21 also appropriately reduces the material cost of the substrate 23.

[0051] The laying process of the ceramic tile 11 is generally carried out from bottom to top. In order to be suitable for this laying sequence, the wall connection plate 24 is formed by extending upward from the rear edge of the base plate 23. The rear edge of the base plate 23 is located behind the clamping member 12. Accordingly, the wall connection plate 24 is located behind the clamping plate 122 and not in the insertion groove 1111. Therefore, the wall connection plate 24 can be fixed to the leveling member 4 without being interfered by the clamping member 12.

[0052] The specific laying process is as follows: first, set up the first wall paving tile unit on the ground, and the clamping member 12 at the bottom of the tile 11 is located in the accommodating groove 111, so that the bottom edge of the tile 11 can be directly supported on the ground without being interfered by the clamping member 12, and install the first wall connector 2 on the top of the first wall paving tile unit. At this time, the wall connecting plate 24 of the first wall connector 2 is exposed and located above the first wall paving tile unit. At this time, the wall connecting plate 24 of the first wall connector 2 can be nailed and fixed to the wall 3 without being interfered by the first wall paving tile unit, completing the laying of the first wall paving tile unit on the wall 3, and then install the second wall paving tile unit on the first wall connector 2 to complete the laying of the two wall paving tile units on the wall 3.

[0053] In this embodiment, the upper plug-in plate 21, the base plate 23 and the wall connecting plate 24 are surrounded to form a component groove. After the second wall paving tile unit is laid, the clamping plate 122 at the bottom of the second wall paving tile unit enters the component groove and fits with the wall connecting plate 24, so that the second wall paving tile unit can be as close to the wall 3 as possible. At the same time, the wall connecting plate 24 and the upper plug-in plate 21 are used to clamp the clamping plate 122 at the bottom of the second wall paving tile unit, thereby enhancing the connection strength between the second wall paving tile unit and the wall connector 2.

[0054] In this embodiment, after the second wall paving tile unit is installed, the bottom edge of the lower plug-in plate 22 is pressed on the component connecting plate 123 at the top of the first wall paving tile unit, and the top edge of the upper plug-in plate 21 is pressed on the component connecting plate 123 at the bottom of the second wall paving tile unit, so as to ensure the plug-in strength and effect of the lower plug-in plate 22 and the upper plug-in plate 21, thereby improving the connection strength between the two wall paving tile units.

[0055] Through the deformation of the clamping plate 122 at the bottom of the second wall paving tile unit, the plug-in plate 21 can be smoothly plugged into the plug-in groove 1111 at the bottom of the second wall paving tile unit. During the plug-in process, a part of the wall connection plate 24 and the end of the screw 31 can also enter the receiving groove 111 at the bottom of the second wall paving tile unit. The second wall paving tile unit avoids the wall connection plate 24 and the end of the screw 31 by means of the receiving groove 111, so as to avoid affecting the installation of the second wall paving tile unit. The screw hole on the wall connection plate 24 is located at the top of the wall connection plate 24. Therefore, after the second wall paving tile unit is installed, the screw 31 is located above the component connection plate 123, so as to avoid the end of the screw 31 affecting the component connection plate 123 and the clamping plate 122, and ensure the fitting effect of the clamping plate 122 and the wall connection plate 24.

[0056] Optionally, in other embodiments, a second wall connector 2 can be installed on the top of the second wall paving tile unit and fixed to the wall 3, and then subsequent wall paving tile units can be installed in sequence to increase the paving area of ​​the wall 3 in the vertical direction. This paving method has high adjustability.

[0057] It can be seen that the wall connector 2 not only plays the role of fixing the wall paving tile unit to the wall 3, but also plays the role of connecting the adjacent wall paving tile units in the vertical direction. Taking the case of three wall paving tile units and two wall connectors 2 as an example, one of the wall connectors 2 is damaged and loosened on the wall 3, but at this time the two wall connectors 2 still play the role of connecting the three wall paving tile units to form a whole, so the three wall paving tile units can be installed on the wall 3 through the undamaged wall connector 2, and the two wall paving tile units directly connected to the damaged wall connector 2 will not fall off the wall 3. It can be seen that the installation of the wall paving tile unit on the wall 3 through the wall connector 2 effectively increases safety.

[0058] Embodiment 2:

[0059] See also Figure 5-7 In this embodiment, the clamping member also includes a pasting plate 121, a clamping plate 122 and a member connecting plate 123. The edge of the pasting plate 121 is fixed to the front edge of the member connecting plate 123, the edge of the clamping plate 122 is fixed to the rear edge of the member connecting plate 123, and the pasting plate 121 is pasted and fixed to the inner wall of the receiving groove 111. The difference between this embodiment and the first embodiment is that the pasting plate 121 and the clamping plate 122 are located on the same side of the member connecting plate 123, wherein in the clamping member at the top of the wall paving tile unit, the pasting plate 121 and the clamping plate 122 are both located above the member connecting plate 123, and in the clamping member at the bottom of the wall paving tile unit, the pasting plate 121 and the clamping plate 122 are both located below the member connecting plate 123. Therefore, the plug-in slot 1111 of the present embodiment is formed by the pasting plate 121, the clamping plate 122 and the component connecting plate 123. Therefore, the edge of the pasting plate 121 does not need to be against the top or bottom inner wall of the receiving slot 111. At this time, an adjustment gap is left in the vertical direction between the component connecting plate 123 and the inner wall of the receiving slot 111, so that the pasting plate 121 can be pasted at different positions on the inner wall of the receiving slot 111, so that the clamping component can match the substrate 23 of different specifications and thicknesses. At the same time, it can also better ensure that the clamping component is located in the receiving slot 111, so as to maximize the exposure of the clamping component to the outside of the receiving slot 111, so as to prevent the clamping component from affecting the transportation of the tile unit for wall paving.

[0060] The above is only a specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Those skilled in the art should understand that the present invention includes but is not limited to the contents described in the drawings and the above specific embodiments. Any modification that does not deviate from the functional and structural principles of the present invention will be included in the scope of the claims.

Claims

1. A tile unit for wall paving, characterized in that: The ceramic tile comprises a ceramic tile and a clamping member, wherein a receiving groove is provided on the top and / or bottom of the back of the ceramic tile, and the clamping member is attached to the inner wall of the receiving groove so that the clamping member is located in the receiving groove and forms an inserting groove in the receiving groove, and the notch of the inserting groove is arranged toward the outside of the receiving groove; The clamping component includes an adhesive plate, a clamping plate and a component connecting plate. The edges of the adhesive plate and the clamping plate are fixed by the component connecting plate. The adhesive plate and the clamping plate are located on the same side of the component connecting plate. The adhesive plate is adhesively fixed to the inner wall of the accommodating groove. The plug-in groove is formed by the adhesive plate, the clamping plate and the component connecting plate. An adjustment gap is left in the vertical direction between the component connecting plate and the inner wall of the accommodating groove.

2. A wall tile installation structure, characterized in that: It comprises the wall paving tile unit as claimed in claim 1 and a wall connector, wherein the wall connector is used to install the wall paving tile unit as claimed in claim 1 onto the wall, and the wall connector comprises a base plate and a plug-in board, the edge of the plug-in board is fixed on the surface of the base plate, the rear edge of the base plate extends upward or downward to form a wall connecting plate, the plug-in board is plugged into the plug-in slot, and the wall connecting plate is fixed to the wall.

3. The wall tile installation structure according to claim 2, characterized in that: The plug-in boards are composed of two pieces, namely an upper plug-in board and a lower plug-in board. The bottom edge of the upper plug-in board is fixed on the upper surface of the base plate, and the top edge of the lower plug-in board is fixed on the lower surface of the base plate.

4. The wall tile installation structure according to claim 3, characterized in that: The plug board is located in the middle of the base plate.

5. The wall tile installation structure according to claim 4, characterized in that: The upper plug-in board and the lower plug-in board are located in the same plane, and the thickness of the substrate located at the front side of the upper plug-in board is smaller than the thickness of the substrate located at the rear side of the upper plug-in board.

6. The wall tile installation structure according to claim 4, characterized in that: The plug board, the base plate and the wall connection plate are surrounded to form a component groove, and the component groove is used for clamping the clamping component.

7. The wall tile installation structure according to claim 3, characterized in that: The wall connection plate is formed by extending upward from the rear edge of the base plate, and a screw hole is arranged on the top of the wall connection plate.

Citation Information

Patent Citations

  • Ceramic tile dry hanging structure

    CN211622401U