A fast assembly and leveling device for deck sheet steel of marine structures

By using a lifting device in the offshore oil industry to control the operation of the hook, rapid leveling of the secondary beam and the main beam is achieved, which solves the problem of numerous spot welding processes, improves the prefabrication efficiency and accuracy of deck sheets, and reduces costs.

CN114475964BActive Publication Date: 2024-10-01OFFSHORE OIL ENG QINGDAO +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202111521745.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-12-13
Publication Date
2024-10-01
Estimated Expiration
2041-12-13

AI Technical Summary

Technical Problem

In the offshore oil industry, during the prefabrication process of deck structure, the spot welding method of secondary beams and main beams requires multiple processes, resulting in additional labor, machinery and material consumption, obstructing the welding space, and increasing prefabrication costs.

Method used

A quick assembly and leveling device for deck steel of marine structures is designed. It uses a lifting device to control the operation of the hook, achieves accurate positioning and rapid leveling of the secondary beam and the main beam, and simplifies the spot welding process, including the main frame and hooks. And the lifting device realizes the self-locking fixation of the hook through the bolt column, nut and lifting seat.

Benefits of technology

It improves the prefabrication efficiency of deck pieces and the installation accuracy of secondary beams, saves materials and labor hours, reduces prefabrication costs, and enables reusable hooks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114475964B_ABST
    Figure CN114475964B_ABST
Patent Text Reader

Abstract

The present invention discloses a fast assembly and leveling device for profiled steel of a deck of an ocean structure, comprising a main beam, a secondary beam arranged on the main beam, a main frame arranged on the top of the secondary beam, a lifting device arranged inside the main frame for controlling hooks on both sides thereof, and the top of the hook extending into the upper flange of the main beam. The fast assembly and leveling device for profiled steel of a deck of an ocean structure can control the angle of the hook through the lifting device, thereby enabling the main beam and the secondary beam to be stably fixed, and this process improves the prefabrication efficiency of the deck sheet and the installation accuracy of the horizontal adjustment of the secondary beam, while improving the prefabrication efficiency of the deck sheet and reducing the prefabrication cost.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field related to offshore petroleum engineering, in particular to a fast assembling and leveling device for deck sheet steel of an offshore structure. Background Art

[0002] Currently in the offshore oil industry, the prefabrication of deck structures for structures such as the upper module structure of the jacket, the upper module structure of the floating production storage and offloading vessel, and the liquefied natural gas process module is a routine task with a huge workload during the construction phase. Among them, a large amount of work requires the secondary beams and the main beams to be placed at 90 degrees in a flat surface, temporarily positioned, inspected, and then welded and fixed.

[0003] The current method of spot welding the ribs is to temporarily fix the secondary beam to the main beam, and after the dimensional accuracy is confirmed to be correct and reported for inspection, the final permanent welding and fixation is performed. This process has many steps, which not only consumes additional labor, machinery, materials and other costs, but also hinders the welding operation space. Moreover, after welding, the ribs need to be cut and polished, which increases the prefabrication cost. Summary of the invention

[0004] The object of the present invention is to provide a rapid assembly and leveling device for deck sheet steel of marine structures, so as to solve the problem that the current spot welding method of rib plates proposed in the above-mentioned background technology is to temporarily fix the secondary beam to the main beam, and after the dimensional accuracy is confirmed to be correct, that is, after inspection, the final permanent welding and fixing is carried out. This process has many steps, which not only consumes additional labor, machinery, materials and other costs, but also hinders the operation space of welding. Moreover, after welding, the rib plates need to be cut and polished, which increases the prefabrication cost.

[0005] To achieve the above-mentioned purpose, the present invention provides the following technical solution: a rapid assembly and leveling device for a deck sheet steel of an offshore structure, comprising a main beam, a secondary beam being arranged on the main beam, a main frame being arranged on the top of the secondary beam, a pulling device being arranged inside the main frame and being able to control hooks on both sides thereof, and the top of the hook extending into the upper flange of the main beam.

[0006] Preferably, the main frame is formed by two "T"-shaped steel plates facing each other and welded through two horizontal ribs at the top and waist.

[0007] Preferably, the two hooks of the same shape respectively pass through the gaps on the left and right sides of the main frame, the hooks are rotatably connected to the main frame through an axis, and the lifting device inside the main frame is connected by bolts.

[0008] Preferably, the lifting device includes a bolt column, a nut and a lifting seat, the lifting seat is arranged on the top of the main frame, a nut is fixedly installed on the top of the lifting seat, the internal thread of the nut is connected to the bolt column, and the bolt column extends to the interior of the lifting seat and drives the hooks on its left and right sides to operate.

[0009] Preferably, the interior of the lifting seat is set to be hollow, the bolt column extends into the lifting seat and has a "T" shape, and the end of the "T"-shaped bolt column extending into the lifting seat is rotatably connected to the top of the hook.

[0010] Preferably, a baffle located at the bottom end of the bolt column is fixedly provided inside the lifting seat, and the baffle is located at the bottom of the gap on the left and right sides of the main frame.

[0011] Compared with the prior art, the beneficial effects of the present invention are as follows: the marine structure deck plate steel rapid assembly leveler, by controlling the operation of the hook through the pulling device, can not only accurately position the secondary beam on the main beam, and quickly realize the leveling of the secondary beam and the main beam, but also solves the problem of having too many processes through spot welding of rib plates, greatly improves the prefabrication efficiency of the deck plate and the installation accuracy of the horizontal adjustment of the secondary beam, and can be reused, saving a lot of materials and man-hours, greatly improving the prefabrication efficiency of the deck plate and reducing the prefabrication cost. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1 It is a schematic diagram of the side view structure of the secondary beam of the present invention;

[0013] Figure 2 For the present invention Figure 1 A schematic diagram of the enlarged structure of point A;

[0014] Figure 3 It is a schematic diagram of the side structure of the main beam of the present invention.

[0015] In the figure: 1. main beam; 2. secondary beam; 3. main frame; 4. hook; 5. lifting device; 501. bolt column; 502. nut; 503. lifting seat; 504. baffle. DETAILED DESCRIPTION

[0016] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0017] See also Figure 1-3The present invention provides a technical solution: a marine structure deck sheet steel rapid assembly leveler, comprising a main beam 1, a secondary beam 2 is arranged on the main beam 1, a main frame 3 is arranged on the top of the secondary beam 2, and a lifting device 5 that can control hooks 4 on both sides of the main frame 3 is arranged inside the main frame 3, and the top of the hook 4 extends to the upper flange of the main beam 1.

[0018] The main frame 3 is composed of two "T"-shaped steel plates facing each other and welded through two horizontal ribs at the top and waist. Through the design of the main frame 3, its bottom can be used as a caliper for leveling the main beam 1 and the secondary beam 2 during the prefabrication of the deck plate, which is convenient for the subsequent lifting device 5 to fix the main beam 1 and the secondary beam 2.

[0019] Two hooks 4 of the same shape respectively pass through the gaps on the left and right sides of the main frame 3. The hooks 4 are rotatably connected to the main frame 3 through an axis, and the pulling device 5 inside the main frame 3 is connected by bolts. Through the design of the hooks 4, the operation of the internal parts of the pulling device 5 can be controlled by the handle, so that the two groups of hooks 4 can move inward synchronously to fix the main beam 1 and the secondary beam 2. The operation is simple and convenient.

[0020] The lifting device 5 includes a bolt column 501, a nut 502 and a lifting seat 503. The lifting seat 503 is arranged on the top of the main frame 3. The nut 502 is fixedly installed on the top of the lifting seat 503. The internal thread of the nut 502 is connected to the bolt column 501. The bolt column 501 extends to the inside of the lifting seat 503 and drives the hooks 4 on the left and right sides to operate; when the deflection of the hook 4 is controlled, the bolt column 501 is rotated by the handle. Under the action of the nut 502, the two groups of hooks 4 connected to the bottom side of the bolt column 501 can move upward inside the lifting seat 503, and then the bottom end of the hook 4 moves inward, completing the fixation of the main beam 1 and the secondary beam 2. At the same time, the bolt column 501 and the nut 502 have a self-locking function, making the fixation more firm.

[0021] The interior of the lifting seat 503 is set to be hollow, and the bolt column 501 extends into the interior of the lifting seat 503 and has a "T"-shaped structural shape, and one end of the "T"-shaped bolt column 501 extending into the interior of the lifting seat 503 is rotatably connected to the top of the hook 4; through the design of the structural shape of the bolt column 501, when the bolt column 501 moves upward, it can drive the top of the hook 4 to rotate inside it, and the side of the hook 4 is rotatably connected to the lifting seat 503, that is, its bottom end will move inward.

[0022] A baffle 504 located at the bottom end of the bolt column 501 is fixed inside the lifting seat 503, and the baffle 504 is located at the bottom of the gap on the left and right sides of the main frame 3; through the design of the baffle 504, when the fixation of the main beam 1 and the secondary beam 2 is released, the bottom end of the bolt column 501 can be supported for easy storage.

[0023] Working principle: When installing the secondary beam 2 to connect with the main beam 1, place the main frame 3 and the hook 4 across the upper flanges of the secondary beam 2 and the main beam 1, lower the hook 4 to hook the upper flange of the secondary beam 2, wait for lifting, manually screw the nut 502 to tighten the hook 4, and pull the upper flange of the secondary beam 2 to the same level as the upper flange of the main beam 1 to complete the docking work.

[0024] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A rapid assembly and leveling device for deck sheet steel of an offshore structure, comprising a main beam (1), characterized in that: A secondary beam (2) is arranged on the main beam (1), a main frame (3) is arranged on the top of the secondary beam (2), and a lifting device (5) is arranged inside the main frame (3) to control hooks (4) on both sides thereof, and the top of the hook (4) extends into the upper flange of the main beam (1); The main frame (3) is formed by two "T"-shaped steel plates facing each other and welded through two horizontal ribs at the top and waist. Two hooks (4) of the same shape, each passing through a gap on the left and right sides of the main frame (3); the hooks (4) are rotatably connected to the main frame (3) via an axis; and the lifting device (5) inside the main frame (3) is connected via bolts; The lifting device (5) includes a bolt column (501), a nut (502) and a lifting seat (503). The lifting seat (503) is arranged on the top of the main frame (3). A nut (502) is fixedly installed on the top of the lifting seat (503). The internal thread of the nut (502) is connected to the bolt column (501). The bolt column (501) extends into the interior of the lifting seat (503) and drives the hooks (4) on the left and right sides thereof to operate.

2. The rapid assembly and leveling device for deck sheet steel of marine structures according to claim 1 is characterized by: The interior of the lifting seat (503) is configured to be hollow, the bolt column (501) extends into the interior of the lifting seat (503) and has a "T"-shaped structure, and one end of the "T"-shaped bolt column (501) extending into the interior of the lifting seat (503) is rotatably connected to the top end of the hook (4).

3. The rapid assembly and leveling device for deck sheet steel of marine structure according to claim 2 is characterized by: A baffle (504) located at the bottom end of the bolt column (501) is fixedly disposed inside the lifting seat (503), and the baffle (504) is located at the bottom of the gap on the left and right sides of the main frame (3).