A coal mine drilling depth measurement short section and a drilling depth determination method
By using an automated measurement sub that includes a data acquisition unit and drilling rig water pressure data in underground coal mines, the problem of large borehole depth measurement error has been solved, and efficient and accurate borehole depth determination has been achieved.
Patent Information
- Application Number
- CN202111563828.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-12-20
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2041-12-20
AI Technical Summary
Existing methods for measuring borehole depth in coal mines suffer from large measurement errors, false alarms and omissions due to manual counting, and the existing equipment is either expensive or poorly applicable, making it impossible to accurately measure borehole depth.
The coal mine borehole depth measurement sub includes a data acquisition unit, a microcontroller unit, a storage unit, a wireless communication unit, a clock synchronization unit, and a power supply unit. It measures borehole depth using a triaxial accelerometer, a geomagnetic field sensor, and a gyroscope, and combines this with drilling rig water pressure data for synchronous timing and data processing, thus achieving automated measurement.
It improves the accuracy and efficiency of borehole depth measurement, reduces environmental impact, avoids the labor intensity and errors caused by manual counting, and is highly adaptable to various borehole types.
Smart Images

Figure CN114483002B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of coal mine drilling, and relates to a coal mine drilling depth measuring pup joint and a drilling depth determination method. Background Art
[0002] Directional drilling or rotary drilling is usually used to achieve underground drilling exploration in coal mines for water exploration and coal seam gas extraction. In underground drilling construction projects, drilling inclinometers are usually used to measure and judge the drilling trajectory. The trajectory parameters include the inclination, azimuth, tool face angle and drilling depth of the borehole. The inclination, azimuth and tool face angle of the borehole can be measured by the drilling inclinometer, and the measurement of drilling depth is one of the important factors that restrict the accurate measurement of the drilling trajectory.
[0003] At present, manual counting is often used to measure the drilling depth during underground directional drilling construction. This method has large measurement errors and may result in workers making false reports or missing reports, causing a mismatch between the drilling depth and the drilling posture angle, ultimately leading to large deviations in the drilling trajectory measurement and inaccurate final hole position measurement.
[0004] In addition, existing borehole depth measurement methods also include sonic wave measurement methods, machine-based visual recognition methods, and drilling fluid pressure-based measurement methods. The defects of these methods are: the sonic wave measurement method is greatly affected by the environment, the sound waves diverge severely in the hole, and there are a lot of clutter, so the measurement effect is not ideal; the machine-based visual recognition method requires the installation of cameras and the laying of optical cables at the construction site, so the cost is relatively high, and when the visibility of the drilling site is low or obstructed, the measurement effect will be greatly reduced; the drilling fluid pressure-based measurement method has a better measurement effect for upward inclined holes, but is no longer applicable to nearly horizontal or downward inclined holes. Summary of the invention
[0005] In view of the defects and shortcomings in the prior art, the present invention provides a coal mine drilling depth measurement pup joint and a drilling depth determination method to overcome the technical problem in the prior art that the borehole depth measurement error is large due to the use of manual technology to measure the borehole depth in underground mine drilling.
[0006] To achieve the above object, the present invention adopts the following technical scheme:
[0007] A coal mine drilling depth measuring pup joint, comprising an outer tube of the measuring pup joint, wherein a data acquisition unit, a micro control unit, a storage unit, a wireless communication unit, a clock synchronization unit and a power supply unit are arranged in the outer tube of the measuring pup joint;
[0008] The data acquisition unit is connected to the micro control unit, and is used to collect drilling data and transmit the collected data to the micro control unit. The data acquisition unit includes a three-axis accelerometer for measuring three-axis acceleration, a three-axis geomagnetic field sensor for measuring geomagnetic components, and a three-axis gyroscope for measuring three-axis angular velocity;
[0009] The storage unit is used to store the collected data sent by the micro control unit, and send the stored data to the micro control unit;
[0010] The microcontrol unit can communicate with the data acquisition unit, the storage unit, the wireless communication unit, and the clock synchronization unit respectively, and is used to control the storage unit to store data and receive data sent by the storage unit, and is also used to synchronize time for the data acquisition unit and issue parameter commands;
[0011] The power supply unit is used to supply power to the data acquisition unit, micro control unit, storage unit, wireless communication unit, and clock synchronization unit;
[0012] The wireless communication unit can communicate with the micro control unit to transmit the received data to the remote server and receive the parameter command sent by the remote server to the micro control unit.
[0013] The present invention also has the following technical features:
[0014] Specifically, the three-axis acceleration sensor, the three-axis geomagnetic field sensor, the three-axis gyroscope and the clock synchronization unit are respectively connected to the micro control unit.
[0015] Furthermore, the outer tube of the measuring short section is a hollow structure, and a pressure switch connected to the power supply unit is provided at one end of the measuring outer tube; when the drilling rig is pressurized, the pressure switch is closed, and the data acquisition unit starts to collect data; when the drilling rig is depressurized, the pressure switch is opened, and the data acquisition unit stops collecting data.
[0016] Furthermore, a non-magnetic drill rod is mounted outside the outer tube of the measuring short section. The non-magnetic drill rod is connected to a water supply device via a plurality of ordinary drill rods with hollow structures. The water supply device is connected to a high-pressure water supply device via a pipeline. A pressure sensor for collecting the water pressure of the drilling rig is provided on the high-pressure water supply device. The pressure sensor is also connected to a remote server.
[0017] A method for determining the drilling depth is implemented by the above-mentioned coal mine drilling depth measurement sub, comprising the following steps:
[0018] Step 1: connecting a data acquisition unit, a storage unit, a micro control unit and a pressure sensor through a wireless communication unit, and performing synchronous timing of the acquisition unit, the storage unit, the micro control unit and the pressure sensor;
[0019] Step 2: Install the coal mine drilling depth measurement sub into the non-magnetic drill rod while drilling. During the drilling process, each time a drill rod is added, the coal mine drilling depth measurement sub collects and stores multiple sets of measurement data, including axial drilling three-axis acceleration, geomagnetic component and three-axis angular velocity; the pressure sensor collects the drilling rig water pressure at a predetermined time interval, and transmits the collected drilling rig water pressure to the remote server for storage, and the remote server also stores the drilling rig water pressure collection time at the same time;
[0020] Step 3: After the hole is drilled, the remote server processes the multiple sets of collected data corresponding to each drill rod to obtain the axial drilling displacement and axial drilling speed corresponding to each drill rod, and then determines the axial drilling displacement corresponding to each drill rod to obtain the corresponding drilling depth of each drill rod. Finally, the corresponding drilling depth of each drill rod is accumulated to obtain the drilling depth.
[0021] Furthermore, step 3 specifically includes the following sub-steps:
[0022] Step 3.1, the remote server preprocesses the received multiple sets of collected data to obtain multiple sets of preprocessed data; the preprocessed data includes preprocessed magnetic field components, preprocessed three-axis accelerations and preprocessed three-axis angular velocities;
[0023] Step 3.2, correcting the preprocessed three-axis angular velocity with the preprocessed magnetic field component and the preprocessed three-axis acceleration to obtain a corrected three-axis angular velocity;
[0024] Step 3.3, update the attitude rotation matrix with the corrected three-axis angular velocity; determine the y-axis gravity acceleration in the instrument coordinate system based on the updated attitude rotation matrix and the acquired gravity acceleration in the geographic coordinate system, and then obtain the y-axis acceleration after removing the y-axis gravity acceleration, and then perform sliding window filtering on the obtained y-axis acceleration to obtain the filtered y-axis acceleration a y ;
[0025] Step 3.4: Filter the Y-axis acceleration a y Performing an integral operation in the discrete domain, obtaining the axial drilling displacement and axial drilling speed corresponding to each drill rod;
[0026] Step 3.5: Determine the corresponding drilling depth of each drill rod according to the following conditions, including:
[0027] If the following conditions are met, the length of the drill rod is used as the corresponding drilling depth of each drill rod:
[0028] If the following conditions are not met, the axial drilling displacement corresponding to each drill rod obtained in step 3.4 is used as the drilling depth of each drill rod;
[0029]
[0030] Where S(Δt) is the axial drilling displacement corresponding to each drill pipe, in m; S min is the minimum threshold of axial drilling displacement of each drill pipe, in m, S max is the maximum threshold of axial drilling displacement of each drill pipe, in m; t ps is the duration of drilling rig water pressure, in min; t zmin is the minimum threshold of drilling time for each drill rod, in units of min, t zmax is the maximum threshold of drilling time for each drill rod, in min; P Δt The drilling rig water pressure collected by the pressure sensor is in MPa; P min is the minimum threshold of the drilling rig water pressure, in MPa, and 0 MPa<P min <4Mpa;
[0031] Step 3.6: Accumulate the corresponding drilling depth of each drill rod to obtain the drilling depth.
[0032] Furthermore, the window length of the sliding window filtering process described in step 3.3 is 5 to 10.
[0033] Furthermore, the y-axis gravity acceleration in the instrument coordinate system described in step 3.3 is determined by the following formula:
[0034]
[0035] In the formula, g b is the gravitational acceleration of the y-axis in the instrument coordinate system, is the attitude rotation matrix, g n is the gravitational acceleration on the y-axis in the geographic coordinate system.
[0036] Furthermore, the y-axis acceleration after removing the y-axis gravity acceleration described in step 3.3 is obtained by the following formula:
[0037] G` b =G b -g b
[0038] In the formula, G b ' is the acceleration of the y-axis after removing the acceleration of gravity on the y-axis, G b is the preprocessed three-axis acceleration vector.
[0039] Compared with the prior art, the present invention has the following beneficial technical effects:
[0040] The measuring nipple provided by the present invention solves the technical problem that drilling depth measurement in the prior art requires human intervention, avoids the defects and shortcomings such as high labor intensity, false alarms, missed alarms, etc. caused by the need to manually count the number of drill rods during the drilling process, makes the determination of the drilling depth more accurate and reasonable, and achieves a good balance between the efficiency and accuracy of the drilling depth determination. At the same time, it can reduce the impact of the environment on the drilling depth measurement, greatly improve the reliability of the drilling depth determination, has strong adaptability, and has a strong value for promotion and use. BRIEF DESCRIPTION OF THE DRAWINGS
[0041] Figure 1 It is a structural diagram of a short section for measuring the depth of a coal mine borehole;
[0042] Figure 2 It is the connection diagram of the short section for measuring the depth of the coal mine borehole;
[0043] Figure 3 is a flow chart of the method of the present invention;
[0044] Figure 4 This is a curve showing the relationship between the drilling water pressure and the drilling depth during the drilling process obtained in Example 1 of the present invention.
[0045] Meaning of the symbols in the figure:
[0046] 1- measuring short section outer tube, 2- data acquisition unit, 3- micro control unit, 4- storage unit, 5- wireless communication unit, 6- clock synchronization unit, 7- power supply unit, 8- remote server, 9- pressure switch, 10- non-magnetic drill pipe, 11- water feeder, 12- high-pressure water feeder, 13- pressure sensor; 21- three-axis accelerometer, 22- three-axis geomagnetic field sensor, 23- three-axis gyroscope.
[0047] The present invention is described in detail below with reference to the accompanying drawings and specific implementation methods. DETAILED DESCRIPTION
[0048] The method of the present invention installs a coal mine drilling depth measuring short section behind the drill bit, and during the drilling process, the corresponding axial linear acceleration of each drill rod is solved by the coal mine drilling depth measuring short section, and the corresponding axial drilling displacement of each drill rod is calculated. At the same time, the axial drilling displacement of each drill rod is corrected by using the pressure data of the drilling rig and the drilling time and other parameters during the drilling process to determine the corresponding drilling depth of each drill rod, and then the corresponding drilling depth of each drill rod is accumulated to obtain the drilling depth, and finally the total drilling depth is obtained. The technical problem of large hole depth measurement error caused by the use of manual technology for drilling depth measurement in underground mine drilling in the prior art is solved.
[0049] The technical terms involved in the present invention are explained as follows:
[0050] Geographic coordinate system: A three-dimensional spatial coordinate system defined with the z-axis pointing to the sky, the y-axis pointing to the north of the earth, and the x-axis pointing to the east of the earth.
[0051] Instrument coordinate system: the y-axis points forward along the axis of the measuring short section, the x-axis is in a plane perpendicular to the center of gravity of the measuring short section and points to the right perpendicular to the y-axis, and the z-axis points upward perpendicular to the oxy plane.
[0052] Non-magnetic short-joint drilling time: refers to the time from the start of drilling by the drilling rig pressurizing until the drilling rig depressurizes and completes drilling.
[0053] It should be noted that in the device of the present invention, during the drilling process, the length of the non-magnetic drill rod sleeved outside the measuring short section is the same as the length of other common drill rods.
[0054] The attitude rotation matrix update processing, sliding window filtering processing and discrete domain integral operation used in the method of the present invention are all conventional operations well known to those skilled in the art.
[0055] In accordance with the above technical scheme, specific embodiments of the present invention are given below. It should be noted that the present invention is not limited to the following specific embodiments, and all equivalent changes made on the basis of the technical scheme of this application fall within the protection scope of the present invention.
[0056] The present invention is further described in detail below with reference to the embodiments.
[0057] Example 1
[0058] like Figure 1 and Figure 2 As shown, this embodiment provides a coal mine drilling depth measuring pup joint, including a measuring pup joint outer tube 1, wherein a data acquisition unit 2, a micro control unit 3, a storage unit 4, a wireless communication unit 5, a clock synchronization unit 6 and a power supply unit 7 are arranged in the measuring pup joint outer tube 1;
[0059] The data acquisition unit is connected to the micro control unit 3, and is used to collect drilling data and transmit the collected data to the micro control unit 3. The data acquisition unit 2 includes a three-axis accelerometer 21 for measuring three-axis acceleration, a three-axis geomagnetic field sensor 22 for measuring geomagnetic components, and a three-axis gyroscope 23 for measuring three-axis angular velocity;
[0060] When drilling, the micro control unit 3 controls the three-axis accelerometer 21, the three-axis geomagnetic field sensor 22 and the three-axis gyroscope 23 to collect data, and transmits the collected raw data to the storage unit 3;
[0061] The storage unit 4 is used to store the collected data sent by the micro control unit, and send the stored data to the micro control unit 3;
[0062] The micro control unit 3 can communicate with the data acquisition unit 2, the storage unit 4, the wireless communication unit 5 and the clock synchronization unit 6 respectively, and is used to control the storage unit 4 to store data and receive data sent by the storage unit 4, and is also used to synchronize the time for the data acquisition unit 2 and issue parameter commands;
[0063] The power supply unit 7 is used to supply power to the data acquisition unit 2, the microcontroller unit 3, the storage unit 4, the wireless communication unit 5 and the clock synchronization unit 6; the power supply unit 7 in this embodiment is composed of a lithium iron phosphate battery connected to a secondary protection circuit 7, and outputs an intrinsically safe power supply.
[0064] The wireless communication unit 5 can communicate with the micro control unit 3 to transmit the received data to the remote server 8 , and receive the parameter command sent by the remote server 8 and transmit it to the micro control unit 3 .
[0065] As a preferred solution of this embodiment, the three-axis acceleration sensor 21 , the three-axis geomagnetic field sensor 22 , the three-axis gyroscope 33 and the clock synchronization unit 6 are respectively connected to the micro control unit 3 .
[0066] The outer tube 1 of the measuring short section is a hollow structure, and one end of the measuring outer tube 1 is provided with a pressure switch 9 connected to the power supply unit 7; when the drilling rig is pressurized, the pressure switch 9 is closed, and the data acquisition unit 2 starts to collect data; when the drilling rig is depressurized, the pressure switch 9 is opened, and the data acquisition unit 2 stops collecting data.
[0067] The outer tube 1 of the measuring short joint is also provided with a non-magnetic drill rod 10, which is connected to a water feeder 11 via a plurality of ordinary drill rods with hollow structures, that is, the non-magnetic drill rod 10 is connected to a plurality of ordinary drill rods, and the rear of the last ordinary drill rod is connected to the water feeder 11. The water feeder 11 is removed each time an ordinary drill rod is added, and after adding, the water feeder 11 is screwed onto the last ordinary drill rod, and then water is fed to drill.
[0068] The water feeder 11 is connected to a high-pressure water feeder 12 via a pipeline. The high-pressure water feeder 12 is provided with a pressure sensor 13 for collecting the water pressure of the drilling rig. The pressure sensor 13 is also connected to a remote server 8 .
[0069] The use process of the device of the present invention is as follows:
[0070] The coal mine drilling depth measurement short section 1 is installed in the non-magnetic drill rod 10 for measurement while drilling. During the drilling process, when the drilling rig is pressurized, the pressure switch 9 is closed, and the micro control unit 3 controls the three-axis accelerometer 21, the three-axis geomagnetic field sensor 22 and the three-axis gyroscope 23 to collect data, and transmits the collected original data to the storage unit 4; when the drilling rig is depressurized, the pressure switch 9 is opened, and the data acquisition unit stops collecting data. After the entire drilling process is completed, the coal mine drilling depth measurement short section 1 is withdrawn from the hole, and the coal mine drilling depth measurement short section 1 is connected to the remote server 8 through the wireless communication unit 5, and the stored data is transmitted to the remote server 8 for data calculation and processing.
[0071] Example 2
[0072] In this embodiment, the target coal seam to be drilled is a high-gas outburst coal seam in a coal mine in Huaibei, which belongs to a high-gas outburst mine. The maximum original gas pressure measured is 4Mpa. It is determined to use bottom extraction tunnel construction to construct gas extraction drilling holes for gas control.
[0073] like Figure 3 As shown, this embodiment discloses a method for determining drilling depth, which is implemented by the coal mine drilling depth measurement sub disclosed in Example 1, and includes the following steps:
[0074] Step 1: connecting a data acquisition unit, a storage unit, a micro control unit and a pressure sensor through a wireless communication unit, and performing synchronous timing of the acquisition unit, the storage unit, the micro control unit and the pressure sensor;
[0075] Step 2: Install the coal mine drilling depth measurement sub into the non-magnetic drill rod while drilling. During the drilling process, each time a drill rod is added, the coal mine drilling depth measurement sub collects and stores multiple sets of measurement data, including axial drilling three-axis acceleration, geomagnetic component and three-axis angular velocity; the pressure sensor collects the drilling rig water pressure at a predetermined time interval, and transmits the collected drilling rig water pressure to the remote server for storage, and the remote server also stores the drilling rig water pressure collection time at the same time;
[0076] Step 3: After the hole is drilled, the remote server processes the multiple sets of collected data corresponding to each drill rod to obtain the axial drilling displacement corresponding to each drill rod, and then determines the axial drilling displacement corresponding to each drill rod to obtain the corresponding drilling depth of each drill rod. Finally, the corresponding drilling depth of each drill rod is accumulated to obtain the drilling depth.
[0077] One end of the non-magnetic drill rod outside the coal mine drilling depth measurement short section is connected to the drill bit. During the drilling process, the pressure switch is closed to provide water pressure for the drill bit. After completing the drilling of a single drill rod, the pressure switch is opened to stop the pressurization, and then a drill rod is added to the tail of the last drill rod in the drill rod string. Then, the pressure switch is closed again and drilling continues. This action is repeated until the drilling in the entire borehole is completed. During this process, for each additional drill rod, the coal mine drilling depth measurement short section must collect and store data at a certain time interval after the pressure switch is closed. For example, the time interval in this embodiment is 20ms, and the data is collected until the pressure switch is opened, that is, each drill rod corresponds to multiple groups of measurement data.
[0078] It includes the following sub-steps:
[0079] Step 3.1, the remote server preprocesses the received multiple sets of collected data to obtain multiple sets of preprocessed data; the preprocessed data includes preprocessed magnetic field components, preprocessed three-axis accelerations and preprocessed three-axis angular velocities;
[0080] The preprocessing is data low-pass filtering, that is, firstly, a low-pass filtering algorithm is used to filter out high-frequency components in the collected data.
[0081] Step 3.2, correct the preprocessed three-axis angular velocity with the preprocessed magnetic field component and the preprocessed three-axis acceleration to obtain the corrected three-axis angular velocity; that is, the three-axis acceleration, magnetic field component and three-axis angular velocity are corrected by the existing complementary filtering and data fusion method to obtain the corrected three-axis angular velocity.
[0082] Step 3.3, update the attitude rotation matrix with the corrected three-axis angular velocity; determine the y-axis gravity acceleration in the instrument coordinate system based on the updated attitude rotation matrix and the acquired gravity acceleration in the geographic coordinate system, and then obtain the y-axis acceleration after removing the y-axis gravity acceleration, and then perform sliding window filtering on the obtained y-axis acceleration to obtain the filtered y-axis acceleration a y ;
[0083] Among them, the window length of the sliding window filtering process is 5 to 10;
[0084] The y-axis gravity acceleration in the instrument coordinate system is determined by the following formula:
[0085]
[0086] In the formula, g b is the gravitational acceleration of the y-axis in the instrument coordinate system, is the attitude rotation matrix, g n is the gravitational acceleration on the y-axis in the geographic coordinate system.
[0087] The y-axis acceleration after removing the y-axis gravity acceleration is obtained by the following formula:
[0088] G` b =G b -g b
[0089] In the formula, G b ' is the acceleration of the y-axis after removing the acceleration of gravity on the y-axis, G b is the preprocessed three-axis acceleration vector.
[0090] Step 3.4: Filter the Y-axis acceleration a y The axial drilling displacement and axial drilling speed corresponding to each drill rod are obtained by performing an integral operation in the discrete domain;
[0091] Among them, the discrete domain integral operation adopts the trapezoidal algorithm, which is a mature operation method. y By performing the first integration and the second integration in the discrete domain respectively, the axial drilling displacement and the axial drilling speed corresponding to each drill rod can be obtained respectively;
[0092] For example, in this embodiment, the length of the non-magnetic drill rod and the length of the other drill rods are both 1 m. Under the condition of water pressure, it is calculated that the axial drilling speed corresponding to one of the drill rods is 0, and the axial drilling displacement is 0.9 m.
[0093] Step 3.5: Determine the corresponding drilling depth of each drill rod according to the following conditions, including:
[0094] If the following conditions are met, the length of the drill rod is used as the corresponding drilling depth of each drill rod:
[0095] If the following conditions are not met, the axial drilling displacement corresponding to each drill rod obtained in step 3.4 is used as the drilling depth of each drill rod;
[0096]
[0097] Where S(Δt) is the axial drilling displacement corresponding to each drill pipe, in m; S min is the minimum threshold of axial drilling displacement of each drill pipe, in m, S max is the maximum threshold of axial drilling displacement of each drill pipe, in m; t ps is the duration of drilling rig water pressure, in min; t zmin is the minimum threshold of drilling time for each drill rod, in units of min, t zmax is the maximum threshold of drilling time for each drill rod, in min; P Δt The drilling rig water pressure collected by the pressure sensor is in MPa; Pmin is the minimum threshold of the drilling rig water pressure, in MPa, and 0 MPa<P min <4Mpa; V(Δt) is the axial drilling speed of each drill pipe, in m / s;
[0098] Step 3.6: Accumulate the corresponding drilling depth of each drill rod to obtain the drilling depth.
[0099] In this embodiment, S min and S max These are all empirical values. Due to the different lengths of drill rods used in different drilling operations, S min and S max The values are also different.
[0100] In this embodiment, the length of a single drill rod is 1 m. Taking the drilling of the first drill rod as an example, S min The value of S is 0.8m, max 1.3m, t zmin 3min, t zmax 8min, P min It is 4Mpa, wherein, since the axial drilling displacement of the non-magnetic drill rod obtained in step 3.4 is 0.9m, the water pressure of the drilling rig is 10Mpa, and the water pressure duration is 6min, the above judgment conditions are met. Therefore, in this embodiment, the length of the non-magnetic drill rod is used as the drilling depth of the non-magnetic drill rod, that is, the drilling depth is 1m.
[0101] Step 3.6: Accumulate the corresponding drilling depth of each drill rod to obtain the drilling depth.
[0102] After the drilling construction is completed, water pressure is added to punch the holes, and finally the following data is drawn based on the obtained data: Figure 3 The relationship curve between the drilling water pressure and the drilling depth during the drilling process is shown. In this embodiment, a total of 31 ordinary drill rods of the same length and 1 non-magnetic drill rod with a measuring short section are used in the drilling process. The non-magnetic drill rod is installed behind the drill bit. Therefore, a total of 32 sets of data including drilling data of the non-magnetic drill rod and the ordinary drill rod are collected during the entire drilling process, and the final drilling depth is 31.4 meters.
[0103] By adopting the method of the present invention, the process of measuring the borehole depth during the drilling process does not require human intervention, thus avoiding the problems of high labor intensity, false alarms, missed alarms, etc. caused by manual counting, which proves that the embodiment of the present invention has a better effect.
Claims
1. A method for determining drilling depth, characterized in that: The method is implemented by a coal mine borehole depth measuring pup joint, the coal mine borehole depth measuring pup joint comprising a measuring pup joint outer tube (1), wherein a data acquisition unit (2), a micro control unit (3), a storage unit (4), a wireless communication unit (5), a clock synchronization unit (6) and a power supply unit (7) are arranged inside the measuring pup joint outer tube (1); The data acquisition unit is connected to (2) a micro control unit (3) and is used to collect drilling data and transmit the collected data to the micro control unit (3). The data acquisition unit (2) comprises a three-axis acceleration sensor (21) for measuring three-axis acceleration, a three-axis geomagnetic field sensor (22) for measuring geomagnetic components, and a three-axis gyroscope (23) for measuring three-axis angular velocity. The storage unit (4) is used to store the collected data sent by the micro control unit, and to send the stored data to the micro control unit (3); The microcontrol unit (3) can communicate with the data acquisition unit (2), the storage unit (4), the wireless communication unit (5) and the clock synchronization unit (6) respectively, and is used to control the storage unit (4) to store data and receive data sent by the storage unit (4), and is also used to synchronize time for the data acquisition unit (2) and issue parameter commands; The power supply unit (7) is used to supply power to the data acquisition unit (2), the micro control unit (3), the storage unit (4), the wireless communication unit (5) and the clock synchronization unit (6); The wireless communication unit (5) can communicate with the micro control unit (3) to transmit received data to the remote server (8), and receive parameter commands issued by the remote server (8) and transmit them to the micro control unit (3); The method comprises the following steps: Step 1: connecting a data acquisition unit, a storage unit, a micro control unit and a pressure sensor through a wireless communication unit, and performing synchronous timing of the acquisition unit, the storage unit, the micro control unit and the pressure sensor; Step 2: Install the coal mine drilling depth measurement sub into the non-magnetic drill rod while drilling. During the drilling process, each time a drill rod is added, the coal mine drilling depth measurement sub collects and stores multiple sets of measurement data, including axial drilling three-axis acceleration, geomagnetic component and three-axis angular velocity; the pressure sensor collects the drilling rig water pressure at a predetermined time interval, and transmits the collected drilling rig water pressure to the remote server for storage, and the remote server also stores the drilling rig water pressure collection time at the same time; Step 3: After drilling, the remote server processes the multiple sets of collected data corresponding to each drill rod to obtain the axial drilling displacement and axial drilling speed corresponding to each drill rod, and then determines the axial drilling displacement corresponding to each drill rod to obtain the corresponding drilling depth of each drill rod. Finally, the corresponding drilling depth of each drill rod is accumulated to obtain the drilling depth. Step 3 specifically includes the following sub-steps: Step 3.1, the remote server preprocesses the received multiple sets of collected data to obtain multiple sets of preprocessed data; the preprocessed data includes preprocessed magnetic field components, preprocessed three-axis accelerations and preprocessed three-axis angular velocities; Step 3.2, correcting the preprocessed three-axis angular velocity with the preprocessed magnetic field component and the preprocessed three-axis acceleration to obtain a corrected three-axis angular velocity; Step 3.3, update the attitude rotation matrix with the corrected three-axis angular velocity; determine the y-axis gravity acceleration in the instrument coordinate system based on the updated attitude rotation matrix and the acquired gravity acceleration in the geographic coordinate system, and then obtain the y-axis acceleration after removing the y-axis gravity acceleration, and then perform sliding window filtering on the obtained y-axis acceleration to obtain the filtered ; Step 3.4: After filtering Performing an integral operation in the discrete domain, obtaining the axial drilling displacement and axial drilling speed corresponding to each drill rod; Step 3.5: Determine the corresponding drilling depth of each drill rod according to the following conditions, including: If the following conditions are met, the length of the drill rod is used as the corresponding drilling depth of each drill rod: If the following conditions are not met, the axial drilling displacement corresponding to each drill rod obtained in step 3.4 is used as the drilling depth of each drill rod; In the formula, is the axial drilling displacement corresponding to each drill rod, in m; is the minimum threshold of axial drilling displacement of each drill pipe, in m. is the maximum threshold of axial drilling displacement of each drill pipe, in m; is the duration of drilling rig water pressure, in min; t zmin is the minimum threshold of drilling time for each drill rod, in units of min. t zmax The maximum threshold of drilling time for each drill rod, in min; The drilling rig water pressure collected by the pressure sensor, in MPa; The minimum threshold of the drilling rig water pressure, in MPa, with 0M pa < P min <4 Mpa ; Step 3.6: Accumulate the corresponding drilling depth of each drill rod to obtain the drilling depth.
2. The method for determining the drilling depth according to claim 1, characterized in that: The three-axis acceleration sensor (21), the three-axis geomagnetic field sensor (22), the three-axis gyroscope (23) and the clock synchronization unit (6) are respectively connected to the micro control unit (3).
3. The method for determining drilling depth according to claim 1, characterized in that: The outer tube (1) of the measuring nipple is a hollow structure, and one end of the outer tube (1) of the measuring nipple is provided with a pressure switch (9) connected to a power supply unit (7); when the drilling rig is pressurized, the pressure switch (9) is closed, and the data acquisition unit (2) starts to collect data; when the drilling rig is depressurized, the pressure switch (9) is opened, and the data acquisition unit (2) stops collecting data.
4. The method for determining the drilling depth according to claim 1, wherein: A non-magnetic drill rod (10) is also mounted outside the outer tube of the measuring nipple (1); the non-magnetic drill rod (10) is connected to a water feeder (11) via a plurality of common drill rods with hollow structures; the water feeder (11) is connected to a high-pressure water feeder (12) via a pipeline; a pressure sensor (13) for collecting drilling rig water pressure is provided on the high-pressure water feeder (12); the pressure sensor (13) is also connected to a remote server (8).
5. The method for determining drilling depth according to claim 1, characterized in that: The window length of the sliding window filtering process described in step 3.3 is 5 to 10.
6. The method for determining drilling depth according to claim 1, characterized in that: The y-axis gravity acceleration in the instrument coordinate system described in step 3.3 is determined by the following formula: In the formula, g b is the gravitational acceleration of the y-axis in the instrument coordinate system, is the attitude rotation matrix, g n is the gravitational acceleration on the y-axis in the geographic coordinate system.
7. The method for determining drilling depth according to claim 1, characterized in that: The y-axis acceleration after removing the y-axis gravity acceleration described in step 3.3 is obtained by the following formula: In the formula, G b ’ is the acceleration along the y-axis after removing the acceleration due to gravity on the y-axis. The pre-processed three-axis Velocity vector.
