Rockburst early warning method, device, electronic equipment and medium
By determining the analysis time window and microseismic event differentiation rate in rock burst early warning, combined with principal component analysis and variance calculation, the problem of poor universality and qualitative analysis of early warning methods in the existing technology is solved, and more accurate rock burst early warning is achieved. and a wider range of applications.
Patent Information
- Application Number
- CN202210093600.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-01-26
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2042-01-26
AI Technical Summary
Existing rockburst early warning methods have poor universality and limited application scope. Most of them are qualitative analysis. It is difficult to give specific parameter early warning values and cannot effectively deal with the influence of different engineering geological conditions and external factors.
By determining the analysis time window within the monitoring period, the number and quantity variance of microseismic events are obtained, the differentiation rate of microseismic events is calculated, and statistical analysis is performed to determine the differentiation rate early warning value, and then rock burst early warning is carried out, combining principal component analysis and variance calculation , eliminate the influence of external factors, and quantitatively describe the degree of differentiation of microseismic events.
It improves the universality and application scope of the rockburst early warning method, provides specific parameter early warning values, enhances the accuracy of monitoring and early warning, solves the problem of qualitative analysis, and can more accurately reflect the degree of internal damage to the rock mass.
Smart Images

Figure CN114488289B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of rockburst monitoring and early warning, and in particular to a rockburst early warning method, device, electronic equipment and medium. Background Art
[0002] In mining, water conservancy, and tunnel excavation projects, the excavation of tunnels or underground chambers leads to the redistribution of rock stress. When the energy accumulated in the rock reaches the bearing capacity of the rock, it will be suddenly released violently, causing sudden instability of the rock, that is, rock burst disasters, which have a great impact on the safety of life and property of workers. Rock burst disasters have become a safety issue that must be solved in the development of deep mineral resources and engineering in my country. Carrying out rock burst disaster early warning research is an important guarantee for safe production in mines and the smooth progress of underground engineering, and it is also a hot spot and difficulty in current research.
[0003] At present, the early warning of rock burst based on microseismic monitoring technology mostly uses the temporal and spatial characteristics of microseismic events, the change characteristics of microseismic parameters such as b value and energy index, and reflects the stability state of the rock mass through abnormal changes in parameters to warn of the occurrence of rock burst disasters. However, different engineering geological conditions and rock mass states vary greatly, and external factors such as the monitoring system environment and the station network layout plan have a great influence on the monitoring results, resulting in the poor universality of the current rock burst disaster early warning methods and a small application range. In addition, most of the current early warning methods are qualitative parameter analysis, and it is difficult to give specific parameter warning values. Summary of the invention
[0004] In view of this, an object of the present invention is to provide a rockburst early warning method, device, electronic equipment and medium, which can provide specific parameter early warning values and improve the universality and application scope of the early warning method.
[0005] In order to achieve the above purpose, the technical solution adopted by the embodiment of the present invention is as follows:
[0006] In a first aspect, an embodiment of the present invention provides a first aspect, an embodiment of the present invention provides a rockburst warning method, comprising: determining an analysis time window within a monitoring period, and obtaining the number of microseismic events in each analysis time window; determining the variance of the number of microseismic events in each analysis time window, and determining the corresponding relationship between the variance of the number of microseismic events and the analysis time; determining the microseismic event differentiation rate based on the corresponding relationship; performing statistical analysis on the microseismic event differentiation rate, determining a microseismic event differentiation rate warning value, and performing rockburst warning based on the microseismic event differentiation rate warning value.
[0007] In one embodiment, determining the analysis time window within the monitoring period includes: using a preset analysis algorithm to determine the analysis time window according to the following formula:
[0008]
[0009] Among them, P is the monitoring period, K is the analysis time window, is the number of analysis time windows, q is the analysis time window number, is the intermediate eigenvalue of the covariance matrix of the qth analysis time window, is the minimum eigenvalue of the covariance matrix of the qth window.
[0010] In one embodiment, determining the microseismic event differentiation rate based on the corresponding relationship includes: performing derivative calculation on the corresponding relationship to determine the microseismic event differentiation rate, and determining a stable differentiation stage of the microseismic event differentiation rate.
[0011] In one embodiment, a statistical analysis is performed on the microseismic event differentiation rate to determine a warning value for the microseismic event differentiation rate, including: performing a statistical analysis on the stable differentiation stage of the microseismic event differentiation rate to determine a function expression for the stable differentiation stage; determining a confidence interval for the stable differentiation stage based on the function expression for the stable differentiation stage; and determining an upper limit value of the confidence interval as the warning value for the microseismic event differentiation rate.
[0012] In one embodiment, performing rock burst warning based on the microseismic event differentiation rate warning value includes: if the microseismic event differentiation rate exceeds the microseismic event differentiation rate warning value, performing rock burst warning.
[0013] In the second aspect, an embodiment of the present invention provides a rockburst warning device, including: an analysis time window determination module, used to determine the analysis time window within the monitoring period, and obtain the number of microseismic events in each analysis time window; a corresponding relationship determination module, used to determine the variance of the number of microseismic events in each analysis time window, and determine the corresponding relationship between the variance of the number of microseismic events and the analysis time; a microseismic event differentiation rate determination module, used to determine the microseismic event differentiation rate based on the corresponding relationship; an early warning module, used to perform statistical analysis on the microseismic event differentiation rate, determine a microseismic event differentiation rate early warning value, and perform rockburst early warning based on the microseismic event differentiation rate early warning value.
[0014] In one embodiment, the microseismic event differentiation rate determination module is further used to: perform derivative calculation on the corresponding relationship to determine the microseismic event differentiation rate, and determine the stable differentiation stage of the microseismic event differentiation rate.
[0015] In one embodiment, the early warning module is also used to: perform statistical analysis on the stable differentiation stage of the microseismic event differentiation rate to determine the function expression of the stable differentiation stage; determine the confidence interval of the stable differentiation stage based on the function expression of the stable differentiation stage; and determine the upper limit value of the confidence interval as the early warning value of the microseismic event differentiation rate.
[0016] In a third aspect, an embodiment of the present invention provides an electronic device, comprising a processor and a memory, wherein the memory stores computer-executable instructions that can be executed by the processor, and the processor executes the computer-executable instructions to implement the steps of any one of the methods provided in the first aspect above.
[0017] In a fourth aspect, an embodiment of the present invention provides a computer-readable storage medium, on which a computer program is stored. When the computer program is executed by a processor, the steps of any one of the methods provided in the first aspect are executed.
[0018] The embodiments of the present invention bring the following beneficial effects:
[0019] The rockburst warning method, device, electronic device and medium provided by the embodiment of the present invention first determine the analysis time window within the monitoring period and obtain the number of microseismic events in each analysis time window; then determine the variance of the number of microseismic events in each analysis time window, and determine the corresponding relationship between the variance of the number of microseismic events and the analysis time; then determine the microseismic event differentiation rate based on the corresponding relationship; finally, perform statistical analysis on the microseismic event differentiation rate, determine the microseismic event differentiation rate warning value, and perform rockburst warning based on the microseismic event differentiation rate warning value. The above method can reduce the workload of calculating the microseismic event differentiation rate by reasonably determining the length of the analysis time window; secondly, the microseismic event differentiation rate is determined by using the corresponding relationship between the variance of the number of microseismic events and the analysis time, which can eliminate the influence of external factors on the monitoring results and improve the accuracy of monitoring and warning; finally, according to the distribution characteristics of the differentiation rate data, the rockburst disaster microseismic event differentiation rate warning value is determined, and the degree of differentiation of microseismic events is quantitatively described, which solves the problem that the current rockburst disaster warning methods are mostly qualitative analysis. In summary, the above method can give specific parameter warning values and improve the universality and application scope of the warning method.
[0020] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or understood by practicing the present invention. The purpose and other advantages of the present invention are realized and obtained by the structures particularly pointed out in the description, claims and drawings.
[0021] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, preferred embodiments are given below and described in detail with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0023] Figure 1 A flow chart of a rockburst early warning method provided by an embodiment of the present invention;
[0024] Figure 2 A schematic diagram of microseismic event differentiation rate provided by an embodiment of the present invention;
[0025] Figure 3 A schematic diagram of a microseismic event differentiation rate early warning provided by an embodiment of the present invention;
[0026] Figure 4 A flow chart of another rockburst early warning method provided by an embodiment of the present invention;
[0027] Figure 5 A schematic structural diagram of a rockburst early warning device provided by an embodiment of the present invention;
[0028] Figure 6 A schematic diagram of the structure of an electronic device provided by an embodiment of the present invention. DETAILED DESCRIPTION
[0029] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution of the present invention will be clearly and completely described below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0030] At present, the early warning of rock burst based on microseismic monitoring technology mostly uses the temporal and spatial characteristics of microseismic events, the change characteristics of microseismic parameters such as b value and energy index, and reflects the stability state of the rock mass through abnormal changes in parameters to warn of the occurrence of rock burst disasters. However, different engineering geological conditions and rock mass states vary greatly, and external factors such as the monitoring system environment and the station network layout plan have a great influence on the monitoring results, resulting in the poor universality of the current rock burst disaster early warning methods and a small application range. In addition, most of the current early warning methods are qualitative parameter analysis, and it is difficult to give specific parameter warning values.
[0031] Based on this, the embodiments of the present invention provide a rockburst early warning method, device, electronic device and medium, which can provide specific parameter early warning values and improve the universality and application scope of the early warning method.
[0032] To facilitate understanding of this embodiment, a rockburst early warning method disclosed in an embodiment of the present invention is first introduced in detail. The method can be executed by an electronic device, such as a smart phone, a computer, an iPad, etc. Figure 1 The flowchart of a rockburst early warning method shown in FIG. 1 illustrates that the method mainly includes the following steps S101 to S104:
[0033] Step S101: determine the analysis time windows within the monitoring period, and obtain the number of microseismic events in each analysis time window.
[0034] In a possible implementation, a microseismic monitoring system with reasonable network layout and accurate positioning effect can be constructed based on specific engineering conditions (such as geological conditions, rock mass stability status, etc.). Microseismic events will occur during the deformation and destruction of rock mass, accompanied by the generation, expansion, accumulation and release of cracks, and the microseismic monitoring system can obtain microseismic events in real time and receive microseismic event waveform information. Within a certain monitoring period, the principal component analysis method can be used to determine the analysis time window with the optimal length of K, and then the difference algorithm can be used to calculate the number of microseismic events in each analysis time window.
[0035] Step S102: determining the variance of the number of microseismic events in each analysis time window, and determining the corresponding relationship between the variance of the number of microseismic events and the analysis time.
[0036] In a possible implementation, the variance of the number of microseismic events can indicate the degree to which the number of microseismic events deviates from the number average value and its degree of dispersion during the rock mass destruction process. The larger the variance of the number of microseismic events, the more obvious the differentiation of microseismic events, which can indicate the degree of damage to the rock mass. Based on this, in the embodiment of the present invention, the variance calculation formula can be used to calculate the variance V of the number of microseismic events in each analysis time window, and the corresponding relationship between the variance of the number of microseismic events and the analysis time can be determined to draw a time curve of the variance of the number of microseismic events.
[0037] Specifically, the variance of the number of microseismic events can be calculated according to the following formula:
[0038]
[0039] Where V is the variance of the number of microseismic events, P is the monitoring period, K is the analysis time window, is the number of analysis time windows, q is the analysis time window number, I q is the number of microseismic events in the qth analysis time window.
[0040] Step S103: Determine the microseismic event differentiation rate based on the corresponding relationship.
[0041] In one possible implementation, the microseismic number variance time curve can be differentiated to calculate the microseismic event differentiation rate, which can be used to represent the rock mass damage rate. Figure 2 shown.
[0042] Step S104: Statistically analyzing the microseismic event differentiation rate, determining a microseismic event differentiation rate warning value, and performing rock burst warning based on the microseismic event differentiation rate warning value.
[0043] In a possible implementation, the microseismic event differentiation rate can be statistically analyzed to determine a confidence interval, and the upper limit of the confidence interval is determined as a microseismic event differentiation rate warning value. When the microseismic event differentiation rate reaches the warning value, a rock burst disaster warning is issued.
[0044] The rockburst warning method provided by the embodiment of the present invention can reduce the workload of calculating the differentiation rate of microseismic events by reasonably determining the length of the analysis time window; secondly, the microseismic event differentiation rate is determined by using the corresponding relationship between the variance of the number of microseismic events and the analysis time, which can eliminate the influence of external factors on the monitoring results and improve the accuracy of monitoring and early warning; finally, according to the distribution characteristics of the differentiation rate data, the differentiation rate warning value of the microseismic event of the rockburst disaster is determined, and the degree of differentiation of the microseismic event is quantitatively described, which solves the problem that the current rockburst disaster early warning methods are mostly qualitative analysis. In summary, the above method can give specific parameter warning values, while improving the universality and application scope of the early warning method.
[0045] In one embodiment, in order to reduce the impact of the time window length on the warning result, the principal component analysis principle can be used to determine the optimal analysis time window length. In this embodiment, when determining the analysis time window within the monitoring period, the following methods can be used, including but not limited to: using a preset analysis algorithm, and determining the analysis time window according to the following formula:
[0046]
[0047] Where P is the monitoring period, K is the analysis time window, is the number of analysis time windows, q is the analysis time window number, is the intermediate eigenvalue of the covariance matrix of the qth analysis time window, is the minimum eigenvalue of the covariance matrix of the qth window. Specifically, when Q is close to a constant, K is the length of the analysis time window.
[0048] In one embodiment, when determining the microseismic event differentiation rate based on the corresponding relationship, the following methods may be used, including but not limited to: performing derivative calculations on the corresponding relationship to determine the microseismic event differentiation rate, and determining a stable differentiation stage of the microseismic event differentiation rate.
[0049] In specific applications, the microseismic event number variance curve (i.e., the corresponding relationship between the microseismic event number variance and the analysis time) can be derived to calculate the microseismic event differentiation rate. The derivative formula is:
[0050]
[0051] Where v is the microseismic event differentiation rate, t i is the time, and h is the time interval.
[0052] In the process of rock mass rupture, the microseismic event differentiation rate can be divided into a stable differentiation stage and an accelerated differentiation stage according to the distribution characteristics of the microseismic event differentiation rate. Figure 2 shown.
[0053] Furthermore, in order to solve the problem that most of the current rock burst disaster warning methods are qualitative analysis, the degree of differentiation of microseismic events is quantitatively described. In the embodiment of the present invention, when performing statistical analysis on the differentiation rate of microseismic events and determining the early warning value of the differentiation rate of microseismic events, the following methods can be used, including but not limited to:
[0054] Firstly, the stable differentiation stage of microseismic event differentiation rate is statistically analyzed to determine the functional expression of the stable differentiation stage.
[0055] In specific applications, the differentiation rate of microseismic events in the stable differentiation stage can be statistically analyzed. The differentiation rate of microseismic events is distributed in the form of a Gauss Amp function, which is expressed as: In the formula, y0 represents the offset of the curve in the y direction, A represents the amplitude of the curve, and its value is the difference between the maximum value and the minimum value. It is a deformation of the normal distribution. The standard normal distribution formula is: The axis of symmetry of the curve is x c , w is the correlation coefficient.
[0056] Then, based on the functional expression of the stable differentiation stage, the confidence interval of the stable differentiation stage is determined.
[0057] Finally, the upper limit of the confidence interval is determined as the warning value of the microseismic event differentiation rate.
[0058] In one embodiment, the confidence interval of the mathematical expectation u of the microseismic event differentiation rate in the stable differentiation stage is calculated, with a confidence level of 1-a. The statistic is:
[0059] For a confidence level of 1-a, we can find the upper and lower values of a normal variable by looking up the table. Divided into points Make From this we can see that the confidence interval with a confidence level of 1-a is In the formula, a is probability, u is statistic, P is distribution probability, n is the number of samples, and X is the data mean. This interval can include the stable differentiation stage of the number of microseismic events, and can screen out the accelerated differentiation stage of the number of microseismic events. The upper limit of the interval calculated is Set as warning value, such as Figure 3 shown.
[0060] The rockburst warning method provided by the embodiment of the present invention can reduce the workload of microseismic rate calculation by reasonably determining the length of the time window according to the principle of principal component analysis; it can eliminate the influence of external factors on the monitoring results and improve the accuracy of monitoring and early warning by using the microseismic event differentiation rate parameter; it can analyze the degree to which the microseismic event increment is away from the average by using the microseismic event number variance parameter, quantitatively describe the differentiation degree of microseismic events, and further reflect the degree of damage inside the rock mass; it can analyze the differentiation rate of microseismic events, divide the differentiation process of microseismic events into a stable differentiation stage and an accelerated differentiation stage, determine the microseismic differentiation rate warning value of rockburst disaster according to the distribution characteristics of the differentiation rate data, quantitatively describe the differentiation degree of microseismic events, and solve the problem that the current rockburst disaster early warning methods are mostly qualitative analysis. In summary, the above method can give specific parameter warning values, while improving the universality and application scope of the early warning method.
[0061] For ease of understanding, the present invention also provides a specific rock burst warning method, see Figure 4 The flowchart of another rock burst early warning method shown in FIG. 1 illustrates that the method mainly includes the following steps S401 to S407:
[0062] Step S401: construct a microseismic monitoring system.
[0063] Specifically, based on the specific project profile (geological conditions, rock mass stability status), a microseismic monitoring system with reasonable network layout and accurate positioning effect can be constructed.
[0064] Step S402: Acquire microseismic monitoring data.
[0065] Specifically, during the deformation and destruction process of rock mass, microseismic events will occur, accompanied by the generation, expansion, accumulation and release of cracks, and the microseismic monitoring system can receive the waveform information of microseismic events.
[0066] Step S403: Determine the analysis time window.
[0067] Specifically, the principal component analysis method can be used to determine the optimal analysis time window with a length of K within a certain monitoring period.
[0068] Step S404: Calculate the number of microseismic events in each analysis time window.
[0069] Specifically, the difference algorithm can be used to calculate the number of microseismic events in each analysis time window I q .
[0070] Step S405: Calculate the variance of the number of microseismic events in each analysis time window.
[0071] Specifically, the variance calculation formula can be used to calculate the variance V of the number of microseismic events in each analysis time window, and a time curve of the variance of the number of microseismic events can be drawn.
[0072] Step S406: Calculate the microseismic event differentiation rate.
[0073] Specifically, the variance curve of the number of microseismic events can be differentiated to calculate the microseismic event differentiation rate, and based on the data distribution characteristics of the microseismic event differentiation rate, the microseismic event differentiation rate can be divided into a "stable differentiation stage" and an "accelerated differentiation stage".
[0074] Step S407: Determine the microseismic event differentiation rate warning value.
[0075] Specifically, the differentiation rate of microseismic events in the stable differentiation stage can be statistically analyzed to determine the function expression and the confidence interval with a confidence level of 1-a. The upper limit of the interval is determined as the warning value of the differentiation rate of microseismic events. When the differentiation rate of microseismic events reaches this value, a rock burst disaster warning is issued.
[0076] The rockburst warning method provided by the embodiment of the present invention determines the reasonable time window length according to the principle of principal component analysis for the monitoring period, and counts the microseismic events within the time window, thereby solving the shortcomings of large amount of monitoring data and large computing workload in practical applications; secondly, the microseismic event differentiation rate parameter is adopted to eliminate the influence of external environmental factors on the monitoring results, reduce monitoring errors, improve the accuracy of monitoring and early warning, and increase the universality and applicability of the rockburst disaster early warning method; finally, the differentiation rate of microseismic events is analyzed, and the early warning value of the microseismic event differentiation rate of rockburst disaster is determined according to the data distribution characteristics of the stable differentiation stage of the rock mass, thereby solving the shortcomings that the current rockburst disaster early warning methods are mostly qualitative analysis.
[0077] For the rockburst warning method provided in the above embodiment, the present invention also provides a rockburst warning device, see Figure 5 The structural schematic diagram of a rockburst early warning device shown in FIG. 1 may include the following parts:
[0078] The analysis time window determination module 501 is used to determine the analysis time windows within the monitoring period and obtain the number of microseismic events in each analysis time window.
[0079] The corresponding relationship determination module 502 is used to determine the variance of the number of microseismic events in each analysis time window, and determine the corresponding relationship between the variance of the number of microseismic events and the analysis time.
[0080] The microseismic event differentiation rate determination module 503 is used to determine the microseismic event differentiation rate based on the corresponding relationship.
[0081] The early warning module 504 is used to perform statistical analysis on the microseismic event differentiation rate, determine the early warning value of the microseismic event differentiation rate, and perform rock burst early warning based on the early warning value of the microseismic event differentiation rate.
[0082] The rockburst warning device provided by the embodiment of the present invention can reduce the workload of calculating the differentiation rate of microseismic events by reasonably determining the length of the analysis time window; secondly, the microseismic event differentiation rate is determined by using the corresponding relationship between the variance of the number of microseismic events and the analysis time, which can eliminate the influence of external factors on the monitoring results and improve the accuracy of monitoring and early warning; finally, according to the distribution characteristics of the differentiation rate data, the early warning value of the differentiation rate of microseismic events of rockburst disasters is determined, and the degree of differentiation of microseismic events is quantitatively described, which solves the problem that the current rockburst disaster early warning methods are mostly qualitative analysis. In summary, the above device can give specific parameter early warning values, while improving the universality and application scope of the early warning method.
[0083] In one implementation, the analysis time window determination module 501 is further used to: use a preset analysis algorithm to determine the analysis time window according to the following formula:
[0084]
[0085] Among them, P is the monitoring period, K is the analysis time window, is the number of analysis time windows, q is the analysis time window number, is the intermediate eigenvalue of the covariance matrix of the qth analysis time window, is the minimum eigenvalue of the covariance matrix of the qth window.
[0086] In one embodiment, the microseismic event differentiation rate determination module 503 is further used to: perform derivative calculation on the corresponding relationship to determine the microseismic event differentiation rate, and determine the stable differentiation stage of the microseismic event differentiation rate.
[0087] In one embodiment, the above-mentioned early warning module 504 is also used to: perform statistical analysis on the stable differentiation stage of the microseismic event differentiation rate to determine the function expression of the stable differentiation stage; determine the confidence interval of the stable differentiation stage based on the function expression of the stable differentiation stage; and determine the upper limit value of the confidence interval as the early warning value of the microseismic event differentiation rate.
[0088] In one implementation, the warning module 504 is further configured to: issue a rock burst warning if the microseismic event differentiation rate exceeds a microseismic event differentiation rate warning value.
[0089] The device provided in the embodiment of the present invention has the same implementation principle and technical effects as those of the aforementioned method embodiment. For the sake of brief description, for matters not mentioned in the device embodiment, reference may be made to the corresponding contents in the aforementioned method embodiment.
[0090] An embodiment of the present invention further provides an electronic device. Specifically, the electronic device includes a processor and a storage device. The storage device stores a computer program, and when the computer program is executed by the processor, it executes the method described in any one of the above implementation methods.
[0091] Figure 6 A structural diagram of an electronic device provided in an embodiment of the present invention, the electronic device 100 includes: a processor 60, a memory 61, a bus 62 and a communication interface 63, wherein the processor 60, the communication interface 63 and the memory 61 are connected via the bus 62; the processor 60 is used to execute an executable module stored in the memory 61, such as a computer program.
[0092] The memory 61 may include a high-speed random access memory (RAM), and may also include a non-volatile memory, such as at least one disk memory. The communication connection between the system network element and at least one other network element is realized through at least one communication interface 63 (which may be wired or wireless), and the Internet, wide area network, local area network, metropolitan area network, etc. may be used.
[0093] The bus 62 may be an ISA bus, a PCI bus, or an EISA bus, etc. The bus may be divided into an address bus, a data bus, a control bus, etc. For ease of representation, Figure 6 Only one bidirectional arrow is used in the diagram, but this does not mean that there is only one bus or only one type of bus.
[0094] Among them, the memory 61 is used to store programs, and the processor 60 executes the program after receiving the execution instruction. The method executed by the device for flow process definition disclosed in any embodiment of the above-mentioned embodiment of the present invention can be applied to the processor 60 or implemented by the processor 60.
[0095] The processor 60 may be an integrated circuit chip with signal processing capabilities. In the implementation process, each step of the above method can be completed by the hardware integrated logic circuit or software instructions in the processor 60. The above processor 60 can be a general-purpose processor, including a central processing unit (CPU), a network processor (NP), etc.; it can also be a digital signal processor (DSP), an application-specific integrated circuit (ASIC), a field-programmable gate array (FPGA), or other programmable logic devices, discrete gates or transistor logic devices, discrete hardware components. The methods, steps and logic block diagrams disclosed in the embodiments of the present invention can be implemented or executed. The general-purpose processor can be a microprocessor or the processor can also be any conventional processor. The steps of the method disclosed in the embodiments of the present invention can be directly embodied as a hardware decoding processor to be executed, or the hardware and software modules in the decoding processor can be executed. The software module can be located in a mature storage medium in the field such as a random access memory, a flash memory, a read-only memory, a programmable read-only memory or an electrically erasable programmable memory, a register, etc. The storage medium is located in the memory 61, and the processor 60 reads the information in the memory 61 and completes the steps of the above method in combination with its hardware.
[0096] The computer program product of the readable storage medium provided in the embodiment of the present invention includes a computer-readable storage medium storing program code, and the instructions included in the program code can be used to execute the methods described in the previous method embodiments. The specific implementation can be referred to the previous method embodiments, which will not be repeated here.
[0097] If the functions are implemented in the form of software functional units and sold or used as independent products, they can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, or the part that contributes to the prior art or the part of the technical solution, can be embodied in the form of a software product. The computer software product is stored in a storage medium, including several instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the methods described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk, etc., which can store program codes.
[0098] Finally, it should be noted that the above-described embodiments are only specific implementations of the present invention, which are used to illustrate the technical solutions of the present invention, rather than to limit them. The protection scope of the present invention is not limited thereto. Although the present invention is described in detail with reference to the above-described embodiments, ordinary technicians in the field should understand that any technician familiar with the technical field can still modify the technical solutions recorded in the above-described embodiments within the technical scope disclosed by the present invention, or can easily think of changes, or make equivalent replacements for some of the technical features therein; and these modifications, changes or replacements do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the embodiments of the present invention, and should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.
Claims
1. A rockburst early warning method, characterized in that: include: Determine the analysis time window within the monitoring period and obtain the number of microseismic events in each analysis time window; Determining the variance of the number of microseismic events in each of the analysis time windows, and determining the corresponding relationship between the variance of the number of microseismic events and the analysis time; Determining a microseismic event differentiation rate based on the corresponding relationship; A statistical analysis is performed on the microseismic event differentiation rate to determine a microseismic event differentiation rate warning value, and a rock burst warning is performed based on the microseismic event differentiation rate warning value.
2. The method according to claim 1, characterized in that: Determine the analysis time window within the monitoring period, including: Using the preset analysis algorithm, the analysis time window is determined according to the following formula: Among them, P is the monitoring period, K is the analysis time window, is the number of analysis time windows, q is the analysis time window number, is the intermediate eigenvalue of the covariance matrix of the qth analysis time window, is the minimum eigenvalue of the covariance matrix of the qth window.
3. The method according to claim 1, characterized in that Determining the microseismic event differentiation rate based on the corresponding relationship includes: The corresponding relationship is derived and calculated to determine the microseismic event differentiation rate, and to determine the stable differentiation stage of the microseismic event differentiation rate.
4. The method according to claim 3, characterized in that Performing statistical analysis on the microseismic event differentiation rate to determine a microseismic event differentiation rate warning value includes: Performing statistical analysis on the stable differentiation stage of the microseismic event differentiation rate to determine a functional expression of the stable differentiation stage; Determining a confidence interval of the stable differentiation stage based on a functional expression of the stable differentiation stage; The upper limit value of the confidence interval is determined as the early warning value of the microseismic event differentiation rate.
5. The method according to claim 1, characterized in that Performing rock burst warning based on the microseismic event differentiation rate warning value includes: If the microseismic event differentiation rate exceeds the microseismic event differentiation rate warning value, a rock burst warning is issued.
6. A rock burst warning device, characterized in that: include: An analysis time window determination module is used to determine the analysis time window within the monitoring period and obtain the number of microseismic events in each analysis time window; A corresponding relationship determination module, used to determine the variance of the number of microseismic events in each of the analysis time windows, and determine the corresponding relationship between the variance of the number of microseismic events and the analysis time; A microseismic event differentiation rate determination module, used to determine the microseismic event differentiation rate based on the corresponding relationship; The early warning module is used to perform statistical analysis on the microseismic event differentiation rate, determine a microseismic event differentiation rate early warning value, and perform rock burst early warning based on the microseismic event differentiation rate early warning value.
7. The device according to claim 6, characterized in that The microseismic event differentiation rate determination module is also used to: perform derivative calculation on the corresponding relationship to determine the microseismic event differentiation rate, and determine the stable differentiation stage of the microseismic event differentiation rate.
8. The device according to claim 7, characterized in that The early warning module is also used to: perform statistical analysis on the stable differentiation stage of the microseismic event differentiation rate to determine the function expression of the stable differentiation stage; Determining a confidence interval of the stable differentiation stage based on a functional expression of the stable differentiation stage; The upper limit value of the confidence interval is determined as the early warning value of the microseismic event differentiation rate.
9. An electronic device, characterized in that: The method comprises a processor and a memory, wherein the memory stores computer executable instructions that can be executed by the processor, and the processor executes the computer executable instructions to implement the steps of the method according to any one of claims 1 to 5.
10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 5 are executed.