A well wall watering device and reverse drilling well wall support construction method
The well wall watering device and reverse drilling method provide a safe and efficient solution for small-diameter shaft construction by using a rotating template and controlled concrete pouring, addressing safety and efficiency issues in traditional methods.
Patent Information
- Application Number
- CN202210277963.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-03-21
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2042-03-21
AI Technical Summary
Traditional construction methods for small-diameter shafts are unsafe, inefficient, and require workers to enter the shaft for support operations, posing safety risks and complicating the construction process.
A well wall watering device and reverse drilling method using a rotating template, flattening mechanism, material guide table, baffle, and rotating shaft, allowing for safe and efficient construction without personnel entering the shaft, utilizing a cylindrical rotating template and truncated cone-shaped platform with ventilation, and controlled concrete pouring.
Ensures a safe working environment, simplifies the construction process, reduces equipment and material costs, and enhances safety and efficiency by eliminating the need for workers to enter the shaft during support operations.
Smart Images

Figure CN114508355B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of surrounding rock support for underground engineering, and in particular to a well wall watering device and a reverse well drilling well wall support construction method. Background Art
[0002] Small diameter shafts are widely used in economic life. Traditional construction methods include forward excavation and reverse construction. Rock is broken by drilling and blasting, and support is provided by masonry, stacking, anchor spraying, pouring, etc. The construction is difficult and poses a great threat to safety.
[0003] To solve the above problems, the raise boring machine was developed. During the excavation of the raise boring machine, the workers do not need to enter the unsafe wellbore, the working environment is good, and the operation is safe. Other construction methods such as hanging tanks and climbing tanks are avoided, and the operators are harmed by falling rocks, water and harmful gases. The construction of the raise boring machine is a revolution in the construction technology of small-diameter shafts. It provides a new solution for the construction of small-diameter shafts, greatly simplifies the construction process, and makes the construction of small-diameter shafts safer and more efficient.
[0004] The surrounding rock conditions of small-diameter vertical shafts are ever-changing, and most of them require support. During the shaft support period, construction workers still need to enter the shaft to carry out operations, which results in low construction efficiency and difficult safety management. Summary of the invention
[0005] In order to overcome the defects in the prior art, the present invention provides a construction equipment and method which is easy to operate, safe and efficient.
[0006] A shaft wall sprinkler comprises a rotating template, a flattening mechanism, a material guide table, a baffle, spokes, a rotating shaft, and a connecting component; the rotating template is cylindrical; the material guide table is a truncated cone-shaped platform, the bottom edge of which is welded to the upper edge of the rotating template, and the top edge of which is an open ventilation hole; a cylindrical baffle is welded to the edge of the opening at the top of the material guide table; at least three flattening mechanisms are evenly distributed and fixedly connected to the outer periphery of the top of the rotating template or the outer periphery of the material guide table; a rotating shaft is arranged at the internal axis of the shaft wall sprinkler, and the rotating shaft is connected to the rotating template, the material guide table and the baffle through spokes; a connecting component is arranged at the top of the rotating shaft.
[0007] Furthermore, the rotating template, the material guide table and the baffle are made of steel plates.
[0008] Furthermore, the flattening mechanism is made of steel plates or steel sections.
[0009] Furthermore, the flattening mechanism is fixedly connected by welding or bolting.
[0010] Furthermore, the rotating shaft is made of a steel pipe or round steel, and its length is slightly shorter than the height of the well wall sprinkler.
[0011] Furthermore, the spokes are made of steel sections and fixed on the rotating template, the material guide table, the baffle and the rotating shaft.
[0012] Furthermore, a reverse drilling well wall support construction method adopts a well wall watering device to carry out well wall support construction, and the specific method is as follows:
[0013] Step 1: Make a well wall sprinkler according to the design section of the shaft and the specifications of the raise boring machine for the construction shaft;
[0014] Step 2: Build a construction platform, complete the shaft excavation, remove the drill rod, and pour concrete to the bottom of the shaft to form the shaft wall base;
[0015] Step 3, installing a well wall sprinkler at the front end of the drill pipe;
[0016] Step 4: The drill pipe lowers the well wall pouring device along the axis line of the shaft to the bottom of the shaft, and pours the well wall between the clear section of the well wall and the shaft excavation section;
[0017] Step 5: Place the ash pipe into the shaft and pour concrete into the shaft wall. The specific method is as follows:
[0018] Control the flow of concrete according to the diameter of the ash chute; keep the raise borer driving the shaft wall pourer to rotate during pouring, and slowly lift the shaft wall pourer; control the pouring progress, and control the lifting speed of the shaft wall pourer within 1M / H; the shaft wall should be poured continuously to the top of the shaft;
[0019] Step six: After pouring, remove the raise borer and well wall sprinkler; place a manhole cover at the well mouth to prevent foreign objects from entering the well and damaging the well wall; and leave the well wall to solidify.
[0020] Furthermore, according to the requirements of the construction process, a curing agent can be added to the concrete.
[0021] Furthermore, when the shaft is deeper, a special centralizer is added to the shaft excavation section 15.
[0022] Compared with the prior art, the present invention has the following beneficial effects:
[0023] 1) During the well wall support construction, personnel do not need to enter the well, creating a safe and comfortable working environment and improving the safety of construction.
[0024] 2) The construction process is simplified and the construction period is effectively shortened.
[0025] 3) Reduced equipment and material investment, saved costs, and achieved higher economic benefits. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 It is a schematic diagram of the shaft wall support construction of the present invention;
[0027] Figure 2 It is a side view schematic diagram of the well wall watering device of the present invention;
[0028] Figure 3 This is a cross-sectional view of the well wall sprinkler of the present invention;
[0029] Figure 4 It is a top view schematic diagram of the well wall watering device of the present invention;
[0030] Figure 5 It is a cross-sectional schematic diagram of the well wall watering device of the present invention;
[0031] In the figure: 1. rotating template, 2. leveling mechanism, 3. material guide table, 4. baffle, 5. spokes, 6. rotating shaft, 7. connecting parts, 8. ash chute, 9. vent, 10. drill rod, 11. raise drilling rig, 12. upper construction platform, 13. shaft wall seat, 14. net section of shaft wall, 15. shaft excavation section. DETAILED DESCRIPTION
[0032] In order to make the purpose, technical solution and advantages of the present invention more clear, the present invention is further described in detail below with reference to the accompanying drawings. However, it should be understood that the specific examples described herein are only used to explain the present invention and do not limit the scope of the present invention.
[0033] like Figure 1 As shown, the vertical shaft of the embodiment is designed to be 35m deep, with a design diameter of 2800mm, concrete support, and a shaft wall thickness of 350mm. Reverse drilling is used for excavation.
[0034] A reverse drilling well wall support construction method specifically comprises the following steps.
[0035] 1) The shaft wall watering device 16 is manufactured according to the shaft design section and the specifications of the raise boring machine 11 for constructing the shaft.
[0036] like Figures 2 to 5As shown, the well wall pouring device 16 includes a rotating template 1, a flattening mechanism 2, a material guide table 3, a baffle 4, a spoke 5, a rotating shaft 6, and a connecting component 7. The rotating template 1 is processed into a cylindrical shape by steel plate. The diameter of the rotating template 1 is 2800mm and the height is 1200mm, which serves as the net section of the drilling well wall. The material guide table 3 is a truncated cone-shaped platform processed by steel plate. Its bottom edge is welded to the upper edge of the rotating template 1, and its top edge is an open-shaped ventilation hole 9. The diameter of the ventilation hole 9 is 1000mm. The ventilation hole 9 ensures smooth ventilation during the well pouring, avoids the formation of negative pressure in the lower part of the well during the lifting process of the well wall pouring device, hinders the lifting of the well wall pouring device and damages the poured well wall; it can also discharge toxic and harmful gases that may appear in the well to ensure the air quality of the construction environment. A cylindrical baffle 4 made of steel plate is welded at the edge of the top opening of the material guide table 3 to ensure that the concrete does not block the ventilation hole. Three flattening mechanisms 2 are evenly distributed on the outer circumference of the top of the rotating template 1, and more flattening mechanisms 2 can also be set. The flattening mechanism 2 is a rod-shaped object made of steel plate or steel section, with a length of 300 mm. The fixing method is welding or bolt connection or other fixed connection methods. The flattening mechanism 2 can also be fixed on the material guide table 3. A rotating shaft 6 made of steel pipe or round steel is set at the internal axis of the well wall pouring device, and its length is slightly shorter than the height of the well wall pouring device. The rotating shaft 6 is connected to the rotating template 1, the material guide table 3 and the baffle 4 through spokes 5, wherein the spokes 5 are made of steel section and welded to the rotating template 1, the material guide table 2, the baffle 4 and the rotating shaft 6. A threaded connection component 7 is set at the top of the rotating shaft 6, and the well wall pouring device is threadedly connected to the drill rod 10 of the raise drilling rig 11 through the connection component 7.
[0037] For easy transportation, the well wall watering device can be decomposed into multiple modules and assembled into a whole at the construction site. The flattening mechanism 2, the spokes 5, the rotating shaft 6 are respectively connected with the rotating template 1, the guide table 3, and the baffle 4 by welding or bolts.
[0038] 2) Use steel, steel plates, wood boards and other materials to build a construction platform 12, install and fix the raise boring machine 11 for excavation construction, and complete the vertical shaft excavation. The excavated vertical shaft has a diameter of 3500mm. Take out the drill rod 10, pour concrete into the vertical shaft, and form a vertical shaft wall seat 13 at the bottom of the vertical shaft.
[0039] 3) Remove the hole-reaming drill bit of the raise-boring machine 11 and install the well wall watering device 16 at the front end of the drill pipe 10.
[0040] 4) Lower the wall watering device 16 to the bottom of the shaft, and keep the drill pipe 10 on the axis of the shaft. The rotating template 1 of the wall watering device 16 serves as the shaft wall net section 14, and waters the shaft wall between the shaft wall net section 14 and the shaft excavation section 15.
[0041] 5) Place the ash pipe 8 into the shaft, and pour concrete into the shaft through the ash pipe 8 to pour the shaft wall. The specific method is as follows:
[0042] Control the flow rate of concrete according to the diameter of the ash chute 8 to prevent excessive concrete pouring, which may cause concrete to block the vent 9; during the pouring, keep the raise borer 11 to drive the shaft wall pouring device 16 to rotate, and slowly lift the shaft wall pouring device 16; control the pouring progress to prevent excessive lifting, which may cause uneven shaft wall pouring or cause the shaft wall to collapse before it is formed, and control the lifting speed of the shaft wall pouring device 16 within 1M / H; the shaft wall should be poured continuously to the upper end of the shaft.
[0043] 6) After the pouring is completed, the raise borer 11 and the well wall pouring device 16 are removed; a well cover is placed at the well mouth to prevent foreign matter from entering the well and damaging the well wall; and the well wall is left to solidify.
[0044] In order to meet the needs of construction technology, a certain amount of curing agent and other additives can be added to the concrete to increase the curing properties of the concrete and better complete the pouring of the well wall.
[0045] When the shaft is deep, a special centralizer can be added to ensure uniform pouring of the shaft wall. The centralizer is supported on the shaft excavation section 15.
[0046] The present invention is not limited to the above-mentioned embodiments. Without departing from the essential content of the present invention, any deformation, improvement and substitution that can be thought of by those skilled in the art shall fall within the scope of the present invention.
Claims
1. A method for supporting the well wall during reverse drilling. Features: A shaft wall watering device is used for shaft wall support construction, the shaft wall watering device comprising a rotating template (1), a flattening mechanism (2), a material guide platform (3), a baffle (4), spokes (5), a rotating shaft (6), and a connecting component (7); the rotating template (1) is cylindrical; the material guide platform (3) is a truncated cone-shaped platform, the bottom edge of which is welded to the upper edge of the rotating template (1), and the top edge of which is an open ventilation hole (9); a cylindrical baffle (4) is welded to the edge of the top opening of the material guide platform (3); at least three flattening mechanisms (2) are evenly distributed and fixedly connected to the top periphery of the rotating template (1) or the periphery of the material guide platform (3); a rotating shaft (6) is arranged at the inner axis of the shaft wall watering device, and the rotating shaft (6) is connected to the rotating template (1), the material guide platform (3) and the baffle (4) through the spokes (5); a connecting component (7) is arranged at the top of the rotating shaft (6); The specific method is as follows: Step 1, manufacturing a shaft wall watering device (16) according to the design section of the shaft and the specifications of the raise boring machine (11) for constructing the shaft; Step 2: build a construction platform (12), complete the shaft excavation, remove the drill rod (10), and pour concrete into the bottom of the shaft to form a shaft wall seat (13); Step 3, installing a well wall sprinkler (16) at the front end of the drill rod (10); Step 4: The drill rod (10) lowers the well wall pouring device (16) along the axis of the shaft to the bottom of the shaft, and pours the well wall between the well wall clear section (14) and the shaft excavation section (15); Step 5: Place the ash chute (8) into the shaft and pour concrete into the shaft wall. The specific method is as follows: The flow rate of concrete is controlled according to the diameter of the ash chute (8); during the pouring period, the raise boring machine (11) is kept driving the shaft wall pouring device (16) to rotate, and the shaft wall pouring device (16) is slowly lifted; the pouring progress is controlled, and the lifting speed of the shaft wall pouring device (16) is controlled within 1M / H; the shaft wall should be poured continuously to the upper end of the shaft; Step 6: After the pouring is completed, the raise borer (11) and the well wall pouring device (16) are removed; a well cover is placed at the well opening to prevent foreign matter from entering the well and damaging the well wall; and the well wall is left to solidify.
2. A method for supporting the well wall of a reverse drilling according to claim 1, Features: The rotating template (1), the material guide platform (3) and the baffle plate (4) are made of steel plates.
3. A method for supporting the well wall of a reverse drilling according to claim 1, Features: The flattening mechanism (2) is made of steel plate or steel section.
4. A method for supporting the wellbore wall according to claim 1, Features: The fixing connection method of the flattening mechanism (2) is welding or bolt connection.
5. A method for supporting the well wall of a reverse drilling according to claim 1, Features: The rotating shaft (6) is made of a steel pipe or round steel, and its length is slightly shorter than the height of the well wall sprinkler.
6. A method for supporting the well wall of a reverse drilling according to claim 1, Features: The spokes (5) are made of steel and are fixed on the rotating template (1), the material guide table (3), the baffle (4) and the rotating shaft (6).
7. A method for supporting the wellbore wall according to any one of claims 1 to 6, Features: According to the construction process requirements, curing agent is added to the concrete.
8. A method for supporting the wellbore wall according to any one of claims 1 to 6, Features: When the shaft is deeper, a special centralizer is added to the shaft excavation section.