Power control method and device for new energy station taking into account unit regulation performance
By calculating the comprehensive score and weight matrix of the regulation performance of the generating units in the new energy power station, and dynamically adjusting the priority, the problem of not considering the regulation performance of the generating units in the existing technology is solved, and the regulation accuracy and efficiency of the new energy power station are improved.
Patent Information
- Application Number
- CN202210095794.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-01-26
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2042-01-26
AI Technical Summary
Existing power regulation methods for renewable energy power plants do not take into account the regulation performance of the adjustable equipment itself, resulting in units with poor regulation performance being unable to complete tasks, affecting regulation accuracy and efficiency.
By calculating the comprehensive score of the regulation performance of each unit in the new energy power station, the regulation priority is determined based on the regulation performance weight matrix, and dynamic regulation is carried out in combination with the regulation margin and power regulation amount, giving priority to the use of units with good regulation performance.
It has improved the accuracy and response level of active and reactive power control in new energy power plants, achieved stable and precise power regulation, and reduced the negative impact of individual unit regulation performance defects.
Smart Images

Figure CN114530896B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of renewable energy power generation control, and in particular to a renewable energy station power control method and device taking into account the regulating performance of a unit. Background Art
[0002] New energy stations mainly use primary frequency regulation, automatic generation control (AGC) and automatic voltage control (AVC) technologies for power regulation. Among them, primary frequency regulation and AGC achieve power system frequency regulation by adjusting the active output of all adjustable equipment in new energy stations; AVC achieves power system voltage regulation by adjusting the reactive output of all adjustable equipment in new energy stations. It is conceivable that whether it is primary frequency regulation, AGC or AVC, it is crucial to reasonably allocate the power regulation amount of new energy stations to adjust the power output of adjustable equipment in new energy stations.
[0003] At present, the allocation strategies such as average strategy, capacity strategy and margin strategy have been widely adopted to allocate the power regulation of new energy stations, and the regulation performance of new energy stations is heavily dependent on the allocation strategy. However, the existing allocation strategy does not take into account the regulation performance of the adjustable equipment itself, resulting in some units with poor regulation performance being unable to complete the given tasks, which in turn makes the power regulation accuracy of new energy stations low and the power regulation efficiency slow. Summary of the invention
[0004] The purpose of the present invention is to provide a power control method and device for a new energy station taking into account the regulation performance of the unit, so as to solve the problem in the prior art that the regulation performance of the adjustable equipment itself is not used as an influencing factor of the power control quality of the new energy station, and to eliminate the negative impact of the regulation performance defects of individual adjustable equipment itself on the power control of the new energy station as much as possible, so as to ensure the regulation accuracy and efficiency of the new energy station.
[0005] In a first aspect, an embodiment of the present invention provides a power control method for a new energy station taking into account the regulating performance of a unit, comprising:
[0006] According to the regulation performance weight matrix of the new energy station, determine the comprehensive regulation performance score of each unit in the new energy station;
[0007] Based on the comprehensive score of the regulation performance, determining the regulation priority of each unit in the new energy station;
[0008] The power regulation of each unit in the new energy station is carried out by utilizing the power regulation amount of the new energy station as well as the regulation margin and regulation priority of each unit in the new energy station.
[0009] According to a power control method for a new energy station taking into account the regulating performance of a unit provided by the present invention, the regulating performance weight matrix is composed of weights corresponding to various regulating performances; the regulating performance includes: regulating accuracy, regulating rate and theoretical power confidence;
[0010] The comprehensive score of the regulation performance of each unit in the new energy station is determined according to the regulation performance weight matrix of the new energy station, including:
[0011] Determine the regulation performance score of each unit in the new energy station during the last power regulation; wherein the regulation performance score includes: regulation accuracy score, regulation rate score and theoretical power confidence score;
[0012] The regulation performance scores are weighted and summed to obtain a comprehensive regulation performance score for each unit in the new energy station.
[0013] According to a new energy station power control method taking into account the regulating performance of a unit provided by the present invention, the method for determining the regulating performance weight matrix includes:
[0014] Conduct L power regulation tests on the new energy station to obtain the regulation performance scores of each unit in the new energy station corresponding to the L power regulation;
[0015] The regulation performance scores of each unit in the new energy station corresponding to the L-time power regulation are averaged to obtain the regulation performance score of the new energy station corresponding to the L-time power regulation, and then generate the regulation performance score matrix of the new energy station;
[0016] Using the regulation performance score matrix and adopting the entropy weight method to determine the regulation performance weight matrix;
[0017] Among them, the number of rows of the adjustment performance score matrix is L, and the number of columns is the number of adjustment performance; L is the preset number of tests.
[0018] According to a power control method for a new energy station taking into account the regulating performance of a unit provided by the present invention, the regulating accuracy score is specifically calculated by the following formula:
[0019]
[0020]
[0021] Among them, K P represents the regulation accuracy score, P(t) represents the actual power generated by the unit at time t, and P s Indicates the power adjustment setting value of the power control unit this time, P NCIt represents the rated steady-state deviation of the unit, T2 is the moment when the actual power of the unit first enters the regulation dead zone of the power regulation set value of the unit in this power regulation, T3 is the end time of this power regulation, ΔP is the ratio of the integral of the absolute value of the deviation between the actual power of the unit and the power regulation set value of the unit in this power regulation from T2 to T3 to the duration from T2 to T3;
[0022] The adjustment rate score is specifically calculated by the following formula:
[0023]
[0024]
[0025] Among them, K V represents the regulation rate fraction, V N represents the reference value of the regulation rate, V represents the regulation rate of the unit in this regulation, P(T2) represents the actual power of the unit at time T2, P(T1) represents the actual power of the unit at time T1, and T1 represents the moment when the actual power of the unit is out of the regulation dead zone at the initial moment of this power regulation;
[0026] The theoretical power confidence score is specifically calculated by the following formula:
[0027]
[0028] Among them, K t represents the theoretical power confidence score, P(T3) represents the actual power of the unit at time T3, and C N Indicates the rated installed capacity of the unit, G f Indicates the confidence level of the unit's initial theoretical power.
[0029] According to a new energy station power control method taking into account the regulating performance of the unit provided by the present invention, the regulating performance weight matrix is specifically calculated by the following formula:
[0030]
[0031]
[0032]
[0033] Among them, k ij represents the jth regulation performance score of the new energy station during the i-th power regulation, p ij Indicates k ij The normalized result, E j represents the information entropy of the jth adjustment performance score, W j represents the weight corresponding to the jth adjustment performance, and M represents the number of adjustment performances.
[0034] According to a power control method for a new energy station taking into account the regulating performance of a unit provided by the present invention, the regulating priority of each unit in the new energy station is determined based on the comprehensive score of the regulating performance, including:
[0035] According to the comprehensive score of regulation performance, the units in the new energy station are sorted in descending order;
[0036] Select U units from the sequence from the front to the back, find the unit whose bad review counter value is not less than 1 among the U units, and reduce the bad review counter value of the found unit by 1;
[0037] Select S units from the sequence from the back to the front, and add 1 to the count value of the bad review counter of the selected unit;
[0038] The control priority of the units whose bad review counters in the new energy station are greater than the first pre-designed value is set to low, and the control priority of the remaining units is set to high;
[0039] Among them, U is the product of the first preset percentage and the total number of new energy station units, and S is the product of the second preset percentage and the total number of new energy station units.
[0040] According to a power control method for a new energy station taking into account the regulating performance of units provided by the present invention, units with high regulating priority are classified into a first set, and units with low regulating priority are classified into a second set; the power regulation amount of the new energy station, and the regulating margin and regulating priority of each unit in the new energy station are used to perform power regulation on each unit in the new energy station, including:
[0041] Determine the sum of the power regulation margins of the units in the first set; wherein, when the power regulation amount of the new energy station is a positive value, the power regulation margin is the difference between the theoretical power and the actual power; when the power regulation amount of the new energy station is a negative value, the power regulation margin is the difference between the actual power and the minimum power limit;
[0042] When the absolute value of the power regulation amount of the new energy station is greater than the sum of the power regulation margins, the power regulation difference of the new energy station and the weight of each unit in the second set are calculated; the power regulation amount of each unit in the first set is set as its own power regulation margin, and the power regulation amount of each unit in the second set is set as the product of its own weight and the power regulation difference; wherein the power regulation difference of the new energy station is the difference between the absolute value of the power regulation amount of the new energy station and the sum of the power regulation margins; the weight of each unit in the second set is the ratio between the power regulation margin of each unit in the second set and the sum of the power regulation margins of the units in the second set;
[0043] In other cases, the weight of each unit in the first set is calculated; the power regulation amount of each unit in the first set is set to be the product of its own weight and the absolute value of the power regulation amount of the new energy station; and the power regulation amount of each unit in the second set is set to be 0; wherein the weight of each unit in the first set is the ratio of the power regulation margin of each unit in the first set to the sum of the power regulation margins of the units in the first set;
[0044] Based on the positive and negative conditions of the power regulation amount of the new energy station, the actual power of each unit in the new energy station is regulated according to the power regulation amount of each unit in the new energy station.
[0045] In a second aspect, an embodiment of the present invention provides a new energy station power control device taking into account the unit regulation performance, including:
[0046] A regulation performance comprehensive score determination unit, used to determine the regulation performance comprehensive score of each unit in the new energy station according to the regulation performance weight matrix of the new energy station;
[0047] A control priority determination unit, used to determine the control priority of each unit in the new energy station based on the comprehensive score of the regulation performance;
[0048] The power control unit is used to utilize the power regulation amount of the new energy station, as well as the regulation margin and regulation priority of each unit in the new energy station to perform power regulation on each unit in the new energy station.
[0049] In a third aspect, the present invention further provides an electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the program, the steps of the power control method for a new energy station taking into account the unit regulation performance as described in the first aspect are implemented.
[0050] In a fourth aspect, the present invention further provides a non-transitory computer-readable storage medium, which, when executed by a processor, implements the steps of the power control method for a new energy station taking into account the unit regulation performance as described in the first aspect.
[0051] The present invention provides a power control method and device for a new energy station taking into account the regulation performance of the unit. The method and device use the regulation performance weight matrix of the new energy station to calculate the comprehensive score of the regulation performance of each unit in the new energy station to measure the regulation performance of the unit; the regulation priority of the unit is set according to the regulation performance of the unit, and the unit regulation priority is used as an important consideration for power control; it ensures that the units with good regulation performance participate in the control first, and eliminates the impact of the defects of the regulation performance of individual units on the overall power control of the new energy station as much as possible, and improves the active and reactive control accuracy, rate and response level of the new energy station without manual intervention, thereby achieving stable and precise control. BRIEF DESCRIPTION OF THE DRAWINGS
[0052] In order to more clearly illustrate the technical solutions in the present invention or the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0053] Figure 1 It is a flow chart of a power control method for a new energy station taking into account the regulating performance of a unit provided by the present invention;
[0054] Figure 2 It is a power regulation response curve diagram of a new energy station provided by the present invention;
[0055] Figure 3 It is a structural schematic diagram of a new energy station power control device taking into account the regulating performance of the unit provided by the present invention;
[0056] Figure 4 It is a structural schematic diagram of an electronic device for realizing a power control method for a new energy station taking into account the regulating performance of a unit provided by the present invention. DETAILED DESCRIPTION
[0057] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be clearly and completely described below in conjunction with the drawings of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0058] Combine the following Figure 1-Figure 4 The present invention describes a method and device for controlling power of a new energy station taking into account the regulating performance of a generator set.
[0059] First, as Figure 1 As shown, the present invention provides a power control method for a new energy station taking into account the regulating performance of a unit, comprising:
[0060] S11. Determine the comprehensive score of the regulation performance of each unit in the new energy station according to the regulation performance weight matrix of the new energy station;
[0061] It can be understood that the power control of new energy stations is the active output control of new energy stations or the reactive output control of new energy stations; the active output control of new energy stations usually adopts primary frequency regulation and AGC technology; the reactive output control of new energy stations usually adopts AVC technology; among them, primary frequency regulation is autonomous regulation, which monitors the frequency of the grid connection point in real time, and adjusts the active output of the units (adjustable equipment) in the new energy station accordingly when it is detected that the frequency of the grid connection point exceeds the limit to respond to the change of frequency, so as to realize the frequency regulation of the power system; AGC accurately adjusts the active output of the units in the new energy station according to the received active dispatching instructions; AVC uses the received reactive / voltage dispatching instructions to accurately adjust the reactive output of the units in the new energy station.
[0062] At present, no matter it is primary frequency regulation, AGC or AVC, allocation strategies such as averaging strategy, capacity strategy and margin strategy are used to allocate the power regulation amount of new energy sites; specifically, the averaging strategy averages the power regulation amount according to the number of units; the capacity strategy calculates the unit weight based on the rated capacity of the unit, and allocates the power regulation amount by weighted average; the margin strategy calculates the unit weight based on the adjustable margin of the unit, and allocates the power regulation amount by weighted average; this leads to the regulation performance of new energy sites being heavily dependent on the allocation strategy, without considering the impact of the regulation performance of the unit itself on the power regulation of new energy sites.
[0063] Therefore, in order to take into account the regulation performance of the unit itself, the present invention scores the regulation performance of each unit in the new energy station, obtains a corresponding comprehensive score of the regulation performance, and uses the value of the comprehensive score of the regulation performance to measure the quality of the unit's regulation performance.
[0064] S12. Determine the control priority of each unit in the new energy station based on the comprehensive score of the regulation performance;
[0065] The present invention utilizes the unit regulation performance to dynamically sort the unit regulation priority, so as to give priority to regulating units with high priority (high regulation performance); at the same time, it ensures that when the unit with high priority cannot meet the regulation demand, the unit with low priority can still be regulated.
[0066] S13. Utilize the power regulation amount of the new energy station, as well as the regulation margin and regulation priority of each unit in the new energy station to perform power regulation on each unit in the new energy station.
[0067] The present invention considers the regulation performance of each unit in the new energy station by considering the regulation priority of each unit in the new energy station, and eliminates the impact of the regulation performance defects of individual units on the overall power regulation of the new energy station as much as possible.
[0068] The present invention provides a power control method for a new energy station taking into account the regulation performance of the unit. The method uses the regulation performance weight matrix of the new energy station to calculate the comprehensive score of the regulation performance of each unit in the new energy station to measure the regulation performance of the unit; the regulation priority of the unit is set according to the regulation performance of the unit, and the unit regulation priority is used as an important consideration for power control; it ensures that the units with good regulation performance participate in the control first, eliminates the influence of the regulation performance defects of individual units on the overall power control of the new energy station as much as possible, improves the active and reactive control accuracy, rate and response level of the new energy station without manual intervention, and realizes stable and precise control.
[0069] Based on the above embodiments, as an optional embodiment, the adjustment performance weight matrix is composed of weights corresponding to various adjustment performances; the adjustment performance includes: adjustment accuracy, adjustment rate and theoretical power confidence;
[0070] It can be understood that for active power regulation, the regulation performance weight matrix is W 有功 = {W 有功调节精度 ; W 有功调节速率 ; W 有功理论功率置信度}; For reactive power regulation, the regulation performance weight matrix is W 无功 = {W 无功调节精度 ; W 无功调节速率 ; W 无功理论功率置信度};
[0071] The comprehensive score of the regulation performance of each unit in the new energy station is determined according to the regulation performance weight matrix of the new energy station, including:
[0072] Determine the regulation performance score of each unit in the new energy station during the last power regulation; wherein the regulation performance score includes: regulation accuracy score, regulation rate score and theoretical power confidence score;
[0073] As you can imagine, taking active power regulation as an example, during the operation of the system, at the end of each active power regulation, the active power regulation accuracy score, active power regulation rate score and active power theoretical power confidence score of all units are counted, and the statistical results are used for the next active power regulation. The same is true for reactive power regulation.
[0074] The regulation performance scores are weighted and summed to obtain a comprehensive regulation performance score for each unit in the new energy station.
[0075] Taking active power regulation as an example, the comprehensive score of regulation performance = active power regulation accuracy score * active power regulation accuracy weight + active power regulation rate score * active power regulation rate weight + active theoretical power confidence score * active theoretical power confidence weight; the same applies to reactive power regulation.
[0076] The present invention dynamically evaluates the regulation performance of each unit in the new energy station (that is, the regulation performance of each unit in the new energy station is evaluated once during each power regulation), laying the foundation for the accurate setting of the regulation priority of each unit in the subsequent new energy station.
[0077] Based on the above embodiments, as an optional embodiment, the method for determining the adjustment performance weight matrix includes:
[0078] Conduct L power regulation tests on the new energy station to obtain the regulation performance scores of each unit in the new energy station corresponding to the L power regulation;
[0079] It should be noted that L is the preset number of tests, which needs to be selected according to the actual working conditions. For example, 10 power regulation tests are conducted on the new energy station, and the regulation performance scores of each unit in the new energy station corresponding to these 10 power regulation tests are obtained. In addition, all units are not prioritized during the test.
[0080] The regulation performance scores of each unit in the new energy station corresponding to the L-time power regulation are averaged to obtain the regulation performance score of the new energy station corresponding to the L-time power regulation, and then generate the regulation performance score matrix of the new energy station;
[0081] For example: the regulation accuracy scores of each unit in the new energy station corresponding to 10 power controls are averaged to obtain the regulation accuracy scores of the new energy station corresponding to the 10 power controls; that is, for each power control, the regulation accuracy scores of each unit are averaged, and the average value is used as the regulation accuracy score of the new energy station for this power control; the same applies to the regulation rate and theoretical power confidence.
[0082] Using the regulation performance score matrix and adopting the entropy weight method to determine the regulation performance weight matrix;
[0083] The entropy weight method is used to determine the influence of equipment regulation accuracy, regulation rate and theoretical power confidence on the regulation performance of new energy stations, and the regulation performance weight matrix is used to represent it.
[0084] Among them, the number of rows of the adjustment performance score matrix is L, and the number of columns is the number of adjustment performance; L is the preset number of tests.
[0085] The present invention calculates the corresponding regulation performance weight matrix for each new energy station, thereby eliminating the influence on power regulation caused by inconsistent conditions of the new energy stations but still using the same set of weights.
[0086] Based on the above embodiments, as an optional embodiment, the adjustment accuracy score is specifically calculated by the following formula:
[0087]
[0088]
[0089] Among them, K P represents the regulation accuracy score, P(t) represents the actual power generated by the unit at time t, and P s Indicates the power adjustment setting value of the power control unit this time, P NC It represents the rated steady-state deviation of the unit, T2 is the moment when the actual power of the unit first enters the regulation dead zone of the power regulation set value of the unit in this power regulation, T3 is the end time of this power regulation, ΔP is the ratio of the integral of the absolute value of the deviation between the actual power of the unit and the power regulation set value of the unit in this power regulation from T2 to T3 to the duration from T2 to T3;
[0090] The adjustment rate score is specifically calculated by the following formula:
[0091]
[0092]
[0093] Among them, K V represents the regulation rate fraction, V N represents the reference value of the regulation rate, V represents the regulation rate of the unit in this regulation, P(T2) represents the actual power of the unit at time T2, P(T1) represents the actual power of the unit at time T1, and T1 represents the moment when the actual power of the unit is out of the regulation dead zone at the initial moment of this power regulation;
[0094] The theoretical power confidence score is specifically calculated by the following formula:
[0095]
[0096] Among them, K t represents the theoretical power confidence score, P(T3) represents the actual power of the unit at time T3, and C M Indicates the rated installed capacity of the unit, G f Indicates the confidence level of the unit's initial theoretical power.
[0097] Figure 2 The power regulation response curve of the new energy station is shown as an example. Figure 2 As shown, T0 represents the initial moment of this power regulation, T1 represents the moment when the actual power of the unit goes out of the regulation dead zone of the actual power of the unit at the moment T0; T2 represents the moment when the actual power of the unit first enters the regulation dead zone of the power regulation setting value of the unit in this power regulation, T3 represents the end moment of this power regulation, and is also the initial moment of the next power regulation; T4 represents the moment when the actual power of the unit goes out of the regulation dead zone of the actual power of the unit at the moment T3; T5 represents the moment when the actual power of the unit first enters the regulation dead zone of the power regulation setting value of the unit in the next power regulation, P1 represents the actual power of the unit at the moment T0, P2 represents the power regulation setting value of the unit in this power regulation, P3 represents the power regulation setting value of the unit in the next power regulation, P max Indicates the theoretical power of the unit, P min Indicates the minimum power limit of the unit, that is, the power value required to maintain normal operation of the unit.
[0098] For the regulation accuracy fraction, the rated steady-state deviation of the unit is usually taken as 1%P N , P N is the rated power capacity of the unit. In addition, because T2 is the moment when the actual power of the unit first enters the dead zone of the power regulation set value of the unit in this power regulation, the regulation accuracy of the unit must be measured based on the deviation between the actual power of the unit from T2 to T3 and the power regulation set value of the unit in this power regulation. The smaller the oscillation around the power regulation set value of the unit in this power regulation, the higher the regulation accuracy. Another point to note is that for a unit, the regulation dead zone is constant, that is, assuming that the regulation dead zone is [-0.01, 0.02], then the regulation dead zone of the actual power of the unit at T0 is [-0.01+P1, 0.02+P2], and the regulation dead zone of the power regulation set value of the unit in this power regulation is [-0.01+P2, 0.02+P2].
[0099] For the regulation rate fraction, the regulation rate reference value is usually taken as 1.5%P NIn addition, T1 represents the moment when the actual power of the unit leaves the regulation dead zone at the initial moment of this power regulation, and T2 represents the moment when the actual power of the unit first enters the regulation dead zone of the power regulation set value of this power regulation. Therefore, T1 to T2 are the core stage of the unit power regulation, which is the best stage to measure the regulation rate.
[0100] For the theoretical power confidence score, the unit's initial theoretical power confidence score is usually set to 0.8. In addition, because the theoretical power is the theoretical power of the new energy unit calculated based on the meteorological statistics method or the sample unit method, the unit output will not be higher than the theoretical power due to the influence of the weather, so the theoretical power is only required to be referred to when the power needs to be increased, and it is not affected by the weather when it is reduced. Therefore, when the power is reduced, the unit's theoretical power confidence score is set to the unit's initial theoretical power confidence.
[0101] The present invention provides a specific calculation method for the regulation accuracy score, the regulation rate score and the theoretical power confidence score, provides a feasible method for measuring the regulation performance of the unit, and ensures the measurement accuracy of the regulation performance of the unit.
[0102] Based on the above embodiments, as an optional embodiment, the adjustment performance weight matrix is specifically calculated by the following formula:
[0103]
[0104]
[0105]
[0106] Among them, k ij represents the jth regulation performance score of the new energy station during the i-th power regulation, p ij Indicates k ij The normalized result, E j represents the information entropy of the jth adjustment performance score, W j represents the weight corresponding to the jth adjustment performance, and M represents the number of adjustment performances.
[0107] In the present invention, j is the index number of regulation performance, for example: j=1 represents regulation accuracy; j=2 represents regulation rate; j=3 represents theoretical power confidence. The present invention uses the entropy weight method to calculate the influence of the unit regulation rate, regulation accuracy and theoretical power confidence on the power regulation of the new energy station, laying a foundation for the calculation of the regulation performance of the unit in the new energy station.
[0108] Based on the above embodiments, as an optional embodiment, determining the control priority of each unit in the new energy station based on the comprehensive score of the regulation performance includes:
[0109] According to the comprehensive score of regulation performance, the units in the new energy station are sorted in descending order;
[0110] Select U units from the sequence from the front to the back, find the unit whose bad review counter value is not less than 1 among the U units, and reduce the bad review counter value of the found unit by 1;
[0111] Select S units from the sequence from the back to the front, and add 1 to the count value of the bad review counter of the selected unit;
[0112] The control priority of the units whose bad review counters in the new energy station are greater than the first pre-designed value is set to low, and the control priority of the remaining units is set to high;
[0113] Among them, U is the product of the first preset percentage and the total number of new energy station units, and S is the product of the second preset percentage and the total number of new energy station units.
[0114] In the present invention, assuming that the first preset percentage is 50%, the second preset percentage is 10%, and the first pre-designed value is set to 10; then the units in the new energy station are sorted in descending order according to the comprehensive score of the regulation performance of each unit in the new energy station; and the count value of the bad review counter of the unit ranked in the bottom 10% is increased by 1; the count value of the bad review counter of the unit ranked in the top 50% and the count value of the bad review counter is not less than 1 is reduced by 1 (this setting is because the bad review counter cannot be a negative value); the bad review counters of all units are counted, and the regulation priority of the unit with a count value greater than 10 is set to low, and the workstation interface reminds the duty officer to pay attention; the regulation priority of the remaining units is set to high. It can be understood that the regulation priority of each unit in the new energy station is actually formulated based on the comprehensive performance of the long-term regulation performance of each unit, and it is in dynamic change; this setting can more accurately measure the regulation performance of each unit in the new energy station.
[0115] The present invention sets the control priority of some units with poor regulation performance (slow rate, low accuracy or inaccurate theoretical power) to a low level, so that they try not to participate in subsequent regulation, thereby reducing the adverse effects of units with poor regulation performance on the power regulation of new energy stations, and improving the active and reactive control accuracy, rate and response level of new energy stations. The priority of the present invention is set automatically without manual intervention, and the power regulation effect of new energy stations is improved without optimizing hardware and communication links.
[0116] Based on the above embodiments, as an optional embodiment, the units with high control priority are classified into the first set, and the units with low control priority are classified into the second set; the power regulation amount of the new energy station, and the regulation margin and control priority of each unit in the new energy station are used to perform power regulation on each unit in the new energy station, including:
[0117] Determine the sum of the power regulation margins of the units in the first set; wherein, when the power regulation amount of the new energy station is a positive value, the power regulation margin is the difference between the theoretical power and the actual power; when the power regulation amount of the new energy station is a negative value, the power regulation margin is the difference between the actual power and the minimum power limit;
[0118] When the absolute value of the power regulation amount of the new energy station is greater than the sum of the power regulation margins, the power regulation difference of the new energy station and the weight of each unit in the second set are calculated; the power regulation amount of each unit in the first set is set as its own power regulation margin, and the power regulation amount of each unit in the second set is set as the product of its own weight and the power regulation difference; wherein the power regulation difference of the new energy station is the difference between the absolute value of the power regulation amount of the new energy station and the sum of the power regulation margins; the weight of each unit in the second set is the ratio between the power regulation margin of each unit in the second set and the sum of the power regulation margins of the units in the second set;
[0119] In other cases, the weight of each unit in the first set is calculated; the power regulation amount of each unit in the first set is set to be the product of its own weight and the absolute value of the power regulation amount of the new energy station; and the power regulation amount of each unit in the second set is set to be 0; wherein the weight of each unit in the first set is the ratio of the power regulation margin of each unit in the first set to the sum of the power regulation margins of the units in the first set;
[0120] Based on the positive and negative conditions of the power regulation amount of the new energy station, the actual power of each unit in the new energy station is regulated according to the power regulation amount of each unit in the new energy station.
[0121] Taking active power regulation as an example (the same applies to reactive power), the first step is to determine the power regulation amount Δp of the new energy station; (it can also be called the power regulation amount required by the new energy station, which is given by the superior dispatcher);
[0122] Step 2: Calculate the active power upward margin Mup_pα and the active power downward margin Mdown_pα for all units with high priority; where α is the unit index; Mup_pα is the difference between the theoretical active power and the actual active power of the α-th unit, Mdown_pα is the difference between the actual active power of the α-th unit and the minimum limit of active power. The minimum limit of active power is the minimum adjustable threshold value of the unit preset to prevent the unit from tripping, generally taking 10% of the rated installed active power of the unit.
[0123] Step 3: Calculate the total active power upward margin Mup1 and the total active power downward margin Mdown1 for all units with high priority.
[0124] Step 4: If Δp < 0, go to Step 5; if Δp > 0 and Δp > Mup1, then all units with high priority allocate Δp according to their respective active power upward margins; then the remaining adjustment amount of Δp - Mup1 is weighted and averaged and allocated to all units with low adjustment priority according to the weights of the units with low priority; if Δp > 0 and Δp ≤ Mup1, then Δp is weighted and averaged and allocated to all units with high adjustment priority according to the weights of the units with high priority; the weights of the units with low priority are formulated according to the proportion of the active power upward margin of the units with low priority in the total active power upward margin of all units with low priority; the weights of the units with high priority are formulated according to the proportion of the active power upward margin of the units with high priority in the total active power upward margin of all units with high priority.
[0125] Step 5: If |Δp| > Mdown1, then all units with high priority allocate |Δp| according to their respective active power downward margins; then the remaining adjustment amount of |Δp| - Mdown1 is weighted and averaged and allocated to all units with low adjustment priority according to the weights of the units with low priority; if |Δp| < Mdown1, then |Δp| is weighted and averaged and allocated to all units with high adjustment priority according to the weights of the units with high priority; the weights of the units with low priority are formulated according to the proportion of the active power downward margin of the units with low priority in the total active power downward margin of all units with low priority; the weights of the units with high priority are formulated according to the proportion of the active power downward margin of the units with high priority in the total active power downward margin of all units with high priority.
[0126] Step 6: If Δp > 0, adjust the active power of each unit to the sum of the actual power and the allocated active power adjustment amount; if Δp ≤ 0, adjust the active power of each unit to the difference between the actual power and the allocated active power adjustment amount.
[0127] The present invention takes into account the regulation performance of the unit and combines it with a margin allocation strategy to reduce the impact of regulation performance defects of individual equipment on the overall power regulation performance. It improves the active and reactive control accuracy, rate and response level of the entire field without manual intervention, thereby achieving stable and accurate power control.
[0128] An example is provided below to better explain the present invention.
[0129] Assume that a photovoltaic power station has 10 inverters, each with a rated installed capacity of 5MW; the regulation performance weight matrix W of the new energy station is obtained by the experiment: 有功 = {W 有功调节精度 ; W 有功调节速率 ; W 有功理论功率置信度} is {0.5; 0.2; 0.3};
[0130] The current actual active power of each inverter is {3.5MW; 3.7MW; 3.4MW; 2.7MW; 2.4MW; 3.9MW; 3.5MW; 3.7MW; 3.4MW; 2.7MW}; the theoretical power is {4.2MW; 4.3MW; 4.4MW; 4.3MW; 4.3MW; 4.5MW; 4.3MW; 4.3MW; 4.2MW; 4.1MW}; the active power target value of this round is 37MW; the priorities of the 10 inverters in the last round of adjustment are {high; high; high; high; low; high; low; low; high; high}; the bad review counters of the 10 inverters in the last round of adjustment are {3; 3; 2; 5; 11; 8; 12; 10; 9; 4}; the active power regulation accuracy scores, active power regulation rate scores, and theoretical power confidence scores of the 10 inverters calculated after the last round of adjustment are shown in Table 1:
[0131] Table 1
[0132] Inverter number Adjustment accuracy score Adjustment rate fraction Theoretical Power Confidence Score 1 0.9 0.8 0.8 2 0.85 0.76 0.43 3 0.79 0.81 0.65 4 0.78 0.82 0.7 5 0.65 0.84 0.7 6 0.9 0.76 0.5 7 0.7 0.8 0.8 8 0.8 0.5 0.7 9 0.75 0.5 0.75 10 0.8 0.65 0.8
[0133] According to the regulation performance weight matrix of the new energy station, the comprehensive score and ranking of each inverter regulation performance are calculated, as shown in Table 2:
[0134] Table 2
[0135] Inverter number Overall score of regulation performance Ranking 1 0.85 1 2 0.706 8 3 0.752 4 4 0.764 3 5 0.703 9 6 0.752 5 7 0.75 6 8 0.71 7 9 0.7 10 10 0.77 2
[0136] It can be seen that inverter 9 ranks last, and its negative review counter needs to be increased by 1. At this time, the adjustment priority of inverter 9 is reduced to low; inverters 1, 3, 4, 6, and 10 rank in the top 50%, and their negative review counters need to be reduced by 1, and their priorities remain unchanged; the adjusted priorities are {high; high; high; high; low; high; low; high; low; low; low; high};
[0137] The calculation results show that the adjustment margins of each inverter are {0.7; 0.6; 1.0; 1.6; 2.1; 0.4; 0.8; 0.8; 1.4} respectively; the total adjustment margin of the inverter with high priority is 5.7MW; the current total active power is 32.9MW, and the target value is .7MW, which requires an increase of 4.1MW (less than 5.7MW), so the inverter with high priority can be adjusted;
[0138] The weight of each inverter is calculated based on the down-regulation margin of each inverter, and 4.1MW is weighted and evenly distributed to inverters 1, 2, 3, 4, 6, and 10. The required adjustment amount and final adjustment instructions of each inverter are shown in Table 3:
[0139] Table 3
[0140]
[0141] In the second aspect, the power control device of the new energy station taking into account the regulation performance of the unit provided by the present invention is described. The power control device of the new energy station taking into account the regulation performance of the unit described below and the power control method of the new energy station taking into account the regulation performance of the unit described above can be referred to each other. Figure 3 The following is a schematic diagram of a power control device for a new energy station taking into account the regulating performance of the unit. Figure 3 As shown, the device includes: a regulation performance comprehensive score determination unit 21, a regulation priority determination unit 22 and a power regulation unit 23;
[0142] The regulation performance comprehensive score determination unit 21 is used to determine the regulation performance comprehensive score of each unit in the new energy station according to the regulation performance weight matrix of the new energy station;
[0143] A control priority determination unit 22, used to determine the control priority of each unit in the new energy station based on the comprehensive score of the regulation performance;
[0144] The power control unit 23 is used to use the power adjustment amount of the new energy station, as well as the adjustment margin and control priority of each unit in the new energy station to perform power control on each unit in the new energy station.
[0145] The present invention provides a power control device for a new energy station taking into account the regulation performance of the unit. The device uses the regulation performance weight matrix of the new energy station to calculate the comprehensive score of the regulation performance of each unit in the new energy station to measure the regulation performance of the unit; the regulation priority of the unit is set according to the regulation performance of the unit, and the unit regulation priority is used as an important consideration for power control; it ensures that the units with good regulation performance participate in the regulation first, eliminates the influence of the regulation performance defects of individual units on the overall power control of the new energy station as much as possible, improves the active and reactive control accuracy, rate and response level of the new energy station without manual intervention, and realizes stable and precise control.
[0146] Based on the above embodiments, as an optional embodiment, the adjustment performance weight matrix is composed of weights corresponding to various adjustment performances; the adjustment performance includes: adjustment accuracy, adjustment rate and theoretical power confidence;
[0147] The regulation performance comprehensive score determination unit 21 comprises:
[0148] The first determination unit is used to determine the regulation performance score of each unit in the new energy station during the last power regulation; wherein the regulation performance score includes: regulation accuracy score, regulation rate score and theoretical power confidence score;
[0149] The weighted summation unit is used to perform weighted summation on the regulation performance scores to obtain a comprehensive regulation performance score of each unit in the new energy station.
[0150] Based on the above embodiments, as an optional embodiment, the system further includes: an adjustment performance weight matrix determination module 20; the adjustment performance weight matrix determination module 20 includes:
[0151] The test unit is used to conduct L times power regulation test on the new energy station to obtain the regulation performance score of each unit in the new energy station corresponding to the L times power regulation;
[0152] A regulation performance score matrix generating unit is used to average the regulation performance scores of each unit in the new energy station corresponding to the L-time power regulation, obtain the regulation performance score of the new energy station corresponding to the L-time power regulation, and then generate the regulation performance score matrix of the new energy station;
[0153] A regulation performance weight matrix determining unit, used to use the regulation performance score matrix and adopt an entropy weight method to determine the regulation performance weight matrix;
[0154] Among them, the number of rows of the adjustment performance score matrix is L, and the number of columns is the number of adjustment performance; L is the preset number of tests.
[0155] Based on the above embodiments, as an optional embodiment, the adjustment accuracy score is specifically calculated by the following formula:
[0156]
[0157]
[0158] Among them, K P represents the regulation accuracy score, P(t) represents the actual power generated by the unit at time t, and P s Indicates the power adjustment setting value of the power control unit this time, P NC It represents the rated steady-state deviation of the unit, T2 is the moment when the actual power of the unit first enters the regulation dead zone of the power regulation set value of the unit in this power regulation, T3 is the end time of this power regulation, ΔP is the ratio of the integral of the absolute value of the deviation between the actual power of the unit and the power regulation set value of the unit in this power regulation from T2 to T3 to the duration from T2 to T3;
[0159] The adjustment rate score is specifically calculated by the following formula:
[0160]
[0161]
[0162] Among them, K V represents the regulation rate fraction, V N represents the reference value of the regulation rate, V represents the regulation rate of the unit in this regulation, P(T2) represents the actual power of the unit at time T2, P(T1) represents the actual power of the unit at time T1, and T1 represents the moment when the actual power of the unit is out of the regulation dead zone at the initial moment of this power regulation;
[0163] The theoretical power confidence score is specifically calculated by the following formula:
[0164]
[0165] Among them, K t represents the theoretical power confidence score, P(T3) represents the actual power of the unit at time T3, and C N Indicates the rated installed capacity of the unit, G f Indicates the confidence level of the unit's initial theoretical power.
[0166] Based on the above embodiments, as an optional embodiment, the adjustment performance weight matrix is specifically calculated by the following formula:
[0167]
[0168]
[0169]
[0170] Among them, k ij represents the jth regulation performance score of the new energy station during the i-th power regulation, p ij Indicates k ij The normalized result, E j represents the information entropy of the jth adjustment performance score, W j represents the weight corresponding to the jth adjustment performance, and M represents the number of adjustment performances.
[0171] Based on the above embodiments, as an optional embodiment, the control priority determination unit 22 includes:
[0172] A sorting unit is used to sort the units in the new energy station in descending order according to the comprehensive score of regulation performance;
[0173] The first counting unit is used to select U units from the sequence from the front to the back, find the unit whose bad review counter has a count value not less than 1 among the U units, and reduce the count value of the bad review counter of the found unit by 1;
[0174] The second counting unit is used to select S units from the sequence from the back to the front, and increase the count value of the bad review counter of the selected unit by 1;
[0175] A priority setting unit, used to set the control priority of the unit whose count value of the bad review counter in the new energy station is greater than the first pre-designed value to low, and the control priority of the remaining units to high;
[0176] Among them, U is the product of the first preset percentage and the total number of new energy station units, and S is the product of the second preset percentage and the total number of new energy station units.
[0177] Based on the above embodiments, as an optional embodiment, the units with high control priority are classified into the first set, and the units with low control priority are classified into the second set; the power control unit 23 includes:
[0178] The second determining unit is used to determine the sum of the power regulation margins of the units in the first set; wherein, when the power regulation amount of the new energy station is a positive value, the power regulation margin is the difference between the theoretical power and the actual power; when the power regulation amount of the new energy station is a negative value, the power regulation margin is the difference between the actual power and the minimum power limit;
[0179] The first setting unit is used to calculate the power regulation difference of the new energy station and the weight of each unit in the second set when the absolute value of the power regulation amount of the new energy station is greater than the sum of the power regulation margins; the power regulation amount of each unit in the first set is set as its own power regulation margin, and the power regulation amount of each unit in the second set is set as the product of its own weight and the power regulation difference; wherein the power regulation difference of the new energy station is the difference between the absolute value of the power regulation amount of the new energy station and the sum of the power regulation margins; the weight of each unit in the second set is the ratio between the power regulation margin of each unit in the second set and the sum of the power regulation margins of the units in the second set;
[0180] The second setting unit is used to calculate the weight of each unit in the first set in other cases; the power regulation amount of each unit in the first set is set to be the product of its own weight and the absolute value of the power regulation amount of the new energy station; and the power regulation amount of each unit in the second set is set to be 0; wherein the weight of each unit in the first set is the ratio of the power regulation margin of each unit in the first set to the sum of the power regulation margins of the units in the first set;
[0181] The control unit is used to control the actual power of each unit in the new energy station based on the positive and negative conditions of the power adjustment amount of the new energy station and according to the power adjustment amount of each unit in the new energy station.
[0182] Thirdly, Figure 4 An example of a physical structure diagram of an electronic device is shown in FIG. Figure 4 As shown, the electronic device may include: a processor 410, a communication interface 420, a memory 430 and a communication bus 440, wherein the processor 410, the communication interface 420 and the memory 430 communicate with each other through the communication bus 440. The processor 410 may call the logic instructions in the memory 430 to execute a power control method for a new energy station taking into account the regulating performance of the unit, the method comprising: determining the comprehensive score of the regulating performance of each unit in the new energy station according to the regulating performance weight matrix of the new energy station; determining the regulating priority of each unit in the new energy station based on the comprehensive score of the regulating performance; and performing power control on each unit in the new energy station by using the power regulation amount of the new energy station, as well as the regulating margin and regulating priority of each unit in the new energy station.
[0183] In addition, the logic instructions in the above-mentioned memory 430 can be implemented in the form of a software functional unit and can be stored in a computer-readable storage medium when it is sold or used as an independent product. Based on such an understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art or the part of the technical solution, can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk and other media that can store program codes.
[0184] In a fourth aspect, the present invention further provides a non-transitory computer-readable storage medium having a computer program stored thereon. When the computer program is executed by a processor, it is implemented to execute the power control method of a new energy station taking into account the regulation performance of the unit provided in the above-mentioned embodiments. The method includes: determining the comprehensive score of the regulation performance of each unit in the new energy station according to the regulation performance weight matrix of the new energy station; determining the regulation priority of each unit in the new energy station based on the comprehensive score of the regulation performance; and performing power control on each unit in the new energy station by utilizing the power regulation amount of the new energy station, as well as the regulation margin and regulation priority of each unit in the new energy station.
[0185] The device embodiments described above are merely illustrative, wherein the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. Ordinary technicians in this field can understand and implement it without paying creative labor.
[0186] Through the description of the above implementation methods, those skilled in the art can clearly understand that each implementation method can be implemented by means of software plus a necessary general hardware platform, and of course, it can also be implemented by hardware. Based on this understanding, the above technical solution is essentially or the part that contributes to the prior art can be embodied in the form of a software product, and the computer software product can be stored in a computer-readable storage medium, such as ROM / RAM, a disk, an optical disk, etc., including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to execute the methods described in each embodiment or some parts of the embodiments.
[0187] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A power control method for a new energy station taking into account the regulating performance of the unit, It is characterized in that The method comprises: According to the regulation performance weight matrix of the new energy station, determine the comprehensive regulation performance score of each unit in the new energy station; Based on the comprehensive score of the regulation performance, determining the regulation priority of each unit in the new energy station; Use the power regulation amount of the new energy station, as well as the regulation margin and regulation priority of each unit in the new energy station to regulate the power of each unit in the new energy station; The regulation performance weight matrix is composed of weights corresponding to various regulation performances; the regulation performance includes: regulation accuracy, regulation rate and theoretical power confidence; The comprehensive score of the regulation performance of each unit in the new energy station is determined according to the regulation performance weight matrix of the new energy station, including: Determine the regulation performance score of each unit in the new energy station during the last power regulation; wherein the regulation performance score includes: regulation accuracy score, regulation rate score and theoretical power confidence score; The regulation performance scores are weighted and summed to obtain a comprehensive regulation performance score for each unit in the new energy station; The units with high control priority are classified into the first set, and the units with low control priority are classified into the second set; the power control of each unit in the new energy station is performed by using the power control amount of the new energy station, and the control margin and control priority of each unit in the new energy station, including: Determine the sum of the power regulation margins of the units in the first set; wherein, when the power regulation amount of the new energy station is a positive value, the power regulation margin is the difference between the theoretical power and the actual power; when the power regulation amount of the new energy station is a negative value, the power regulation margin is the difference between the actual power and the minimum power limit; When the absolute value of the power regulation amount of the new energy station is greater than the sum of the power regulation margins, the power regulation difference of the new energy station and the weight of each unit in the second set are calculated; the power regulation amount of each unit in the first set is set as its own power regulation margin, and the power regulation amount of each unit in the second set is set as the product of its own weight and the power regulation difference; wherein the power regulation difference of the new energy station is the difference between the absolute value of the power regulation amount of the new energy station and the sum of the power regulation margins; the weight of each unit in the second set is the ratio between the power regulation margin of each unit in the second set and the sum of the power regulation margins of the units in the second set; In other cases, the weight of each unit in the first set is calculated; the power regulation amount of each unit in the first set is set to be the product of its own weight and the absolute value of the power regulation amount of the new energy station; and the power regulation amount of each unit in the second set is set to be 0; wherein the weight of each unit in the first set is the ratio of the power regulation margin of each unit in the first set to the sum of the power regulation margins of the units in the first set; Based on the positive and negative conditions of the power regulation amount of the new energy station, the actual power of each unit in the new energy station is regulated according to the power regulation amount of each unit in the new energy station; Determining the control priority of each unit in the new energy station based on the comprehensive score of the regulation performance includes: According to the comprehensive score of regulation performance, the units in the new energy station are sorted in descending order; Select U units from the sequence from the front to the back, find the unit whose bad review counter value is not less than 1 among the U units, and reduce the bad review counter value of the found unit by 1; Select S units from the sequence from the back to the front, and add 1 to the count value of the bad review counter of the selected unit; The control priority of the units whose bad review counters in the new energy station are greater than the first pre-designed value is set to low, and the control priority of the remaining units is set to high; Among them, U is the product of the first preset percentage and the total number of new energy station units, and S is the product of the second preset percentage and the total number of new energy station units.
2. According to claim 1, the power control method for a new energy station taking into account the regulating performance of the unit, It is characterized in that The method for determining the adjustment performance weight matrix includes: Conduct L power regulation tests on the new energy station to obtain the regulation performance scores of each unit in the new energy station corresponding to the L power regulation; The regulation performance scores of each unit in the new energy station corresponding to the L-time power regulation are averaged to obtain the regulation performance score of the new energy station corresponding to the L-time power regulation, and then generate the regulation performance score matrix of the new energy station; Using the regulation performance score matrix and adopting the entropy weight method to determine the regulation performance weight matrix; Among them, the number of rows of the adjustment performance score matrix is L, and the number of columns is the number of adjustment performance; L is the preset number of tests.
3. The power control method for a new energy station taking into account the regulating performance of the unit according to claim 1 or 2, It is characterized in that The adjustment accuracy score is specifically calculated by the following formula: Among them, K P represents the regulation accuracy score, P(t) represents the actual power generated by the unit at time t, and P s Indicates the power adjustment setting value of the power control unit this time, P NC Indicates the rated steady-state deviation of the unit, T 2 T is the moment when the actual power of the unit first enters the dead zone of the power regulation set value of the unit in this power regulation. 3 is the end time of this power regulation, ΔP is T 2 To T 3 The integral of the absolute value of the deviation between the actual power of the unit at this moment and the power regulation set value of the power control unit at this moment and T 2 To T 3 The ratio of moment duration; The adjustment rate score is specifically calculated by the following formula: Among them, K V represents the regulation rate fraction, V N represents the reference value of the regulation rate, V represents the regulation rate of the unit under this regulation, P(T 2 ) indicates T 2 The actual power of the unit at the moment, P(T 1 ) indicates T 1 The actual power of the unit at the moment, T 1 Indicates the moment when the actual power of the unit is in the regulation dead zone at the initial moment of this power regulation; The theoretical power confidence score is specifically calculated by the following formula: Among them, K t represents the theoretical power confidence score, P(T 3 ) indicates T 3 The actual power of the unit at the moment, C N Indicates the rated installed capacity of the unit, G f Indicates the confidence level of the unit's initial theoretical power.
4. The power control method for a new energy station taking into account the regulating performance of the unit according to claim 1 or 2, It is characterized in that The adjustment performance weight matrix is specifically calculated by the following formula: Among them, k ij represents the jth regulation performance score of the new energy station during the i-th power regulation, p ij Indicates k ij The normalized result, E j represents the information entropy of the jth adjustment performance score, W j It represents the weight corresponding to the jth regulation performance, M represents the number of regulation performances, and L represents conducting L power regulation tests on the new energy station.
5. A power control device for a new energy station taking into account the regulating performance of the unit, It is characterized in that The device comprises: A regulation performance comprehensive score determination unit, used to determine the regulation performance comprehensive score of each unit in the new energy station according to the regulation performance weight matrix of the new energy station; A control priority determination unit, used to determine the control priority of each unit in the new energy station based on the comprehensive score of the regulation performance; A power control unit is used to control the power of each unit in the new energy station by using the power control amount of the new energy station, as well as the control margin and control priority of each unit in the new energy station; The regulation performance weight matrix is composed of weights corresponding to various regulation performances; the regulation performance includes: regulation accuracy, regulation rate and theoretical power confidence; The comprehensive score of the regulation performance of each unit in the new energy station is determined according to the regulation performance weight matrix of the new energy station, including: Determine the regulation performance score of each unit in the new energy station during the last power regulation; wherein the regulation performance score includes: regulation accuracy score, regulation rate score and theoretical power confidence score; The regulation performance scores are weighted and summed to obtain a comprehensive regulation performance score for each unit in the new energy station; The units with high control priority are classified into the first set, and the units with low control priority are classified into the second set; the power control of each unit in the new energy station is performed by using the power control amount of the new energy station, and the control margin and control priority of each unit in the new energy station, including: Determine the sum of the power regulation margins of the units in the first set; wherein, when the power regulation amount of the new energy station is a positive value, the power regulation margin is the difference between the theoretical power and the actual power; when the power regulation amount of the new energy station is a negative value, the power regulation margin is the difference between the actual power and the minimum power limit; When the absolute value of the power regulation amount of the new energy station is greater than the sum of the power regulation margins, the power regulation difference of the new energy station and the weight of each unit in the second set are calculated; the power regulation amount of each unit in the first set is set as its own power regulation margin, and the power regulation amount of each unit in the second set is set as the product of its own weight and the power regulation difference; wherein the power regulation difference of the new energy station is the difference between the absolute value of the power regulation amount of the new energy station and the sum of the power regulation margins; the weight of each unit in the second set is the ratio between the power regulation margin of each unit in the second set and the sum of the power regulation margins of the units in the second set; In other cases, the weight of each unit in the first set is calculated; the power regulation amount of each unit in the first set is set to be the product of its own weight and the absolute value of the power regulation amount of the new energy station; and the power regulation amount of each unit in the second set is set to be 0; wherein the weight of each unit in the first set is the ratio of the power regulation margin of each unit in the first set to the sum of the power regulation margins of the units in the first set; Based on the positive and negative conditions of the power regulation amount of the new energy station, the actual power of each unit in the new energy station is regulated according to the power regulation amount of each unit in the new energy station; the regulation priority of each unit in the new energy station is determined based on the comprehensive score of the regulation performance, including: According to the comprehensive score of regulation performance, the units in the new energy station are sorted in descending order; Select U units from the sequence from the front to the back, find the unit whose bad review counter value is not less than 1 among the U units, and reduce the bad review counter value of the found unit by 1; Select S units from the sequence from the back to the front, and add 1 to the count value of the bad review counter of the selected unit; The control priority of the units whose bad review counters in the new energy station are greater than the first pre-designed value is set to low, and the control priority of the remaining units is set to high; Among them, U is the product of the first preset percentage and the total number of new energy station units, and S is the product of the second preset percentage and the total number of new energy station units.
6. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, It is characterized in that When the processor executes the program, the steps of the new energy station power control method taking into account the unit regulation performance as described in any one of claims 1 to 4 are implemented.
7. A non-transitory computer-readable storage medium having a computer program stored thereon, It is characterized in that When the computer program is executed by the processor, the steps of the power control method for a new energy station taking into account the unit regulation performance as described in any one of claims 1 to 4 are implemented.