Prefabricated UHPC formwork filled with concrete bridge guardrail and construction method thereof
Through the semi-prefabricated and semi-cast-in-place construction method of the concrete bridge guardrail filled in the prefabricated UHPC mold shell, the problems of cumbersome construction and low industrialization of traditional guardrails are solved, efficient and environmentally friendly bridge guardrail construction are achieved, and the mechanical properties and use of guardrails are improved. life.
Patent Information
- Application Number
- CN202210313508.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-03-28
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2042-03-28
AI Technical Summary
The construction of traditional reinforced concrete guardrails is cumbersome and time-consuming, and has low industrialization and high pollution, which slows down the construction progress of bridges and does not conform to the trend of green building.
Use prefabricated UHPC mold shell to fill concrete bridge guardrails. By installing prefabricated UHPC mold shells, embedded steel bars and grouting holes on the bridge deck, combined with semi-prefabricated and semi-cast in-situ construction methods, the on-site formwork project and steel bar binding are reduced and construction is improved. efficiency.
It improves construction efficiency and industrialization, reduces labor costs, improves the mechanical properties and service life of guardrails, and meets the requirements of green buildings.
Smart Images

Figure CN114635355B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of bridge engineering, and in particular relates to a prefabricated UHPC formwork filled with concrete bridge guardrail and a construction method thereof. Background Art
[0002] At present, traditional reinforced concrete guardrails generally adopt the formwork cast-in-place structure. When the bridge deck is cast, the protruding steel bars are embedded in advance, and then the guardrail steel bars are tied together with the protruding steel bars of the bridge deck to form a steel skeleton, and finally the formwork is set up to cast the anti-collision guardrail.
[0003] The existing reinforced concrete guardrails have the following disadvantages: 1. Traditional reinforced concrete guardrails often have the disadvantages of cumbersome steel bar tying, time-consuming formwork construction, and large on-site workload; 2. As the final process of the main structure construction of the bridge, the pouring of traditional guardrails requires a lot of time, which slows down the overall construction progress; 3. Cast-in-place guardrails also have the disadvantages of low industrialization and high pollution, which do not conform to the trend of green buildings. Summary of the invention
[0004] The present invention provides a prefabricated UHPC formwork filled with concrete bridge guardrail and a construction method thereof, which overcomes the above problems and provides a bridge guardrail with high construction efficiency, high degree of industrialization and good mechanical properties.
[0005] The technical solution adopted by the present invention to solve the technical problem is: a prefabricated UHPC formwork filled with concrete bridge guardrail, the bridge guardrail is installed on the bridge deck, the bridge guardrail comprises a prefabricated UHPC formwork, a plurality of embedded steel bars and at least one grouting hole, wherein:
[0006] The UHPC formwork comprises a first shell, a second shell and a third shell, wherein the first shell is arranged in a vertical direction, the second shell is arranged opposite to the first shell, the length of the second shell in a height direction is greater than the length of the first shell in a height direction, the top surface of the second shell is flush with the top surface of the second shell, and the third shell is arranged on the top of the first shell and the second shell;
[0007] The first shell, the third shell, and the second shell are sequentially connected to form an integral body to enclose the UHPC formwork;
[0008] The second shell includes a first prefabricated plate, a second prefabricated plate and a third prefabricated plate connected in sequence, the other end of the first prefabricated plate is connected to the third shell, and the third prefabricated plate is provided with a plurality of reserved channels to form a grid-like structure;
[0009] One end of a plurality of the embedded steel bars is embedded in the first shell, and the other end is embedded in the second shell;
[0010] Each embedded steel bar corresponds to one of the reserved channels at one end of the second shell, and extends from the inside of the third shell into the reserved channel;
[0011] The grouting holes are provided on the third shell body and are used for pouring concrete.
[0012] As a further preferred embodiment of the present invention, a groove is provided at a coaxial position between the bridge deck and the third prefabricated board.
[0013] As a further preferred embodiment of the present invention, a plurality of protruding steel bars are arranged in the groove, and each of the protruding steel bars corresponds to one of the reserved channels.
[0014] As a further preferred embodiment of the present invention, each of the protruding steel bars is connected to one of the embedded steel bars via a steel bar sleeve.
[0015] As a further preferred embodiment of the present invention, the first prefabricated board and the second prefabricated board are arranged at an obtuse angle, and the second prefabricated board and the third prefabricated board are arranged at an obtuse angle.
[0016] As a further preferred embodiment of the present invention, it further includes dry shear teeth, wherein a plurality of shear teeth are arranged on the inner walls of the first shell and the second shell along the length direction of the third shell.
[0017] A construction method for prefabricated UHPC formwork filled with concrete bridge guardrail is also provided, which specifically comprises the following steps:
[0018] S1. In a prefabrication plant, a plurality of UHPC formworks formed by integrally forming the first shell, the third shell, and the second shell are completed. When prefabricating the UHPC formworks, the embedded steel bars are pre-embedded and at least one grouting hole and a plurality of the reserved channels are reserved;
[0019] S2, opening the groove on the bridge deck along the length direction of the bridge deck;
[0020] S3, arranging a plurality of protruding steel bars in the groove;
[0021] S4, transporting the prefabricated UHPC formwork to the construction site;
[0022] S5, taking a UHPC formwork, inserting the bottom of the third precast panel in the third shell of the UHPC formwork into the groove, contacting the bottom of the groove, and at the same time, the bottom of the first shell contacts the bridge deck;
[0023] S6, installing a plurality of the steel bar sleeves to connect the embedded steel bars with the protruding steel bars;
[0024] S7, vertically placing a baffle on the side of the third prefabricated plate of the UHPC formwork away from the first shell, the baffle needs to be in close contact with the third prefabricated plate to avoid gaps between the reserved channels and the baffle member; at the same time, placing the baffle on both sides of the UHPC formwork, where the baffle needs to avoid gaps between the two sides of the UHPC formwork;
[0025] S8, pouring concrete into the grouting hole until the interior of the UHPC formwork is filled with concrete;
[0026] S9, after the concrete solidifies, remove all the baffles;
[0027] S10, take another UHPC formwork, insert the bottom of the third prefabricated panel in the third shell of the UHPC formwork into the groove to make it contact with the bottom of the groove, and at the same time, the bottom of the first shell is in contact with the bridge deck, and seamlessly fit the UHPC formwork with one side of the UHPC formwork in step S5;
[0028] S11, repeat step S6;
[0029] S12, vertically placing the baffle on the side of the third prefabricated plate of the UHPC formwork away from the first shell, the baffle needs to be in close contact with the third prefabricated plate to avoid gaps between the reserved channels and the baffle member; at the same time, placing the baffle on the side of the UHPC formwork away from the adjacent UHPC formwork, where the baffle needs to avoid gaps between the side of the UHPC formwork;
[0030] S13, repeating steps S8 to S9;
[0031] S14, repeating steps S10 to S13 until a plurality of the UHPC formworks are sequentially and adjacently installed on the bridge deck.
[0032] As a further preferred embodiment of the present invention, when installing the first UHPC formwork, before performing step S6, the position of the first UHPC formwork in the groove needs to be adjusted until the embedded steel bars are coaxial with the protruding steel bars.
[0033] As a further preferred embodiment of the present invention, the UHPC formwork shell being filled with concrete means that the space between the first shell and the second shell, the plurality of reserved channels, the space overlapping the groove and the reserved channels, and the inside of the grouting holes are all completely filled with concrete.
[0034] Through the above technical solution, compared with the prior art, the present invention has the following beneficial effects:
[0035] 1. The present invention adopts a semi-prefabricated and semi-cast-in-place method, which reduces the formwork engineering of on-site construction and improves construction efficiency.
[0036] 2. The present invention arranges embedded steel bars in the UHPC formwork and reserves protruding steel bars in the bridge deck. The two types of steel bars are connected by steel sleeves during construction, so that the UHPC formwork and the bridge deck form a reliable connection. The UHPC formwork does not require a traditional guardrail steel bar skeleton, which reduces the steel bar binding project in on-site construction, improves construction efficiency, and reduces labor costs.
[0037] 3. The UHPC formwork of the present invention is made of ultra-high performance concrete (Ultra High Performance Concrete, UHPC), which has excellent properties such as high strength, high toughness, high impermeability, high corrosion resistance, and high explosion resistance. It can improve the strength, toughness, anti-permeability, corrosion resistance, and explosion resistance of the UHPC formwork. In addition, the UHPC formwork makes the concrete on its inner wall not easy to fall off, thereby extending the service life of the UHPC formwork. BRIEF DESCRIPTION OF THE DRAWINGS
[0038] The present invention is further described below in conjunction with the accompanying drawings and embodiments.
[0039] Figure 1 It is a schematic diagram of the cross-sectional structure of the present invention;
[0040] Figure 2 It is a stereogram of the overall structure of the present invention;
[0041] Figure 3 It is a schematic diagram of step S1 in the construction method of the present invention;
[0042] Figure 4 It is a schematic diagram of step S2 in the construction method of the present invention;
[0043] Figure 5 It is a schematic diagram of step S4 and step S5 in the construction method of the present invention;
[0044] Figure 6 It is a schematic diagram of the structure of the present invention after being filled with concrete.
[0045] In the figure: 1. bridge deck; 11. groove; 2. protruding steel bars; 3. UHPC formwork; 31. grouting holes; 32. reserved channels; 33. shear teeth; 34. first shell; 35. second shell; 351. first precast plate; 352. second precast plate; 353. third precast plate; 36. third shell; 4. embedded steel bars; 5. steel bar sleeves. DETAILED DESCRIPTION
[0046] The present invention will now be described in further detail with reference to the accompanying drawings. These drawings are simplified schematic diagrams, which only illustrate the basic structure of the present invention in a schematic manner, and therefore only show the components related to the present invention.
[0047] In the description of the present invention, it should be understood that the terms "left side", "right side", "upper part", "lower part" and the like indicate the orientation or positional relationship based on the orientation or positional relationship shown in the drawings, which is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation. "First", "second" and the like do not indicate the importance of the components, and therefore cannot be understood as limiting the present invention. The specific dimensions used in this embodiment are only for illustrating the technical solution, and do not limit the scope of protection of the present invention.
[0048] Example 1
[0049] This embodiment provides a preferred implementation scheme, a prefabricated UHPC formwork filled with concrete bridge guardrail, such as Figure 1 to Figure 2 As shown, the bridge guardrail includes a prefabricated UHPC formwork 3, a plurality of embedded steel bars 4 and at least one grouting hole 31, wherein:
[0050] The above-mentioned UHPC formwork 3 includes a first shell 34, a second shell 35, and a third shell 36. The first shell 34 is arranged in the vertical direction, the second shell 35 is arranged opposite to the first shell 34, the length of the second shell 35 in the height direction is greater than the length of the first shell 34 in the height direction, the top surface of the second shell 35 is flush with the top surface of the second shell 35, and the third shell 36 is arranged on the top of the first shell 34 and the second shell 35. The first shell 34, the third shell 36, and the second shell 35 are connected in sequence to form an integral body to enclose the UHPC formwork 3.
[0051] The UHPC formwork 3 is made of ultra-high performance concrete (Ultra High Performance Concrete, UHPC), which has excellent properties such as high strength, high toughness, high permeability, high corrosion resistance, and high explosion resistance. It can improve the strength, toughness, anti-permeability, corrosion resistance, and explosion resistance of the UHPC formwork. In addition, the UHPC formwork 3 makes the concrete on its inner wall not easy to fall off, thereby extending the service life of the UHPC formwork.
[0052] The second shell 35 comprises a first prefabricated plate 351, a second prefabricated plate 352 and a third prefabricated plate 353 which are connected in sequence, the other end of the first prefabricated plate 351 is connected to the third shell 36, and the third prefabricated plate 353 is provided with a plurality of reserved channels 32 to form a grid-like structure. Preferably, the first prefabricated plate 351 and the second prefabricated plate 352 are arranged at an obtuse angle, and the second prefabricated plate 352 and the third prefabricated plate 353 are arranged at an obtuse angle, and the obtuse angle ranges from 100 degrees to 170 degrees.
[0053] One end of the embedded steel bars 4 is embedded in the first shell 34, and the other end is embedded in the second shell 35. One end of each embedded steel bar 4 in the second shell 35 corresponds to one of the reserved channels 32, and extends from the inside of the third shell 36 into the reserved channel 32.
[0054] Specifically, the embedded steel bar 4 includes a first bending section, a middle section and a second bending section connected in sequence. The first bending section is embedded in the first shell 34, and the other end of the first bending section extends upward. The length of the first bending section embedded in the first shell 34 shall not be less than 5 cm, ensuring sufficient anchoring depth to provide sufficient pull-out and shear strength; the middle section is obliquely arranged in the UHPC formwork 3; the second bending section is embedded in the third shell 36, and the other end of the second bending section extends downward into the reserved channel 32. In order to improve the tighter connection between the embedded steel bar 4 and the UHPC formwork 3 and better strength, preferably, the middle section of the embedded steel bar 4 is arranged along the setting direction of the second prefabricated plate 352, so that the middle section is partially embedded in the second prefabricated plate 352, that is, the angle between the middle section and the second bending section is the same as the angle between the second prefabricated plate 352 and the third prefabricated plate 353.
[0055] The grouting holes 31 are provided on the third shell 36 for pouring concrete. Preferably, two grouting holes 31 are provided, and the two grouting holes 31 are respectively located at two ends of the second shell. When grouting is performed, the two grouting holes 31 can be performed simultaneously to achieve more uniform concrete pouring.
[0056] Furthermore, a groove 11 is provided at the coaxial position between the bridge deck 1 and the third prefabricated plate 353, and the depth of the groove 11 shall not be less than 3 cm to ensure sufficient shear strength when impacted, and the groove 11 shall not be greater than half of the thickness of the bridge deck 1 to avoid excessive impact on the lateral force performance of the bridge deck. A plurality of protruding steel bars 2 are arranged in the groove 11, and each of the protruding steel bars 2 corresponds to one of the reserved channels 32. Each of the protruding steel bars 2 is connected to one of the embedded steel bars 4 through a steel bar sleeve 5.
[0057] The other end of the first bending section extends upward, and the other end of the second bending section extends downward, so as to limit the embedded steel bars 4 and the extended steel bars 2 to be connected only on the second shell 35. It is not that the embedded steel bars 4 and the extended steel bars 2 cannot be connected at the first shell 34, but the first shell 34 is located at the edge of the bridge, and the installation operation here is not only inconvenient, but also poses a safety hazard.
[0058] Furthermore, in order to achieve a tighter connection between the inner wall of the UHPC formwork 3 and the concrete, a plurality of shear teeth 33 are arranged at intervals on the inner walls of the first shell 34 and the second shell 35 along the length direction and the height direction of the third shell 36 .
[0059] like Figures 3 to 6 As shown, this embodiment also provides a construction method for prefabricated UHPC formwork filled with concrete bridge guardrail, which specifically includes the following steps:
[0060] S1. A plurality of UHPC formwork shells 3 formed by the first shell 34, the third shell 36, and the second shell 35 are completed in a prefabrication plant. When prefabricating the UHPC formwork shells 3, the embedded steel bars 4 are pre-embedded and at least one grouting hole 31 and a plurality of the reserved channels 32 are reserved;
[0061] S2, opening the groove 11 on the bridge deck 1 along the length direction of the bridge deck 1;
[0062] S3, arranging a plurality of protruding steel bars 2 in the groove 11;
[0063] S4, transporting the prefabricated UHPC formwork 3 to the construction site;
[0064] S5, take a UHPC formwork 3, insert the bottom of the third prefabricated plate 353 in the third shell 36 of the UHPC formwork 3 into the groove 11, contact with the bottom of the groove 11, and at the same time, the bottom of the first shell 34 contacts with the bridge deck 1;
[0065] S6, installing a plurality of the steel bar sleeves 5 to connect the embedded steel bars 4 with the protruding steel bars 2;
[0066] Before performing step S6 , the position of the UHPC formwork 3 in step S5 in the groove 11 needs to be adjusted until the embedded steel bars 4 are coaxial with the protruding steel bars 2 .
[0067] S7, a baffle is vertically placed on the side of the third prefabricated plate 353 of the UHPC formwork 3 away from the first shell 34, and the baffle needs to be in close contact with the third prefabricated plate 353 to avoid gaps between the reserved channels 32 and the baffle member; at the same time, the baffle is placed on both sides of the UHPC formwork 3, and here the baffle needs to avoid gaps between the two sides of the UHPC formwork 3;
[0068] Preferably, the baffle may be made of a plastic board or a wooden board.
[0069] S8, pouring concrete into the grouting hole 31 until the interior of the UHPC formwork 3 is filled with concrete;
[0070] The UHPC formwork 3 being filled with concrete means that the space between the first shell 34 and the second shell 35, the plurality of reserved channels 32, the space overlapping the groove 11 and the reserved channels 32, and the inside of the grouting hole 31 are all completely filled with concrete.
[0071] S9, after the concrete solidifies, remove all the baffles;
[0072] S10, take another UHPC formwork 3, insert the bottom of the third prefabricated plate 353 in the third shell 36 of the UHPC formwork 3 into the groove 11, contact the bottom of the groove 11, and at the same time, the bottom of the first shell 34 contacts the bridge deck 1, and the UHPC formwork 3 is seamlessly and tightly attached to one side of the UHPC formwork 3 in step S5;
[0073] S11, repeat step S6;
[0074] S12, vertically placing the baffle on the side of the third prefabricated plate 353 of the UHPC formwork 3 away from the first shell 34, the baffle needs to be in close contact with the third prefabricated plate 353 to avoid gaps between the reserved channels 32 and the baffle member; at the same time, placing the baffle on the side of the UHPC formwork 3 away from the adjacent UHPC formwork 3, where the baffle needs to avoid gaps between the side of the UHPC formwork 3;
[0075] S13, repeating steps S8 to S9;
[0076] S14, repeating steps S10 to S13 until a plurality of the UHPC formworks 3 are sequentially and adjacently installed on the bridge deck 1.
[0077] It will be understood by those skilled in the art that, unless otherwise defined, all terms (including technical and scientific terms) used herein have the same meaning as generally understood by those skilled in the art to which this application belongs. It should also be understood that terms such as those defined in common dictionaries should be understood to have meanings consistent with the meanings in the context of the prior art, and will not be interpreted with idealized or overly formal meanings unless defined as herein.
[0078] The meaning of "and / or" described in this application means that the situations where each exists alone or both exist at the same time are included.
[0079] The term “connection” as used in this application may mean a direct connection between components or an indirect connection between components via other components.
[0080] Based on the above ideal embodiments of the present invention, the relevant staff can make various changes and modifications without departing from the technical concept of the present invention through the above description. The technical scope of the present invention is not limited to the contents of the specification, and its technical scope must be determined according to the scope of the claims.
Claims
1. A prefabricated UHPC formwork filled with concrete bridge guardrail, the bridge guardrail being installed on a bridge deck (1), characterized in that: The bridge guardrail comprises a prefabricated UHPC formwork (3), a plurality of embedded steel bars (4) and at least one grouting hole (31), wherein: The UHPC formwork (3) comprises a first shell (34), a second shell (35), and a third shell (36); the first shell (34) is arranged in a vertical direction; the second shell (35) is arranged opposite to the first shell (34); the length of the second shell (35) in a height direction is greater than the length of the first shell (34) in a height direction; the top surface of the second shell (35) is flush with the top surface of the second shell (35); and the third shell (36) is arranged on top of the first shell (34) and the second shell (35); The first shell (34), the third shell (36), and the second shell (35) are sequentially connected and integrally formed to form the UHPC formwork (3); The second shell (35) comprises a first prefabricated plate (351), a second prefabricated plate (352) and a third prefabricated plate (353) which are connected in sequence, the other end of the first prefabricated plate (351) is connected to the third shell (36), and the third prefabricated plate (353) is provided with a plurality of reserved channels (32) to form a grid-like structure; One end of a plurality of the embedded steel bars (4) is embedded in the first shell (34), and the other end is embedded in the second shell (35); One end of each embedded steel bar (4) located in the second shell (35) corresponds to one of the reserved channels (32), and extends from the inside of the third shell (36) into the reserved channel (32); The embedded steel bar (4) comprises a first bending section, a middle section and a second bending section which are connected in sequence; the first bending section is embedded in the first shell (34), and the other end of the first bending section extends upward, the length of the first bending section extending embedded in the first shell (34) shall not be less than 5 cm, and the middle section is obliquely arranged in the UHPC formwork (3); the second bending section is embedded in the third shell (36), and the other end of the second bending section extends downward into the reserved channel (32), the middle section of the embedded steel bar (4) is arranged along the arrangement direction of the second prefabricated plate (352), so that the middle section is partially embedded in the second prefabricated plate (352), and the angle between the middle section and the second bending section is the same as the angle between the second prefabricated plate (352) and the third prefabricated plate (353); The grouting hole (31) is provided on the third shell (36) and is used for pouring concrete; A groove (11) is provided at a coaxial position between the bridge deck (1) and the third prefabricated plate (353); A plurality of protruding steel bars (2) are arranged in the groove (11), and each of the protruding steel bars (2) corresponds to one of the reserved channels (32); Each of the protruding steel bars (2) is connected to one of the embedded steel bars (4) via a steel bar sleeve (5); The UHPC formwork and the bridge deck (1) are reliably connected, and the interior of the UHPC formwork does not require a traditional guardrail steel bar skeleton, thereby reducing the steel bar binding work in on-site construction; The first prefabricated plate (351) and the second prefabricated plate (352) are arranged at an obtuse angle, and the second prefabricated plate (352) and the third prefabricated plate (353) are arranged at an obtuse angle.
2. A prefabricated UHPC formwork filled with concrete bridge guardrail according to claim 1, characterized in that: It also comprises dry shear teeth (33), wherein a plurality of shear teeth (33) are arranged on the inner walls of the first shell (34) and the second shell (35) along the length direction of the third shell (36).
3. A construction method for a prefabricated UHPC formwork filled with concrete bridge guardrail according to claim 1 or 2, characterized in that: The specific steps are as follows: S1. In a prefabrication plant, a plurality of UHPC formworks (3) formed by integrally molding the first shell (34), the third shell (36), and the second shell (35) are completed. When prefabricating the UHPC formworks (3), the embedded steel bars (4) are pre-embedded and at least one grouting hole (31) and a plurality of the reserved channels (32) are reserved; S2, opening the groove (11) on the bridge deck (1) along the length direction of the bridge deck (1); S3, arranging a plurality of protruding steel bars (2) in the groove (11); S4, transporting the prefabricated UHPC formwork (3) to the construction site; S5, taking a UHPC formwork (3), inserting the bottom of the third prefabricated plate (353) in the third shell (36) of the UHPC formwork (3) into the groove (11), so as to contact the bottom of the groove (11), and at the same time, the bottom of the first shell (34) contacts the bridge deck (1); S6, installing a plurality of the steel bar sleeves (5) to connect the embedded steel bars (4) and the protruding steel bars (2); S7, vertically placing a baffle on the side of the third prefabricated plate (353) of the UHPC formwork (3) away from the first shell (34), the baffle needs to be in close contact with the third prefabricated plate (353) to avoid gaps between the reserved channels (32) and the baffle member; at the same time, placing the baffle on both sides of the UHPC formwork (3), here the baffle needs to avoid gaps between the baffle and the two sides of the UHPC formwork (3); S8, pouring concrete into the grouting hole (31) until the interior of the UHPC formwork (3) is filled with concrete; S9, after the concrete solidifies, remove all the baffles; S10, taking another UHPC formwork (3), inserting the bottom of the third prefabricated plate (353) in the third shell (36) of the UHPC formwork (3) into the groove (11), making contact with the bottom of the groove (11), while the bottom of the first shell (34) makes contact with the bridge deck (1), and seamlessly attaching the UHPC formwork (3) to one side of the UHPC formwork (3) in step S5; S11, repeat step S6; S12, vertically placing the baffle on the side of the third prefabricated plate (353) of the UHPC formwork (3) away from the first shell (34), the baffle needs to be in close contact with the third prefabricated plate (353) to avoid gaps between the plurality of reserved channels (32) and the baffle member; at the same time, placing the baffle on the side of the UHPC formwork (3) away from the adjacent UHPC formwork (3), where the baffle needs to avoid gaps between the side of the UHPC formwork (3); S13, repeating steps S8 to S9; S14, repeating steps S10 to S13 until a plurality of the UHPC formworks (3) are sequentially and adjacently installed on the bridge deck (1).
4. The construction method according to claim 3, characterized in that: When installing the first UHPC formwork (3), before performing step S6, the position of the first UHPC formwork (3) in the groove (11) needs to be adjusted until the embedded steel bars (4) are coaxial with the protruding steel bars (2).
5. The construction method according to claim 4, characterized in that: The UHPC formwork (3) being filled with concrete means that the space between the first shell (34) and the second shell (35), the plurality of reserved channels (32), the overlapping space between the groove (11) and the reserved channels (32), and the interior of the grouting hole (31) are all completely filled with concrete.