A hydraulic fracturing hole protection system and method for crushed soft coal seam

By adopting drilling rig drilling system and flexible hole protection system in coal mine gas outburst disasters, using hydraulic fracturing technology of flexible hole protection brackets and compression spring structures of memory alloy materials, drilling holes and hole protection under complex geological conditions is solved The difficulty of achieving efficient gas extraction and stable drilling has been achieved, reducing the cost of hole protection.

CN114635742BActive Publication Date: 2024-11-19HANCHENG ZAOZHUANG IND CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210314158.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-03-28
Publication Date
2024-11-19
Estimated Expiration
2042-03-28

AI Technical Summary

Technical Problem

Coal mine gas outburst disasters occur frequently. The existing hydraulic fracturing technology is difficult to drill holes and protect holes under complex geological conditions, resulting in low gas extraction efficiency and lack of hole protection equipment. Imature hole protection technology leads to technical bottlenecks.

Method used

Using a crushed soft coal seam hydraulic fracturing hole protection system including drilling rig drilling system, flexible hole protection system and hydraulic fracturing system, a flexible hole protection bracket made of memory alloy material and a water injection support pipe with a pressure spring structure, through high-pressure water Inject flexible hole guard bracket for expansion and support, and use current to stimulate the bracket to expand and contract, achieving stable support for drilling and gas extraction.

Benefits of technology

It realizes efficient hole protection and stable maintenance for drilling, reduces hole protection costs, improves the gas extraction efficiency of coal seams in complex geological structures, and provides efficient and uniform penetration enhancement effect.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114635742B_ABST
    Figure CN114635742B_ABST
Patent Text Reader

Abstract

The invention provides a hydraulic fracturing hole protection system and method for crushed soft coal seams. The hydraulic fracturing hole protection system is designed to address the complex geological structure and low permeability of coal seams, large borehole deformation, and the easy instability of the borehole wall under the influence of factors such as ground stress, gas pressure, and structural stress, forming a collapsed hole. It fully combines the advantages of hydraulic fracturing such as a large impact range, and relies on the hole protection device to ensure efficient hole protection after drilling, maintaining the stability of the borehole. At the same time, the hole protection bracket adopts a memory alloy, fully and effectively utilizes the "two-way memory effect", and can actively control the expansion and closure of the bracket. The hole protection system and method can effectively improve the gas extraction efficiency of coal seams with complex geological structures, and provide solid theoretical and technical support for achieving efficient and uniform permeability enhancement in coal seams with complex geological structures.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of coal mine gas prevention and control, and in particular to a hydraulic fracturing hole protection system and method for a broken soft coal seam. Background Art

[0002] As my country's coal mining gradually extends to deeper areas, geological conditions become more complex, and coal and gas outburst disasters occur frequently. Hydraulic fracturing technology, as a common underground hydraulic gas extraction and permeability enhancement measure, is currently widely used in major mining areas across the country. Hydraulic fracturing technology mainly uses high-pressure water to destroy the original form of the coal body. When the fracture pressure of the coal seam is exceeded, the resulting cracks develop and extend along the coal seam joints, forming a stable gas migration channel, which has the characteristics of a large impact range and good overall permeability enhancement effect. However, the complex and changeable coal seam conditions have brought great difficulties to the drilling and protection of coal seams. The borehole wall is prone to instability under the influence of multiple factors such as ground stress, gas pressure, and tectonic stress, resulting in a series of damage forms such as borehole collapse and borehole deformation, which seriously hinders and affects the underground drilling construction process and gas extraction efficiency. At present, the corresponding complete sets of hole protection equipment are relatively scarce in China. At the same time, the hole protection technology for complex geological conditions is not yet mature, resulting in a series of technical bottlenecks in coal seam gas extraction.

[0003] Therefore, in view of the characteristics of broken and soft coal seams, it is urgent to develop a flexible hole protection system and method for hydraulic fracturing drilling in broken and soft coal seams. Summary of the invention

[0004] The purpose of the present invention is to provide a hydraulic fracturing hole protection system and method for a broken soft coal seam to solve the problems existing in the prior art.

[0005] The technical solution adopted to achieve the purpose of the present invention is as follows: a hydraulic fracturing hole protection system for a broken soft coal seam, including a drilling rig drilling tool system, a flexible hole protection system and a hydraulic fracturing system.

[0006] The drilling rig and drilling tool system comprises a drill bit, a drill rod and a drilling rig. The drill bit is installed at the head end of the drill rod. The drill bit has a central hole. The central hole is connected to the inner cavity of the drill rod. The drilling rig clamps the rear end of the drill rod.

[0007] The flexible hole protection system comprises a front end fixing device, a water injection support pipe and a flexible hole protection bracket.

[0008] The water injection support pipe has a water injection hole on its wall. The front end of the water injection support pipe is connected and fixed with a front end fixing device, and the rear end is connected with a hydraulic pump. The front end fixing device has a support hook. The support hook adopts a compression spring structure. The water injection support pipe is arranged in the inner cavity of the drill rod. The front end fixing device is arranged in the central channel of the drill bit. The support hook of the front end fixing device is engaged with the inner wall of the central channel.

[0009] The flexible hole protection bracket is made of memory alloy material. In the working state, the flexible hole protection bracket presents a low potential phase shape, that is, the memory alloy is in a cooling state and an elongated state when the power is off. In the low potential phase shape, the flexible hole protection bracket is a mesh structure. The flexible hole protection bracket includes a plurality of annular support tubes arranged in sequence along the longitudinal direction. Each annular support tube includes a plurality of unit waves, and the unit waves are arranged in sequence along the circumferential direction. Two adjacent annular support tubes are distributed in mirror symmetry. The two opposite wave peaks of the two adjacent annular support tubes are fixedly connected. The inner cavities of the two adjacent annular support tubes are connected. The inner cavities of the plurality of annular support tubes constitute a pipe network structure. In the non-working state, the flexible hole protection bracket presents a high potential phase shape. At this time, the memory alloy is energized, and the memory alloy bracket is in a heating state after being excited by the current, and the shape begins to shrink. In the low potential phase shape, the flexible hole protection bracket in a contracted state is sleeved on the pipe body of the water injection support pipe. The water injection hole is connected to the inner cavity of the pipe network of the flexible hole protection bracket.

[0010] The hydraulic fracturing system includes an emulsification pump station, a water tank, a sealing device, a fracturing pipe string and a casing. The water tank and the emulsification pump are connected by a high-pressure hose. After the high-pressure water is generated, it enters the water volume regulating device through the high-pressure water pipe. The high-pressure water pipe is provided with a flow meter and a pressure gauge. The front section of the fracturing pipe string is connected to a high-pressure pipeline conversion joint.

[0011] During operation, the drilling tool system delivers the flexible hole protection system to the preset position. Push the water injection support pipe, and the front fixing device extends from the central hole of the drill bit. The support hook is unfolded and embedded in the coal seam on the inner wall of the borehole. Exit the drilling tool system. Grouting and sealing the hole. Turn off the external potential switch, stop the power supply, and the flexible hole protection bracket enters the cooling state and then unfolds. The hydraulic pump injects water into the water injection support pipe, and the water enters the flexible hole protection bracket through the water injection support pipe. The flexible hole protection bracket is pressurized and expanded to support the borehole. Perform hydraulic fracturing. Perform gas extraction. After the extraction is completed, the flexible hole protection bracket is depressurized. Trigger the external potential switch, and the flexible hole protection bracket is in a heated state after being excited by the current and then elastically retracts. As an applied external power source, electrical excitation can assist the water injection support pipe to enable the flexible hole protection bracket to smoothly unfold and complete the hole protection work.

[0012] Furthermore, the water injection support pipe is made by splicing a plurality of support pipe sections. Two adjacent support pipe sections are connected by a water injection support pipe connecting section. A flexible hole protection bracket is correspondingly arranged on each support pipe section.

[0013] Furthermore, an insulating layer is provided on the outer wall of the water injection support pipe, which can prevent a short circuit from occurring when the water injection support pipe contacts the flexible hole protection bracket.

[0014] The present invention also discloses a hydraulic fracturing hole protection method for a broken soft coal seam according to the system, comprising the following steps:

[0015] 1) Install the system and ground pipelines, and inspect them.

[0016] 2) Construction of fracturing drilling. The drilling system delivers the flexible hole protection system to the preset position. Push the water injection support pipe. The front fixing device extends from the center hole of the drill bit. The support claw is unfolded and embedded in the coal seam on the inner wall of the borehole.

[0017] 3) Exit the drilling system. The hydraulic pump injects high-pressure water into the water injection support pipe. The flexible hole protection support is pressurized and expanded to support the drill hole.

[0018] 4) Transporting fracturing pipe: transport the fracturing pipe to the predetermined position of the borehole, and connect the front section of the fracturing pipe string to the high-pressure pipe conversion joint to the hydraulic fracturing pump group.

[0019] 5) Grouting and sealing. The front section of the water injection support pipe is connected to the casing. Cement slurry is injected from the outer side of the casing to the surrounding area outside the fracturing string for permanent sealing, and expansion material is injected into the inner area where the fracturing string and the casing are connected for temporary sealing.

[0020] 6) Start fracturing. Start the hydraulic fracturing pump group, open the water tank to allow high-pressure water to reach the fracturing channel through the high-pressure pipeline, and start hydraulic fracturing. The fracturing string includes a hydraulic ejector, a centralizer, a screen and a guide shoe.

[0021] 7) After fracturing, close the orifice safety valve and observe the changes in the pressure gauge.

[0022] 8) When the pressure of the emulsification pump rises sharply or the water level in the water tank stops dropping, immediately stop the pressure and shut down the water pump, close the pressure relief valve, take over the fracturing hole to extract gas, and record the concentration and pure amount of gas extraction in time.

[0023] 9) Pull the fracturing pipe out of the fracturing borehole

[0024] 10) After the extraction meets the standards, the flexible hole protection system shall be recovered in time.

[0025] 11) Inject expansion material into the internal area where the fracturing string is connected to the casing and the borehole to achieve permanent isolation.

[0026] The technical effects of the present invention are unquestionable:

[0027] A. It can ensure efficient hole protection after drilling and maintain the stability of the borehole. Compared with the passive hole protection of the traditional screen pipe, the adaptive working mode of the flexible hole protection bracket can make the hole protection range larger, maintain the stable annular structure of the borehole, and reduce the supporting force required for hole protection;

[0028] B. The hole protection device can be recycled after use, which greatly reduces the cost of hole protection;

[0029] C. It can effectively improve the gas extraction efficiency of coal seams with complex geological structures, and provide solid theoretical and technical support for achieving efficient and uniform permeability enhancement in coal seams with complex geological structures. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] Figure 1 This is a schematic diagram of the structure of the hydraulic fracturing hole protection system for broken soft coal seams;

[0031] Figure 2 It is a working diagram of the flexible hole protection system;

[0032] Figure 3 This is a schematic diagram of the fully expanded flexible unit.

[0033] Figure 4 Schematic diagram of the flexible unit unfolding process.

[0034] In the figure: drilling rig 1, drill rod 3, water injection support pipe connecting section 4, support fixing device 5, drill bit 6, emulsification pump 7, water injection support pipe 8, flexible hole protection bracket 9, water tank 11. DETAILED DESCRIPTION

[0035] The present invention is further described below in conjunction with the embodiments, but it should not be understood that the above subject matter of the present invention is limited to the following embodiments. Without departing from the above technical ideas of the present invention, various substitutions and changes are made according to the common technical knowledge and customary means in the art, which should all be included in the protection scope of the present invention.

[0036] Embodiment 1:

[0037] See also Figure 1 This embodiment provides a hydraulic fracturing hole protection system for a crushed soft coal seam, including a drilling rig drilling tool system, a flexible hole protection system and a hydraulic fracturing system.

[0038] The drilling rig and drilling tool system comprises a drill bit 6, a drill rod 3 and a drilling rig 1. The drill bit 6 is installed at the head end of the drill rod 3. The drill bit 6 has a central hole. The central hole is connected to the inner cavity of the drill rod 3. The drilling rig 1 clamps the tail end of the drill rod 3.

[0039] The flexible hole protection system includes a front end fixing device 5 , a water injection support pipe 8 and a flexible hole protection bracket 9 .

[0040] The water injection support tube 8 is provided with a water injection hole on its wall. The front end of the water injection support tube 8 is connected and fixed with a front end fixing device 5, and the rear end is connected with a hydraulic pump. The front end fixing device 5 has a support hook. The support hook adopts a compression spring structure. The water injection support tube 8 is arranged in the inner cavity of the drill rod 3. The front end fixing device 5 is arranged in the central channel of the drill bit 6. The support hook of the front end fixing device 5 is engaged with the inner wall of the central channel.

[0041] See also Figure 3 , the flexible hole protection bracket 9 is a mesh structure. The flexible hole protection bracket 9 includes annular support tubes arranged in sequence along the longitudinal direction. Each annular support tube includes unit waves, and the unit waves are arranged in sequence along the circumferential direction. Two adjacent annular support tubes are distributed in mirror symmetry. The two adjacent wave peaks of the two adjacent annular support tubes are fixedly connected. The inner cavities of the two adjacent annular support tubes are connected through a one-way valve, and the inner cavities of the annular support tubes constitute a pipe network structure. In a non-working state, the flexible hole protection bracket 9 in a tightened state is sleeved on the pipe body of the water injection support tube 8. The water injection hole is connected to the pipe network inner cavity of the flexible hole protection bracket 9. The water injection support tube 8 is made by splicing multiple sections of support tubes. The adjacent two sections of support tubes are connected by a water injection support tube connecting section 4. A flexible hole protection bracket 9 is correspondingly arranged on each section of the support tube.

[0042] The hydraulic fracturing system includes an emulsification pump station 7, a water tank 11, a sealing device and a fracturing string. The water tank 11 and the emulsification pump 7 are connected by a high-pressure hose. After the high-pressure water is generated, it enters the water volume regulating device through the high-pressure water pipe. The high-pressure water pipe is provided with a flow meter and a pressure gauge. The front section of the fracturing string is connected to a high-pressure pipeline conversion joint.

[0043] During operation, the drilling tool system transports the flexible hole protection system to the preset position. Push the water injection support pipe 8, and the front fixing device 5 extends from the central hole of the drill bit 6. The support claw is unfolded and embedded in the coal seam on the inner wall of the borehole. Exit the drilling tool system. Grouting and sealing the hole. Turn off the external potential switch, stop the power supply, and the flexible hole protection bracket 9 enters a cooling state and then unfolds. The hydraulic pump injects water into the water injection support pipe 8, and the water enters the flexible hole protection bracket 9 through the water injection support pipe 8. The flexible hole protection bracket 9 is pressurized and expanded to support the borehole. Perform hydraulic fracturing. Perform gas extraction. After the extraction is completed, the flexible hole protection bracket 9 is depressurized. Trigger the external potential switch, and the flexible hole protection bracket 9 is in a heated state after being excited by the current and then elastically retracts. As an applied external power source, electrical excitation can assist the water injection support pipe 8 so that the flexible hole protection bracket 9 can be smoothly unfolded to complete the hole protection work.

[0044] Embodiment 2:

[0045] The main structure of this embodiment is the same as that of Embodiment 1, wherein an insulating layer is provided on the outer wall of the water injection support pipe 8 to prevent a short circuit from occurring when the water injection support pipe 8 contacts the flexible hole protection bracket 9 .

[0046] Embodiment 3:

[0047] The main structure of this embodiment is the same as that of embodiment 1, wherein Figure 4 The current excitation mode is: first, the power is cut off at the bottom of the hole, and the water injection support pipe is opened. The individual supports are affected by the potential and expand to the hole mouth in sequence.

[0048] Embodiment 4:

[0049] See also Figure 2 This embodiment provides a method for hydraulic fracturing and hole protection in a crushed soft coal seam according to the system described in Embodiment 1, comprising the following steps:

[0050] 1) Install the system and ground pipelines, and inspect them.

[0051] 2) Construction of fracturing drilling. The drilling tool system delivers the flexible hole protection system to the preset position. The water injection support pipe 6 is pushed. The front fixing device 5 extends from the central hole of the drill bit 4. The support claw is unfolded and embedded in the coal seam on the inner wall of the borehole.

[0052] 3) Exit the drilling system. The hydraulic pump injects high-pressure water into the water injection support pipe 8. The flexible hole protection support 9 is pressurized and expanded to support the drill hole.

[0053] 4) Transporting fracturing pipe: transport the fracturing pipe to the predetermined position of the borehole, and connect the front section of the fracturing pipe string to the high-pressure pipe conversion joint to the hydraulic fracturing pump group.

[0054] 5) Grouting and sealing. The front section of the water injection support pipe 8 is connected to the casing. Cement slurry is injected from the outer side of the casing to the surrounding area outside the fracturing string for sealing, and expansion material is injected into the inner area where the fracturing string is connected to the casing for sealing.

[0055] 6) Start fracturing. Start the hydraulic fracturing pump group, open the water tank to allow high-pressure water to reach the fracturing channel through the high-pressure pipeline, and start hydraulic fracturing. The fracturing string includes a hydraulic ejector, a centralizer, a screen and a guide shoe.

[0056] 7) After fracturing, close the orifice safety valve and observe the changes in the pressure gauge.

[0057] 9) Pull the fracturing pipe out of the fracturing borehole

[0058] 10) After the extraction meets the standards, the flexible hole protection system shall be recovered in time.

[0059] 11) Inject expansion material into the internal area where the fracturing string is connected to the casing and the borehole to achieve permanent isolation.

Claims

1. A hydraulic fracturing hole protection system for broken soft coal seams, characterized by: Including drilling rig drilling tool system, flexible hole protection system and hydraulic fracturing system; The drilling rig and drilling tool system comprises a drill bit (6), a drill rod (3) and a drilling rig (1); the drill bit (6) is installed at the head end of the drill rod (3); the drill bit (6) has a central hole; the central hole is connected to the inner cavity of the drill rod (3); the drilling rig (1) clamps the rear end of the drill rod (3); The flexible hole protection system comprises a front end fixing device (5), a water injection support pipe (8) and a flexible hole protection bracket (9); The water injection support pipe (8) is provided with a water injection hole on its wall; the front end of the water injection support pipe (8) is connected and fixed with a front end fixing device (5), and the rear end is connected with a hydraulic pump; the front end fixing device (5) has a supporting hook; the supporting hook adopts a compression spring structure; the water injection support pipe (8) is arranged in the inner cavity of the drill rod (3); the front end fixing device (5) is arranged in the central hole of the drill bit (6); the supporting hook of the front end fixing device (5) is engaged with the inner wall of the central hole; The flexible hole protection bracket (9) is made of memory alloy material; in the working state, the flexible hole protection bracket (9) presents a low potential phase shape; in the low potential phase shape, the flexible hole protection bracket (9) is a mesh structure; the flexible hole protection bracket (9) includes a plurality of annular support tubes arranged in sequence along the longitudinal direction; each annular support tube includes a plurality of unit waves, and the unit waves are arranged in sequence along the circumferential direction; two adjacent annular support tubes are distributed in mirror symmetry; two adjacent annular support tubes are fixedly connected between two opposite wave peaks; the inner cavities of the two adjacent annular support tubes are connected; the inner cavities of the plurality of annular support tubes constitute a pipe network structure; in the non-working state, the flexible hole protection bracket (9) presents a high potential phase shape; in the low potential phase shape, the flexible hole protection bracket (9) in a contracted state is sleeved on the pipe body of the water injection support pipe (8); the water injection hole is connected to the pipe network inner cavity of the flexible hole protection bracket (9); The hydraulic fracturing system comprises an emulsification pump station (7), a water tank (11), a sealing device, a fracturing pipe string and a casing; the water tank (11) and the emulsification pump (7) are connected by a high-pressure hose; after the high-pressure water is generated, it enters the water volume regulating device through the high-pressure water pipe; the high-pressure water pipe is provided with a flow meter and a pressure gauge; the front section of the fracturing pipe string is connected to a high-pressure pipeline conversion joint; During operation, the drilling tool system delivers the flexible hole protection system to a preset position; pushes the water injection support pipe (8), and the front end fixing device (5) extends from the central hole of the drill bit (6); the support hook claw is unfolded and embedded in the coal seam on the inner wall of the borehole; Exit the drilling tool system; perform grouting and hole sealing; turn off the external potential switch, stop powering on, and allow the flexible hole protection bracket (9) to enter a cooling state and then expand; a hydraulic pump injects water into the water injection support pipe (8), and the water enters the flexible hole protection bracket (9) through the water injection support pipe (8); the flexible hole protection bracket (9) is pressurized and expanded, thereby supporting the borehole; and hydraulic fracturing is performed; Gas extraction is performed; after the extraction is completed, the flexible hole protection bracket (9) is depressurized; the external potential switch is triggered, and the flexible hole protection bracket (9) is in a heated state after being excited by the current and then elastically retracts.

2. A broken soft coal seam hydraulic fracturing hole protection system according to claim 1, characterized in that: The water injection support pipe (8) is made by splicing a plurality of support pipe sections; two adjacent support pipe sections are connected via a water injection support pipe connecting section (4); and a flexible hole protection bracket (9) is correspondingly provided on each support pipe section.

3. The broken soft coal seam hydraulic fracturing hole protection system according to claim 1 is characterized by: An insulating layer is provided on the outer wall of the water injection support pipe (8).

4. A method for hydraulic fracturing and hole protection in a crushed soft coal seam according to the system of claim 1, characterized in that: The following steps are involved: 1) Install the system and ground pipelines, and inspect them; 2) Construction of fracturing drilling; The drilling tool system delivers the flexible hole protection system to a preset position; pushes the water injection support pipe (8); the front end fixing device (5) extends from the central hole of the drill bit (4); the support hook claw is unfolded and embedded in the coal seam on the inner wall of the borehole; 3) withdrawing the drilling tool system; the hydraulic pump injects high-pressure water into the water injection support pipe (8); the flexible hole protection support (9) is pressurized and expanded to support the drill hole; 4) Transporting the fracturing pipe: transport the fracturing pipe to the predetermined position of the borehole, and connect the front section of the fracturing pipe string to the high-pressure pipe conversion joint to the hydraulic fracturing pump group; 5) grouting and sealing the hole; the front section of the water injection support pipe (8) is connected to the casing; cement slurry is injected from the outer side of the casing to the surrounding area outside the fracturing string for permanent sealing, and swelling material is injected into the inner area where the fracturing string and the casing are connected for temporary sealing; 6) Start fracturing; start the hydraulic fracturing pump group, open the water tank to allow high-pressure water to reach the fracturing channel through the high-pressure pipeline, and start hydraulic fracturing; the fracturing string includes a hydraulic ejector, a centralizer, a screen pipe and a guide shoe; 7) After fracturing, close the orifice safety valve and observe the changes in the pressure gauge; 8) When the pressure of the emulsification pump rises sharply or the water level in the water tank stops dropping, immediately stop the pressure or shut down the water pump, close the pressure relief valve, take over the fracturing hole to extract gas, and record the concentration and pure amount of gas extraction in time; 9) withdrawing the fracturing pipe from the fracturing borehole; 10) After the extraction reaches the standard, the flexible hole protection system shall be recovered in time; 11) Inject expansion material into the internal area where the fracturing string is connected to the casing and the borehole to achieve permanent isolation.