A method for regulating energy storage power stations under the background of electricity spot market

By using two-stage optimization scheduling model and clustering and Monte Carlo simulation technology in the power spot market, the scheduling strategy of energy storage power stations was formulated, which solved the problems of electricity price uncertainty and operational losses, and improved the economy of energy storage power stations Sex and multi-scenario application capabilities.

CN114662762BActive Publication Date: 2024-12-03ZHEJIANG UNIV
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202210297331.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-03-24
Publication Date
2024-12-03
Estimated Expiration
2042-03-24

AI Technical Summary

Technical Problem

In the context of the spot power market, how to formulate effective energy storage power station regulation strategies, analyze the economic benefits of energy storage power stations participating in the spot power energy market and the frequency regulation auxiliary service market, and consider the uncertainty of electricity prices to ensure the electrochemical energy storage power station Economic feasibility.

Method used

Using the spot electricity energy market's electricity price, real-time electricity price and FM auxiliary service market electricity price data, establish a two-stage optimization scheduling model, combine clustering methods and Monte Carlo simulations, generate electricity price prediction scenarios, formulate scheduling strategies for energy storage power plants, and consider storage Energy power station operation losses and electricity price uncertainty, optimize energy storage bidding strategies.

Benefits of technology

It has achieved the formulation of the most economical control strategy of electrochemical energy storage power stations under multiple scenarios, improved the economy and scheduling efficiency of energy storage power stations, met the needs of different electricity price fluctuations, and provided effective for electrochemical energy storage power stations. The basis for regulation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114662762B_ABST
    Figure CN114662762B_ABST
Patent Text Reader

Abstract

The present invention discloses a method for formulating a control strategy for an energy storage power station in the context of a spot electricity market. The technical solution adopted by the present invention is: using the day-ahead electricity price, real-time electricity price and frequency regulation auxiliary service market electricity price data of the spot electricity energy market as input, and adjusting the energy storage bidding strategy in consideration of the difference in electricity prices between the day-ahead and real-time electricity energy markets, thereby further improving the economy of the energy storage power station in multiple scenarios, taking into account the operating losses of the energy storage power station and the uncertainty of electricity prices in the context of the spot electricity market, and establishing a two-stage optimization scheduling model in which the energy storage power station simultaneously participates in the peak regulation and frequency regulation services with the greatest benefits. The present invention formulates an optimal energy storage power station scheduling strategy taking into account the operating losses of the energy storage power station and the uncertainty of electricity prices, and realizes the multi-scenario application of the energy storage power station in the context of the spot electricity market, thereby providing a basis for the regulation of the electrochemical energy storage power station and improving the economy of the energy storage power station.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of dispatching energy storage power stations in power systems, and relates to a method for regulating energy storage power stations under the background of a power spot market. Background Art

[0002] In order to further promote the construction of the power market system, my country has identified eight regions as the first batch of pilot areas for the reform of the power spot market. With the implementation of supporting policies for the power system reform, the application value of grid energy storage has gradually gained market attention and recognition. Relevant policies further propose that energy storage will shift from research and development demonstration to commercialization and large-scale development in the future. In recent years, many provinces and cities in my country have issued policies to support energy storage as a main body of the power market to participate in power market transactions.

[0003] On the other hand, energy storage has the characteristics of fast charging and discharging speed, high regulation accuracy and fast response, and its cost is on a downward trend as energy storage technology matures. Energy storage power stations can simultaneously participate in the spot electricity and frequency regulation auxiliary service markets for arbitrage, and multi-scenario arbitrage of energy storage power stations is the future development trend of energy storage.

[0004] Therefore, how to formulate regulatory strategies for energy storage power stations participating in peak load and frequency regulation services under the background of electricity spot market, analyze the economic benefits of energy storage power stations participating in the spot electricity market and frequency regulation auxiliary service market, and formulate regulatory strategies and evaluate the benefits of energy storage power stations are issues worthy of in-depth study. Summary of the invention

[0005] The technical problem to be solved by the present invention is to overcome the defects of the prior art and provide a method for regulating and controlling energy storage power stations under the background of the electricity spot market. The method adopts the day-ahead electricity price, real-time electricity price and frequency regulation auxiliary service market electricity price data of the spot electricity energy market as input, and adjusts the energy storage bidding strategy in consideration of the difference between the day-ahead and real-time electricity energy market electricity prices. The method takes into account the operating losses of the energy storage power station and the uncertainty of electricity prices under the background of the electricity spot market, and establishes a two-stage optimization scheduling model in which the energy storage power station simultaneously participates in the peak regulation and frequency regulation services to maximize the benefits. The method analyzes the economic feasibility of the electrochemical energy storage power station in the power system under multiple application scenarios, so as to formulate a regulation strategy for the electrochemical energy storage power station that meets different electricity price uncertainty fluctuation scenarios, thereby providing a basis for the regulation of the electrochemical energy storage power station.

[0006] To this end, the technical solution adopted in the present invention is as follows:

[0007] A method for regulating an energy storage power station under the background of a power spot market comprises the following steps:

[0008] S1: During the production cycle, obtain the day-ahead electricity price, real-time electricity price and frequency regulation auxiliary service market electricity price data of the spot electricity energy market;

[0009] S2: In the energy storage power station control strategy formulation model, the energy storage bidding strategy is adjusted by considering the difference in electricity prices between the day-ahead market and the real-time market. The day-ahead market (DAM) and the real-time market (RTM) clearing rules are combined and the maximum net profit of the energy storage power station is taken as the objective function. A two-stage optimization scheduling model is established that takes into account the operation loss of the energy storage power station and the uncertainty of electricity prices in the background of the electricity spot market.

[0010] S3, based on the data obtained in S1, a series of electricity price forecast scenarios are generated through clustering method and Monte Carlo simulation expansion, and the two-stage optimization scheduling model is solved under all the generated electricity price forecast scenarios to obtain the energy storage power station scheduling strategy under the background of the electricity spot market;

[0011] S4: Based on the energy storage power station dispatching strategy formulated in S3, the energy storage power station is dispatched.

[0012] Preferably, in step S2, in the energy storage power station control strategy formulation model, only the spot electricity market is cleared in the day-ahead market, and the real-time spot electricity and frequency regulation auxiliary service markets are jointly cleared. The day-ahead market revenue of the energy storage power station is the time-of-use electricity price difference of the energy storage power station participating in the electricity market for charging and discharging at different time periods, and the calculation formula is:

[0013]

[0014] In the formula, is the day-ahead electricity market revenue of the energy storage power station, τ is the total production simulation time period, is the day-ahead node electricity price in the time period [i,i+1], is the discharge power of the energy storage power station in the day-ahead market during the time period [i,i+1], is the charging power of the energy storage power station in the day-ahead market during the time period [i,i+1]; C p,1 is the equivalent loss cost of charging and discharging of the energy storage power station, which is calculated by the following formula:

[0015]

[0016] In the formula, C w is the equivalent capacity price of the energy storage power station, E es is the capacity of the energy storage power station, N1 is the equivalent number of cycles when the discharge depth of the energy storage battery in the peak-shaving mode is D1, and r1 is the interest rate coefficient in the peak-shaving mode;

[0017] The real-time market revenue of the energy storage power station is the frequency regulation capacity revenue and frequency regulation mileage revenue when the energy storage power station participates in the electric energy market and provides frequency regulation auxiliary services. The frequency regulation revenue calculation formula of the energy storage power station in the real-time market is:

[0018]

[0019] Where: is the real-time electricity price in the time period [i,i+1];

[0020] In addition, the energy storage power station in the real-time market is used to revise the day-ahead electricity market bid, and the electricity market revenue in the real-time market is calculated according to the electricity spot market rules. The calculation formula for the electricity market revenue in the real-time market is:

[0021]

[0022] In the formula, is the frequency regulation income of the energy storage power station in the real-time market, k reg The frequency regulation performance score of energy storage is is the capacity of the frequency modulation market participating in the real-time market in the time period [i,i+1], They are the frequency regulation capacity price and the frequency regulation mileage price. is the discharge power of the energy storage power station in the real-time market during the time period [i,i+1], is the charging power of the energy storage power station in the real-time market in the time period [i,i+1], σ is the energy storage frequency regulation mileage ratio, are the proportions of upward and downward frequency regulation provided in the time period [i,i+1] respectively; β is the average amount of energy storage frequency regulation increased or decreased per hour; C p,2 The equivalent loss cost of energy storage participating in frequency regulation auxiliary services is calculated by the following formula:

[0023]

[0024] Where N2 is the equivalent number of cycles when the discharge depth of the energy storage battery in frequency modulation mode is D2, and r2 is the interest rate coefficient in frequency modulation mode;

[0025] For the day-ahead market and the real-time market, a two-stage optimization dispatch model is established with the maximum net profit of the energy storage power station as the objective function, taking into account the operation loss of the energy storage power station and the uncertainty of electricity prices in the background of the electricity spot market:

[0026]

[0027] Where R is the discount rate;

[0028] The constraints in the two-stage optimization scheduling model include energy storage charge state constraints and energy storage power constraints.

[0029] Preferably, in said S1, the data acquired during the production cycle includes electricity prices at electric energy market nodes in the day-ahead market, electricity prices at electric energy market nodes in the real-time market, frequency regulation capacity prices and frequency regulation mileage prices.

[0030] Preferably, the specific process of step S3 is as follows:

[0031] Based on the data obtained in S1, the node electricity prices of the energy market in the day-ahead market, the node electricity prices of the energy market in the real-time market, the price of frequency regulation capacity and the price of frequency regulation mileage are extracted, and then the node electricity prices of the energy market in the day-ahead market, the node electricity prices of the energy market in the real-time market, the price of frequency regulation capacity and the price of frequency regulation mileage are clustered respectively by the clustering method; for each category of the electricity price data obtained by clustering, a series of electricity price forecast scenarios covering the uncertainty fluctuations of electricity prices are generated through Monte Carlo simulation according to the preset forecast deviation; based on all the electricity price forecast scenarios generated by simulation, a two-stage optimization scheduling model is solved to obtain the optimal energy storage power station scheduling strategy under the background of the electricity spot market.

[0032] Preferably, the clustering method adopts K-means clustering.

[0033] The beneficial effects of the present invention are as follows: the present invention can formulate an economically optimal bidding strategy that takes into account the operating losses of the energy storage power station and the uncertainty of electricity prices, and realizes the multi-scenario application of the energy storage power station in the context of the electricity spot market, thereby providing a basis for the scheduling of the energy storage power station and improving the economy of the energy storage power station. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] Figure 1 It is a flow chart of the energy storage power station control method of the present invention;

[0035] Figure 2 It is the clearing electricity price data of the Zhejiang power spot market on a certain day of trial operation in the application example of the present invention;

[0036] Figure 3 It is a schematic diagram of the day-ahead market regulation strategy of the energy storage power station and the power consumption change of the energy storage power station in the peak and frequency regulation mode of the energy storage power station in the application example of the present invention;

[0037] Figure 4 It is a schematic diagram of the real-time market regulation strategy of the energy storage power station and the power consumption change of the energy storage power station in the peak and frequency regulation mode in the application example of the present invention;

[0038] Figure 5 It is a schematic diagram of the distribution of the benefits of the energy storage power station participating in DAM on a typical day in the application example of the present invention;

[0039] Figure 6 It is a schematic diagram of the distribution of the benefits of the energy storage power station participating in RTM on a typical day in the application example of the present invention; DETAILED DESCRIPTION

[0040] The present invention will be further described and illustrated below in conjunction with the accompanying drawings and specific implementation methods.

[0041] In a preferred embodiment of the present invention, a method for regulating an energy storage power station in a power spot market is provided, the method comprising the following steps:

[0042] S1: During the production cycle, obtain the day-ahead electricity price, real-time electricity price and frequency regulation auxiliary service market electricity price data of the spot electricity energy market.

[0043] Note that in this step, the data used can be the historical clearing data of the electricity spot market. Specifically, the data obtained during the production cycle includes the node electricity prices of the electric energy market in the day-ahead market, the node electricity prices of the electric energy market in the real-time market, the frequency regulation capacity price, and the frequency regulation mileage price. The acquired data can be input into the energy storage power station regulation strategy formulation model for solving the model. The specific formulation process of the two-stage regulation strategy formulation model for energy storage power stations is described in S2.

[0044] S2: In the energy storage power station regulation strategy formulation model, the energy storage bidding strategy is adjusted by considering the difference in electricity prices between the day-ahead market and the real-time electricity market. The clearing rules of the day-ahead market (DAM) and the real-time market (RTM) are combined and the maximization of the net profit of the energy storage power station is taken as the objective function. A two-stage optimization scheduling model is established that takes into account the operating losses of the energy storage power station and the uncertainty of electricity prices in the context of the electricity spot market.

[0045] In the present invention, the energy storage power station control strategy formulation model is specifically as follows:

[0046] In the day-ahead market, only the spot electricity market is cleared, and the real-time spot electricity and frequency regulation auxiliary service markets are jointly cleared. The day-ahead market revenue of the energy storage power station is the time-of-use electricity price difference of the energy storage power station participating in the electricity market for charging and discharging at different times. The calculation formula is:

[0047]

[0048] In the formula, is the day-ahead electricity market revenue of the energy storage power station, τ is the total production simulation time period, is the day-ahead node electricity price in the time period [i,i+1], is the discharge power of the energy storage power station in the day-ahead market during the time period [i,i+1], is the charging power of the energy storage power station in the day-ahead market during the time period [i,i+1]; C p,1 is the equivalent loss cost of charging and discharging of the energy storage power station, which is calculated by the following formula:

[0049]

[0050] In the formula, C wis the equivalent capacity price of the energy storage power station, E es is the capacity of the energy storage power station, N1 is the equivalent number of cycles when the discharge depth of the energy storage battery in the peak-shaving mode is D1, and r1 is the interest rate coefficient in the peak-shaving mode;

[0051] The real-time market revenue of the energy storage power station is the frequency regulation capacity revenue and frequency regulation mileage revenue when the energy storage power station participates in the electric energy market and provides frequency regulation auxiliary services. The frequency regulation revenue calculation formula of the energy storage power station in the real-time market is:

[0052]

[0053] Where: is the real-time electricity price in the time period [i,i+1];

[0054] In addition, the energy storage power station in the real-time market is used to revise the day-ahead electricity market bid, and the electricity market revenue in the real-time market is calculated according to the electricity spot market rules. The calculation formula for the electricity market revenue in the real-time market is:

[0055]

[0056] In the formula, is the frequency regulation income of the energy storage power station in the real-time market, k reg The frequency regulation performance score of energy storage is is the capacity of the frequency modulation market participating in the real-time market in the time period [i,i+1], They are the frequency regulation capacity price and the frequency regulation mileage price. is the discharge power of the energy storage power station in the real-time market during the time period [i,i+1], is the charging power of the energy storage power station in the real-time market in the time period [i,i+1], σ is the energy storage frequency regulation mileage ratio, are the proportions of upward and downward frequency regulation provided in the time period [i,i+1] respectively; β is the average amount of energy storage frequency regulation increased or decreased per hour; C p,2 The equivalent loss cost of energy storage participating in frequency regulation auxiliary services is calculated by the following formula:

[0057]

[0058] Where N2 is the equivalent number of cycles when the discharge depth of the energy storage battery in frequency modulation mode is D2, and r2 is the interest rate coefficient in frequency modulation mode;

[0059] For the day-ahead market and the real-time market, a two-stage optimization dispatch model is established with the maximum net profit of the energy storage power station as the objective function, taking into account the operation loss of the energy storage power station and the uncertainty of electricity prices in the background of the electricity spot market:

[0060]

[0061] Where R is the discount rate;

[0062] The constraints in the two-stage optimization scheduling model include energy storage charge state constraints and energy storage power constraints.

[0063] Therefore, the above objective function and corresponding constraints constitute a two-stage optimization model. The optimal solution of the optimization model can be used as the scheduling strategy of the energy storage power station by solving the optimization model.

[0064] S3. Based on the data obtained in S1, a series of electricity price forecast scenarios are generated through clustering methods and Monte Carlo simulation expansion, and the two-stage optimization scheduling model is solved under all the generated electricity price forecast scenarios to obtain the energy storage power station scheduling strategy under the background of the electricity spot market.

[0065] In the present invention, the clustering method used may be K-means clustering. K-means clustering and Monte Carlo simulation are used to quantify the uncertainty of electricity prices, and the specific process is as follows:

[0066] Based on the data obtained in S1, the node electricity prices of the energy market in the day-ahead market, the node electricity prices of the energy market in the real-time market, the price of frequency regulation capacity and the price of frequency regulation mileage are extracted, and then the node electricity prices of the energy market in the day-ahead market, the node electricity prices of the energy market in the real-time market, the price of frequency regulation capacity and the price of frequency regulation mileage are clustered respectively by the clustering method; for each category of the electricity price data obtained by clustering, a series of electricity price forecast scenarios covering the uncertainty fluctuations of electricity prices are generated through Monte Carlo simulation according to the preset forecast deviation; based on all the electricity price forecast scenarios generated by simulation, a two-stage optimization scheduling model is solved to obtain the optimal energy storage power station scheduling strategy under the background of the electricity spot market.

[0067] In the subsequent embodiments of the present invention, for each category of electricity price data obtained, the mean absolute percentage error (MAPE) of the day-ahead electricity energy market node electricity price can be set to 10%, the real-time electricity energy node electricity price MAPE can be set to 20%, and the frequency regulation auxiliary service market error value can be the same as the day-ahead electricity energy market node electricity price error. Through Monte Carlo simulation, n (such as 1000) electricity price prediction scenarios are generated for energy storage power station bidding strategy formulation and probability benefit analysis. Based on the results of probability benefit analysis, the economic application scenarios of energy storage power stations and the economic feasibility of application in the context of the electricity spot market are analyzed. Each electricity price prediction scenario corresponds to a group of electricity prices of electricity energy market nodes in the day-ahead market, electricity prices of electricity energy market nodes in the real-time market, frequency regulation capacity prices, and frequency regulation mileage prices. Due to the use of Monte Carlo simulation, all electricity price prediction scenarios finally obtained can better simulate the uncertainty fluctuations of electricity prices relative to the original data obtained in S1. Then, by using all the electricity price forecast scenarios generated by these simulations as data and solving the two-stage optimization scheduling model, we can obtain the optimal energy storage power station scheduling strategy that meets all electricity price forecast scenarios to the greatest extent. This provides a basis for energy storage power station scheduling and a reference for the commercial operation model of energy storage power stations under the background of electricity spot.

[0068] S4: Based on the energy storage power station dispatching strategy formulated in S3, the energy storage power station is dispatched.

[0069] When the present invention conducts economic feasibility assessment, the economic feasibility of the energy storage power station in the context of the electricity spot market can be analyzed by describing the probability distribution of the energy storage power station revenue. Specifically, in step S3, the energy storage power station revenue conclusion under different electricity price scenarios can be obtained based on the probability distribution of the energy storage power station revenue, which is more in line with the dynamic characteristics of the electricity spot market.

[0070] In order to verify the effectiveness of the present invention, the above method is implemented in the subsequent application examples using the trial operation data of the Zhejiang power spot market. The specific steps are not repeated here, and the technical effects and implementation details are mainly given.

[0071] Application Examples

[0072] In this case, the energy storage power station control method in the context of the power spot market shown in S1 to S4 of the present invention is written using MATLAB software, which will not be described in detail. The following mainly shows its specific technical effects based on case data, and the model in this method is solved by calling Gurobi.

[0073] Operating environment:

[0074] AMD Ryzen 5 3400G CPU 3.70GHz, 16GB RAM, Microsoft Windows 10X64

[0075] Gurobi 9.0.3

[0076] MATLAB 2020B

[0077] Implementation results:

[0078] This application example is based on the trial operation data of the Zhejiang power spot market in a certain month, including the day-ahead node electricity price, real-time node electricity price, frequency regulation auxiliary service capacity compensation electricity price, and mileage compensation price data. In this example, the construction scale of the energy storage power station is 100MW / 200MWh, the upper and lower limits of SOC are 0.9 and 0.1 respectively, the interval time is 1h, and the discount rate is 0. The proportion of upward and downward frequency regulation is 25%, and the energy storage frequency regulation mileage ratio is 10. The two-stage control strategy of the energy storage power station participating in the peak and frequency regulation mode under the background of the spot market is formulated through the maximum benefit optimization model, which is used as a reference for the evaluation of the benefits of the energy storage power station.

[0079] Figure 1 A flow chart of the method for formulating the energy storage power station control strategy includes two stages: day-ahead market (DAM) and real-time market (RTM).

[0080] Figure 2 The data is for the clearing electricity price of the Zhejiang power spot market on a certain day of trial operation.

[0081] Figure 3 It reflects the day-ahead market regulation strategy of energy storage power stations and the changes in the power generation of energy storage power stations when they participate in peak load and frequency regulation mode. Figure 4 It reflects the real-time market regulation strategy of energy storage power stations and the changes in the power of energy storage power stations when they participate in the peak and frequency regulation mode. Since the compensation price of frequency regulation ancillary services is high, the proportion of income from frequency regulation services is high, and since there is a difference between the real-time market electricity price and the day-ahead market electricity price, the charging and discharging power of energy storage power stations in the electricity market will change. In addition, since frequency regulation services have both upward and downward frequency regulation, the changes in the power of energy storage power stations when participating in frequency regulation services are relatively small.

[0082] Figure 5 It reflects the distribution of the benefits of the energy storage power station participating in DAM on a typical day. The average benefit of the energy storage power station through time-of-use electricity price peak-valley arbitrage in the day-ahead market on that typical day is 15,899 yuan; Figure 6 It reflects the distribution of revenues of energy storage power stations participating in RTM on a typical day. The average revenue of the energy storage power station through peak load and frequency regulation auxiliary services in the real-time market on that typical day is 248,425 yuan.

[0083] According to the results of this case, due to the high compensation price of the energy storage power station frequency regulation market, the energy storage power station mainly participates in the frequency regulation auxiliary service arbitrage, and supplements the energy storage power station electricity through the electric energy market. In addition, due to the difference between the node electricity price in the day-ahead market and the node electricity price in the real-time market, modifying the day-ahead electric energy market bidding is conducive to the energy storage power station to obtain higher expected returns in the real-time market, thereby meeting the revenue needs of energy storage power stations participating in various application scenarios under the background of electricity spot, and improving the economic efficiency of energy storage power stations.

[0084] Therefore, through the above-mentioned energy storage power station control method of the present invention, it is possible to specify an energy storage power station scheduling strategy that meets the electricity spot background, and then effectively schedule the energy storage power station, provide a basis for the scheduling of the energy storage power station, and improve the economy of the energy storage power station.

[0085] It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention. On the contrary, the present invention covers any substitution, equivalent method and scheme made within the scope of the present invention as defined by the claims. Further, in order to enable the public to have a better understanding of the present invention, some specific details of the present invention are described in detail below. Those skilled in the art can fully understand the present invention without the description of these details.

Claims

1. A method for regulating energy storage power stations in the context of electricity spot market. It is characterized in that The steps include: S1: During the production cycle, obtain the day-ahead electricity price, real-time electricity price and frequency regulation auxiliary service market electricity price data of the spot electricity energy market; S2: In the energy storage power station control strategy formulation model, the energy storage bidding strategy is adjusted by considering the difference in electricity prices between the day-ahead market and the real-time market. The day-ahead market (DAM) and the real-time market (RTM) clearing rules are combined and the maximum net profit of the energy storage power station is taken as the objective function. A two-stage optimization scheduling model is established that takes into account the operation loss of the energy storage power station and the uncertainty of electricity prices in the background of the electricity spot market. S3, based on the data obtained in S1, a series of electricity price forecast scenarios are generated through clustering method and Monte Carlo simulation expansion, and the two-stage optimization scheduling model is solved under all the generated electricity price forecast scenarios to obtain the energy storage power station scheduling strategy under the background of the electricity spot market; S4: dispatching the energy storage power station based on the energy storage power station dispatching strategy formulated in S3; In the step S2, in the energy storage power station control strategy formulation model, only the spot electricity market is cleared in the day-ahead market, and the real-time spot electricity and frequency regulation auxiliary service markets are jointly cleared. The day-ahead market revenue of the energy storage power station is the time-of-use electricity price difference of the energy storage power station participating in the electricity market for charging and discharging at different time periods, and the calculation formula is: In the formula, is the day-ahead electricity market revenue of the energy storage power station, τ is the total production simulation time period, λ i DA is the day-ahead node electricity price in the time period [i,i+1], is the discharge power of the energy storage power station in the day-ahead market during the time period [i,i+1], is the charging power of the energy storage power station in the day-ahead market during the time period [i,i+1]; C p,1 is the equivalent loss cost of charging and discharging of the energy storage power station, which is calculated by the following formula: In the formula, C w is the equivalent capacity price of the energy storage power station, E es Configure the capacity of the energy storage power station, N 1 The discharge depth of the energy storage battery in peak load mode is D 1 The equivalent number of cycles, r 1 is the interest rate coefficient in the peak load mode; The real-time market revenue of the energy storage power station is the frequency regulation capacity revenue and frequency regulation mileage revenue when the energy storage power station participates in the electric energy market and provides frequency regulation auxiliary services. The frequency regulation revenue calculation formula of the energy storage power station in the real-time market is: Where: is the real-time electricity price in the time period [i,i+1]; In addition, the energy storage power station in the real-time market is used to revise the day-ahead electricity market bid, and the electricity market revenue in the real-time market is calculated according to the electricity spot market rules. The calculation formula for the electricity market revenue in the real-time market is: In the formula, is the frequency regulation income of the energy storage power station in the real-time market, k reg The frequency regulation performance score of energy storage is is the capacity of the frequency modulation market participating in the real-time market in the time period [i,i+1], They are the frequency regulation capacity price and the frequency regulation mileage price. is the discharge power of the energy storage power station in the real-time market during the time period [i,i+1], is the charging power of the energy storage power station in the real-time market in the time period [i,i+1], σ is the energy storage frequency regulation mileage ratio, are the proportions of upward and downward frequency regulation provided in the time period [i,i+1] respectively; β is the average amount of energy storage frequency regulation increased or decreased per hour; C p,2 The equivalent loss cost of energy storage participating in frequency regulation auxiliary services is calculated by the following formula: Where N 2 The discharge depth of the energy storage battery in frequency modulation mode is D 2 The equivalent number of cycles, r 2 is the interest rate coefficient in frequency modulation mode; For the day-ahead market and the real-time market, a two-stage optimization dispatch model is established with the maximum net profit of the energy storage power station as the objective function, taking into account the operation loss of the energy storage power station and the uncertainty of electricity prices in the background of the electricity spot market: Where R is the discount rate; The constraints in the two-stage optimization scheduling model include energy storage charge state constraints and energy storage power constraints.

2. According to the method for regulating energy storage power stations in the context of a power spot market as described in claim 1, It is characterized in that In the above-mentioned S1, the data acquired during the production cycle includes the electricity prices at the nodes of the electric energy market in the day-ahead market, the electricity prices at the nodes of the electric energy market in the real-time market, the frequency regulation capacity price and the frequency regulation mileage price.

3. According to the method for regulating energy storage power stations in the context of a power spot market as described in claim 1, It is characterized in that The specific process of step S3 is as follows: Based on the data obtained in S1, the node electricity prices of the energy market in the day-ahead market, the node electricity prices of the energy market in the real-time market, the price of frequency regulation capacity and the price of frequency regulation mileage are extracted, and then the node electricity prices of the energy market in the day-ahead market, the node electricity prices of the energy market in the real-time market, the price of frequency regulation capacity and the price of frequency regulation mileage are clustered respectively by the clustering method; for each category of the electricity price data obtained by clustering, a series of electricity price forecast scenarios covering the uncertainty fluctuations of electricity prices are generated through Monte Carlo simulation according to the preset forecast deviation; based on all the electricity price forecast scenarios generated by simulation, a two-stage optimization scheduling model is solved to obtain the optimal energy storage power station scheduling strategy under the background of the electricity spot market.

4. According to the method for regulating energy storage power stations in the context of a power spot market as described in claim 1, It is characterized in that The clustering method adopts K-means clustering.

Citation Information

Patent Citations

  • Method for assessing risks of wind-photovoltaic-energy storage large user involvement in current market electricity transaction

    CN106779498A

  • Energy storage aggregator bidding method based on worst conditional value at risk

    CN111476647A

  • Energy storage bidding strategy method considering electricity price uncertainty and loss cost

    CN111553750A

  • Clearing method for participation of multi-element small and micro subjects in spot market based on virtual power plant

    CN112529622A

  • Method for formulating peak regulation and frequency modulation control strategy of energy storage power station in receiving-end power grid

    CN112886585A