A green premium evaluation method for distributed photovoltaic electricity cost based on GIS

By constructing distributed photovoltaic engineering data sets and models based on GIS methods, the shortcomings of spatial autoregressive models in model setting and variable determination in distributed photovoltaic projects are solved, and low-carbon operation of photovoltaic projects and the reduction of green cost premiums are achieved. , which provides the basis for optimal site selection and scale layout of distributed energy projects.

CN114707906BActive Publication Date: 2024-10-15ECONOMIC TECH RES INST OF STATE GRID ANHUI ELECTRIC POWER +1
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202210504150.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-05-10
Publication Date
2024-10-15
Estimated Expiration
2042-05-10

AI Technical Summary

Technical Problem

Existing spatial autoregressive models lack detailed descriptions and explanations during construction and selection, fail to effectively explore model settings and variable determination, and are difficult to conduct in-depth analysis of the spatial distribution characteristics that affect distributed photovoltaic projects.

Method used

A GIS-based method is used to construct a distributed photovoltaic engineering data set, and the uncertainty of solar irradiance is calculated through geographical information registration and the stochastic theory method of Beta distribution, and a spatial attribute power generation calculation model and green premium electricity cost analysis are constructed. The model uses MATLAB and ArcGIS for descriptive analysis and fitting, and outputs distributed photovoltaic premium electricity costs.

Benefits of technology

It effectively reduces the green cost premium of photovoltaic projects in the process of optimal location selection of distributed power sources, realizes low-carbon operation of photovoltaic projects, accurately identifies factors affecting distributed photovoltaic power generation projects, and solves the problem of coordinating the scale of distributed energy projects and optimizing project layouts. basic issues.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114707906B_ABST
    Figure CN114707906B_ABST
Patent Text Reader

Abstract

The present invention relates to a distributed photovoltaic electricity cost green premium evaluation method based on GIS, including: constructing a distributed photovoltaic engineering data set; performing geographic information registration on the distributed photovoltaic engineering data set to obtain an engineering data set with the most effective geographic information registration; obtaining a geospatial variable data set corresponding to the engineering data set with the most effective geographic information registration under different geospatial variables, and a power generation result corresponding to the geospatial variable data set; constructing a power generation calculation model with spatial attributes to obtain a power generation calculation model with fitted spatial attributes; constructing a green premium electricity cost analysis model, and outputting a distributed photovoltaic premium electricity cost premium. The present invention can effectively reduce the green cost premium of photovoltaic engineering power generation in the process of distributed power supply optimization site selection, and can enable photovoltaic engineering to operate in a low-carbon manner from construction, operation and demolition, and may even achieve a negative index for the green cost premium of power generation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of new energy construction, and in particular to a distributed photovoltaic electricity cost green premium evaluation method based on GIS. Background Art

[0002] With the depletion of fossil fuels worldwide and the deregulation of the power industry, the integration technology of distributed generators has rapidly attracted people's attention in the past decade. As a supplement to centralized power generation, distributed power generation has many positive effects on power systems, especially distribution systems with long power supply distances and weak network structures, such as shifting peak loads, reducing network losses, and improving voltage distribution.

[0003] The construction planning of distributed energy projects needs to balance the changing trends of the projects with regional resource conditions and user energy demand, so as to achieve flexible matching and meet the requirements of regional low-carbon green and economic development. The overall link composed of renewable resource conditions, distributed energy projects and user load demand is a two-sided random chain system that influences each other and changes dynamically.

[0004] Exploratory spatial data analysis is a method to study the spatial aggregation and heterogeneity of an object through its spatial distribution characteristics. It can systematically analyze the spatial differentiation characteristics of the research object as a whole, but it cannot deeply explore the effects of different influencing factors on the spatial distribution of the research object. The spatial autoregression model can be used to explore driving factors and explain the degree of influence of factors with spatial correlation on the research object. As an important tool for spatial factor research, the spatial autoregression model and the economics branch established on this basis - spatial econometrics have received widespread attention and discussion, providing important methodological support for the study of new economic geography. There are still some problems with the spatial autoregression model. One of the important problems is that the model form setting needs to be scrutinized, such as no detailed description and explanation is given when constructing or selecting a spatial regression model, the model setting is explored without linking to actual problems, and the determination of model variables has not been carefully analyzed. Summary of the invention

[0005] The purpose of the present invention is to provide a GIS-based distributed photovoltaic electricity cost green premium evaluation method that can effectively control the green premium of green photovoltaic projects according to spatial variables, thereby reducing the green photovoltaic electricity cost premium.

[0006] To achieve the above object, the present invention adopts the following technical solution: a GIS-based distributed photovoltaic electricity cost green premium evaluation method, the method comprising the following steps in order:

[0007] (1) Construct a distributed photovoltaic project dataset, which includes the construction data, operation data, maintenance data, and demolition data of the project;

[0008] (2) Performing geographic information registration on the distributed photovoltaic project data set to obtain the project data set with the most effective geographic information registration;

[0009] (3) The uncertainty of solar irradiance is calculated by a random theoretical method with Beta distribution. A descriptive analysis is performed on the engineering data set with the most effective geographic information registration based on the random theoretical method with Beta distribution and MATLAB software. The geospatial variable data set corresponding to the engineering data set with the most effective geographic information registration under different geospatial variables and the power generation results corresponding to the geospatial variable data set are output.

[0010] (4) Constructing a power generation calculation model with spatial attributes, inputting the geographic spatial variable data set and power generation results into the power generation calculation model with spatial attributes, and then fitting it through the least squares method to obtain a power generation calculation model with fitted spatial attributes;

[0011] (5) Construct a green premium electricity cost analysis model, substitute the power generation calculation model that fits the spatial attributes into the green premium electricity cost analysis model, and the green premium electricity cost analysis model outputs the distributed photovoltaic premium electricity cost premium.

[0012] The step (2) specifically comprises the following steps:

[0013] (2a) Input the distributed photovoltaic project dataset into the geographic information tool ArcGIS;

[0014] (2b) The geographic information tool ArcGIS is used to perform geographic information registration of distributed photovoltaic projects, delete variables with duplicate locations, and calculate the quality attributes of neighborhood variables;

[0015] (2c) The geographic information tool ArcGIS outputs the engineering dataset with the most effective geographic information registration. The engineering dataset with the most effective geographic information registration includes latitude and longitude data, meteorological data, global horizontal radiation, diffuse horizontal radiation, ambient temperature, wind speed, sunshine duration and light intensity registered with geospatial information.

[0016] In step (3), the calculation of the uncertainty of solar irradiance by a random theoretical method with Beta distribution specifically includes the following steps:

[0017] (3a) The probability density function of solar irradiance is:

[0018]

[0019] Where, s is the solar irradiance; s max is the upper limit of solar irradiance at a given time; α and β are shape parameters of Beta distribution;

[0020] (3b) The calculation formulas of α and β are as follows:

[0021]

[0022]

[0023] Among them, μ g is the average value of historical solar irradiance data in time period g, σ g is the standard deviation of the historical solar irradiance data in time period g;

[0024] (3c) Based on the specific Beta distribution corresponding to each time period, the probability density function is discretized using the multi-state theory. The probability density function of each time period is divided into N states, and each state has the same span;

[0025] Assume T-min and T-max They represent the upper and lower bounds of state T respectively. The probability of solar irradiance falling in state T is expressed as:

[0026]

[0027] (3d) Use piecewise function to express the relationship between the active power output of photovoltaic and solar irradiance:

[0028]

[0029] Among them, s rated is the rated solar irradiance of photovoltaic, p s-rated is the rated active output power of the photovoltaic system.

[0030] In step (4), the formula of the power generation calculation model of the spatial attribute is as follows:

[0031] C pro =b0+b1x1+b2x2+…+b n x n +e

[0032] Among them, C pro is the predicted power generation of distributed photovoltaics, (x1, x2…x n ) is the characteristic of the geographical space attribute that affects photovoltaic power generation. The geographical space attributes that affect photovoltaic power generation include meteorological data, ambient temperature, wind speed, sunshine duration and light intensity. The function fitted by the least squares method is subjected to Pearson analysis to test the goodness of fit:

[0033] Put R 1 =(-∞, +∞) is divided into an appropriate number of continuous intervals: -∞ <a0<a1<a2<…<a k-1 k <+∞ with n i Indicates that the sample value falls within the interval (a i-1 , a i ), the Pearson goodness-of-fit test formula is:

[0034]

[0035] Among them, n is the total sample size, p i The result of distributed photovoltaic power generation predicted by the fitting formula falls within (a i-1 , a i ) divided by n, χ 2 is the chi-square value. The larger the value, the worse the goodness of fit. Conversely, the better the goodness of fit. If the chi-square distribution expression reaches the critical value, the test passes.

[0036] If the test passes, the power generation calculation formula of the fitting space attribute is obtained:

[0037] C pro =b0+b1x1+b2x2+…+b n x n +e

[0038] If the test fails, add the influential geographic spatial variables and test again. If it passes, the power generation calculation formula of the fitted spatial attributes is obtained:

[0039] C pro =b0+b1x1+b2x2+…+b n x n +b n x a +b n x b +b n x c +e

[0040] Where: x a 、x b 、x c For the added influential geospatial variables.

[0041] In step (5), the formula of the green premium electricity cost analysis model is:

[0042] C ep =C invest +C operation +C buy -C​pro

[0043] Where: C invest , C operation are investment and construction costs, operation and maintenance costs, and C buy is the cost of purchasing electricity from the main grid, C pro The benefits of low storage and high generation for energy storage batteries;

[0044]

[0045] Where: r0 is the discount rate, which is 0.06; y is the applicable planning period, which is 20 years for distributed photovoltaics and 10 years for energy storage batteries; They are the investment and construction costs of photovoltaic and energy storage batteries per unit capacity; are the actual grid-connected capacities of photovoltaic and energy storage batteries at node j in scenario k, respectively;

[0046] C operation

[0047] Where: λ is the conversion ratio of operation and maintenance cost, which is 0.1; is the power abandonment cost per unit capacity of distributed photovoltaics; is the theoretical value of the PV grid-connected capacity of node j in scenario k; The real-time electricity price per unit capacity for purchasing electricity from the main grid; are the charging and discharging power values ​​of energy storage battery node j in scenario k respectively;

[0048]

[0049] In the formula, is the main network purchase power of node j in scenario k;

[0050]

[0051] In the formula, They are respectively the loads before and after the energy storage battery of node j in scenario k is activated.

[0052] It can be seen from the above technical scheme that the beneficial effects of the present invention are: first, the present invention can effectively reduce the green cost premium of photovoltaic power generation in the process of distributed power generation optimization site selection, and can enable photovoltaic projects to operate in a low-carbon manner from construction, operation and demolition, and may even achieve a negative index for the green cost premium of power generation; second, the present invention utilizes photovoltaic power plants as fast reactive power sources in emergency situations, and takes this factor into consideration when optimizing the site selection of distributed photovoltaics, which also has huge economic value. At the same time, it can accurately identify factors affecting distributed photovoltaic power generation projects, and solve the important basic problems of coordinating the scale of distributed energy projects and optimizing project layout. BRIEF DESCRIPTION OF THE DRAWINGS

[0053] Figure 1 is a flow chart of the method of the present invention;

[0054] Figure 2 It is a discretization diagram of the continuous probability density function;

[0055] Figure 3 Schematic diagram of the relationship between photovoltaic active power output and solar irradiance. DETAILED DESCRIPTION

[0056] like Figure 1 As shown, a distributed photovoltaic power cost green premium evaluation method based on GIS includes the following steps in sequence:

[0057] (1) Construct a distributed photovoltaic project dataset, which includes the construction data, operation data, maintenance data, and demolition data of the project;

[0058] (2) Performing geographic information registration on the distributed photovoltaic project data set to obtain the project data set with the most effective geographic information registration;

[0059] (3) The uncertainty of solar irradiance is calculated by a random theoretical method with Beta distribution. A descriptive analysis is performed on the engineering data set with the most effective geographic information registration based on the random theoretical method with Beta distribution and MATLAB software. The geospatial variable data set corresponding to the engineering data set with the most effective geographic information registration under different geospatial variables and the power generation results corresponding to the geospatial variable data set are output.

[0060] (4) Constructing a power generation calculation model with spatial attributes, inputting the geographic spatial variable data set and power generation results into the power generation calculation model with spatial attributes, and then fitting it through the least squares method to obtain a power generation calculation model with fitted spatial attributes;

[0061] (5) Construct a green premium electricity cost analysis model, substitute the power generation calculation model that fits the spatial attributes into the green premium electricity cost analysis model, and the green premium electricity cost analysis model outputs the distributed photovoltaic premium electricity cost premium.

[0062] The step (2) specifically comprises the following steps:

[0063] (2a) Input the distributed photovoltaic project dataset into the geographic information tool ArcGIS;

[0064] (2b) The geographic information tool ArcGIS is used to perform geographic information registration of distributed photovoltaic projects, delete variables with duplicate locations, and calculate the quality attributes of neighborhood variables;

[0065] (2c) The geographic information tool ArcGIS outputs the engineering dataset with the most effective geographic information registration. The engineering dataset with the most effective geographic information registration includes latitude and longitude data, meteorological data, global horizontal radiation, diffuse horizontal radiation, ambient temperature, wind speed, sunshine duration and light intensity registered with geospatial information.

[0066] In step (3), the calculation of the uncertainty of solar irradiance by a random theoretical method with Beta distribution specifically includes the following steps:

[0067] (3a) The probability density function of solar irradiance is:

[0068]

[0069] Where, s is the solar irradiance; s max is the upper limit of solar irradiance at a given time; α and β are shape parameters of Beta distribution;

[0070] (3b) The calculation formulas of α and β are as follows:

[0071]

[0072]

[0073] Among them, μ g is the average value of historical solar irradiance data in time period g, σ g is the standard deviation of the historical solar irradiance data in time period g;

[0074] (3c) Based on the specific Beta distribution corresponding to each time period, the probability density function is discretized using the multi-state theory. The probability density function of each time period is divided into N states, and each state has the same span;

[0075] Assume T-min and T-max They represent the upper and lower bounds of state T respectively. The probability of solar irradiance falling in state T is expressed as:

[0076]

[0077] (3d) Use piecewise function to express the relationship between the active power output of photovoltaic and solar irradiance:

[0078]

[0079] Among them, s rated is the rated solar irradiance of photovoltaic, p s-rated is the rated active output power of the photovoltaic system.

[0080] In step (4), the formula of the power generation calculation model of the spatial attribute is as follows:

[0081] C pro =b0+b1x1+b2x2+…+b n x n +e

[0082] Among them, C pro is the predicted power generation of distributed photovoltaics, (x1, x2…x n ) is the characteristic of the geographical space attribute that affects photovoltaic power generation. The geographical space attributes that affect photovoltaic power generation include meteorological data, ambient temperature, wind speed, sunshine duration and light intensity. The function fitted by the least squares method is subjected to Pearson analysis to test the goodness of fit:

[0083] Put R 1 =(-∞, +∞) is divided into an appropriate number of continuous intervals: -∞ <a0<a1<a2<…<a k-1 k <+∞ with n i Indicates that the sample value falls within the interval (a i-1 , a i ), the Pearson goodness-of-fit test formula is:

[0084]

[0085] Among them, n is the total sample size, p i The result of distributed photovoltaic power generation predicted by the fitting formula falls within (a i-1 , a i ) divided by n, x 2 is the chi-square value. The larger the value, the worse the goodness of fit. Conversely, the better the goodness of fit. If the chi-square distribution expression reaches the critical value, the test passes.

[0086] If the test passes, the power generation calculation formula of the fitting space attribute is obtained:

[0087] C pro =b0+b1x1+b2x2+…+b n x n +e

[0088] If the test fails, add the influential geographic spatial variables and test again. If it passes, the power generation calculation formula of the fitted spatial attributes is obtained:

[0089] C pro =b0+b1x1+b2x2+…+b n x n +b n x a +b​n x b +b n x c +e

[0090] Where: x a 、x b 、x c For the added influential geospatial variables.

[0091] In step (5), the formula of the green premium electricity cost analysis model is:

[0092] C ep =C invest +C operation +C buy -C pro

[0093] Where: C invest , C operation are investment and construction costs, operation and maintenance costs, and C buy is the cost of purchasing electricity from the main grid, C pro The benefits of low storage and high generation for energy storage batteries;

[0094]

[0095] Where: r0 is the discount rate, which is 0.06; y is the applicable planning period, which is 20 years for distributed photovoltaics and 10 years for energy storage batteries; They are the investment and construction costs of photovoltaic and energy storage batteries per unit capacity; are the actual grid-connected capacities of photovoltaic and energy storage batteries at node j in scenario k, respectively;

[0096] C operation

[0097] Where: λ is the conversion ratio of operation and maintenance cost, which is 0.1; is the power abandonment cost per unit capacity of distributed photovoltaics; is the theoretical value of the PV grid-connected capacity of node j in scenario k; The real-time electricity price per unit capacity for purchasing electricity from the main grid; are the charging and discharging power values ​​of energy storage battery node j in scenario k respectively;

[0098]

[0099] In the formula, is the main network purchase power of node j in scenario k;

[0100]

[0101] In the formula, They are respectively the loads before and after the energy storage battery of node j in scenario k is activated.

[0102] like Figure 2 As shown, based on the specific Beta distribution corresponding to each time period, the probability density function is discretized using multi-state theory, and the probability density function of each time period is divided into N states, each state having the same span.

[0103] like Figure 3 As shown in Figure 2, the relationship between the active power output of photovoltaics and the solar irradiance can be expressed as a piecewise function, reaching s rated At the critical value of irradiance, photovoltaic power generation has reached its maximum and will no longer increase with the increase of solar irradiance.

[0104] In summary, the present invention can effectively reduce the green cost premium of photovoltaic power generation in the process of optimizing site selection for distributed power sources, and can enable photovoltaic projects to operate in a low-carbon manner from construction, operation and demolition, and may even achieve a negative index for the green cost premium of power generation; the present invention utilizes photovoltaic power plants as fast reactive power sources in emergency situations, and takes this factor into consideration when optimizing site selection for distributed photovoltaics, which also has huge economic value, and can accurately identify factors that affect distributed photovoltaic power generation projects, solving important basic issues such as coordinating the scale of distributed energy projects and optimizing project layout.

Claims

1. A green premium evaluation method for distributed photovoltaic power generation cost based on GIS, Features: The method comprises the following steps in order: (1) Construct a distributed photovoltaic project dataset, which includes the construction data, operation data, maintenance data, and demolition data of the project; (2) Performing geographic information registration on the distributed photovoltaic project data set to obtain the project data set with the most effective geographic information registration; (3) The uncertainty of solar irradiance is calculated by a random theoretical method with Beta distribution. A descriptive analysis is performed on the engineering dataset with the most effective geographic information registration based on the random theoretical method with Beta distribution and MATLAB software. The geospatial variable dataset corresponding to the engineering dataset with the most effective geographic information registration under different geospatial variables and the power generation results corresponding to the geospatial variable dataset are output. (4) Constructing a power generation calculation model with spatial attributes, inputting the geographic spatial variable data set and power generation results into the power generation calculation model with spatial attributes, and then fitting it through the least squares method to obtain a power generation calculation model with fitted spatial attributes; (5) Construct a green premium electricity cost analysis model, substitute the power generation calculation model fitting the spatial attributes into the green premium electricity cost analysis model, and the green premium electricity cost analysis model outputs the distributed photovoltaic premium electricity cost premium; The step (2) specifically comprises the following steps: (2a) Input the distributed photovoltaic project dataset into the geographic information tool ArcGIS; (2b) The geographic information tool ArcGIS is used to perform geographic information registration of distributed photovoltaic projects, delete variables with duplicate locations, and calculate the quality attributes of neighborhood variables; (2c) The geographic information tool ArcGIS outputs the engineering dataset with the most effective geographic information registration. The engineering dataset with the most effective geographic information registration includes latitude and longitude data, meteorological data, global horizontal radiation, diffuse horizontal radiation, ambient temperature, wind speed, sunshine duration and light intensity registered with geospatial information; In step (3), the calculation of the uncertainty of solar irradiance by a random theoretical method with Beta distribution specifically includes the following steps: (3a) The probability density function of solar irradiance is: Where, s is the solar irradiance; s max is the upper limit of solar irradiance at a given time; α and β are shape parameters of Beta distribution; (3b) The calculation formulas of α and β are as follows: Among them, μ g is the average value of historical solar irradiance data in time period g, σ g is the standard deviation of the historical solar irradiance data in time period g; (3c) Based on the specific Beta distribution corresponding to each time period, the probability density function is discretized using the multi-state theory. The probability density function of each time period is divided into N states, and each state has the same span; Assume T-min and T-max They represent the upper and lower bounds of state T respectively. The probability of solar irradiance falling in state T is expressed as: (3d) Use piecewise function to express the relationship between the active power output of photovoltaic and solar irradiance: Among them, s rated is the rated solar irradiance of photovoltaic, p s-rated is the rated active output power of the photovoltaic system; In step (4), the formula of the power generation calculation model of the spatial attribute is as follows: C pro =b 0 +b 1 x 1 +b 2 x 2 +…+b n x n +e Among them, C pro is the predicted power generation of distributed photovoltaics, (x 1 ,x 2 …x n ) is the characteristic of the geographical space attribute that affects photovoltaic power generation. The geographical space attributes that affect photovoltaic power generation include meteorological data, ambient temperature, wind speed, sunshine duration and light intensity. The function fitted by the least squares method is subjected to Pearson analysis to test the goodness of fit: Put R 1 =(-∞, +∞) is divided into an appropriate number of continuous intervals: -∞ 0 1 2 <… k-1 k <+∞ with n i Indicates that the sample value falls within the interval (a i-1 , a i ), the Pearson goodness-of-fit test formula is:​​​​​ Among them, n is the total sample size, p i The result of distributed photovoltaic power generation predicted by the fitting formula falls within (a i-1 , a i ) divided by n, χ 2 is the chi-square value. The larger the value, the worse the goodness of fit. Conversely, the better the goodness of fit. If the chi-square distribution expression reaches the critical value, the test passes. If the test passes, the power generation calculation formula of the fitting space attribute is obtained: C pro =b 0 +b 1 x 1 +b 2 x 2 +…+b n x n +e If the test fails, add the influential geographic spatial variables and test again. If it passes, the power generation calculation formula of the fitted spatial attributes is obtained: C pro =b 0 +b 1 x 1 +b 2 x 2 +…+b n x n +b n x a +b n x b +b n x c +e Where: x a 、x b 、x c For the added influential geospatial variables; In step (5), the formula of the green premium electricity cost analysis model is: C ep =C invest +C operation +C buy -C pro Where: C invest , C operation are investment and construction costs, operation and maintenance costs, and C buy is the cost of purchasing electricity from the main grid, C pro The benefits of low storage and high generation for energy storage batteries; Where: r 0 is the discount rate, which is 0.06; y is the applicable planning period, which is 20 years for distributed photovoltaics and 10 years for energy storage batteries; They are the investment and construction costs of photovoltaic and energy storage batteries per unit capacity; are the actual grid-connected capacities of photovoltaic and energy storage batteries at node j in scenario k; C operation Where: λ is the conversion ratio of operation and maintenance cost, which is 0.1; is the power abandonment cost per unit capacity of distributed photovoltaics; is the theoretical value of the PV grid-connected capacity of node j in scenario k; The real-time electricity price per unit capacity for purchasing electricity from the main grid; are the charging and discharging power values ​​of energy storage battery node j in scenario k respectively; In the formula, is the main network purchase power of node j in scenario k; In the formula, They are respectively the loads before and after the energy storage battery of node j in scenario k is activated.

Citation Information

Patent Citations

  • DG-included power distribution network planning method based on Voronoi graph

    CN104268336A

  • Distributed photovoltaic and energy storage coordinated planning method and system based on second-order cone relaxation

    CN107846040A

  • Energy efficiency evaluation method and system for power distribution network containing distributed power supply

    CN111625770A