Automatic timing device, method, equipment and application for hot melt adhesive pressing into skylight air outlet
By designing the automatic timing device for pressing the hot melt adhesive on the sunroof air outlet, the automatic drop and pressing of the sandbags into the air outlet is achieved by using the cylinder and pneumatic control device, the safety hazards, processing waste and action waste in the existing technology are solved, and efficient and safe automated operations are achieved.
Patent Information
- Application Number
- CN202210328533.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-03-30
- Publication Date
- 2025-03-07
- Estimated Expiration
- 2042-03-30
AI Technical Summary
In the existing technology, in the attachment operation of the newly added air outlet parts of the Crown Land Loft skylight, there are problems of safety hazards, processing waste, abandonment of sunroof products and waste of action, especially fixed-point pressing, timing and strength are difficult to guarantee.
An automatic timing device for pressing the hot melt adhesive on the sunroof air outlet is designed. Through the cylinder and pneumatic control device, the automatic drop and pressing the air outlet of the sandbag are realized, and the accuracy of the pressing time is ensured through the timer.
This device not only improves the safety and efficiency of operations, reduces the risk and time waste of manpower operations, but also reduces the number of defective parts and maintenance costs, realizing fully automated operations.
Smart Images

Figure CN114708676B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to a fully automated hot melt adhesive pressing and pasting operation technology for automobile production lines, and in particular to an automatic timing device, method, equipment and application for hot melt adhesive pressing and pasting at a sunroof air outlet. Background Art
[0002] At present, the newly added air outlet parts of the Crown Land sunroof need to be attached to the sunroof, using hot melt adhesive and pressing with a force of 9KG for more than 20 seconds to meet the quality requirements. Currently, a 9KG sandbag is used, which is manually moved to the air outlet and then removed after more than 20 seconds.
[0003] Through the above analysis, the problems and defects of the prior art are as follows:
[0004] (1) Difficult operation: The operator needs to press with a force of 9 kg for more than 20 seconds to meet the quality requirements, which poses a safety and health hazard.
[0005] (2) Processing waste: The pressing position and time were not well controlled, resulting in 12 defective parts within 2 months.
[0006] (3) Skylight parts are discarded and processed poorly: 6 parts are discarded every month.
[0007] (4) Waste of motion: Manually moving sandbags is heavy and requires many locations (6 positions), which wastes work time.
[0008] The difficulty in solving the above problems and defects is that it is difficult to ensure fixed-point pressing, timing, and strength.
[0009] The significance of solving the above problems and defects is: solving the batch defect of air outlets of new models; solving the occupational diseases caused by painful operations. Summary of the invention
[0010] In order to overcome the problems existing in the related art, the embodiments disclosed in the present invention provide a device, method, equipment and application for automatically timing the hot melt adhesive injection into a skylight air outlet.
[0011] The technical solution is as follows: A method for automatically timing the hot melt adhesive injection at a skylight air outlet, comprising:
[0012] The first step is to install the air outlet to the designated position, command different buttons to start different groups of cylinders, and press the sandbags into the air outlet from top to bottom after reaching the designated position;
[0013] The second step is to trigger the switch when all the sandbags are pressed to the designated position. After the device starts timing, all the pressed sandbags return to their positions at the same time.
[0014] In one embodiment, the first step is preceded by:
[0015] Place the skylight ceiling on a specific jig and apply glue to the designated position of the ceiling.
[0016] In one embodiment, the first step specifically includes:
[0017] Step 1: Install the air outlet to the designated position, instruct the first switch (the first switch controls the descending state of the No. 2 cylinder and the No. 3 and No. 4 sandbags) to start a group of cylinders, and the sandbags are pressed into the air outlet from top to bottom after reaching the designated position;
[0018] Step 2: Glue the parts on the left side of the air outlet for assembly, command the second switch to start the second cylinder, and press the sandbag into the air outlet after it reaches the designated position from top to bottom;
[0019] Step 3: Glue the side parts of the right air outlet for assembly, command the third switch to start the third cylinder, and press the sandbag into the air outlet after it reaches the designated position from top to bottom.
[0020] In one embodiment, after the switch is triggered in the second step, a timer starts and 20 seconds later all the pressing sandbags return to their positions simultaneously.
[0021] Another object of the present invention is to provide an automatic timing device for pressing hot melt adhesive into a skylight air outlet, including a main body and an operation control system connected by an aluminum alloy tube, wherein the main body is assembled from a cylinder body and a pulley set; the operation control system is composed of a pneumatic control device, a cylinder motion control device, and a mechanism control device, which is used to enable three groups of sandbags to gradually complete the pressing operation according to the operating sequence.
[0022] In one embodiment, the cylinder body comprises: a first cylinder, a second cylinder and a third cylinder, wherein the first cylinder, the second cylinder and the third cylinder are respectively mounted on the upper end of the body;
[0023] The pneumatic control device includes: a first switch, a second switch, a third switch and a fourth switch, the first switch is connected to the first cylinder, the second switch is connected to the second cylinder, the third switch is connected to the third cylinder, and the fourth switch is respectively connected to the reset ends of the first cylinder, the second cylinder and the third cylinder.
[0024] In one embodiment, the cylinder motion control device includes a first sandbag, a second sandbag, a third sandbag, a fourth sandbag, a fifth sandbag, and a sixth sandbag placed horizontally;
[0025] The first sandbag and the second sandbag are connected to the first cylinder, the third sandbag and the fourth sandbag are connected to the second cylinder, and the fifth sandbag and the sixth sandbag are connected to the third cylinder.
[0026] Another object of the present invention is to provide a sunroof air outlet integrated device, which executes the sunroof air outlet hot melt adhesive pressing automatic timing method.
[0027] The method for automatically timing the hot melt adhesive injection at the skylight air outlet further comprises:
[0028] Step 1: After gluing, place the middle air outlet and press the first switch. At this time, the third sandbag and the fourth sandbag begin to descend under the action of the second cylinder, pressing the middle air outlet;
[0029] Step 2: After gluing, place the left and right air outlets, and press the second and third switches respectively. The first and second sandbags begin to drop under the action of the first cylinder, and the fifth and sixth sandbags begin to drop under the action of the third cylinder, pressing the air outlets on both sides;
[0030] Step 3: Press the fourth switch, and the 20-second countdown will begin. Then all the sandbags will be pulled up to their initial state by the first, second, and third cylinders at the same time, and the operation is completed.
[0031] Another object of the present invention is to provide an application of the automatic timing method for pressing hot melt adhesive into a sunroof air outlet on a motor vehicle production line.
[0032] Combining all the above technical solutions, the advantages and positive effects of the present invention are as follows:
[0033] The present invention saves costs: utilizing own resources, independent research and development, and independent transformation (reducing construction costs and maintenance costs).
[0034] The invention saves time: it saves the operator's waiting time for pressing the sandbag for 20 seconds.
[0035] The present invention improves safety: completely eliminates occupational diseases such as wrist pain caused by pressing the air outlet; and eliminates the harm to operators caused by sandbags sliding down.
[0036] Compared with the prior art, the advantages of the present invention further include:
[0037] The invention has low construction and maintenance costs; the third cylinder is controlled separately according to the operation, and the sandbag falls into the designated position naturally without human touch. It can be promoted in other engineering door types. It has high safety and does not use electrical facilities (380V voltage). It realizes automatic timing control and fully automated operation.
[0038] Compared with the prior art, the advantages of the present invention further include:
[0039] Low cost and time timing effect can be achieved through pure pneumatic control switches and speed regulating valves.
[0040] Lightweight and not using electricity is much safer.
[0041] Not using PLC reduces costs.
[0042] The horizontal expansion is high, and similar projects can be expanded horizontally.
[0043] Low maintenance cost and easy repair.
[0044] Automation improvements eliminated the lack of ergonomics in operations, and the number of defective items dropped from 35 in the peak period to 0 in December, ultimately achieving the challenge goal of 0.
[0045] It is to be understood that both the foregoing general description and the following detailed description are exemplary and explanatory only and are not restrictive of the present disclosure. BRIEF DESCRIPTION OF THE DRAWINGS
[0046] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the present disclosure and, together with the description, serve to explain the principles of the present disclosure.
[0047] Figure 1 It is a flow chart of an automatic timing method for pressing hot melt adhesive into a skylight air outlet provided by an embodiment of the present invention.
[0048] Figure 2 It is a schematic diagram of an automatic timing device for pressing hot melt adhesive into a skylight air outlet provided by an embodiment of the present invention.
[0049] Figure 3 This is a physical picture of the automatic timing device for pressing hot melt adhesive into the skylight air outlet provided by the present invention.
[0050] Figure 4 The present invention provides a principle diagram of installing an air outlet at a designated position, instructing a first switch to start a first cylinder body, and pressing a sandbag into the air outlet after the sandbag reaches the designated position from top to bottom.
[0051] Figure 5 The present invention provides a principle diagram of gluing the left side air outlet part position for assembly, instructing the second switch to start the second cylinder body, and pressing the sandbag into the air outlet after reaching the designated position from top to bottom.
[0052] Figure 6 The invention discloses a gas circuit principle diagram of an automatic timing device for pressing hot melt adhesive into a skylight air outlet.
[0053] Figure 7 This is a simulation experiment diagram of the automatic timing device for pressing hot melt adhesive into the skylight air outlet provided by the present invention.
[0054] In the figure: 1. Main body; 1-1. Cylinder; 1-2. Pulley block; 2. Operation control system; 2-1. Pneumatic control device; 2-2. Cylinder motion control device; 2-3. Mechanism control device. DETAILED DESCRIPTION
[0055] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific embodiments of the present invention are described in detail below in conjunction with the accompanying drawings. In the following description, many specific details are set forth to facilitate a full understanding of the present invention. However, the present invention can be implemented in many other ways different from those described herein, and those skilled in the art can make similar improvements without violating the connotation of the present invention, so the present invention is not limited by the specific implementation disclosed below.
[0056] The method for automatically timing the hot melt adhesive injection at the skylight air outlet provided by the embodiment of the present invention comprises:
[0057] Using pure pneumatic control, automatic timing and return to position are realized;
[0058] Eliminate operators' workload and reduce safety hazards.
[0059] Reduce operation time and eliminate waiting time for operation.
[0060] Specifically, Figure 1 As shown, the present invention provides a method for automatically timing the hot melt adhesive injection at the skylight air outlet, which specifically includes the following steps:
[0061] S101, the operator places the skylight ceiling on a specific fixture and applies glue to the designated position of the ceiling.
[0062] S102, installing the air outlet at the designated position, instructing the first switch to start a group of cylinders, and the sandbags are pressed into the air outlet after reaching the designated position from top to bottom.
[0063] S103, glue the left side air outlet parts for assembly, instruct the second switch and the second cylinder to start, and the sandbag is pressed into the air outlet after reaching the designated position from top to bottom.
[0064] S104, glue the right side air outlet parts for assembly, command the third switch and the third cylinder to start, and the sandbag is pressed into the air outlet after reaching the designated position from top to bottom.
[0065] S105, when all the sandbags are pressed to the designated position, the operator touches the switch, and the device starts timing. After 20 seconds, all the pressed sandbags return to their positions at the same time.
[0066] Figure 2 The invention provides an automatic timing device for pressing hot melt adhesive into a skylight air outlet, comprising:
[0067] The main body 1 is connected by ultra-light aluminum alloy pipes and is assembled by a cylinder 1-1 and a pulley block 1-2.
[0068] The main operation control system 2 is composed of a pneumatic control device 2-1, a cylinder motion control device 2-2, and a mechanism control device 2-3, and is used to enable three groups of sandbags to gradually complete the pressing operation according to the operation sequence.
[0069] like Figure 3 As shown, the model of the first cylinder 1-1-1 of the sunroof outlet hot melt adhesive pressing automatic timing device is: CD912N50-1000Z, the model of the second cylinder 1-1-2 is: C91ZN50-800Z, and the model of the third cylinder 1-1-3 is: MGPM32-1002. The model of the first switch 2-1-1 is: MOV-O3A, the model of the second switch 2-1-2 is: VM130, and the model of the third switch 2-1-3 and the fourth switch 2-1-4 is: VM131.
[0070] When in use, place the skylight ceiling on the fixture, and glue the designated position of the ceiling; install the air outlet to the designated position, instruct the first switch 2-1-1 to start the first cylinder 1-1-1, and the first sandbag 2-2-1 and the second sandbag 2-2-2 are pressed into the air outlet from top to bottom. The process is as follows: after the first switch 2-1-1 is pressed to open, the first cylinder 1-1-1 starts to move, the cylinder rod withdraws, and is lowered 3 times by the mechanism to the pressing points of the first sandbag 2-2-1 and the second sandbag 2-2-2.
[0071] Glue the left side parts of the air outlet for assembly, command the second switch 2-1-2 to start the second cylinder 1-1-2, and the third sandbag 2-2-3 and the fourth sandbag 2-2-4 are pressed into the air outlet after they reach the designated position from top to bottom. The process is as follows: command the second switch 2-1-2 to start the second cylinder 1-1-2, and the third sandbag 2-2-3 and the fourth sandbag 2-2-4 are pressed into the air outlet after they reach the designated position from top to bottom; after the second switch 2-1-2 is pressed to open, the second cylinder 1-1-2 starts to move, the cylinder rod withdraws, and the mechanism is lowered three times to the pressing points of the third sandbag 2-2-3 and the fourth sandbag 2-2-4.
[0072] Glue the side parts of the right air outlet for assembly, command the third switch 2-1-3 to start the third cylinder 1-1-3, and the fifth sandbag 2-2-5 and the sixth sandbag 2-2-6 are pressed into the air outlet after reaching the designated positions from top to bottom. The process is as follows: command the third switch 2-1-3 to start the third cylinder 1-1-3, and the fifth sandbag 2-2-5 and the sixth sandbag 2-2-6 are pressed into the air outlet after reaching the designated positions from top to bottom; after the third switch 2-1-3 is pressed to open, the third cylinder 1-1-3 starts to move, the cylinder rod withdraws, and the mechanism is lowered three times to the pressing points of the fifth sandbag 2-2-5 and the sixth sandbag 2-2-6.
[0073] When all the sandbags are pressed to the designated position, the operator triggers the mechanism control device 2-3, and the mechanism control device 2-3 starts timing. After 20 seconds, all the pressed sandbags return to their positions at the same time. After all the operations are completed, the operator confirms the position of the sandbags and presses the fourth switch 2-1-4 to start the 20-second delay mechanism. After 20 seconds, the first sandbag 2-2-1, the second sandbag 2-2-2, the third sandbag 2-2-3, the fourth sandbag 2-2-4, the fifth sandbag 2-2-5, and the sixth sandbag 2-2-6 are all automatically lifted and return to the origin to complete the action.
[0074] Figure 4 The present invention provides a principle diagram of installing an air outlet at a designated position, instructing a first switch to start a first cylinder body, and pressing a sandbag into the air outlet after the sandbag reaches the designated position from top to bottom.
[0075] Figure 5 The present invention provides a principle diagram of gluing the left side air outlet part position for assembly, instructing the second switch to start the second cylinder body, and pressing the sandbag into the air outlet after reaching the designated position from top to bottom.
[0076] like Figure 5As shown, the air circuit principle of the automatic timing device for pressing hot melt glue into the skylight air outlet is as follows: after gluing, place the middle air outlet and press the first switch 2-1-1. At this time, the third sandbag 2-2-3 and the fourth sandbag 2-2-4 begin to descend under the action of the second cylinder 1-1-2, pressing the middle air outlet; after gluing, place the left air outlet and the right air outlet, and press the second switch 2-1-2 and the third switch 2-1-3 respectively. The first sandbag 2-2-1 and the second sandbag 2-2-2 begin to descend under the action of the first cylinder 1-1-1, and the fifth sandbag 2-2-5 and the sixth sandbag 2-2-6 begin to descend under the action of the third cylinder 1-1-3, pressing the air outlets on both sides; press the fourth switch 2-1-4, and start timing for 20 seconds. Then all the sandbags are simultaneously pulled up to the initial state by the first cylinder 1-1-1, the second cylinder 1-1-2, and the third cylinder 1-1-3, and the operation is completed. The 1-1 lifting mechanism of the cylinder body is used to hang the sandbag above the pressing reference point, thereby ensuring the accuracy of the pressing reference point. Ensure the quality. A pneumatic control button is installed, and the sandbag can be pressed down by pressing the button, eliminating the manual extraction of the sandbag. Reduced labor intensity. A delay program of the air circuit mechanism is made. After the sandbag is pressed down, the air outlet is pressed for 20 seconds and then automatically lifted. Eliminate the operation waiting for the stopwatch timing and the operation delay. Through pure pneumatic control switches and speed regulating valves, low cost and time timing effects can be achieved. Lightweight and no electricity are used, which is safer. The control process does not use PLC and has low cost.
[0077] The technical solution of the present invention is further described below in conjunction with the working principle.
[0078] Figure 3 This is a physical picture of the automatic timing device for pressing hot melt adhesive into the skylight air outlet provided by the present invention.
[0079] The hardware involved in the present invention includes: 4 balancers 1-3Kg EW-3;
[0080] Green pneumatic switch 2 MOV-O3A;
[0081] Yellow pneumatic switch 6 VM130;
[0082] Pneumatic switch 4 VM131;
[0083] 7 2-position 5-way valves 4A120-06;
[0084] 1 red gas valve VHS30-02A-X1;
[0085] 1 red gas valve VHS30-02B-X1;
[0086] Barometer 2 AFR2000;
[0087] 1000 cylinders 5 pcs CD912N50-1000Z;
[0088] 800 cylinder 1 C91ZN50-800Z;
[0089] 100 cylinders 2 pcs MGPM32-1002.
[0090] like Figure 3 The process shown is: first switch, second cylinder, intermediate mechanism to third sandbag, fourth sandbag;
[0091] The second switch, the first cylinder, the left mechanism to the first sandbag and the second sandbag;
[0092] The third switch, the third cylinder, the left mechanism to the fifth sandbag and the sixth sandbag;
[0093] The fourth switch, the mechanism and the fourth cylinder return to the first cylinder, the second cylinder and the third cylinder for gas path recovery.
[0094] The operator places the skylight ceiling on a specific jig and glues the designated position of the ceiling. That is, the overall jig placement diagram is prepared for the working state (the original position of the mechanism).
[0095] Install the air outlet to the designated position, instruct the first switch to start a group of cylinders, and the sandbags are pressed into the air outlet schematic diagram after reaching the designated position from top to bottom.
[0096] The first switch is pressed to open, the second cylinder starts to move, the cylinder rod withdraws, and the mechanism is lowered 3 times to the sandbag pressing point.
[0097] Glue the parts on the left side of the air outlet for assembly, command the second switch and the second cylinder to start, and press the sandbag into the air outlet from top to bottom after reaching the designated position. The principle is as follows:
[0098] The second switch is pressed to start the first cylinder, and the first cylinder pushes out to start the first sandbag and the second sandbag to the pressing position;
[0099] The third switch is pressed to start the third cylinder, and the third cylinder pushes out to start the fifth sandbag and the sixth sandbag to the pressing position.
[0100] The present invention provides a principle that when all the sandbags are pressed to a specified position, an operator touches a switch, and a device starts timing for 20 seconds, and then all the pressed sandbags return to their positions simultaneously.
[0101] After all the operations are completed, the operator confirms the position of the sandbags, presses the fourth switch to start, and activates the 20-second delay mechanism. After 20 seconds, the first sandbag, the second sandbag, the third sandbag, the fourth sandbag, the fifth sandbag, and the sixth sandbag are all automatically lifted and return to the origin to complete the operation.
[0102] like Figure 6 The air path principle of the automatic timing device for pressing hot melt adhesive into the skylight air outlet provided by the present invention includes:
[0103] Step 1: After gluing, place the middle air outlet and press the first switch. At this time, the third sandbag and the fourth sandbag begin to descend under the action of the second cylinder, pressing the middle air outlet;
[0104] Step 2: After gluing, place the left and right air outlets, and press the second and third switches respectively. The first and second sandbags begin to drop under the action of the first cylinder, and the fifth and sixth sandbags begin to drop under the action of the third cylinder, pressing the air outlets on both sides;
[0105] Step 3: Press the fourth switch, and the 20-second countdown will begin. Then all the sandbags will be pulled up to their initial state by the first, second, and third cylinders at the same time, and the operation is completed.
[0106] The technical effects of the present invention are further described below in conjunction with simulation experiments.
[0107] Simulation Figure 7 As shown. The present invention uses a cylinder lifting mechanism to suspend the sandbag above the pressing reference point, thereby ensuring the accuracy of the pressing reference point. Ensure the quality. A pneumatic control button is installed, and the sandbag can be pressed down by pressing the button, eliminating the manual extraction of the sandbag. Reduce labor intensity. A delay program of the air circuit mechanism is made. After the sandbag is pressed down, the air outlet is pressed for 20 seconds and then automatically lifted. Eliminate the operation waiting for the stopwatch timing and the operation delay.
[0108] Those skilled in the art will readily appreciate other embodiments of the present disclosure after considering the specification and practicing the disclosure disclosed herein. This application is intended to cover any variations, uses or adaptations of the present disclosure, which follow the general principles of the present disclosure and include common knowledge or customary techniques in the art that are not disclosed in the present disclosure. The specification and examples are intended to be exemplary only, and the true scope and spirit of the present disclosure are indicated by the appended claims.
[0109] It should be understood that the present disclosure is not limited to the precise structures that have been described above and shown in the drawings, and that various modifications and changes may be made without departing from the scope thereof. The scope of the present disclosure should be limited by the appended claims.
Claims
1. A method for automatically timing the hot melt adhesive injection at a skylight outlet, characterized in that: The method for automatically timing the hot melt adhesive injection at the sunroof air outlet comprises: The first step is to install the air outlet to the designated position, command different buttons to start different groups of cylinders, and press the sandbags into the air outlet from top to bottom after reaching the designated position; The second step is to trigger the switch when all the sandbags are pressed to the designated position. After the switch is triggered, the device starts timing and all the pressed sandbags return to their positions at the same time after 20 seconds. Before the first step, the skylight ceiling needs to be placed on the jig, and the designated position of the ceiling needs to be glued; The first step specifically includes: Step 1: Install the middle air outlet to the designated position, instruct the first switch to start the first cylinder, and press the sandbag into the air outlet after reaching the designated position from top to bottom; Step 2: Glue the parts on the left side of the air outlet for assembly, command the second switch to start the second cylinder, and press the sandbag into the air outlet after it reaches the designated position from top to bottom; Step 3: Glue the right side of the air outlet for assembly, command the third switch to start the third cylinder, and press the sandbag into the air outlet after it reaches the designated position from top to bottom; The method for automatically timing the hot melt adhesive injection at the skylight air outlet further comprises: Step 1: After gluing, place the middle air outlet and start the first switch. At this time, the first sandbag and the second sandbag begin to descend under the action of the first cylinder and press the middle air outlet tightly; Step 2: After gluing, place the left and right air outlets, and start the second and third switches respectively. The third and fourth sandbags begin to drop under the action of the second cylinder, and the fifth and sixth sandbags begin to drop under the action of the third cylinder, pressing the air outlets on both sides; Step 3: Press the fourth switch, and the 20-second countdown will begin. Then all the sandbags will be pulled up to their initial state by the first, second, and third cylinders at the same time, and the operation is completed.
2. A device for automatically timing the hot melt adhesive injection at a skylight outlet for implementing the method for automatically timing the hot melt adhesive injection at a skylight outlet as claimed in claim 1, characterized in that: The automatic timing device for pressing hot melt adhesive into the skylight air outlet comprises a main body (1) and an operation control system (2) connected by an aluminum alloy tube, wherein the main body (1) is assembled from a cylinder body (1-1) and a pulley block (1-2); the operation control system (2) is composed of a pneumatic control device (2-1), a cylinder motion control device (2-2), and a mechanism control device (2-3), and is used to enable three groups of sandbags to gradually complete the pressing operation according to the operation sequence; The cylinder body (1-1) comprises: a first cylinder (1-1-1), a second cylinder (1-1-2) and a third cylinder (1-1-3), wherein the first cylinder (1-1-1), the second cylinder (1-1-2) and the third cylinder (1-1-3) are respectively mounted on the upper end of the main body (1); The pneumatic control device (2-1) comprises: a first switch (2-1-1), a second switch (2-1-2), a third switch (2-1-3) and a fourth switch (2-1-4), wherein the first switch (2-1-1) is connected to the first cylinder (1-1-1), the second switch (2-1-2) is connected to the second cylinder (1-1-2), the third switch (2-1-3) is connected to the third cylinder (1-1-3), and the fourth switch (2-1-4) is respectively connected to the reset ends of the first cylinder (1-1-1), the second cylinder (1-1-2) and the third cylinder (1-1-3); The cylinder motion control device (2-2) comprises a first sandbag (2-2-1), a second sandbag (2-2-2), a third sandbag (2-2-3), a fourth sandbag (2-2-4), a fifth sandbag (2-2-5), and a sixth sandbag (2-2-6) which are placed horizontally; The first sandbag (2-2-1) and the second sandbag (2-2-2) are connected to the first cylinder, the third sandbag (2-2-3) and the fourth sandbag (2-2-4) are connected to the second cylinder, and the fifth sandbag (2-2-5) and the sixth sandbag (2-2-6) are connected to the third cylinder (1-1-3).
3. A skylight air outlet integrated device, characterized in that: The sunroof air outlet integrated device implements the sunroof air outlet hot melt adhesive pressing automatic timing method as described in claim 1.
4. An application of the automatic timing method for pressing hot melt adhesive into a sunroof air outlet as claimed in claim 1 in a motor vehicle production line.
Citation Information
Patent Citations
Gas compressor for mounting radiating fins
CN201483783U
Skylight air outlet hot melt adhesive press-in automatic timing device
CN217355101U