Cable channel design method, device, computer equipment and storage medium

Through three-dimensional model division and automatic path selection, the complex and time-consuming problem of the design of the main cable channel of the nuclear power plant is solved, and automated cable channel design and bridge modeling are realized, which improves design efficiency and accuracy.

CN114757019BActive Publication Date: 2024-11-12CHINA NUCLEAR POWER TECH RES INST CO LTD +2
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202210309031.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-03-28
Publication Date
2024-11-12
Estimated Expiration
2042-03-28

AI Technical Summary

Technical Problem

The design of the main cable channel of a nuclear power plant is complex and time-consuming, and multiple safety level redundancy and voltage level isolation need to be considered, which makes human planning and design consume a lot of manpower and material resources and is difficult to automate.

Method used

Through three-dimensional model division, the planned positioning points are determined automatically, the starting point, end point and intermediate point of the cable channel are selected, and the optimal path is selected according to the preset conditions to realize automatic cable channel design and bridge modeling.

Benefits of technology

It greatly reduces the workload of nuclear power plant layout designers, quickly and effectively completes the planning and design of cable laying, and supports automatic cable laying, improving design efficiency and accuracy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114757019B_ABST
    Figure CN114757019B_ABST
Patent Text Reader

Abstract

The present application relates to a cable channel design method, device, computer equipment, storage medium and computer program product, the method comprising: determining a plannable positioning point according to basic information of the cable channel and a spatial positioning point in a three-dimensional model of the cable channel; determining the starting point, end point and middle point of the cable channel according to the plannable positioning point; determining a number of channel paths according to the starting point, end point and middle point of the cable channel; taking the channel path that meets the preset conditions among the number of channel paths as the final cable channel path. According to the cable laying rules, the cable laying planning and design is automatically completed under the premise of avoiding other items in the plant, the cable laying planning and design can be completed quickly and effectively, and the workload of nuclear power plant layout designers is greatly reduced. In addition, after completing the automatic planning and design of the cable laying, the cable tray modeling can be automatically completed according to the cable channel planning situation, and the subsequent automatic cable laying can be supported.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of channel design, and in particular to a cable channel design method, device, computer equipment, storage medium and computer program product. Background Art

[0002] The main cable channel of a nuclear power plant refers to the cable channel for power, measurement and control, and communication from the generator to the main distribution cabinet, and then from the main distribution cabinet to the main power-consuming equipment in the reactor building, auxiliary building, electrical building, and connection building. The optimization of the layout design of the main cable channel directly affects the reliability of the power supply of the nuclear power plant power system, and is also related to the economy of cable laying and the complexity of the construction process. Compared with conventional cable channels, the planning and design of the main cable channel of the primary circuit of a nuclear power plant needs to comprehensively consider the mutual independence of the power supply circuits of the safety-level redundant series equipment, the mutual independence of the power supply circuits of safety-level equipment and non-safety-level equipment, and the physical isolation of the power supply circuits of cables of different voltage levels, so as to ensure the execution of relevant safety-related functions such as reactivity control, residual heat removal, and radioactive material containment, so that the layout design of the main cable channel meets the requirements of the single fault criterion.

[0003] The main cable channel of a nuclear power plant is designed to be tens of kilometers long, and the planning and design rules are complex. In addition, there are a large number of equipment and process pipelines in the plant, which results in a lot of spatial interference. After the planning is completed, the three-dimensional modeling of the cable tray and support brackets must be completed. Therefore, the planning and design of the main cable channel of a nuclear power plant through artificial planning will consume a lot of manpower and material resources. Summary of the invention

[0004] Based on this, it is necessary to provide a method, device, computer equipment, computer-readable storage medium and computer program product that can automatically and efficiently design a cable channel in response to the above technical problems.

[0005] In a first aspect, the present application provides a cable channel design method. The method comprises:

[0006] According to the basic information of the cable channel and the spatial positioning points in the three-dimensional model of the cable channel, the plannable positioning points are determined, wherein the spatial positioning points are determined by spatially dividing the three-dimensional model of the cable channel based on the unit interval in the horizontal axis, the longitudinal axis and the vertical axis of the three-dimensional model. The plannable positioning points are used to indicate the coordinate positioning points in the three-dimensional model of the cable channel where the cables are allowed to be laid, and the basic information is used to indicate the supporting facilities structure and design requirements of the cable channel;

[0007] Determine the starting point, end point and middle point of the cable channel based on the plannable positioning points;

[0008] Determine several channel paths according to the starting point, end point and middle point of the cable channel;

[0009] A channel path that meets preset conditions among the plurality of channel paths is taken as a final cable channel path.

[0010] In one embodiment, determining the plannable positioning points according to the basic information of the cable channel and the spatial positioning points in the three-dimensional model of the cable channel includes:

[0011] Obtain all spatial positioning points in the three-dimensional model of the cable channel;

[0012] The spatial positioning point where the supporting facility structure is located is taken as the first spatial positioning point, and the spatial positioning point that does not meet the design requirements among all the spatial positioning points is taken as the second spatial positioning point;

[0013] All the spatial positioning points except the first spatial positioning point and the second spatial positioning point are used as plannable positioning points.

[0014] In one embodiment, determining the starting point, the end point, and the middle point of the cable channel according to the plannable positioning point includes:

[0015] Obtain the plant entrance coordinates, plant exit coordinates and electrical load wiring position coordinates in the cable channel;

[0016] The plannable positioning point closest to the factory building entrance coordinates among the plannable positioning points is used as the starting point of the cable channel, and the plannable positioning point closest to the factory building exit coordinates among the plannable positioning points is used as the end point of the cable channel;

[0017] The plannable positioning point that is closest to the electrical load wiring position coordinates among the plannable positioning points is used as the middle point of the cable channel.

[0018] In one embodiment, the number of the intermediate points is at least two; accordingly, a plurality of channel paths are determined according to the starting point, the end point and the intermediate point of the cable channel, including:

[0019] According to the distance between the middle point and the starting point, the middle points are sorted to obtain a sequence list;

[0020] According to a preset algorithm, a first path between the first intermediate point in the sequence list and the starting point, a second path between every two adjacent intermediate points in the sequence list, and a third path between the last intermediate point in the sequence list and the end point are determined;

[0021] According to the first path, the second path and the third path, a plurality of channel paths from the starting point to the end point are determined.

[0022] In one embodiment, the coordinates of the spatial positioning point are composed of a first parameter, a second parameter and a third parameter, the difference between the first parameter corresponding to the middle point and the first parameter corresponding to the starting point is taken as the first difference, the difference between the second parameter corresponding to the middle point and the second parameter corresponding to the starting point is taken as the second difference, and the difference between the third parameter corresponding to the middle point and the third parameter corresponding to the starting point is taken as the third difference; accordingly, the middle points are sorted according to the distance between the middle point and the starting point to obtain a sequence list, including:

[0023] According to the first difference value corresponding to each intermediate point, all the intermediate points are sorted for the first time to obtain an initial sequence list;

[0024] If there are intermediate points with the same first difference in the first sorting process, the intermediate points with the same first difference are sorted for the second time according to the corresponding second difference to obtain an updated initial sequence table;

[0025] If there are intermediate points with the same second difference value in the second sorting process, the intermediate points with the same second difference value are sorted for the third time according to the corresponding third difference value to obtain the final sequence table.

[0026] In one embodiment, the preset conditions include the channel path length and the number of channel path bends; accordingly, a channel path among the plurality of channel paths that meets the preset conditions is used as the final cable channel path, including:

[0027] Calculate the length of each of the plurality of channel paths, and take the channel path with the shortest length as the first path;

[0028] The number of bends in each path in the first path is calculated, and the first path with the smallest number of bends is used as the final cable channel path.

[0029] In a second aspect, the present application also provides a cable channel design device. The device comprises:

[0030] A first determination module is used to determine the plannable positioning points according to the basic information of the cable channel and the spatial positioning points in the three-dimensional model of the cable channel, wherein the spatial positioning points are determined by spatially dividing the three-dimensional model of the cable channel based on unit intervals in the horizontal axis, the longitudinal axis and the vertical axis of the three-dimensional model, the plannable positioning points are used to indicate the coordinate positioning points in the three-dimensional model of the cable channel where the cables are allowed to be laid, and the basic information is used to indicate the supporting facilities structure and design requirements of the cable channel;

[0031] The second determination module is used to determine the starting point, the end point and the middle point of the cable channel according to the plannable positioning points;

[0032] A third determination module is used to determine a number of channel paths according to the starting point, end point and middle point of the cable channel;

[0033] The fourth determination module is used to use a channel path that meets preset conditions among the multiple channel paths as the final cable channel path.

[0034] In a third aspect, the present application further provides a computer device. The computer device includes a memory and a processor, the memory stores a computer program, and the processor implements the following steps when executing the computer program:

[0035] According to the basic information of the cable channel and the spatial positioning points in the three-dimensional model of the cable channel, the plannable positioning points are determined, wherein the spatial positioning points are determined by spatially dividing the three-dimensional model of the cable channel based on the unit interval in the horizontal axis, the longitudinal axis and the vertical axis of the three-dimensional model. The plannable positioning points are used to indicate the coordinate positioning points in the three-dimensional model of the cable channel where the cables are allowed to be laid, and the basic information is used to indicate the supporting facilities structure and design requirements of the cable channel;

[0036] Determine the starting point, end point and middle point of the cable channel based on the plannable positioning points;

[0037] Determine several channel paths according to the starting point, end point and middle point of the cable channel;

[0038] A channel path that meets preset conditions among the plurality of channel paths is taken as a final cable channel path.

[0039] In a fourth aspect, the present application further provides a computer-readable storage medium. The computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the following steps are implemented:

[0040] According to the basic information of the cable channel and the spatial positioning points in the three-dimensional model of the cable channel, the plannable positioning points are determined, wherein the spatial positioning points are determined by spatially dividing the three-dimensional model of the cable channel based on the unit interval in the horizontal axis, the longitudinal axis and the vertical axis of the three-dimensional model. The plannable positioning points are used to indicate the coordinate positioning points in the three-dimensional model of the cable channel where the cables are allowed to be laid, and the basic information is used to indicate the supporting facilities structure and design requirements of the cable channel;

[0041] Determine the starting point, end point and middle point of the cable channel based on the plannable positioning points;

[0042] Determine several channel paths according to the starting point, end point and middle point of the cable channel;

[0043] A channel path that meets preset conditions among the plurality of channel paths is taken as a final cable channel path.

[0044] In a fifth aspect, the present application further provides a computer program product. The computer program product includes a computer program, and when the computer program is executed by a processor, the following steps are implemented:

[0045] According to the basic information of the cable channel and the spatial positioning points in the three-dimensional model of the cable channel, the plannable positioning points are determined, wherein the spatial positioning points are determined by spatially dividing the three-dimensional model of the cable channel based on the unit interval in the horizontal axis, the longitudinal axis and the vertical axis of the three-dimensional model. The plannable positioning points are used to indicate the coordinate positioning points in the three-dimensional model of the cable channel where the cables are allowed to be laid, and the basic information is used to indicate the supporting facilities structure and design requirements of the cable channel;

[0046] Determine the starting point, end point and middle point of the cable channel based on the plannable positioning points;

[0047] Determine several channel paths according to the starting point, end point and middle point of the cable channel;

[0048] A channel path that meets preset conditions among the plurality of channel paths is taken as a final cable channel path.

[0049] The cable channel design method, apparatus, computer equipment, storage medium and computer program product described above determine plannable positioning points based on basic information of the cable channel and spatial positioning points in a three-dimensional model of the cable channel, wherein the spatial positioning points are determined by spatially dividing the three-dimensional model of the cable channel based on unit intervals in the horizontal, longitudinal and vertical directions of the three-dimensional model, and the plannable positioning points are used to indicate coordinate positioning points in the three-dimensional model of the cable channel where cables are allowed to be laid, and the basic information is used to indicate the supporting facility structure and design requirements of the cable channel; based on the plannable positioning points, the starting point, end point and middle point of the cable channel are determined; based on the starting point, end point and middle point of the cable channel, several channel paths are determined; and the channel path that meets preset conditions among the several channel paths is used as the final cable channel path. Through the three-dimensional model of the main cable channel of the nuclear power plant, according to the cable laying rules, and under the premise of avoiding other items in the plant, the cable laying planning and design can be automatically completed. The cable laying planning and design can be completed quickly and effectively, and the workload of nuclear power plant layout designers can be greatly reduced. In addition, after completing the automatic planning and design of cable laying, the cable tray modeling can be automatically completed according to the cable channel planning situation, and the subsequent automatic cable laying can be supported. BRIEF DESCRIPTION OF THE DRAWINGS

[0050] Figure 1 A diagram showing an application environment of a cable channel design method in one embodiment;

[0051] Figure 2 A schematic diagram of a flow chart of a cable channel design method in one embodiment;

[0052] Figure 3 is a schematic diagram of a spatial positioning point in a three-dimensional model in one embodiment;

[0053] Figure 4 A schematic diagram of a flow chart of a cable channel design method in another embodiment;

[0054] Figure 5 A schematic diagram of determining a starting point, an end point, and a middle point of a cable channel in one embodiment;

[0055] Figure 6 is a schematic diagram of a final channel path in one embodiment;

[0056] Figure 7 It is a structural block diagram of a cable channel design device in one embodiment;

[0057] Figure 8 FIG. 4 is a diagram showing the internal structure of a computer device in one embodiment. DETAILED DESCRIPTION

[0058] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.

[0059] The cable channel design method provided in the embodiment of the present application can be to collect the information of the cable channel in real time for modeling, thereby designing the cable channel, or it can be to obtain information and data related to the cable channel to be designed in advance, and design the planning of the cable channel accordingly. For ease of understanding, the present application takes the example of obtaining data in advance and then planning and designing the cable channel. The embodiment of the present application can be applied to Figure 1 In the application environment shown. The terminal 102 communicates with the server 104 through the network. The data storage system can store the data that the server 104 needs to process. The data storage system can be integrated on the server 104, or it can be placed on the cloud or other network servers. Among them, the terminal 102 can be, but is not limited to, various personal computers, laptops, smart phones, tablet computers, Internet of Things devices and portable wearable devices. The Internet of Things devices can be smart speakers, smart TVs, smart air conditioners, smart car-mounted devices, etc. Portable wearable devices can be smart watches, smart bracelets, head-mounted devices, etc. The server 104 can be implemented with an independent server or a server cluster consisting of multiple servers.

[0060] In one embodiment, Figure 2 As shown, a cable channel design method is provided, which is applied to Figure 1 The server in the example is used to illustrate the following steps:

[0061] Step 202, determining plannable positioning points based on basic information of the cable channel and spatial positioning points in the three-dimensional model of the cable channel, wherein the spatial positioning points are determined by spatially dividing the three-dimensional model of the cable channel based on unit intervals in the horizontal axis, the longitudinal axis and the vertical axis of the three-dimensional model, the plannable positioning points are used to indicate coordinate positioning points in the three-dimensional model of the cable channel where cables are allowed to be laid, and the basic information is used to indicate the supporting facility structure and design requirements of the cable channel;

[0062] The three-dimensional model of the cable channel is obtained by testing the cable channel plant environment in advance, including the environment of the cable channel and the surrounding equipment structure. In order to quickly locate the position of the main cable channel, the space of the plant will be divided and the coordinates will be located, such as Figure 3 As shown, the space is divided along the directions of the three axes X, Y, and Z of the space coordinate system where the three-dimensional model of the cable channel is located, and a number of space positioning points are obtained.

[0063] It is understandable that compared with conventional cable channels, the planning and design of the main cable channel of the primary circuit of a nuclear power plant needs to comprehensively consider the mutual independence of the power supply circuits of the safety-level redundant series equipment, the mutual independence of the power supply circuits of safety-level equipment and non-safety-level equipment, the physical isolation of power supply circuits of cables of different voltage levels, etc., to ensure the execution of relevant safety-related functions such as reactivity control, waste heat removal and radioactive material containment, so that the layout design of the main cable channel meets the requirements of the single fault criterion. Therefore, not all spatial positioning points can be used to lay cable channels, and when laying multiple cables, they will affect each other.

[0064] Specifically, according to the design requirements of the cable channel and the spatial positioning points corresponding to the locations of other facilities in the factory where the existing cable channel is located, all spatial positioning points are screened to determine the plannable positioning points. For example, clearly create the voltage level, safety series, and bridge type information of the planned cable channel; mark the spatial positioning points occupied by equipment, structures, pipelines and other items in the space as unavailable; according to the basic principles of cable channel design, mark the spatial positioning points that do not meet the design principles as unavailable, for example: the spatial positioning points in the dangerous area are all set to unavailable; when planning the A column cable bridge, the spatial positioning points within the minimum separation spacing of the B column bridge are all set to unavailable; etc. After screening, the remaining spatial positioning points are marked as available plannable positioning points.

[0065] Step 204, determining the starting point, end point and middle point of the cable channel according to the plannable positioning points;

[0066] The middle point of the cable channel refers to the point corresponding to the area that the cable channel to be planned must pass through when laying. These points are usually spatial positioning points close to the wiring location of the power load, or areas where the power load is more concentrated.

[0067] Step 206, determining a plurality of channel paths according to the starting point, the end point and the middle point of the cable channel;

[0068] It is understandable that in the three-dimensional model, all spatial positioning points are divided into available points and unavailable points, where available points are plannable positioning points, including starting points, middle points and end points. The path from the starting point to the end point is determined by the starting point, middle point and end point of the cable channel.

[0069] Specifically, for the intermediate points to be passed, the points are arranged according to the difference between the X coordinates of the points and the starting point. When the X coordinate differences are the same, they are arranged according to the Y coordinate difference; when the Y coordinate differences are also the same, they are arranged according to the Z coordinate difference. The intermediate points to be passed are marked in order as point 1, point 2, etc. to be passed; the paths passing through all the intermediate points are traversed through the preset algorithm, and the paths that meet the requirements are selected as the final paths. For example,

[0070] All paths from the starting point to the middle point 1 are determined by a preset algorithm. Considering the actual construction situation of the cable channel, these paths can only be along the X, Y, and Z directions. Paths passing through unusable points are discarded, and paths passing through only available points are retained;

[0071] All paths from midpoint 1 to midpoint 2 are determined by a preset algorithm. Considering the actual construction situation of the cable channel, these paths can only be along the X, Y, and Z directions. Paths passing through unavailable points are discarded, and paths passing through available points only are retained.

[0072] ...(count until the last intermediate point to be passed);

[0073] All paths from the last intermediate point to the end point are determined by a preset algorithm. Considering the actual construction situation of the cable channel, these paths can only be along the X, Y, and Z directions, and the paths passing through unavailable points are discarded, and the paths passing through available points only are retained;

[0074] Then, the paths between each two adjacent points are connected to form a channel path from the starting point to the end point.

[0075] The preset algorithm here can use depth-first search. Let x be the currently visited vertex. After marking x as visited, select an undetected edge (x, y) from x. If it is found that vertex y has been visited, then reselect another undetected edge from x. Otherwise, follow the edge (x, y) to reach y that has not been visited, visit y and mark it as visited. Then start searching from y until all paths from y are searched, that is, after all vertices reachable from y are visited, backtrack to vertex x and select another undetected edge from x. The above process continues until all edges from x have been detected. At this point, if x is not the source point, backtrack to the vertex that was visited before x; otherwise, all vertices in the graph that have paths connected to the source point (that is, all vertices reachable from the source point) have been visited.

[0076] Step 208: taking a channel path that meets a preset condition among the plurality of channel paths as a final cable channel path.

[0077] The cable channel can be selected in the following ways: select by the shortest channel length; select by the least number of channel bends; consider both the channel length and the number of bends. If this method is used, several channels with the shortest length are first selected, and then the channel with the least number of bends is selected from these channels. After that, all the paths selected in the above steps are spliced ​​to form a complete cable channel.

[0078] It is also possible to arrange and combine the paths between each two adjacent points to obtain several channel paths, and then directly select the final output result of the channel path committee with composite conditions from all the paths through the above selection method.

[0079] The method provided in the above embodiment determines the plannable positioning points according to the basic information of the cable channel and the spatial positioning points in the three-dimensional model of the cable channel, wherein the spatial positioning points are determined by spatially dividing the three-dimensional model of the cable channel based on the unit interval in the three directions of the horizontal axis, the longitudinal axis and the vertical axis of the three-dimensional model, and the plannable positioning points are used to indicate the coordinate positioning points in the three-dimensional model of the cable channel where the cables are allowed to be laid, and the basic information is used to indicate the supporting facilities structure and design requirements of the cable channel; according to the plannable positioning points, the starting point, the end point and the middle point of the cable channel are determined; according to the starting point, the end point and the middle point of the cable channel, several channel paths are determined; and the channel path that meets the preset conditions in the several channel paths is used as the final cable channel path. Through the three-dimensional model of the main cable channel of the nuclear power plant, according to the cable laying rules, the cable laying planning and design are automatically completed under the premise of avoiding other items in the plant, the cable laying planning and design can be completed quickly and effectively, and the workload of the nuclear power plant layout design personnel is greatly reduced. In addition, after completing the automatic planning and design of cable laying, the cable tray modeling can be automatically completed according to the cable channel planning situation, and the subsequent automatic cable laying can be supported.

[0080] In one embodiment, see Figure 4 , according to the basic information of the cable channel and the spatial positioning points in the three-dimensional model of the cable channel, determine the plannable positioning points, including:

[0081] Step 402, obtaining all spatial positioning points in the three-dimensional model of the cable channel;

[0082] Step 404, taking the spatial positioning point where the supporting facility structure is located as the first spatial positioning point, and taking the spatial positioning point that does not meet the design requirements among all the spatial positioning points as the second spatial positioning point;

[0083] Step 406: All the spatial positioning points except the first spatial positioning point and the second spatial positioning point are taken as plannable positioning points.

[0084] The nuclear power plant section is related to nuclear safety. Mechanical and process equipment involved in nuclear safety-related functions such as reactivity control, residual heat removal, and radioactive material containment must have reliable power supply. The design of the nuclear power plant follows the single failure criterion, and the path of the main cable channel needs to ensure the relative independence of the power supply of two mutually redundant series of safety-level mechanical equipment. At the same time, the space is limited and small, and there are many professional systems and equipment. In order to ensure the rationality of the layout of the main cable channel of the primary circuit of the nuclear power plant and the reliability of power supply, the following principles need to be strictly followed during the design process: isolation principle, physical isolation and other criteria.

[0085] Among them, the isolation principle: the paths of the A and B cable channels should belong to different fire partitions, different rooms, different corridors, etc. In the design of the main cable channel network, the isolation principle between the main cable A and B columns should be strictly followed. Physical isolation: separate the two electrical connections from the entity, so that any expected disaster cannot cause the two electrical connections to fail at the same time. All of the above principles can be converted into specific data after manual determination, stored in the server, and directly called when screening all spatial positioning points.

[0086] Specifically, all the spatial positioning points occupied by equipment, structures, pipelines and other items are marked as unavailable. According to the basic principles of the above design, the spatial positioning points that do not meet the design principles are marked as unavailable. For example, the spatial positioning points in the dangerous area are all set as unavailable; when planning the cable tray in column A, the spatial positioning points within the minimum separation distance of the cable tray in column B are all set as unavailable; after screening, the remaining spatial positioning points are marked as plannable positioning points.

[0087] In the method provided in the above embodiment, all spatial positioning points in the three-dimensional model of the cable channel are obtained; the spatial positioning point where the supporting facility structure is located is used as the first spatial positioning point, and the spatial positioning point that does not meet the design requirements among all spatial positioning points is used as the second spatial positioning point; and the spatial positioning points other than the first spatial positioning point and the second spatial positioning point among all spatial positioning points are used as plannable positioning points. All spatial positioning points are screened according to the pre-set single failure criterion requirements, so that the automatically planned cable channel path can ensure the relative independence of the power supply of two mutually redundant series of safety-level mechanical equipment.

[0088] In one embodiment, determining the starting point, the end point, and the middle point of the cable channel according to the plannable positioning point includes:

[0089] Obtain the plant entrance coordinates, plant exit coordinates and electrical load wiring position coordinates in the cable channel;

[0090] The plannable positioning point closest to the factory building entrance coordinates among the plannable positioning points is used as the starting point of the cable channel, and the plannable positioning point closest to the factory building exit coordinates among the plannable positioning points is used as the end point of the cable channel;

[0091] The plannable positioning point that is closest to the electrical load wiring position coordinates among the plannable positioning points is used as the middle point of the cable channel.

[0092] See also Figure 5 , use the spatial positioning point 1 and spatial positioning point 2 close to the cable entry and exit holes of the factory building as the starting and end points of the main channel, and use the spatial positioning point 3 and spatial positioning point 4 close to the power load wiring position as the spatial positioning points that the cable main channel must pass through.

[0093] In one embodiment, the number of the intermediate points is at least two; accordingly, a plurality of channel paths are determined according to the starting point, the end point and the intermediate point of the cable channel, including:

[0094] According to the distance between the middle point and the starting point, the middle points are sorted to obtain a sequence list;

[0095] According to a preset algorithm, a first path between the first intermediate point in the sequence list and the starting point, a second path between every two adjacent intermediate points in the sequence list, and a third path between the last intermediate point in the sequence list and the end point are determined;

[0096] According to the first path, the second path and the third path, a plurality of channel paths from the starting point to the end point are determined.

[0097] It should be noted that when determining the channel path through the starting point, the middle point and the end point, there may be more than one path between any two points in the sequence list. Therefore, the path of the composite condition between each two adjacent points can be determined first, and then expanded from the local to the whole. Alternatively, the path between each two adjacent points can be combined into several channel paths, and then the channel path of the composite condition can be selected from them.

[0098] The preset algorithms include but are not limited to the following algorithms: depth or breadth first search algorithm, Freud algorithm, Dijkstra algorithm, Bellman-Ford algorithm. Taking the depth limited search algorithm as an example, when there are 3 intermediate points, between the starting point and the intermediate point 1, the intermediate point 1 and the intermediate point 2, the intermediate point 2 and the intermediate point 3, and the intermediate point 3 and the end point, the depth limited search algorithm is used to traverse all the paths, and the paths passing through the unusable points are excluded. The remaining paths are the available paths between each two adjacent points, and then according to the relationship between the start and the end of each path, they are combined to obtain the channel path from the starting point to the end point.

[0099] In the method provided in the above embodiment, the intermediate points are sorted according to the distance between the intermediate points and the starting point to obtain a sequence list; according to a preset algorithm, the first path between the first intermediate point in the sequence list and the starting point, the second path between each two adjacent intermediate points in the sequence list, and the third path between the last intermediate point in the sequence list and the end point are determined; according to the first path, the second path and the third path, several channel paths from the starting point to the end point are determined. Through the three-dimensional model of the main cable channel of the nuclear power plant, according to the cable laying rules, and under the premise of avoiding other items in the plant, the cable laying planning and design are automatically completed, which can quickly and effectively complete the cable laying planning and design, and greatly reduce the workload of nuclear power plant layout designers. In addition, after completing the automatic planning and design of cable laying, the cable tray modeling can be automatically completed according to the cable channel planning situation, and the subsequent automatic cable laying can be supported.

[0100] In one embodiment, the coordinates of the spatial positioning point are composed of a first parameter, a second parameter and a third parameter, the difference between the first parameter corresponding to the middle point and the first parameter corresponding to the starting point is taken as the first difference, the difference between the second parameter corresponding to the middle point and the second parameter corresponding to the starting point is taken as the second difference, and the difference between the third parameter corresponding to the middle point and the third parameter corresponding to the starting point is taken as the third difference; accordingly, the middle points are sorted according to the distance between the middle point and the starting point to obtain a sequence list, including:

[0101] According to the first difference value corresponding to each intermediate point, all the intermediate points are sorted for the first time to obtain an initial sequence list;

[0102] If there are intermediate points with the same first difference in the first sorting process, the intermediate points with the same first difference are sorted for the second time according to the corresponding second difference to obtain an updated initial sequence table;

[0103] If there are intermediate points with the same second difference value in the second sorting process, the intermediate points with the same second difference value are sorted for the third time according to the corresponding third difference value to obtain a final sequence table.

[0104] It should be noted that, combined with the actual construction situation of the cable channel, the channel path can only be along the X, Y, and Z directions of the three-dimensional model coordinate system. In addition, when laying cables, it is definitely better to lay them as close to a straight line as possible. Therefore, for the intermediate points that the cable channel must pass through, the path is planned according to the distance from the starting point. Among them, the distance from the intermediate point to the starting point can be directly calculated by coordinates, or it can be compared in three directions of the coordinate system in turn. For example, the coordinates of the starting point are (0,5,3), the coordinates of the end point are (10,5,3), and the coordinates of the two intermediate points are (2,1,2) and (5,1,3), then (2,1,2) is the intermediate point 1, and (5,1,3) is the intermediate point 2.

[0105] In one embodiment, the preset conditions include the channel path length and the number of channel path bends; accordingly, a channel path among the plurality of channel paths that meets the preset conditions is used as the final cable channel path, including:

[0106] Calculate the length of each of the plurality of channel paths, and take the channel path with the shortest length as the first path;

[0107] The number of bends in each path in the first path is calculated, and the first path with the smallest number of bends is used as the final cable channel path.

[0108] Among them, bending refers to the bending of the cable. It is understandable that when laying cables, the principle of laying them in a straight line as much as possible must be followed, and the shorter the cable length, the more cost-saving it is. Therefore, the method provided in the above embodiment selects the channel path according to the channel path length and the number of bends, which can save costs and reduce the difficulty of laying in actual projects. Figure 6 , which is a schematic diagram of a path plan.

[0109] It should be understood that, although the steps in the flowcharts involved in the above embodiments are displayed in sequence according to the indication of the arrows, these steps are not necessarily executed in sequence according to the order indicated by the arrows. Unless there is a clear explanation in this article, the execution of these steps is not strictly limited in order, and these steps can be executed in other orders. Moreover, at least a part of the steps in the flowcharts involved in the above embodiments may include multiple steps or multiple stages, and these steps or stages are not necessarily executed at the same time, but can be executed at different times, and the execution order of these steps or stages is not necessarily carried out in sequence, but can be executed in turn or alternately with other steps or at least a part of the steps or stages in other steps.

[0110] Based on the same inventive concept, the embodiment of the present application also provides a cable channel design device for implementing the cable channel design method involved above. The implementation scheme for solving the problem provided by the device is similar to the implementation scheme recorded in the above method, so the specific limitations in one or more cable channel design device embodiments provided below can refer to the limitations of the cable channel design method above, and will not be repeated here.

[0111] In one embodiment, Figure 7 As shown, a cable channel design device is provided, including: a first determination module 701, a second determination module 702, a third determination module 703 and a fourth determination module 704, wherein:

[0112] The first determination module 701 is used to determine the plannable positioning points according to the basic information of the cable channel and the spatial positioning points in the three-dimensional model of the cable channel, wherein the spatial positioning points are determined by spatially dividing the three-dimensional model of the cable channel based on the unit interval in the horizontal axis, the longitudinal axis and the vertical axis of the three-dimensional model, the plannable positioning points are used to indicate the coordinate positioning points in the three-dimensional model of the cable channel where the cables are allowed to be laid, and the basic information is used to indicate the supporting facilities structure and design requirements of the cable channel;

[0113] The second determination module 702 is used to determine the starting point, the end point and the middle point of the cable channel according to the plannable positioning points;

[0114] The third determination module 703 is used to determine a plurality of channel paths according to the starting point, the end point and the middle point of the cable channel;

[0115] The fourth determining module 704 is used to use a channel path that meets a preset condition among the plurality of channel paths as a final cable channel path.

[0116] In one embodiment, the first determining module 701 is further configured to:

[0117] Obtain all spatial positioning points in the three-dimensional model of the cable channel;

[0118] The spatial positioning point where the supporting facility structure is located is taken as the first spatial positioning point, and the spatial positioning point that does not meet the design requirements among all the spatial positioning points is taken as the second spatial positioning point;

[0119] All the spatial positioning points except the first spatial positioning point and the second spatial positioning point are used as plannable positioning points.

[0120] In one embodiment, the second determining module 702 is further configured to:

[0121] Obtain the plant entrance coordinates, plant exit coordinates and electrical load wiring position coordinates in the cable channel;

[0122] The plannable positioning point closest to the factory building entrance coordinates among the plannable positioning points is used as the starting point of the cable channel, and the plannable positioning point closest to the factory building exit coordinates among the plannable positioning points is used as the end point of the cable channel;

[0123] The plannable positioning point that is closest to the electrical load wiring position coordinates among the plannable positioning points is used as the middle point of the cable channel.

[0124] In one embodiment, the third determining module 703 is further configured to:

[0125] According to the distance between the middle point and the starting point, the middle points are sorted to obtain a sequence list;

[0126] According to a preset algorithm, a first path between the first intermediate point in the sequence list and the starting point, a second path between every two adjacent intermediate points in the sequence list, and a third path between the last intermediate point in the sequence list and the end point are determined;

[0127] According to the first path, the second path and the third path, a plurality of channel paths from the starting point to the end point are determined.

[0128] In one embodiment, the coordinates of the spatial positioning point are composed of a first parameter, a second parameter, and a third parameter, and a difference between the first parameter corresponding to the middle point and the first parameter corresponding to the starting point is used as a first difference, a difference between the second parameter corresponding to the middle point and the second parameter corresponding to the starting point is used as a second difference, and a difference between the third parameter corresponding to the middle point and the third parameter corresponding to the starting point is used as a third difference; accordingly, the third determination module 703 is further used to:

[0129] According to the first difference value corresponding to each intermediate point, all the intermediate points are sorted for the first time to obtain an initial sequence list;

[0130] If there are intermediate points with the same first difference in the first sorting process, the intermediate points with the same first difference are sorted for the second time according to the corresponding second difference to obtain an updated initial sequence table;

[0131] If there are intermediate points with the same second difference value in the second sorting process, the intermediate points with the same second difference value are sorted for the third time according to the corresponding third difference value to obtain the final sequence table.

[0132] In one embodiment, the fourth determining module 704 is further configured to:

[0133] Calculate the length of each of the plurality of channel paths, and take the channel path with the shortest length as the first path;

[0134] The number of bends in each path in the first path is calculated, and the first path with the smallest number of bends is used as the final cable channel path.

[0135] Each module in the cable channel design device can be implemented in whole or in part by software, hardware, or a combination thereof. Each module can be embedded in or independent of a processor in a computer device in the form of hardware, or can be stored in a memory in a computer device in the form of software, so that the processor can call and execute operations corresponding to each module.

[0136] In one embodiment, a computer device is provided. The computer device may be a server, and its internal structure diagram may be as follows: Figure 8As shown. The computer device includes a processor, a memory and a network interface connected through a system bus. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The database of the computer device is used to store coordinate positioning point data. The network interface of the computer device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, a cable channel design method is implemented.

[0137] Those skilled in the art will understand that Figure 8 The structure shown in the figure is only a block diagram of a part of the structure related to the solution of the present application, and does not constitute a limitation on the computer device to which the solution of the present application is applied. The specific computer device may include more or fewer components than those shown in the figure, or combine certain components, or have a different arrangement of components.

[0138] In one embodiment, a computer device is provided, including a memory and a processor, wherein a computer program is stored in the memory, and when the processor executes the computer program, the following steps are implemented:

[0139] According to the basic information of the cable channel and the spatial positioning points in the three-dimensional model of the cable channel, the plannable positioning points are determined, wherein the spatial positioning points are determined by spatially dividing the three-dimensional model of the cable channel based on the unit interval in the horizontal axis, the longitudinal axis and the vertical axis of the three-dimensional model. The plannable positioning points are used to indicate the coordinate positioning points in the three-dimensional model of the cable channel where the cables are allowed to be laid, and the basic information is used to indicate the supporting facilities structure and design requirements of the cable channel;

[0140] Determine the starting point, end point and middle point of the cable channel based on the plannable positioning points;

[0141] Determine several channel paths according to the starting point, end point and middle point of the cable channel;

[0142] A channel path that meets preset conditions among the plurality of channel paths is taken as a final cable channel path.

[0143] In one embodiment, when the processor executes the computer program, the processor further implements the following steps:

[0144] Obtain all spatial positioning points in the three-dimensional model of the cable channel;

[0145] The spatial positioning point where the supporting facility structure is located is taken as the first spatial positioning point, and the spatial positioning point that does not meet the design requirements among all the spatial positioning points is taken as the second spatial positioning point;

[0146] All the spatial positioning points except the first spatial positioning point and the second spatial positioning point are used as plannable positioning points.

[0147] In one embodiment, when the processor executes the computer program, the processor further implements the following steps:

[0148] Obtain the plant entrance coordinates, plant exit coordinates and electrical load wiring position coordinates in the cable channel;

[0149] The plannable positioning point closest to the factory building entrance coordinates among the plannable positioning points is used as the starting point of the cable channel, and the plannable positioning point closest to the factory building exit coordinates among the plannable positioning points is used as the end point of the cable channel;

[0150] The plannable positioning point that is closest to the electrical load wiring position coordinates among the plannable positioning points is used as the middle point of the cable channel.

[0151] In one embodiment, the number of the intermediate points is at least two; accordingly, when the processor executes the computer program, the following steps are also implemented:

[0152] According to the distance between the middle point and the starting point, the middle points are sorted to obtain a sequence list;

[0153] According to a preset algorithm, a first path between the first intermediate point in the sequence list and the starting point, a second path between every two adjacent intermediate points in the sequence list, and a third path between the last intermediate point in the sequence list and the end point are determined;

[0154] According to the first path, the second path and the third path, a plurality of channel paths from the starting point to the end point are determined.

[0155] In one embodiment, the coordinates of the spatial positioning point are composed of a first parameter, a second parameter, and a third parameter, and the difference between the first parameter corresponding to the middle point and the first parameter corresponding to the starting point is taken as the first difference, the difference between the second parameter corresponding to the middle point and the second parameter corresponding to the starting point is taken as the second difference, and the difference between the third parameter corresponding to the middle point and the third parameter corresponding to the starting point is taken as the third difference; accordingly, when the processor executes the computer program, the following steps are also implemented:

[0156] According to the first difference value corresponding to each intermediate point, all the intermediate points are sorted for the first time to obtain an initial sequence list;

[0157] If there are intermediate points with the same first difference in the first sorting process, the intermediate points with the same first difference are sorted for the second time according to the corresponding second difference to obtain an updated initial sequence table;

[0158] If there are intermediate points with the same second difference value in the second sorting process, the intermediate points with the same second difference value are sorted for the third time according to the corresponding third difference value to obtain the final sequence table.

[0159] In one embodiment, the preset conditions include the channel path length and the number of channel path bends; accordingly, when the processor executes the computer program, the following steps are also implemented:

[0160] Calculate the length of each of the plurality of channel paths, and take the channel path with the shortest length as the first path;

[0161] The number of bends in each path in the first path is calculated, and the first path with the smallest number of bends is used as the final cable channel path.

[0162] In one embodiment, a computer readable storage medium is provided, on which a computer program is stored, and when the computer program is executed by a processor, the following steps are implemented:

[0163] According to the basic information of the cable channel and the spatial positioning points in the three-dimensional model of the cable channel, the plannable positioning points are determined, wherein the spatial positioning points are determined by spatially dividing the three-dimensional model of the cable channel based on the unit interval in the horizontal axis, the longitudinal axis and the vertical axis of the three-dimensional model. The plannable positioning points are used to indicate the coordinate positioning points in the three-dimensional model of the cable channel where the cables are allowed to be laid, and the basic information is used to indicate the supporting facilities structure and design requirements of the cable channel;

[0164] Determine the starting point, end point and middle point of the cable channel based on the plannable positioning points;

[0165] Determine several channel paths according to the starting point, end point and middle point of the cable channel;

[0166] A channel path that meets preset conditions among the plurality of channel paths is taken as a final cable channel path.

[0167] In one embodiment, when the computer program is executed by a processor, the following steps are also implemented:

[0168] Obtain all spatial positioning points in the three-dimensional model of the cable channel;

[0169] The spatial positioning point where the supporting facility structure is located is taken as the first spatial positioning point, and the spatial positioning point that does not meet the design requirements among all the spatial positioning points is taken as the second spatial positioning point;

[0170] All the spatial positioning points except the first spatial positioning point and the second spatial positioning point are used as plannable positioning points.

[0171] In one embodiment, when the computer program is executed by a processor, the following steps are also implemented:

[0172] Obtain the plant entrance coordinates, plant exit coordinates and electrical load wiring position coordinates in the cable channel;

[0173] The plannable positioning point closest to the factory building entrance coordinates among the plannable positioning points is used as the starting point of the cable channel, and the plannable positioning point closest to the factory building exit coordinates among the plannable positioning points is used as the end point of the cable channel;

[0174] The plannable positioning point that is closest to the electrical load wiring position coordinates among the plannable positioning points is used as the middle point of the cable channel.

[0175] In one embodiment, the number of the intermediate points is at least two; accordingly, when the computer program is executed by the processor, the following steps are also implemented:

[0176] According to the distance between the middle point and the starting point, the middle points are sorted to obtain a sequence list;

[0177] According to a preset algorithm, a first path between the first intermediate point in the sequence list and the starting point, a second path between every two adjacent intermediate points in the sequence list, and a third path between the last intermediate point in the sequence list and the end point are determined;

[0178] According to the first path, the second path and the third path, a plurality of channel paths from the starting point to the end point are determined.

[0179] In one embodiment, the coordinates of the spatial positioning point are composed of a first parameter, a second parameter, and a third parameter, and the difference between the first parameter corresponding to the middle point and the first parameter corresponding to the starting point is taken as the first difference, the difference between the second parameter corresponding to the middle point and the second parameter corresponding to the starting point is taken as the second difference, and the difference between the third parameter corresponding to the middle point and the third parameter corresponding to the starting point is taken as the third difference; accordingly, when the computer program is executed by the processor, the following steps are also implemented:

[0180] According to the first difference value corresponding to each intermediate point, all the intermediate points are sorted for the first time to obtain an initial sequence list;

[0181] If there are intermediate points with the same first difference in the first sorting process, the intermediate points with the same first difference are sorted for the second time according to the corresponding second difference to obtain an updated initial sequence table;

[0182] If there are intermediate points with the same second difference value in the second sorting process, the intermediate points with the same second difference value are sorted for the third time according to the corresponding third difference value to obtain the final sequence table.

[0183] In one embodiment, the preset conditions include the channel path length and the number of channel path bends; accordingly, when the computer program is executed by the processor, the following steps are also implemented:

[0184] Calculate the length of each of the plurality of channel paths, and take the channel path with the shortest length as the first path;

[0185] The number of bends in each path in the first path is calculated, and the first path with the smallest number of bends is used as the final cable channel path.

[0186] In one embodiment, a computer program product is provided, comprising a computer program, which, when executed by a processor, implements the following steps:

[0187] According to the basic information of the cable channel and the spatial positioning points in the three-dimensional model of the cable channel, the plannable positioning points are determined, wherein the spatial positioning points are determined by spatially dividing the three-dimensional model of the cable channel based on the unit interval in the horizontal axis, the longitudinal axis and the vertical axis of the three-dimensional model. The plannable positioning points are used to indicate the coordinate positioning points in the three-dimensional model of the cable channel where the cables are allowed to be laid, and the basic information is used to indicate the supporting facilities structure and design requirements of the cable channel;

[0188] Determine the starting point, end point and middle point of the cable channel based on the plannable positioning points;

[0189] Determine several channel paths according to the starting point, end point and middle point of the cable channel;

[0190] A channel path that meets preset conditions among the plurality of channel paths is taken as a final cable channel path.

[0191] In one embodiment, when the computer program is executed by a processor, the following steps are also implemented:

[0192] Obtain all spatial positioning points in the three-dimensional model of the cable channel;

[0193] The spatial positioning point where the supporting facility structure is located is taken as the first spatial positioning point, and the spatial positioning point that does not meet the design requirements among all the spatial positioning points is taken as the second spatial positioning point;

[0194] All the spatial positioning points except the first spatial positioning point and the second spatial positioning point are used as plannable positioning points.

[0195] In one embodiment, when the computer program is executed by a processor, the following steps are also implemented:

[0196] Obtain the plant entrance coordinates, plant exit coordinates and electrical load wiring position coordinates in the cable channel;

[0197] The plannable positioning point closest to the factory building entrance coordinates among the plannable positioning points is used as the starting point of the cable channel, and the plannable positioning point closest to the factory building exit coordinates among the plannable positioning points is used as the end point of the cable channel;

[0198] The plannable positioning point that is closest to the electrical load wiring position coordinates among the plannable positioning points is used as the middle point of the cable channel.

[0199] In one embodiment, the number of the intermediate points is at least two; accordingly, when the computer program is executed by the processor, the following steps are also implemented:

[0200] According to the distance between the middle point and the starting point, the middle points are sorted to obtain a sequence list;

[0201] According to a preset algorithm, a first path between the first intermediate point in the sequence list and the starting point, a second path between every two adjacent intermediate points in the sequence list, and a third path between the last intermediate point in the sequence list and the end point are determined;

[0202] According to the first path, the second path and the third path, a plurality of channel paths from the starting point to the end point are determined.

[0203] In one embodiment, the coordinates of the spatial positioning point are composed of a first parameter, a second parameter, and a third parameter, and the difference between the first parameter corresponding to the middle point and the first parameter corresponding to the starting point is taken as the first difference, the difference between the second parameter corresponding to the middle point and the second parameter corresponding to the starting point is taken as the second difference, and the difference between the third parameter corresponding to the middle point and the third parameter corresponding to the starting point is taken as the third difference; accordingly, when the computer program is executed by the processor, the following steps are also implemented:

[0204] According to the first difference value corresponding to each intermediate point, all the intermediate points are sorted for the first time to obtain an initial sequence list;

[0205] If there are intermediate points with the same first difference in the first sorting process, the intermediate points with the same first difference are sorted for the second time according to the corresponding second difference to obtain an updated initial sequence table;

[0206] If there are intermediate points with the same second difference value in the second sorting process, the intermediate points with the same second difference value are sorted for the third time according to the corresponding third difference value to obtain the final sequence table.

[0207] In one embodiment, the preset conditions include the channel path length and the number of channel path bends; accordingly, when the computer program is executed by the processor, the following steps are also implemented:

[0208] Calculate the length of each of the plurality of channel paths, and take the channel path with the shortest length as the first path;

[0209] The number of bends in each path in the first path is calculated, and the first path with the smallest number of bends is used as the final cable channel path.

[0210] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to the memory, database or other medium used in the embodiments provided in the present application can include at least one of non-volatile and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetoresistive random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory can include random access memory (RAM) or external cache memory, etc. As an illustration and not limitation, RAM can be in various forms, such as static random access memory (SRAM) or dynamic random access memory (DRAM). The database involved in each embodiment provided in this application may include at least one of a relational database and a non-relational database. Non-relational databases may include distributed databases based on blockchains, etc., but are not limited to this. The processor involved in each embodiment provided in this application may be a general-purpose processor, a central processing unit, a graphics processor, a digital signal processor, a programmable logic device, a data processing logic device based on quantum computing, etc., but are not limited to this.

[0211] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0212] The above embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the present application. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the present application shall be subject to the attached claims.

Claims

1. A cable channel design method, characterized in that: The method comprises: Determine the plannable positioning points according to the basic information of the cable channel and the spatial positioning points in the three-dimensional model of the cable channel, wherein the spatial positioning points are determined by spatially dividing the three-dimensional model of the cable channel based on unit intervals in the horizontal axis, the longitudinal axis and the vertical axis of the three-dimensional model, the plannable positioning points are used to indicate the coordinate positioning points in the three-dimensional model of the cable channel where the cables are allowed to be laid, and the basic information is used to indicate the supporting facilities structure and design requirements of the cable channel; Obtaining the plant entrance coordinates, plant exit coordinates and electrical load wiring position coordinates in the cable channel; The plannable positioning point closest to the factory building entrance coordinates among the plannable positioning points is used as the starting point of the cable channel, and the plannable positioning point closest to the factory building exit coordinates among the plannable positioning points is used as the end point of the cable channel; the plannable positioning point closest to the electric load connection position coordinates among the plannable positioning points is used as the middle point of the cable channel; the number of the middle points is at least two; According to the distance between the intermediate point and the starting point, the intermediate points are sorted to obtain a sequence list; according to a preset algorithm, a first path between the first intermediate point in the sequence list and the starting point, a second path between every two adjacent intermediate points in the sequence list, and a third path between the last intermediate point in the sequence list and the end point are determined; according to the first path, the second path and the third path, a plurality of channel paths from the starting point to the end point are determined; A channel path among several channel paths that meets preset conditions is taken as the final cable channel path, wherein the preset conditions include the channel path length and the number of channel path bends; specifically: each length of the several channel paths is calculated, and the channel path with the shortest length is taken as the first path; the number of bends of each path in the first path is calculated, and the first path with the smallest number of bends is taken as the final cable channel path.

2. The method according to claim 1, characterized in that: The determining of the plannable positioning points according to the basic information of the cable channel and the spatial positioning points in the three-dimensional model of the cable channel includes: Acquire all spatial positioning points in the three-dimensional model of the cable channel; The spatial positioning point where the supporting facility structure is located is used as the first spatial positioning point, and the spatial positioning point that does not meet the design requirements among all the spatial positioning points is used as the second spatial positioning point; The spatial positioning points other than the first spatial positioning point and the second spatial positioning point among all the spatial positioning points are used as plannable positioning points.

3. The method according to claim 1, characterized in that The coordinates of the spatial positioning point are composed of a first parameter, a second parameter and a third parameter, the difference between the first parameter corresponding to the middle point and the first parameter corresponding to the starting point is taken as the first difference, the difference between the second parameter corresponding to the middle point and the second parameter corresponding to the starting point is taken as the second difference, and the difference between the third parameter corresponding to the middle point and the third parameter corresponding to the starting point is taken as the third difference; accordingly, the middle points are sorted according to the distance between the middle point and the starting point to obtain a sequence list, including: According to the first difference value corresponding to each intermediate point, all the intermediate points are sorted for the first time to obtain an initial sequence list; If there are intermediate points with the same first difference in the first sorting process, the intermediate points with the same first difference are sorted for the second time according to the corresponding second difference to obtain an updated initial sequence table; If there are intermediate points with the same second difference value in the second sorting process, the intermediate points with the same second difference value are sorted for the third time according to the corresponding third difference value to obtain the final sequence table.

4. A cable channel design device, characterized in that: The device comprises: A first determination module is used to determine a plannable positioning point according to basic information of the cable channel and a spatial positioning point in a three-dimensional model of the cable channel, wherein the spatial positioning point is determined by spatially dividing the three-dimensional model of the cable channel based on unit intervals in three directions of the horizontal axis, the longitudinal axis and the vertical axis of the three-dimensional model, the plannable positioning point is used to indicate a coordinate positioning point in the three-dimensional model of the cable channel where cables are allowed to be laid, and the basic information is used to indicate the supporting facility structure and design requirements of the cable channel; A second determination module is used to obtain the plant entrance coordinates, plant exit coordinates and electrical load wiring position coordinates in the cable channel; The plannable positioning point closest to the factory building entrance coordinates among the plannable positioning points is used as the starting point of the cable channel, and the plannable positioning point closest to the factory building exit coordinates among the plannable positioning points is used as the end point of the cable channel; the plannable positioning point closest to the electric load connection position coordinates among the plannable positioning points is used as the middle point of the cable channel; the number of the middle points is at least two; A third determination module is used to sort the intermediate points according to the distance between the intermediate points and the starting point to obtain a sequence list; determine a first path between the first intermediate point in the sequence list and the starting point, a second path between every two adjacent intermediate points in the sequence list, and a third path between the last intermediate point in the sequence list and the end point according to a preset algorithm; determine a plurality of channel paths from the starting point to the end point according to the first path, the second path, and the third path; The fourth determination module is used to select a channel path that meets preset conditions among several channel paths as the final cable channel path, wherein the preset conditions include the channel path length and the number of channel path bends; specifically, it is used to calculate each length of the several channel paths, and select the channel path with the shortest length as the first path; calculate the number of bends of each path in the first path, and select the first path with the smallest number of bends as the final cable channel path.

5. The device according to claim 4, characterized in that The first determination module is further used to: obtain all spatial positioning points in the three-dimensional model of the cable channel; The spatial positioning point where the supporting facility structure is located is used as the first spatial positioning point, and the spatial positioning point that does not meet the design requirements among all the spatial positioning points is used as the second spatial positioning point; The spatial positioning points other than the first spatial positioning point and the second spatial positioning point among all the spatial positioning points are used as plannable positioning points.

6. The device according to claim 4, characterized in that The coordinates of the spatial positioning point are composed of a first parameter, a second parameter and a third parameter, the difference between the first parameter corresponding to the middle point and the first parameter corresponding to the starting point is taken as the first difference, the difference between the second parameter corresponding to the middle point and the second parameter corresponding to the starting point is taken as the second difference, and the difference between the third parameter corresponding to the middle point and the third parameter corresponding to the starting point is taken as the third difference; The third determination module is further used to: perform a first sorting of all the midpoints according to the first difference corresponding to each midpoint to obtain an initial sequence list; If there are intermediate points with the same first difference in the first sorting process, the intermediate points with the same first difference are sorted for the second time according to the corresponding second difference to obtain an updated initial sequence table; If there are intermediate points with the same second difference value in the second sorting process, the intermediate points with the same second difference value are sorted for the third time according to the corresponding third difference value to obtain the final sequence table.

7. A computer device comprising a memory and a processor, wherein the memory stores a computer program, characterized in that: When the processor executes the computer program, the steps of the method according to any one of claims 1 to 3 are implemented.

8. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 3 are implemented.

9. A computer program product, comprising a computer program, characterized in that When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 3 are implemented.

Citation Information

Patent Citations

  • Design method and system for improving precision of cable laying length

    CN106096079A

  • Cable path planning method and device, equipment and storage medium

    CN112749458A

  • Cable quantity totalizing device, cable quantity totalizing method, and computer readable recording medium storing cable quantity totalizing program

    KR1020070020350A