Construction structure of structural column without bracket and method for fast construction of structural column without bracket

By using the construction structure and method of corbel-free structural columns in the building structure, the problems of external wall water seepage and prolonged construction period caused by the inconvenience of corbel pouring in traditional wall construction are solved, achieving more efficient construction speed and stability.

CN114790794BActive Publication Date: 2024-10-29LONGYUAN CONSTR GROUP
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202210563126.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-05-18
Publication Date
2024-10-29
Estimated Expiration
2042-05-18

AI Technical Summary

Technical Problem

In traditional wall construction methods, the construction of concrete corbels is complex and cannot be poured to the top of the structural column at one time due to physical constraints, resulting in loose horizontal gaps, easy water seepage in the outer wall, slow construction speed, and the need to wait for the completion of the oblique brick stacking before construction can begin. Column pouring extended the construction period.

Method used

The construction structure and method of corbel-free structural columns are adopted. By reserving a space for stacking oblique bricks between the main beam and the waist beam, and using hanging column heads and structural column templates to realize the pouring of structural columns, the corbels are avoided and the oblique bricks are allowed to be laid. Construction of structural columns is carried out before bricks are stacked, and structural column reinforcements are pre-embedded to improve stability.

Benefits of technology

It solves the problem of water seepage in the exterior wall caused by the inconvenient pouring of corbels in the traditional method, shortens the waiting time for structural column pouring, increases the construction speed, reduces later maintenance costs, and improves the stability of the insertion bars.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114790794B_ABST
    Figure CN114790794B_ABST
Patent Text Reader

Abstract

The present invention provides a corbel-free structural column construction structure and a corbel-free method for quickly constructing structural columns, which are used to construct a structural column between a main beam and a waist beam, and a space for stacking inclined bricks is reserved between the main beam and the masonry wall. The construction structure includes a hanging column head and two structural column templates. The hanging column head is located below the main beam and is integrally cast with the main beam. A structural column casting port is reserved on the hanging column head. The two structural column templates are respectively installed on both sides of the masonry wall, and the bottom end of the structural column template is located on the waist beam, and the top end is fitted with the side walls on both sides of the hanging column head to enclose a structural column casting area, and the structural column casting port is connected to the structural column casting area. By integrally casting with the main beam to form the hanging column head, and reserving a casting port on the hanging column head, the casting of the structural column can be realized without setting a corbel, which solves the problem that the traditional dustpan mouth cannot be installed due to physical conditions, resulting in the inability to cast the structural column to the top at one time.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building structure design, and in particular to a corbel-free structural column construction structure and a corbel-free structural column fast construction method. Background Art

[0002] At present, newly built residential buildings and factory buildings mostly use frame infill wall structures. The construction quality of infill wall masonry structures is uneven. Anti-seismic measures mostly include adding structural columns, waist beams, wall tie bars and other measures. The construction requirements are numerous and complex, and the construction levels of workers are different. Therefore, common quality problems are often prone to occur. In particular, due to the superposition of factors such as rushing construction schedules, construction supervision efforts are often compromised, and external wall seepage often occurs during the completion delivery or maintenance period. Repairs are troublesome and costly. Once the repairs are not handled properly, they are prone to "secondary recurrence", which will cause damage to the owner's reputation and indirectly affect the company's quality reputation.

[0003] The traditional wall construction method is: first plant the reinforcement → tie the reinforcement of the structural column → build the wall → build the wall and remove the formwork at the waist beam and below → build the wall above the waist beam to the top, leaving 15 to 20 cm of inclined bricks for top masonry → wait for settlement time (usually 14 days) → add inclined bricks → build concrete corbels → cast the structural columns above the waist beam → remove the formwork of the structural columns → remove and roughen the concrete corbels → accept the wall → next step (painting).

[0004] After analyzing the traditional technology, the concrete corbel construction adopts the dustpan pouring method, which is complicated to construct. The traditional method sometimes cannot install the dustpan due to structural conditions, so it cannot be poured to the top of the structural column at one time. The horizontal construction joint formed between the later poured structural column and the top beam is difficult to handle. If not handled carefully, it is easy to cause water seepage in the exterior wall. In addition, through the observation of traditional technology and the analysis of on-site labor time, in each process of masonry sub-items, the pouring of the structural column above the waist beam requires the completion of the top inclined brick masonry before pouring the structural column, which greatly reduces the turnover rate of the structural column template, slows the construction speed, and is not conducive to the construction period. Summary of the invention

[0005] The purpose of the present invention is to provide a construction structure of a structural column without a corbel and a method for quickly constructing a structural column without a corbel, which can realize the pouring of the structural column without setting a corbel, and solves the problem that the traditional dustpan mouth cannot be installed due to physical conditions, resulting in the inability to pour the structural column to the top at one time, and then the horizontal gap is not dense, there is a hidden danger of water seepage in the exterior wall, and the later maintenance cost is high. In addition, the construction of the structural column can be carried out without waiting for the completion of the inclined brick stacking, which greatly shortens the waiting time for the concrete pouring of the structural column, compresses the construction period of the structural column in the wall masonry sub-project, and improves the construction speed.

[0006] In order to achieve the above-mentioned purpose, the present invention provides a corbel-free structural column construction structure, which is used for constructing a structural column between a main beam and a waist beam, and a space for stacking inclined bricks is reserved between the main beam and the masonry wall. The corbel-free structural column construction structure includes a hanging column head and two structural column formworks. The hanging column head is located below the main beam and is cast integrally with the main beam. A structural column casting opening is reserved on the hanging column head. Two structural column formworks are respectively installed on both sides of the masonry wall, and the bottom end of the structural column formwork is located on the waist beam, and the top end is fitted with the side walls on the opposite sides of the hanging column head to enclose a structural column casting area, and the structural column casting opening is connected to the structural column casting area.

[0007] Optionally, the corbel-free structural column construction structure also includes a plurality of structural column dowels, which are vertically pre-embedded in the main beam and the lower hanging column head, and both ends of the structural column dowels extend out of the main beam and the lower hanging column head respectively.

[0008] Optionally, the corbel-free structural column construction structure further includes structural reinforcement bars arranged in the casting area of ​​the structural column, and one end of the structural column dowel bars extending out of the hanging column head overlaps the structural reinforcement bars.

[0009] Optionally, the two structural column templates are fixed by a plurality of tension bolts.

[0010] Optionally, the size of the hanging column head is the same as the size of the structural column.

[0011] Optionally, an exhaust hole is reserved in the hanging column head, and the exhaust hole is connected to the pouring area.

[0012] Based on this, the present invention also provides a method for quickly constructing a structural column without a corbel, which is used to construct a structural column between a main beam and a waist beam, and a space for stacking inclined bricks is reserved between the main beam and the masonry wall, comprising the following steps:

[0013] Before casting the main beam in situ, prefabricate the casting template for the hanging column head according to the size of the structural column;

[0014] Positioning and installing the template of the hanging column head according to the position of the structural column, and connecting the casting template of the hanging column head with the casting template of the main beam;

[0015] The main beam is cast and formed, and the hanging column head is integrally formed, and a structural column casting opening is reserved on the hanging column head;

[0016] The casting formwork of the main beam and the lower hanging column head is removed;

[0017] When the masonry height of the masonry wall is higher than the lower surface of the lower hanging column head, two structural column templates are respectively installed on both sides of the masonry wall, so that the bottom end of the structural column template is located on the waist beam, and the top end is in contact with the side walls on the opposite sides of the lower hanging column head to enclose a structural column casting area, and the structural column casting port is connected to the structural column casting area;

[0018] pouring concrete into the structural column pouring area through the structural column pouring opening to form the structural column;

[0019] Sealing the pouring opening of the structural column;

[0020] The structural column formwork is removed.

[0021] Optionally, before casting the main beam, the method for quickly constructing structural columns without corbels further includes:

[0022] A plurality of structural column dowel bars are embedded in the main beam and the lower hanging column head, and two ends of the structural column dowel bars are respectively extended out of the main beam and the lower hanging column head.

[0023] Optionally, after the main beam and the lower hanging column head are cast and formed and before the structural column formwork is installed, the method for quickly constructing structural columns without corbels further includes:

[0024] Install structural steel bars in the casting area of ​​the structural column, and overlap the structural steel bars and one end of the structural column dowel bars extending out of the lower hanging column head.

[0025] Optionally, the step of sealing the pouring opening of the structural column specifically includes:

[0026] When the wall is painted, fine stone concrete or cement mortar is used to fill the casting opening of the structural column.

[0027] The present invention provides a corbel-free structural column construction structure and a corbel-free structural column rapid construction method, which has at least one of the following beneficial effects:

[0028] 1) By integrally casting the main beam with the position of the structural column at the bottom of the main beam corresponding to the structural column to form a hanging column head, and reserving a structural column casting port on the hanging column head, the casting of the structural column can be realized without setting a corbel, which has better adaptability than the traditional dustpan-shaped casting construction, and solves the problem that the traditional dustpan-shaped casting cannot be installed due to physical conditions, resulting in the structural column casting not being able to reach the top at one time, and then the horizontal gap is not dense, there is a hidden danger of water seepage on the exterior wall, and the later maintenance cost is high;

[0029] 2) It eliminates the need for corbel formwork support, reduces the cost of chiseling corbels in the later stage, and also eliminates the need for chiseling concrete corbels, thus reducing environmental pollution such as noise and dust to a certain extent;

[0030] 3) The casting formwork for the hanging column head can be used repeatedly and can also be used in different projects, saving construction costs;

[0031] 4) A space for stacking inclined bricks is reserved between the main beam and the masonry wall, so the construction of the structural column can be carried out without waiting for the completion of the inclined brick stacking, which greatly shortens the waiting time for pouring concrete of the structural column, compresses the construction period of the structural column in the wall masonry sub-project, and improves the construction speed;

[0032] 5) By presetting the structural column dowels before pouring the concrete of the main beam and the lower hanging column head, the problem of the traditional method of difficult to ensure the quality of vertical rebar planting is solved, and the stability of the structural column dowels is improved. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] Those skilled in the art will appreciate that the accompanying drawings are provided for a better understanding of the present invention and do not constitute any limitation on the scope of the present invention.

[0034] Figure 1 An elevation view of a corbel-free structural column construction structure provided by an embodiment of the present invention;

[0035] Figure 2 An elevation view of a construction structure of a corbel-free structural column provided in an embodiment of the present invention after construction is completed;

[0036] Figure 3 A schematic diagram of a casting template with a hanging column head provided in an embodiment of the present invention;

[0037] Figure 4 A reinforcement arrangement diagram of a corbel-free structural column construction structure provided in an embodiment of the present invention.

[0038] In the attached figure:

[0039] 1-main beam; 2-waist beam; 3-structural column; 4-masonry wall; 5-underhanging column head; 6-structural column formwork; 7-structural column pouring port; 8-structural column pouring area; 9-structural column dowel bar; 10-structural steel bar;

[0040] 1-1- Casting formwork for main beam; 5-1- Casting formwork for hanging column head. DETAILED DESCRIPTION

[0041] In order to make the purpose, advantages and features of the present invention clearer, the present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments. It should be noted that the drawings are all in a very simplified form and are not drawn to scale, and are only used to conveniently and clearly assist in explaining the purpose of the embodiments of the present invention. In addition, the structure shown in the drawings is often a part of the actual structure. In particular, the emphasis of each drawing is different, and sometimes different scales are used.

[0042] As used in the present invention, the singular forms "one", "an", and "the" include plural objects, unless the content clearly indicates otherwise. As used in the present invention, the term "or" is generally used in a sense that includes "and / or", unless the content clearly indicates otherwise. As used in the present invention, the term "several" is generally used in a sense that includes "at least one", unless the content clearly indicates otherwise. As used in the present invention, the term "at least two" is generally used in a sense that includes "two or more", unless the content clearly indicates otherwise. In addition, the terms "first", "second", and "third" are used only for descriptive purposes and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, the features defined as "first", "second", and "third" may explicitly or implicitly include one or at least two of the features.

[0043] Figure 1 An elevation view of a corbel-free structural column construction structure provided by an embodiment of the present invention; Figure 2 An elevation view of a construction structure of a corbel-free structural column provided in an embodiment of the present invention after construction is completed; Figure 3 A schematic diagram of a casting template with a hanging column head provided in an embodiment of the present invention; Figure 4 A reinforcement arrangement diagram of a corbel-free structural column construction structure provided in an embodiment of the present invention.

[0044] Please refer to Figure 1-Figure 2 The present embodiment provides a corbel-free structural column construction structure, which is used to construct a structural column 3 between a main beam 1 and a waist beam 2, and a space for stacking inclined bricks is reserved between the main beam 1 and the masonry wall 4. The corbel-free structural column construction structure includes a hanging column head 5 and two structural column templates 6. The hanging column head 5 is located below the main beam 1 and is cast integrally with the main beam 1. A structural column casting opening 7 is reserved on the hanging column head 5. Two structural column templates 6 are respectively installed on both sides of the masonry wall 4, and the bottom end of the structural column template 6 is located on the waist beam 2, and the top end is fitted with the side walls on the opposite sides of the hanging column head 5 to enclose a structural column casting area 8, and the structural column casting opening 7 is connected to the structural column casting area 8.

[0045] By integrally casting the main beam 1 with the position of the structural column 3 below the main beam 1 to form a hanging column head 5, and reserving a structural column casting port 7 on the hanging column head 5, the casting of the structural column 3 can be achieved without setting a corbel, which has better adaptability than the traditional dustpan-shaped casting construction, and solves the problem that the traditional dustpan-shaped casting cannot be installed due to physical conditions, resulting in the inability to cast the structural column 3 to the top at one time, and then the horizontal gap is not dense, there is a risk of water seepage on the exterior wall, and the cost of later maintenance is high. In addition, there is no need to wait for the completion of the inclined brick stacking before the construction of the structural column 3, which greatly shortens the waiting time for the concrete pouring of the structural column 3, compresses the construction period of the structural column 3 in the wall masonry sub-project, and improves the construction speed.

[0046] Specifically, the main beam 1 is, for example, a structural beam or a floor beam of a building main body. Before the main beam 1 is cast in situ, the size and position of the structural column 3 can be designed, and then the casting template 5-1 of the hanging column head 5 can be prefabricated according to the size of the structural column 3, and the casting template 5-1 of the hanging column head 5 can be positioned and installed according to the position of the structural column 3, and the casting template 5-1 of the hanging column head 5 can be connected with the casting template 1-1 of the main beam 1. For details, please refer to Figure 3 .

[0047] In this embodiment, the casting template 5-1 of the hanging column head 5 can be a steel template, and the outer dimensions are equal to the cross-sectional dimensions of the structural column 3, so that the size of the hanging column head 5 is the same as the size of the structural column 3. According to the specific project conditions, the casting template 5-1 of the hanging column head 5 is generally 240 mm wide, the column head height is 150 to 200 mm (the specific value is determined according to the masonry modulus), and is designed with a casting port similar to a triangular prism. Of course, this application does not limit the shape of the casting port.

[0048] Preferably, the casting formwork 5-1 can be used multiple times and can also be used in different projects, thus saving construction costs.

[0049] Optionally, an exhaust hole is reserved in the hanging column head 5, and the exhaust hole is connected to the pouring area. The exhaust hole is provided to ensure that the concrete of the structural column 3 can be poured densely and fully.

[0050] Please continue to refer to Figure 1After the construction of the hanging column head is completed, there is no need to wait for the inclined bricks to be stacked (equivalent to reserving space for the inclined bricks to be stacked between the main beam 1 and the masonry wall 4). When the masonry wall 4 is built at a height higher than the lower surface of the hanging column head 5, the two structural column templates 6 can be installed on both sides of the masonry wall 4, respectively, so that the bottom end of the structural column template 6 is located on the waist beam 2, and the top end is in contact with the side walls on the opposite sides of the hanging column head 5 to enclose a structural column casting area 8, and the structural column casting port 7 is connected to the structural column casting area 8. Compared with the method of first laying inclined bricks and then constructing concrete corbels in the traditional construction of structural columns 3, the waiting time for concrete pouring of structural columns 3 is greatly shortened, and the construction period of structural columns 3 in the wall masonry sub-project is compressed.

[0051] In this embodiment, the structural column casting port 7 is located at the lower side of the hanging column head 5 and is connected to the structural column casting area 8. The structural column casting port 7 is in the shape of a triangular prism, and one of the structural column templates 6 at least partially covers the structural column casting port 7 vertically.

[0052] It should be understood that since the structural column formwork 6 cannot completely close the structural column casting opening 7, when the casting of the structural column 3 is completed, there is still a certain amount of space left in the structural column casting opening 7 that has not been cast. Fine stone concrete or cement mortar can be used to plug the structural column casting opening 7 when the wall is painted.

[0053] For better, please refer to Figure 4 The corbel-free structural column construction structure also includes a plurality of structural column dowel bars 9, which are vertically pre-buried in the main beam 1 and the lower hanging column head 5, and the two ends of the structural column dowel bars 9 extend out of the main beam 1 and the lower hanging column head 5 respectively. When constructing the structural column 3 traditionally, it is usually necessary to carry out vertical planting of reinforcement on the cast main beam 1, which makes it difficult to ensure the quality of the planting of reinforcement. However, this embodiment presets the structural column dowel bars 9 before the concrete pouring of the main beam 1 and the lower hanging column head 5, thereby improving the stability of the structural column dowel bars 9 and improving the quality.

[0054] In this embodiment, the structural column dowel bar 9 can be preset through the casting template 5-1 of the lower hanging column head 5. The design length of the structural column dowel bar 9 can be determined according to the reserved length of the steel bars of the structural column 3 of this layer, the total thickness of the main beam 1 and the lap length of the top steel bars of the lower structural column 3.

[0055] Preferably, the corbel-free structural column construction structure further includes structural reinforcement 10 arranged in the structural column casting area 8, and one end of the structural column dowel 9 extending out of the lower hanging column head 5 overlaps the structural reinforcement 10. By overlapping the structural column dowel 9 with the structural reinforcement 10 in the structural column 3, the connection between the cast structural column 3 and the main beam 1 is more stable.

[0056] Based on this, combined Figure 1-Figure 4 The present embodiment also provides a method for quickly constructing a structural column 3 without a corbel, which is used to construct a structural column 3 between a main beam 1 and a waist beam 2, and a space for stacking inclined bricks is reserved between the main beam 1 and the masonry wall 4, comprising the following steps:

[0057] S1. Before casting the main beam 1, prefabricate a casting template 5-1 for the hanging column head 5 according to the size of the structural column 3;

[0058] S2, positioning and installing the template of the hanging column head 5 according to the position of the structural column 3, and connecting the casting template 5-1 of the hanging column head 5 with the casting template 1-1 of the main beam 1;

[0059] S3, casting the main beam 1, and integrally forming the hanging column head 5, wherein a structural column casting opening 7 is reserved on the hanging column head 5;

[0060] S4, removing the casting formwork 1-1 of the main beam 1 and the casting formwork 5-1 of the hanging column head 5;

[0061] S5. When the masonry height of the masonry wall 4 is higher than the lower surface of the lower hanging column head 5, two pieces of the structural column templates 6 are respectively installed on both sides of the masonry wall 4, so that the bottom end of the structural column template 6 is located on the waist beam 2, and the top end is in contact with the side walls on the opposite sides of the lower hanging column head to enclose a structural column casting area 8, and the structural column casting port 7 is connected to the structural column casting area 8;

[0062] S6, pouring concrete into the structural column pouring area 8 through the structural column pouring port 7 to form the structural column 3;

[0063] S7, sealing the pouring opening 7 of the structural column;

[0064] S8, removing the structural column formwork 6.

[0065] The present embodiment also provides a method for quickly constructing structural columns 3 without corbels, by integrally casting a lower hanging column head 5 with the main beam 1 at a position corresponding to the structural column 3 below the main beam 1, and reserving a structural column casting port 7 on the lower hanging column head 5, the casting of the structural column 3 can be achieved without the need to set a corbel, which has better adaptability than the traditional dustpan-shaped casting construction, and solves the problem that the traditional dustpan-shaped casting cannot be installed due to physical conditions, resulting in the inability to cast the structural column 3 to the top at one time, and then the horizontal gap is not dense, there is a risk of water seepage on the exterior wall, and the cost of later maintenance is high. In addition, the construction of the structural column 3 can be carried out without waiting for the completion of the inclined brick stacking, which greatly shortens the waiting time for the concrete pouring of the structural column 3, compresses the construction period of the structural column 3 in the wall masonry sub-project, and improves the construction speed.

[0066] Preferably, after executing step S2 and before executing step S3, the method for quickly constructing the structural column 3 without corbels further comprises:

[0067] A plurality of structural column dowel bars 9 are embedded in the main beam 1 and the lower hanging column head, and the two ends of the structural column dowel bars 9 are extended out of the main beam 1 and the lower hanging column head 5 respectively.

[0068] Further preferably, after executing step S4 and before executing step S5, the method for quickly constructing the structural column 3 without corbels further includes:

[0069] A structural steel bar 10 is installed in the structural column casting area 8, and the structural steel bar 10 is overlapped with an end of the structural column dowel bar 9 extending out of the lower hanging column head 5.

[0070] Preferably, the step of sealing the pouring opening 7 of the structural column specifically includes:

[0071] When the wall is painted, fine stone concrete or cement mortar is used to plug the construction column pouring opening 7.

[0072] In summary, the embodiments of the present invention provide a corbel-free structural column construction structure and a method for quickly constructing structural columns without corbels, by integrally casting a lower hanging column head with the main beam at a position corresponding to the structural column below the main beam, and reserving a structural column casting port on the lower hanging column head, the casting of the structural column can be achieved without setting a corbel, which has better adaptability than the traditional dustpan-shaped casting construction, and solves the problem that the traditional dustpan-shaped casting cannot be installed due to physical conditions, resulting in the inability to cast the structural column to the top in one go, and then the horizontal gap is not dense, there is a risk of water seepage on the exterior wall, and the cost of later maintenance is high. In addition, there is no need to wait for the completion of the inclined brick stacking before the construction of the structural column can be carried out, which greatly shortens the waiting time for the pouring of the structural column concrete, compresses the construction period of the structural column in the wall masonry sub-project, and improves the construction speed.

[0073] The above is only a preferred embodiment of the present invention and does not limit the present invention in any way. Any technician in the relevant technical field, without departing from the scope of the technical solution of the present invention, makes any form of equivalent replacement or modification to the technical solution and technical content disclosed in the present invention, which does not depart from the content of the technical solution of the present invention and still falls within the protection scope of the present invention.

Claims

1. A corbel-free structural column construction structure, used for constructing a structural column between a main beam and a waist beam, and a space for stacking inclined bricks is reserved between the main beam and the masonry wall, characterized in that: The corbel-free structural column construction structure comprises a hanging column head and two structural column templates, wherein the hanging column head is located below the main beam and is integrally cast with the main beam, a structural column casting opening is reserved on the hanging column head, two structural column templates are respectively installed on both sides of the masonry wall, and the bottom end of the structural column template is located on the waist beam, and the top end is fitted with the side walls on the opposite sides of the hanging column head to enclose a structural column casting area, and the structural column casting opening is connected with the structural column casting area; Among them, the casting port of the structural column is a triangular prism-shaped notch on the lower hanging column head. The notch is arranged at the bottom end of the lower hanging column head for the edge of one side of the casting, and is recessed away from the casting side. The notch forms a casting port with a larger bottom plate area and a smaller top area on the lower hanging column head.

2. The corbel-free structural column construction structure according to claim 1, characterized in that: The corbel-free structural column construction structure also includes a plurality of structural column dowel bars, which are vertically pre-embedded in the main beam and the lower hanging column head, and the two ends of the structural column dowel bars extend out of the main beam and the lower hanging column head respectively.

3. The corbel-free structural column construction structure according to claim 2, characterized in that: The corbel-free structural column construction structure also includes structural steel bars arranged in the casting area of ​​the structural column, and one end of the structural column dowel bar extending out of the lower hanging column head overlaps the structural steel bar.

4. The corbel-free structural column construction structure according to claim 1, characterized in that: The two structural column templates are fixed by a plurality of tension bolts.

5. The corbel-free structural column construction structure according to claim 1, characterized in that: The size of the hanging column head is the same as that of the structural column.

6. The corbel-free structural column construction structure according to claim 1, characterized in that: An exhaust hole is also reserved in the lower hanging column head, and the exhaust hole is connected with the pouring area.

7. A method for quickly constructing a structural column without using a corbel, which is used to construct a structural column between a main beam and a waist beam, and a space for stacking inclined bricks is reserved between the main beam and the masonry wall, characterized in that: The following steps are involved: Before casting the main beam in situ, prefabricate the casting template for the hanging column head according to the size of the structural column; Positioning and installing the template of the hanging column head according to the position of the structural column, and connecting the casting template of the hanging column head with the casting template of the main beam; The main beam is cast and formed into an integral part of the hanging column head. A structural column casting opening is reserved on the hanging column head. The structural column casting opening is a triangular prism-shaped notch on the hanging column head. The notch is arranged at the bottom end of the hanging column head for casting the edge of one side and is recessed away from the casting side. The notch forms a casting opening with a larger bottom plate area and a smaller top area on the hanging column head. The casting formwork of the main beam and the lower hanging column head is removed; When the masonry height of the masonry wall is higher than the lower surface of the lower hanging column head, two structural column templates are respectively installed on both sides of the masonry wall, so that the bottom end of the structural column template is located on the waist beam, and the top end is in contact with the side walls on the opposite sides of the lower hanging column head to enclose a structural column casting area, and the structural column casting port is connected to the structural column casting area; pouring concrete into the structural column pouring area through the structural column pouring opening to form the structural column; Sealing the pouring opening of the structural column; The structural column formwork is removed.

8. The method for quickly constructing structural columns without corbels as claimed in claim 7, characterized in that: Before casting and forming the main beam, the method for quickly constructing structural columns without corbels also includes: A plurality of structural column dowel bars are embedded in the main beam and the lower hanging column head, and two ends of the structural column dowel bars are respectively extended out of the main beam and the lower hanging column head.

9. The method for quickly constructing structural columns without corbels as claimed in claim 8, characterized in that: After the main beam and the lower hanging column head are cast and formed and before the structural column formwork is installed, the method for quickly constructing the structural column without the corbel also includes: The structural steel bars are installed in the casting area of ​​the structural column, and the structural steel bars are overlapped with one end of the structural column dowel bars extending out of the lower hanging column head.

10. The method for quickly constructing structural columns without corbels as claimed in claim 7, characterized in that: The step of sealing the pouring opening of the structural column specifically includes: When the wall is painted, fine stone concrete or cement mortar is used to fill the casting opening of the structural column.