A protective device for drilling and peering in anchor bolt construction of a tunnel passing through a fault structure
By designing a protective device for drilling peeping, using steel cables to drive rotating components to break rock spikes and soil blocks, the problem of difficulty in inserting probes during drilling peeping is solved, and the convenience and safety of operation are improved.
Patent Information
- Application Number
- CN202210580678.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-05-25
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2042-05-25
AI Technical Summary
During the drilling peeping process, the protruding rock thorns and soil blocks inside the drilling hole can easily cause the probe to be unable to be inserted, and the holes need to be cleaned again, which is more troublesome.
A protective device including a peephole probe, gasket, bracket, broken wall assembly and probe cleaning assembly is designed. The metal shaft and worm gear surface are driven by external steel cables, and the cutting head and cleaning cotton are used to perform rock thorns and soil blocks. Broken and clean, ensure the probe is inserted smoothly and avoids hole collapse.
It effectively avoids rock thorns and soil blocks from hindering the travel of the probe, improves the safety and cleaning efficiency of the penetration hole probe insertion, and reduces operational complexity.
Smart Images

Figure CN114810035B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of tunnel support construction, in particular to a protective device for drilling and peeping in a tunnel anchor construction across a fault structure. Background Art
[0002] Coal mines are mainly mined underground, and a large number of tunnels need to be excavated underground. The use of tunnel support to keep the tunnels unobstructed and the surrounding rock stable is of great significance to coal mine construction and production. The basic purpose of tunnel support is to ease and reduce the movement of the surrounding rock so that the tunnel cross-section does not shrink excessively, and at the same time prevent the scattered and damaged surrounding rock from falling. Generally, anchor rods and trays are installed for support after drilling.
[0003] Borehole peeping is one of the important links in the design of coal mine tunnel support. It can be used to observe the surrounding rock crushing, loose circle range, dynamic changes of roof and floor structure, etc. During the use of the borehole peeping instrument, the clarity of the image observed by the peeping instrument directly affects the applicability of the equipment. In the process of studying the common anchor construction borehole peeping, the inventor found that the existing technology has the following problems: when there are protruding rock thorns and soil blocks inside the borehole, it is easy to cause the probe to be unable to be inserted, and the hole needs to be cleaned again, which is troublesome to operate.
[0004] In view of this, we propose a protective device for drilling and peeping during anchor construction in tunnels passing through fault structures. Summary of the invention
[0005] The purpose of the present invention is to provide a protective device for peeping at a drilling hole during anchor construction of a tunnel with a fault structure, so as to solve the problem raised in the above background technology that when there are protruding rock thorns or soil blocks inside the borehole, it is easy to cause the probe to be unable to be inserted, and the hole needs to be cleaned again, which is a cumbersome operation. To achieve the above purpose, the present invention provides the following technical solution: A protective device for peeping at a drilling hole during anchor construction of a tunnel with a fault structure, comprising a peephole probe, a gasket fixedly connected to the surface of the peephole probe by screws, and a bracket fixedly connected to the outer side of the gasket surface, a wall breaking component fixedly installed on the outer end of the bracket, and a probe cleaning component driven by the wall breaking component is provided on the side surface of the bracket.
[0006] Preferably, the wall breaking assembly includes a ring seat, which is fixedly connected to the outer end of the bracket, and the interior of the ring seat is provided with an inner cavity connected to its inner ring, a metal shaft is rotatably connected in the inner cavity, and a winding disk is fixedly sleeved on the left end of the metal shaft, a steel cable is wound on the winding disk, and a wire hole connected to the inner cavity is provided inside the bracket and the ring seat, and the outer end of the steel cable extends to the outside through the wire hole.
[0007] The right end of the metal shaft is movably sleeved with a coil spring, and the two ends of the coil spring are respectively clamped on the metal shaft and the inner cavity.
[0008] The inner ring of the ring seat is rotatably connected with a shaft column, and the middle part of the shaft column is set as a worm wheel surface, and the middle part of the metal shaft is set as a worm that meshes with the worm wheel surface.
[0009] The probe cleaning assembly is arranged on the shaft column, the bracket and the steel cable.
[0010] The outer end of the shaft column is fixedly connected to a shield plate, and an embedding groove is provided on the outer edge of the shield plate. Oblique grooves are provided on the side walls on both sides of the embedding groove, and a cutter head is slidably connected to the inside of the embedding groove. Both sides of the cutter head surface are fixedly connected to protrusions, and the two protrusions are slidably embedded in the oblique grooves on the same side.
[0011] A spring is arranged inside the inclined groove, and two ends of the spring are fixedly connected to the protrusion and the inclined groove respectively.
[0012] Preferably, the probe cleaning assembly includes a through groove, the number of which is set to two, the two through grooves are respectively opened on opposite sides of the surfaces of the two brackets, and a movable ring is movably arranged between the two brackets, the upper and lower ends of the movable ring are fixedly connected with a clamping strip, the two clamping strips are respectively slidably connected in the through groove, and the two clamping strips are respectively fixedly connected to the steel cable on the same side.
[0013] The inner side of the movable ring surface is rotatably connected with a cleaning cotton that matches the peephole probe, the outer side of the cleaning cotton surface is fixedly connected with a prism, the inner end of the shaft column is fixedly connected with a prism, and the prism tube is slidably sleeved on the surface of the prism.
[0014] Preferably, the number of the brackets is set to two, and the two brackets are symmetrically arranged along the gasket.
[0015] Preferably, the number and position of the metal shafts correspond one-to-one to the brackets.
[0016] Preferably, a bearing is fixedly sleeved on the surface of the shaft column, and the outer ring of the bearing is fixedly connected to the inner ring of the ring seat.
[0017] Preferably, bolts are threadedly connected to the surface of the shield plate, and the shield plate is fixedly connected to the shaft column through the bolts.
[0018] Preferably, bristles matching the steel cable are fixedly connected to the end of the wire hole.
[0019] Compared with the prior art, the present invention has the following beneficial effects:
[0020] In the present invention, the steel cable is quickly pulled from the outside and pulled outward along the line hole, so that the winding disk and the metal shaft tightening coil spring rotate accordingly, and the worm is used to drive the worm wheel surface and the shaft column to rotate, and the shield plate rotates along the ring seat through the shaft column, thereby generating centrifugal force to throw the cutter head on the surface of the shield plate outward, and the cutter head slides outward along the inclined groove through the protrusion, and the outward-projected cutter head follows the shield plate to perform a circular motion, so as to break and remove rock thorns and soil blocks, and avoid them from hindering the movement of the peephole probe, and the scraping of the circular motion is not easy to cause axial squeezing force on the rock thorns and soil blocks, and effectively avoids the collapse of the inner wall of the channel caused by the shaking and separation of the rock thorns and soil blocks.
[0021] In the present invention, the steel cable is buckled externally and pulled outward along the line hole. The moving steel cable drives the clamping strip and the movable ring to move synchronously along the through groove, so that the movable ring and the cleaning cotton on its surface are displaced and fitted toward the lens. In this process, the winding disk and the metal shaft rotate accordingly due to the steel cable, and the worm gear drives the worm wheel surface and the shaft column to rotate. The rotating shaft column drives the prism tube and the cleaning cotton to rotate using the prism at the inner end, so that the cleaning cotton can be controlled to sweep dust on the lens surface.
[0022] In the present invention, the steel cable is pulled before the peephole probe is inserted to drive the movable ring to move, so that the cleaning cotton button is covered on the lens of the peephole probe, and then the peephole probe is inserted into the drill hole, which can effectively improve the safety of the peephole probe during insertion, and after the insertion, the steel cable is released and the components can be returned to their original positions using the winding spring. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 It is a schematic diagram of the three-dimensional structure of the present invention;
[0024] Figure 2 It is an exploded view of the present invention;
[0025] Figure 3 It is a cross-sectional view of the three-dimensional structure in the present invention;
[0026] Figure 4 For the present invention Figure 3 Exploded diagram of
[0027] Figure 5 For the present invention Figure 4 The enlarged view of point A in the middle;
[0028] Figure 6 For the present invention Figure 4 Enlarged view of point B in the middle.
[0029] In the figure: 1. peephole probe; 2. gasket; 3. bracket; 4. wall breaking assembly; 41. ring seat; 42. inner cavity; 43. metal shaft; 44. reel; 45. steel cable; 46. wire hole; 47. coil spring; 48. shaft column; 49. worm gear surface; 410. worm; 411. shield plate; 412. embedded groove; 413. inclined groove; 414. cutter head; 415. bump; 416. spring; 5. probe cleaning assembly; 51. through groove; 52. movable ring; 53. clamping strip; 54. cleaning cotton; 55. prism tube; 56. prism. DETAILED DESCRIPTION
[0030] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technical staff in this field without creative work are within the scope of protection of the present invention.
[0031] See also Figures 1 to 6 The present invention provides a technical solution: a protective device for drilling and peeping during anchor construction of a tunnel passing through a fault structure, comprising a peephole probe 1, a gasket 2 is fixedly connected to the surface of the peephole probe 1 by screws, and a bracket 3 is fixedly connected to the outer side of the surface of the gasket 2, a wall breaking component 4 is fixedly installed on the outer end of the bracket 3, and a probe cleaning component 5 driven by the wall breaking component 4 is arranged on the side surface of the bracket 3, a hole is drilled in the rock formation according to the installation point of the anchor, and after the drilling is completed, the peephole probe 1 of the peephole is inserted into the borehole for hole observation.
[0032] In this embodiment, Figure 1 , Figure 2 , Figure 3 , Figure 4 , Figure 5 and Figure 6 As shown, the wall-breaking assembly 4 includes a ring seat 41, which is fixedly connected to the outer end of the bracket 3, and an inner cavity 42 communicating with the inner ring of the ring seat 41 is provided inside. A metal shaft 43 is rotatably connected in the inner cavity 42, and a reel 44 is fixedly sleeved on the left end of the metal shaft 43, and a steel cable 45 is wound on the reel 44. A wire hole 46 communicating with the inner cavity 42 is provided inside the bracket 3 and the ring seat 41, and the outer end of the steel cable 45 extends to the outside through the wire hole 46. The steel cable 45 is quickly pulled from the outside, and the steel cable 45 is pulled outward along the wire hole 46, so that the reel 44 and the metal shaft 43 tighten the coil spring 47 and rotate accordingly;
[0033] The right end of the metal shaft 43 is movably sleeved with a coil spring 47, and the two ends of the coil spring 47 are respectively clamped on the metal shaft 43 and the inner cavity 42. The coil spring 47 normally pushes the metal shaft 43 and the winding drum 44 to retract the steel cable 45.
[0034] The inner ring of the ring seat 41 is rotatably connected to a shaft column 48, and the middle part of the shaft column 48 is set as a worm wheel surface 49, and the middle part of the metal shaft 43 is set as a worm 410 that meshes with the worm wheel surface 49. The worm 410 can drive the worm wheel surface 49 and the shaft column 48 to rotate;
[0035] The probe cleaning assembly 5 is arranged on the shaft column 48, the bracket 3 and the steel cable 45;
[0036] The outer end of the shaft column 48 is fixedly connected to the shield plate 411, and the outer edge of the shield plate 411 is provided with an embedding groove 412, and the side walls on both sides of the embedding groove 412 are provided with oblique grooves 413, and the inside of the embedding groove 412 is slidably connected to the cutter head 414, and the two sides of the surface of the cutter head 414 are fixedly connected with protrusions 415, and the two protrusions 415 are respectively slidably embedded in the oblique grooves 413 on the same side, that is, the cutter head 414 is movably embedded in the oblique groove 413 through the protrusions 415, so that the cutter head 414 is slidably connected in the embedding groove 412, and because the oblique groove 413 is an inclined structure, the cutter head 414 slides out at an angle of 45° between the axial and radial directions of the shield plate 411, and the shield plate 411 rotates along the ring seat 41 through the shaft column 48, thereby generating centrifugal force to throw the cutter head 414 on the surface of the shield plate 411 outward, and the cutter head 414 slides outward along the oblique groove 413 through the protrusions 415;
[0037] A spring 416 is disposed inside the inclined groove 413 , and two ends of the spring 416 are fixedly connected to the protrusion 415 and the inclined groove 413 respectively. The spring 416 pushes the protrusion 415 to slide along the inclined groove 412 , that is, the spring 416 normally pushes the cutter head 414 to be recovered in the embedded groove 412 .
[0038] In this embodiment, Figure 1 , Figure 2 , Figure 3 , Figure 4 , Figure 5 and Figure 6 As shown, the probe cleaning assembly 5 includes a through slot 51, the number of the through slots 51 is set to two, the two through slots 51 are respectively opened on opposite sides of the surfaces of the two brackets 3, and a movable ring 52 is movably arranged between the two brackets 3, and the upper and lower ends of the movable ring 52 are fixedly connected with a clamping strip 53, and the two clamping strips 53 are respectively slidably connected in the through slot 51, and the two clamping strips 53 are respectively fixedly connected to the same side steel cable 45;
[0039] The inner side of the surface of the movable ring 52 is rotatably connected to a cleaning cotton 54 that cooperates with the peephole probe 1, and the outer side of the surface of the cleaning cotton 54 is fixedly connected to a prism tube 55. The inner end of the shaft column 48 is fixedly connected to a prism 56. The prism tube 55 is slidably sleeved on the surface of the prism 56. The prism tube 55 can slide outward along the prism 56 without affecting the rotation of the prism 56 driven by the prism 56. The length of the prism 56 is greater than the maximum displacement distance of the prism tube 55, that is, when the cleaning cotton 54 contacts the lens, the prism tube 55 is still sleeved on the prism 56 and will not fall off.
[0040] In this embodiment, Figure 1 , Figure 2 , Figure 3 , Figure 4 , Figure 5 and Figure 6 As shown, the number of brackets 3 is set to two, and the two brackets 3 are symmetrically arranged along the gasket 2, so that the connection and operation of the wall breaking component 4 and the probe cleaning component 5 are more stable.
[0041] In this embodiment, Figure 1 , Figure 2 , Figure 3 , Figure 4 , Figure 5 and Figure 6 As shown, the number and position of the metal shafts 43 correspond one-to-one with the brackets 3 .
[0042] In this embodiment, Figure 1 , Figure 2 , Figure 3 , Figure 4 , Figure 5 and Figure 6 As shown, a bearing is fixedly sleeved on the surface of the shaft column 48, and the outer ring of the bearing is fixedly connected to the inner ring of the ring seat 41. The bearing can effectively reduce the friction coefficient of the shaft column 48 during movement, and can limit its position while ensuring its rotation accuracy.
[0043] In this embodiment, Figure 1 , Figure 2 , Figure 3 , Figure 4 , Figure 5 and Figure 6 As shown, bolts are threadedly connected to the surface of the shield plate 411, and the shield plate 411 is fixedly connected to the shaft column 48 through the bolts, so that the shield plate 411 can be quickly disassembled and assembled along the shaft column 48, which is convenient for replacement after wear.
[0044] In this embodiment, Figure 1 , Figure 2 , Figure 3 , Figure 4 , Figure 5 and Figure 6As shown, a brush matched with the steel cable 45 is fixedly connected to the end of the wire hole 46 to scrape the dust on the external steel cable 45 to prevent the dust from being brought into the inner cavity 42 by the recovered steel cable 45 to affect the transmission.
[0045] The use method and advantages of the present invention: When the protective device for drilling and peeping in the anchor construction of the roadway through the fault structure is in operation and use, the working process is as follows:
[0046] like Figure 1 , Figure 2 , Figure 3 , Figure 4 , Figure 5 and Figure 6 As shown:
[0047] S1, drilling a rock formation according to the installation point of the anchor rod, and after the drilling is completed, inserting the peephole probe 1 of the peephole into the borehole for hole observation;
[0048] S2. When there are protruding rock thorns or soil blocks, the operator can quickly detent the steel cable 45 from the outside, and the steel cable 45 is pulled outward along the line hole 46, so that the winding disk 44 and the metal shaft 43 tighten the coil spring 47 to rotate accordingly, and the worm 410 is used to drive the worm wheel surface 49 and the shaft column 48 to rotate, and the shield plate 411 rotates along the ring seat 41 through the shaft column 48, thereby generating centrifugal force to throw the cutter head 414 on the surface of the shield plate 411 outward, and the cutter head 414 slides outward along the inclined groove 413 through the protrusion 415, and the outward-projected cutter head 414 follows the shield plate 411 to perform a circular motion, so as to crush and remove the rock thorns and soil blocks to prevent them from obstructing the movement of the peephole probe 1, and the scraping of the circular motion is not easy to cause axial squeezing pressure on the rock thorns and soil blocks, which effectively prevents the rock thorns and soil blocks from shaking and detaching to cause the collapse of the inner wall of the channel;
[0049] S3, when the peephole probe 1 is moving in the channel and observing, if dust covers the lens and affects the observation effect, the operator can buckle the steel cable 45, and pull the steel cable 45 outward along the line hole 46, and the moving steel cable 45 drives the clamping strip 53 and the movable ring 52 to move synchronously along the through groove 51, so that the movable ring 52 and the cleaning cotton 54 on its surface are displaced and fitted toward the lens, and in this process, the winding disk 44 and the metal shaft 43 rotate correspondingly due to the steel cable 45, and the worm 410 drives the worm wheel surface 49 and the shaft column 48 to rotate, and the rotating shaft column 48 drives the prism 56 at the inner end to drive the prism tube 55 and the cleaning cotton 54 to rotate, so that the cleaning cotton 54 can be controlled to sweep the dust on the lens surface;
[0050] S4. In view of the possibility that the peephole probe 1 may be scratched or bumped by protrusions during the insertion of the peephole probe 1, the operator can pull the steel cable 45 to drive the movable ring 52 to move before inserting the peephole probe 1, so as to cover the cleaning cotton 54 on the lens of the peephole probe 1, and then insert the peephole probe 1 into the drill hole, which can effectively improve the safety of the peephole probe 1 during the insertion process. After the insertion, the steel cable 45 can be released and the components can be returned to their original positions using the coil spring 47.
[0051] The above shows and describes the basic principles, main features and advantages of the present invention. Technical personnel in this industry should understand that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only preferred examples of the present invention and are not used to limit the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention to be protected. The scope of protection of the present invention is defined by the attached claims and their equivalents.
Claims
1. A protective device for peephole drilling during anchor bolt construction in a tunnel through a fault structure, comprising a peephole probe (1), Features: The surface of the peephole probe (1) is fixedly connected to a gasket (2) by means of screws, and the outer side of the surface of the gasket (2) is fixedly connected to a bracket (3), the outer end of the bracket (3) is fixedly mounted with a wall breaking component (4), and the side surface of the bracket (3) is provided with a probe cleaning component (5) driven by the wall breaking component (4); The wall-breaking component (4) comprises a ring seat (41), the ring seat (41) is fixedly connected to the outer end of the bracket (3), and an inner cavity (42) communicating with the inner ring of the ring seat (41) is provided inside the ring seat (41), a metal shaft (43) is rotatably connected in the inner cavity (42), and a winding disk (44) is fixedly sleeved on the left end of the metal shaft (43), a steel cable (45) is wound on the winding disk (44), and a wire hole (46) communicating with the inner cavity (42) is provided inside the bracket (3) and the ring seat (41), and the outer end of the steel cable (45) passes through the wire hole (46) and extends to the outside; The right end of the metal shaft (43) is movably sleeved with a coil spring (47), and the two ends of the coil spring (47) are respectively clamped on the metal shaft (43) and the inner cavity (42); The inner ring of the ring seat (41) is rotatably connected to a shaft column (48), and the middle portion of the shaft column (48) is set as a worm wheel surface (49), and the middle portion of the metal shaft (43) is set as a worm (410) that meshes with the worm wheel surface (49); The probe cleaning assembly (5) is arranged on the shaft column (48), the bracket (3) and the steel cable (45); The outer end of the shaft column (48) is fixedly connected to a shield plate (411), and the outer edge of the shield plate (411) is provided with an embedding groove (412), the side walls on both sides of the embedding groove (412) are provided with oblique grooves (413), and the interior of the embedding groove (412) is slidably connected to a cutter head (414), and both sides of the surface of the cutter head (414) are fixedly connected to protrusions (415), and the two protrusions (415) are respectively slidably embedded in the oblique grooves (413) on the same side; A spring (416) is disposed inside the inclined groove (413), and two ends of the spring (416) are fixedly connected to the protrusion (415) and the inclined groove (413) respectively.
2. A protective device for drilling and peering in a tunnel anchor construction across a fault structure according to claim 1, Features: The probe cleaning assembly (5) comprises a through slot (51), the number of the through slots (51) is set to two, the two through slots (51) are respectively opened on opposite sides of the surfaces of the two brackets (3), and a movable ring (52) is movably arranged between the two brackets (3), the upper and lower ends of the movable ring (52) are fixedly connected with a clamping strip (53), the two clamping strips (53) are respectively slidably connected in the through slot (51), and the two clamping strips (53) are respectively fixedly connected to the steel cable (45) on the same side; A cleaning cotton (54) that matches the peephole probe (1) is rotatably connected to the inner side of the surface of the movable ring (52), a prism tube (55) is fixedly connected to the outer side of the surface of the cleaning cotton (54), a prism column (56) is fixedly connected to the inner end of the shaft column (48), and the prism tube (55) is slidably sleeved on the surface of the prism column (56).
3. A protective device for drilling and peering in a tunnel anchor construction across a fault structure according to claim 2, Features: The number of the brackets (3) is set to two, and the two brackets (3) are symmetrically arranged along the gasket (2).
4. A protective device for drilling and peering in a tunnel anchor construction across a fault structure according to claim 3, Features: The number and position of the metal shafts (43) correspond one-to-one to the bracket (3).
5. A protective device for drilling and peering in a tunnel anchor construction through a fault structure according to claim 4, Features: A bearing is fixedly sleeved on the surface of the shaft column (48), and the outer ring of the bearing is fixedly connected to the inner ring of the ring seat (41).
6. A protective device for drilling and peering in a tunnel anchor construction across a fault structure according to claim 5, Features: Bolts are threadedly connected to the surface of the shield plate (411), and the shield plate (411) is fixedly connected to the shaft column (48) via the bolts.
7. A protective device for drilling and peering in a tunnel anchor construction across a fault structure according to claim 6, Features: Brush hairs matching the steel cable (45) are fixedly connected to the end of the wire hole (46).