Electric energy meter calibration method, device, equipment, storage medium and program product

By obtaining the calibration route and displaying calibration steps information of the power meter, and combining with the early warning algorithm for error verification, the problem of low calibration efficiency and accuracy of the power meter is solved, automatic calibration and data storage is realized, and calibration is improved Efficiency and accuracy.

CN114817776BActive Publication Date: 2024-11-22MAINTENANCE & TEST CENTRE CSG EHV POWER TRANSMISSION CO
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202210535350.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-05-17
Publication Date
2024-11-22
Estimated Expiration
2042-05-17

AI Technical Summary

Technical Problem

In the prior art, the calibration efficiency of the power meter is not high, and the calibration data transmission and storage efficiency is insufficient, resulting in insufficient calibration accuracy and excessive personnel burden.

Method used

By obtaining the calibration route of the power meter, displaying the calibration step information, and using early warning algorithms to perform error verification, generating calibration reports, realizing automated calibration and data storage, reducing personnel burden, and improving calibration efficiency and accuracy.

Benefits of technology

It effectively improves the efficiency and accuracy of the calibration of the power meter, avoids duplication and omission of inspection routes, ensures the accuracy and reliability of the calibration data, and reduces the work burden of personnel.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114817776B_ABST
    Figure CN114817776B_ABST
Patent Text Reader

Abstract

The present application relates to an electric energy meter calibration method, device, equipment, storage medium and program product. The method comprises: obtaining an electric energy meter calibration route, the electric energy meter calibration route comprises a plurality of electric energy meter identifiers arranged in sequence and a geographical location corresponding to each electric energy meter identifier, the electric energy meter calibration route is determined according to the geographical locations of the plurality of electric energy meters to be calibrated; obtaining a first geographical location of a first electric energy meter currently being calibrated, and obtaining a second geographical location of a second electric energy meter currently being planned to be calibrated according to the electric energy meter calibration route; if the first geographical location and the second geographical location are consistent, displaying the model information of the second electric energy meter; after receiving a model consistency instruction, displaying the calibration step information corresponding to the second electric energy meter, the calibration step information is used to instruct the calibration personnel to calibrate the first electric energy meter according to the calibration step information. The use of this method can improve the efficiency of electric energy meter calibration.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of electric power technology, and in particular to an electric energy meter calibration method, device, equipment, storage medium and program product. Background Art

[0002] The electric energy meter is an important device commonly found in the power system. Regular inspection of the electric energy meter helps to ensure the normal operation of the power system. Therefore, it is necessary to regularly calibrate the electric energy meter and collect the calibration data. However, the efficiency of the electric energy meter calibration work in the related art is not high. Summary of the invention

[0003] Based on this, it is necessary to provide an electric energy meter calibration method, device, equipment, storage medium and program product that can improve the efficiency of electric energy meter calibration in response to the above technical problems.

[0004] In a first aspect, the present application provides a method for calibrating an electric energy meter. The method comprises:

[0005] Obtain an electric energy meter verification route, the electric energy meter verification route includes a plurality of electric energy meter identifiers arranged in sequence and a geographical location corresponding to each electric energy meter identifier, the electric energy meter verification route is determined according to the geographical locations of the plurality of electric energy meters to be verified; obtain a first geographical location of a first electric energy meter currently being verified, and obtain a second geographical location of a second electric energy meter currently being planned to be verified according to the electric energy meter verification route; if the first geographical location is consistent with the second geographical location, display the model information of the second electric energy meter; after receiving a model consistency instruction, display the verification step information corresponding to the second electric energy meter, the verification step information is used to instruct a verification personnel to verify the first electric energy meter according to the verification step information, and the model consistency instruction is used to indicate that the model of the second electric energy meter is consistent with the model of the first electric energy meter.

[0006] In one of the embodiments, obtaining an electric energy meter verification route includes: obtaining multiple electric energy meter identifiers and geographical locations corresponding to the electric energy meter identifiers sent by a background server; arranging the electric energy meter identifiers in order according to the geographical locations corresponding to the electric energy meter identifiers to obtain the electric energy meter verification route.

[0007] In one embodiment, displaying the verification step information corresponding to the second electric energy meter includes: using a voice component in the electric energy meter verification device to play the verification step information corresponding to the second electric energy meter.

[0008] In one of the embodiments, before obtaining the first geographical location of the first electric energy meter currently being actually calibrated, the method further includes: obtaining model information and calibration step information of multiple electric energy meters to be calibrated; generating a target task according to the electric energy meter calibration route, the model information of each electric energy meter, and the calibration step information of each electric energy meter; and sending the target task to a target account, wherein the target task is used to instruct the calibration personnel corresponding to the target account to calibrate each electric energy meter according to the target task.

[0009] In one of the embodiments, the method further includes: acquiring verification data of the second electric energy meter, performing error verification on the verification data, and generating a verification report according to the error verification result.

[0010] In one of the embodiments, the verification data is error-checked and a verification report is generated based on the error-check result, including: using an early warning algorithm to determine the error-check result of the verification data, and when the error-check result does not meet the target error range, an alarm is issued through an alarm component in the electric energy meter verification device; and the verification report is generated based on the error-check result, verification personnel information, and time information of obtaining the error-check result.

[0011] In a second aspect, the present application also provides an electric energy meter calibration device. The device comprises:

[0012] A first acquisition module is used to acquire an electric energy meter verification route, wherein the electric energy meter verification route includes a plurality of electric energy meter identifiers arranged in sequence and a geographical location corresponding to each electric energy meter identifier, and the electric energy meter verification route is determined according to the geographical locations of the plurality of electric energy meters to be verified;

[0013] A second acquisition module is used to acquire a first geographical location of a first electric energy meter that is currently being actually calibrated, and acquire a second geographical location of a second electric energy meter that is currently being planned to be calibrated according to the calibration route of the electric energy meter;

[0014] A first display module, configured to display model information of the second electric energy meter if the first geographical location is consistent with the second geographical location;

[0015] The first display module is used to display the verification step information corresponding to the second electric energy meter after receiving the model consistency instruction, and the verification step information is used to instruct the verification personnel to verify the first electric energy meter according to the verification step information. The model consistency instruction is used to indicate that the model of the second electric energy meter is consistent with the model of the first electric energy meter.

[0016] In one of the embodiments, the first acquisition module is specifically used to: obtain multiple electricity meter identifications and geographical locations corresponding to each electricity meter identification sent by a background server; arrange each electricity meter identification in order according to the geographical location corresponding to each electricity meter identification to obtain the electricity meter verification route.

[0017] In one of the embodiments, the first display module is specifically used to: use the voice component in the electric energy meter calibration device to play the calibration step information corresponding to the second electric energy meter.

[0018] In one embodiment, the device further comprises:

[0019] A third acquisition module is used to obtain model information and verification step information of multiple electric energy meters to be verified;

[0020] A first generating module is used to generate a target task according to the electric energy meter verification route, model information of each electric energy meter and verification step information of each electric energy meter;

[0021] The first sending module is used to send the target task to the target account, and the target task is used to instruct the verification personnel corresponding to the target account to verify each electric energy meter according to the target task.

[0022] In one embodiment, the device further comprises:

[0023] The fourth acquisition module is used to acquire the verification data of the second electric energy meter, perform error verification on the verification data, and generate a verification report according to the error verification result.

[0024] In one of the embodiments, the fourth acquisition module is specifically used to: determine the error verification result of the verification data using an early warning algorithm, and if the error verification result does not meet the target error range, issue an alarm through the alarm component in the electric energy meter verification device; generate the verification report based on the error verification result, verification personnel information, and time information of obtaining the error verification result.

[0025] In a third aspect, the present application also provides an electric energy meter calibration device, which includes a processing component, a positioning component, a display component and a presentation component; the processing component is used to obtain an electric energy meter calibration route, the electric energy meter calibration route includes a plurality of electric energy meter identifiers arranged in sequence and a geographical location corresponding to each electric energy meter identifier, and the electric energy meter calibration route is determined based on the geographical locations of the plurality of electric energy meters to be calibrated; the positioning component is used to obtain a first geographical location of a first electric energy meter currently being calibrated, and send the first geographical location to the processing component; the processing component is also used to obtain a second geographical location of a second electric energy meter currently being planned to be calibrated based on the electric energy meter calibration route, and compare the first geographical location with the second geographical location By comparison, if the first geographical location is consistent with the second geographical location, a display instruction and the model information of the second electric energy meter are sent to the display component; the display component is used to display the model information of the second electric energy meter after receiving the display instruction; the processing component is also used to receive a model consistency instruction, and send the verification step information corresponding to the second electric energy meter to the display component after receiving the model consistency instruction; the verification step information is used to instruct the verification personnel to verify the first electric energy meter according to the verification step information, and the model consistency instruction is used to indicate that the model of the second electric energy meter is consistent with the model of the first electric energy meter; the display component is used to display the verification step information corresponding to the second electric energy meter after receiving the model consistency instruction.

[0026] In one of the embodiments, the electric energy meter calibration device also includes a communication component; the communication component is used to obtain multiple electric energy meter identifications and the geographical locations corresponding to each electric energy meter identification sent by the background server, and send each electric energy meter identification and the geographical location corresponding to each electric energy meter identification to the processing component; the processing component is used to arrange each electric energy meter identification in order according to the geographical location corresponding to each electric energy meter identification to obtain the electric energy meter calibration route; wherein the communication method of the communication component includes at least one of Bluetooth communication, WiFi communication, 4G communication, 5G communication, RS485 bus communication, RS232 bus communication, LORA communication and NB-IOT communication.

[0027] In one of the embodiments, the processing component is also used to obtain model information and verification step information of multiple electric energy meters to be verified, generate a target task based on the electric energy meter verification route, the model information of each electric energy meter and the verification step information of each electric energy meter, and send the target task to the target account through the communication component. The target task is used to instruct the verification personnel corresponding to the target account to verify each electric energy meter according to the target task.

[0028] In one of the embodiments, the processing component is further used to obtain verification data of the second electric energy meter, perform error verification on the verification data, generate a verification report according to the error verification result, and send the verification report to the background server through the communication component.

[0029] In one of the embodiments, the electric energy meter calibration device also includes an alarm component; the processing component is specifically used to determine the error calibration result of the calibration data using an early warning algorithm, and when the error calibration result does not meet the target error range, send an alarm instruction to the alarm component; the alarm component is used to issue an alarm after receiving the alarm instruction.

[0030] In one of the embodiments, the electric energy meter calibration device further includes a multi-protocol conversion component; the multi-protocol conversion component is used to communicate with a background server when the communication component is disconnected and the multi-protocol conversion component is connected.

[0031] In one embodiment, the multi-protocol conversion component includes a serial port to WIFI module and a serial port to Ethernet module; the serial port to WIFI module is used to send serial port data to the background server in the form of WIFI signal; the serial port to Ethernet module is used to encapsulate serial port data into network port data and send it to the background server.

[0032] In a fourth aspect, the present application further provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the steps of any one of the methods described in the first aspect above.

[0033] In a fifth aspect, the present application further provides a computer program product, which includes a computer program, and when the computer program is executed by a processor, the steps of any one of the methods described in the first aspect are implemented.

[0034] The above-mentioned electric energy meter verification method, device, equipment, storage medium and program product obtain an electric energy meter verification route, and the electric energy meter verification route includes multiple electric energy meter identifiers arranged in sequence and the geographical location corresponding to each electric energy meter identifier. The electric energy meter verification route is determined according to the geographical locations of multiple electric energy meters to be verified; and obtain the first geographical location of the first electric energy meter currently being verified, and obtain the second geographical location of the second electric energy meter currently planned to be verified according to the electric energy meter verification route; if the first geographical location is consistent with the second geographical location, the model information of the second electric energy meter is displayed; after receiving the model consistency instruction, the verification step information corresponding to the second electric energy meter is displayed, and the verification step information is used to instruct the verification personnel to verify the first electric energy meter according to the verification step information, and the model consistency instruction is used to indicate that the model of the second electric energy meter is consistent with the model of the first electric energy meter. Therefore, multiple electric energy meters to be verified are verified according to the electric energy meter verification route, avoiding duplication of the inspection route or omission of the inspection, and effectively improving the verification efficiency of multiple electric energy meters. At the same time, when the first geographical location is consistent with the second geographical location, the model information is displayed to ensure the accuracy of the inspection. By displaying the verification step information, the verification personnel can calibrate the electric energy meter step by step and in a standardized manner according to the displayed verification step information, avoid missing verification steps, and further improve the verification efficiency and verification reliability of the electric energy meter. BRIEF DESCRIPTION OF THE DRAWINGS

[0035] Figure 1 A schematic diagram of a flow chart of an electric energy meter calibration method in one embodiment;

[0036] Figure 2 A schematic diagram of a process for obtaining an electric energy meter verification route in an embodiment;

[0037] Figure 3 A schematic diagram of a process for generating a target task in an embodiment;

[0038] Figure 4 A schematic diagram of a process for generating a verification report in an embodiment;

[0039] Figure 5 It is a structural block diagram of an electric energy meter calibration device in one embodiment;

[0040] Figure 6 A schematic diagram of the internal structure of an electric energy meter calibration device in one embodiment;

[0041] Figure 7 Schematic diagram of the internal structure of an electric energy meter calibration device in another embodiment. DETAILED DESCRIPTION

[0042] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.

[0043] With the rapid development of the power system, the calibration of electric energy meters plays an important role in related work. The traditional on-site calibration method of electric energy meters is relatively simple, mainly recording electric energy meter data by manual transcription and calibration personnel independently calibrating based on experience. In addition, the calibration efficiency in related technologies is low and the accuracy is not high enough. At the same time, the calibration data of the electric energy meter needs to be recorded in real time, but manual transcription in related technologies is not convenient and efficient enough, and the data storage and sorting efficiency is not enough.

[0044] Therefore, it is urgent to propose a method and equipment for electric energy meter calibration at the measurement operation site that can effectively improve the calibration efficiency, so as to realize the full process control of the electric energy meter on-site inspection work, effectively solve the problems existing in the data transmission and storage of the electric energy meter calibration, realize the automatic acquisition of calibration data, automatic storage of calibration data, remote control of the calibration device, realize the data transcription, transmission, storage management of the whole process of electric energy meter inspection, reduce the workload of personnel, improve the efficiency of electric energy meter calibration, and ensure the accuracy of calibration data. At the same time, the relevant concepts of quality control are combined in the operation process to ensure the efficiency and safety of the operation implementation process.

[0045] In one embodiment, Figure 1 As shown, a method for calibrating an electric energy meter is provided. This embodiment uses the method applied to an electric energy meter calibration device as an example. In this embodiment, the method includes the following steps:

[0046] Step 101, obtaining an electric energy meter verification route, the electric energy meter verification route comprising a plurality of electric energy meter identifiers arranged in sequence and a geographical location corresponding to each electric energy meter identifier, the electric energy meter verification route being determined according to the geographical locations of the plurality of electric energy meters to be verified.

[0047] Among them, multiple electric energy meters are usually set up on each route in the power system. According to the on-site inspection cycle of different equipment, the electric energy meters are divided into Class I, Class II and Class III. Class I electric energy meters are inspected on-site once every 6 months, and Class II and Class III electric energy meters are inspected on-site once every 12 months. According to the above requirements, it is necessary to perform error calibration on various types of electric energy meters. Since each electric energy meter is located at different positions on different lines, in order to improve the calibration efficiency of the calibration personnel, the electric energy meters that need to be error-calibrated at the same time can be calibrated through the planned electric energy meter calibration route. Among them, the electric energy meter calibration route includes multiple identifications of electric energy meters arranged in sequence and the corresponding geographical locations. The calibration personnel usually perform error calibration on each electric energy meter in sequence according to the electric energy meter calibration route. For example, the electric energy meter verification device can communicate with the background server, which stores the basic information of all electric energy meters in the power system, and when the electric energy meter needs to be error-checked, the background server sends the identification and geographical location information of multiple electric energy meters to be checked to the electric energy meter verification device, and the electric energy meter verification device determines the electric energy meter verification route based on the geographical location information of each electric energy meter received. The determined electric energy meter verification route is the shortest path for verifying all the electric energy meters to be verified.

[0048] Step 102, obtaining a first geographical location of a first electric energy meter that is currently being actually calibrated, and obtaining a second geographical location of a second electric energy meter that is currently being planned to be calibrated according to the calibration route of the electric energy meter.

[0049] In the actual verification process, the verification personnel will use the electric energy meter verification equipment to perform error verification on the electric energy meter. The verification personnel can perform error verification on each electric energy meter according to the electric energy meter verification route. In particular, for each electric energy meter, the electric energy meter at the geographical location of the verification personnel is taken as the first electric energy meter, which is the electric energy meter that the verification personnel intends to perform actual verification. The electric energy meter verification equipment obtains the first geographical location of the first electric energy meter, and determines the second geographical location of the second electric energy meter according to the electric energy meter verification route, wherein the second electric energy meter is the electric energy meter currently required to be verified that is planned in the electric energy meter verification route, and the second geographical location is the geographical location corresponding to the second electric energy meter contained in the electric energy meter verification route.

[0050] Step 103: If the first geographical location is consistent with the second geographical location, then display the model information of the second electric energy meter.

[0051] In order to ensure the accuracy of the verification, the first geographical location needs to be compared with the second geographical location. If the comparison between the two is consistent, it means that the geographical location of the verification personnel is accurate. This can avoid the occurrence of false detection. In addition, when the first geographical location is consistent with the second geographical location, the model information of the second electric energy meter is displayed, so that the verification personnel can compare the model information with the information printed on the first electric energy meter to further improve the accuracy of the verification.

[0052] Step 104, after receiving the model consistency instruction, display the verification step information corresponding to the second electric energy meter, the verification step information is used to instruct the verification personnel to verify the first electric energy meter according to the verification step information, and the model consistency instruction is used to indicate that the model of the second electric energy meter is consistent with the model of the first electric energy meter.

[0053] The electric energy meter verification device can obtain the model consistency instruction triggered by the verification personnel, and determine that the first electric energy meter and the second electric energy meter are the same electric energy meter after receiving the model consistency instruction. Then, according to the verification step information corresponding to the first electric energy meter, the verification step information is gradually displayed, so that the verification personnel can gradually verify the second electric energy meter according to the displayed verification step information, thereby ensuring the standardization of operation and protecting the safety of the verification personnel.

[0054] The above-mentioned electric energy meter verification method obtains an electric energy meter verification route, and the electric energy meter verification route includes multiple electric energy meter identifiers arranged in sequence and the geographical locations corresponding to each electric energy meter identifier. The electric energy meter verification route is determined according to the geographical locations of multiple electric energy meters to be verified; and obtains the first geographical location of the first electric energy meter currently being verified, and obtains the second geographical location of the second electric energy meter currently planned to be verified according to the electric energy meter verification route; if the first geographical location is consistent with the second geographical location, the model information of the second electric energy meter is displayed; after receiving the model consistency instruction, the verification step information corresponding to the second electric energy meter is displayed, and the verification step information is used to instruct the verification personnel to verify the first electric energy meter according to the verification step information, and the model consistency instruction is used to indicate that the model of the second electric energy meter is consistent with the model of the first electric energy meter. Therefore, multiple electric energy meters to be verified are verified according to the electric energy meter verification route, avoiding duplication of the inspection route or omission of the inspection, and effectively improving the verification efficiency of multiple electric energy meters. At the same time, when the first geographical location is consistent with the second geographical location, the model information is displayed to ensure the accuracy of the inspection. By displaying the verification step information, the verification personnel can calibrate the electric energy meter step by step and in a standardized manner according to the displayed verification step information, avoid missing verification steps, and further improve the verification efficiency and verification reliability of the electric energy meter.

[0055] In one embodiment, Figure 2 As shown, it shows a schematic diagram of a process for obtaining an electric energy meter calibration route provided in an embodiment of the present application, including:

[0056] Step 201: Acquire multiple electric energy meter identifiers and geographical locations corresponding to the electric energy meter identifiers sent by a background server.

[0057] The energy meter identifier is, for example, the name or serial number of the energy meter. The background server stores the energy meter identifiers of all energy meters in the power system and the predetermined geographical locations of each energy meter. The inspection cycle of each energy meter is different. The background server determines the multiple energy meters that need to be inspected at present and sends the energy meter identifiers and the corresponding geographical locations to the energy meter inspection device, so that the energy meter inspection device obtains the energy meter inspection route.

[0058] Step 202, according to the geographical location corresponding to each electric energy meter identifier, the electric energy meter identifiers are arranged in order to obtain the electric energy meter verification route.

[0059] Among them, the energy meter verification equipment can plan the most reasonable verification path according to the geographical location corresponding to each energy meter mark, and according to the path, arrange the energy meter marks in order to obtain the energy meter verification route for each energy meter to be verified. By determining the energy meter verification route, missed detection is avoided and the efficiency of energy meter verification is greatly improved.

[0060] In one embodiment, before obtaining the first geographical location of the first electric energy meter currently being actually calibrated, a target task needs to be generated, and the corresponding calibration personnel need to be made clear that the electric energy meter needs to be calibrated according to the target task. Figure 3 As shown, it shows a schematic diagram of a process of generating a target task provided by an embodiment of the present application, including:

[0061] Step 301, obtaining model information and verification step information of multiple electric energy meters to be verified.

[0062] Among them, the energy meter verification device can obtain the model information and verification step information of multiple energy meters to be verified sent by the background server. The verification steps of different models of energy meters may be different. By obtaining the verification step information corresponding to each energy meter, the verification step information is displayed during the verification process to ensure the standardization of the verification personnel's work.

[0063] Step 302: Generate a target task based on the electric energy meter verification route, model information of each electric energy meter, and verification step information of each electric energy meter.

[0064] Among them, after the electric energy meter verification route is determined according to multiple electric energy meters to be verified, a target task is generated according to the verification route and the model information and verification step information of each electric energy meter obtained. The target task is used to instruct the verification personnel who receive the target task to verify each electric energy meter according to the included electric energy meter verification route. At the same time, the verification step information will also be displayed during the verification process.

[0065] Step 303: Send the target task to the target account. The target task is used to instruct the verification personnel corresponding to the target account to verify each electric energy meter according to the target task.

[0066] Among them, the verification personnel corresponding to the target account can view the target task, and according to the order of each energy meter indicated by the energy meter verification route in the target task, align the geographical locations corresponding to each energy meter for error verification. In addition, during the verification process, it is also confirmed based on the model information whether the first energy meter currently being verified is the same energy meter as the second energy meter currently required to be verified, so as to achieve the purpose of accurate verification. Avoid false inspections and missed inspections, and arrange the verification itinerary reasonably and efficiently.

[0067] In one embodiment, displaying the verification step information corresponding to the second electric energy meter includes: using a voice component in the electric energy meter verification device to play the verification step information corresponding to the second electric energy meter.

[0068] Specifically, the electric energy meter calibration device also includes a voice component. During the calibration process of the second electric energy meter, the calibration step information corresponding to the second electric energy meter can be gradually played through the voice component. So that the calibration personnel can carry out the inspection work strictly in accordance with the calibration step information. For example, the calibration step information may include "Please confirm whether the power cord is connected", and obtain the feedback information of the calibration personnel; and play the next calibration step after receiving the feedback information. If no feedback information is received, the next calibration step will not be played to ensure that the calibration process is standardized, complete and rigorous. Among them, the electric energy meter calibration device also includes a feedback button. Therefore, after detecting the triggering operation of the feedback button by the calibration personnel, the electric energy meter calibration device confirms that the feedback information has been received and plays the next calibration step.

[0069] In one embodiment, the method further includes: acquiring verification data of the second electric energy meter, performing error verification on the verification data, and generating a verification report according to the error verification result.

[0070] The calibration of each electric energy meter mainly involves calibrating the working data of each electric energy meter to determine whether the error between the working data and the calibrated working data is within a preset range to ensure the normal operation of each electric energy meter. The working data to be calibrated is the calibration data.

[0071] Specifically, Figure 4 , which shows a schematic diagram of a process for generating a verification report provided by an embodiment of the present application. Error checking is performed on the verification data, and a verification report is generated according to the error checking result, including:

[0072] Step 401, using an early warning algorithm to determine the error verification result of the verification data, and when the error verification result does not meet the target error range, an alarm is issued through an alarm component in the electric energy meter verification device.

[0073] Among them, the energy meter verification device is connected to the energy meter through a junction box, and the energy meter verification device can obtain the verification data of the second energy meter. The verification data at least includes the measured voltage and measured current of the energy meter. In addition, the measured voltage and measured current are error-checked by an early warning algorithm. The early warning algorithm can be expressed by the following mathematical expression:

[0074]

[0075] In the above formula, A is the verification data, B is the calibration data, and C is the target error range. The value of B is pre-set. If the verification data A is the measured voltage, then B is the rated voltage value of the electric energy meter; if the verification data A is the measured current, then B is the calibrated current value of the electric energy meter.

[0076] Usually, commonly used electric energy meters have three accuracy levels: 0.5, 1.0, and 2.0. The allowable error range of a 0.5-level electric energy meter is within ±0.5%; the allowable error range of a 1.0-level electric energy meter is within ±1.0%; the allowable error range of a 2.0-level electric energy meter is within ±2.0%. Therefore, the value of C is 0.5%, 1.0%, or 2.0% according to the accuracy type of the electric energy meter. The electric energy meter calibration equipment can obtain the accuracy level of the electric energy meter to be calibrated in advance, and determine the value of the target range error C according to its corresponding accuracy level, so as to further perform error calibration on the calibration data through the above-mentioned early warning algorithm.

[0077] If the error check result satisfies the above mathematical expression, the error check result satisfies the target error range. If the error check result does not satisfy the above mathematical expression, the error check result does not satisfy the target error range. Therefore, an alarm can be issued through the alarm component in the electric energy meter calibration device to prompt the calibration personnel to inspect the electric energy meter.

[0078] Step 402: Generate the verification report according to the error verification result, verification personnel information, and time information of obtaining the error verification result.

[0079] Among them, according to the meter verification route, the error verification results of each meter to be verified are gradually obtained. At the same time, the verification personnel information can be determined according to the target account. The time information of the error verification result is generated after the error verification of each meter is completed. A verification report is generated based on the error verification result, the verification personnel information, and the time information of obtaining the error verification result. Optionally, the meter verification device can send the verification report to the background server to achieve full record of on-site work and strict management of verification data, so that the entire verification process can be traced back according to the verification report.

[0080] It should be understood that, although the various steps in the flowcharts involved in the above-mentioned embodiments are displayed in sequence according to the indication of the arrows, these steps are not necessarily executed in sequence according to the order indicated by the arrows. Unless there is a clear explanation in this article, the execution of these steps does not have a strict order restriction, and these steps can be executed in other orders. Moreover, at least a part of the steps in the flowcharts involved in the above-mentioned embodiments can include multiple steps or multiple stages, and these steps or stages are not necessarily executed at the same time, but can be executed at different times, and the execution order of these steps or stages is not necessarily to be carried out in sequence, but can be executed in turn or alternately with other steps or at least a part of the steps or stages in other steps.

[0081] Based on the same inventive concept, the embodiment of the present application also provides an electric energy meter calibration device for implementing the electric energy meter calibration method involved above. The implementation scheme for solving the problem provided by the device is similar to the implementation scheme recorded in the above method, so the specific limitations in one or more embodiments of the electric energy meter calibration device provided below can refer to the limitations of the electric energy meter calibration method above, and will not be repeated here.

[0082] In one embodiment, Figure 5 As shown, an electric energy meter calibration device is provided, and the electric energy meter calibration device 500 includes: a first acquisition module 501, a second acquisition module 502, a first display module 503 and a first display module 504, wherein:

[0083] A first acquisition module 501 is used to acquire an electric energy meter verification route, wherein the electric energy meter verification route includes a plurality of electric energy meter identifiers arranged in sequence and a geographical location corresponding to each electric energy meter identifier, and the electric energy meter verification route is determined according to the geographical locations of the plurality of electric energy meters to be verified;

[0084] The second acquisition module 502 is used to acquire a first geographical location of a first electric energy meter that is currently actually calibrated, and acquire a second geographical location of a second electric energy meter that is currently planned to be calibrated according to the electric energy meter calibration route;

[0085] A first display module 503, configured to display the model information of the second electric energy meter if the first geographical location is consistent with the second geographical location;

[0086] The first display module 504 is used to display the verification step information corresponding to the second electric energy meter after receiving the model consistency instruction, and the verification step information is used to instruct the verification personnel to verify the first electric energy meter according to the verification step information. The model consistency instruction is used to indicate that the model of the second electric energy meter is consistent with the model of the first electric energy meter.

[0087] In one embodiment, the first acquisition module 501 is specifically used to: obtain multiple electricity meter identifiers and geographical locations corresponding to each electricity meter identifier sent by the background server; arrange each electricity meter identifier in order according to the geographical location corresponding to each electricity meter identifier to obtain the electricity meter verification route.

[0088] In one embodiment, the first display module 504 is specifically used to: use the voice component in the electric energy meter calibration device to play the calibration step information corresponding to the second electric energy meter.

[0089] In one embodiment, the apparatus further comprises:

[0090] A third acquisition module is used to obtain model information and verification step information of multiple electric energy meters to be verified;

[0091] A first generating module is used to generate a target task according to the electric energy meter verification route, model information of each electric energy meter and verification step information of each electric energy meter;

[0092] The first sending module is used to send the target task to the target account, and the target task is used to instruct the verification personnel corresponding to the target account to verify each electric energy meter according to the target task.

[0093] In one embodiment, the apparatus further comprises:

[0094] The fourth acquisition module is used to acquire the verification data of the second electric energy meter, perform error verification on the verification data, and generate a verification report according to the error verification result.

[0095] In one embodiment, the fourth acquisition module is specifically used to: use an early warning algorithm to determine the error verification result of the verification data, and if the error verification result does not meet the target error range, an alarm is issued through the alarm component in the electric energy meter verification device; based on the error verification result, the verification personnel information, and the time information of obtaining the error verification result, the verification report is generated.

[0096] Each module in the above-mentioned electric energy meter verification device can be implemented in whole or in part by software, hardware and their combination. Each of the above-mentioned modules can be embedded in or independent of the processor in the computer device in the form of hardware, or can be stored in the memory of the computer device in the form of software, so that the processor can call and execute the corresponding operations of each of the above modules.

[0097] In one embodiment, Figure 6As shown, an electric energy meter calibration device is also provided, and the electric energy meter calibration device 600 includes a processing component 601, a positioning component 602, a display component 603 and a display component 604; the processing component 601 is used to obtain an electric energy meter calibration route, and the electric energy meter calibration route includes a plurality of electric energy meter identifiers arranged in sequence and a geographical location corresponding to each electric energy meter identifier, and the electric energy meter calibration route is determined according to the geographical locations of a plurality of electric energy meters to be calibrated; the positioning component 602 is used to obtain a first geographical location of a first electric energy meter currently being actually calibrated, and send the first geographical location to the processing component 601; the processing component 601 is also used to obtain a second geographical location of a second electric energy meter currently being planned to be calibrated according to the electric energy meter calibration route, and compare the first geographical location with the second geographical location. The processing component 601 is used to compare the first geographical location with the second geographical location. If the comparison is consistent, a display instruction and the model information of the second electric energy meter are sent to the display component 603; the display component 603 is used to display the model information of the second electric energy meter after receiving the display instruction; the processing component 601 is also used to receive a model consistency instruction, and after receiving the model consistency instruction, send the verification step information corresponding to the second electric energy meter to the display component 604; the verification step information is used to instruct the verification personnel to verify the first electric energy meter according to the verification step information, and the model consistency instruction is used to indicate that the model of the second electric energy meter is consistent with the model of the first electric energy meter; the display component 604 is used to display the verification step information corresponding to the second electric energy meter after receiving the model consistency instruction.

[0098] The above-mentioned electric energy meter calibration equipment calibrates multiple electric energy meters to be calibrated according to the electric energy meter calibration route, avoids duplication of the calibration route or omission of the calibration, and effectively improves the calibration efficiency of multiple electric energy meters. At the same time, when the first geographical location is consistent with the second geographical location, the model information is displayed to ensure the accuracy of the calibration. By displaying the calibration step information, the calibration personnel can calibrate the electric energy meter step by step and in a standardized manner according to the displayed calibration step information, avoid omission of the calibration step, and further improve the calibration efficiency and calibration reliability of the electric energy meter.

[0099] In one embodiment, the electric energy meter calibration device also includes a communication component; the communication component is used to obtain multiple electric energy meter identifiers and the geographical locations corresponding to each electric energy meter identifier sent by the background server, and send each electric energy meter identifier and the geographical location corresponding to each electric energy meter identifier to the processing component 601; the processing component 601 is used to arrange each electric energy meter identifier in order according to the geographical location corresponding to each electric energy meter identifier to obtain the electric energy meter calibration route; wherein the communication method of the communication component includes at least one of Bluetooth communication, WiFi communication, 4G communication, 5G communication, RS485 bus communication, RS232 bus communication, LORA communication and NB-IOT communication.

[0100] Among them, preferably, the electric energy meter calibration device supports Bluetooth communication, WiFi communication, 4G communication, 5G communication, RS485 bus communication, RS232 bus communication, LORA (Long Range Radio) communication and NB-IOT (Narrow Band Internet of Things) communication and other communication interfaces. Since the communication component expands the communication modules of the above-mentioned multiple protocol interfaces, the problem of single data communication mode and difficult data transmission in complex environments is solved. At the same time, it realizes the functions of two-way transmission of data between external devices and electric energy meter calibration equipment, and storage of data in electric energy meter calibration equipment.

[0101] In one embodiment, the processing component 601 is also used to obtain model information and verification step information of multiple electric energy meters to be verified, generate a target task according to the electric energy meter verification route, the model information of each electric energy meter and the verification step information of each electric energy meter, and send the target task to the target account through the communication component. The target task is used to instruct the verification personnel corresponding to the target account to verify each electric energy meter according to the target task.

[0102] Among them, the electric energy meter verification device can obtain the model information and verification step information of multiple electric energy meters to be verified sent by the background server through the communication component. The verification steps of different models of electric energy meters may be different. By obtaining the verification step information corresponding to each electric energy meter, the verification step information is displayed during the verification process to ensure the standardization of the verification personnel's work.

[0103] After determining the meter verification route according to the multiple meters to be verified, the processing component 601 generates a target task according to the verification route and the model information and verification step information of each meter obtained, and sends it to the target account through the communication component.

[0104] The verification personnel corresponding to the target account can view the target task, and according to the order of each energy meter indicated by the energy meter verification route in the target task, align the geographical locations corresponding to each energy meter for error verification. In addition, during the verification process, it is also confirmed based on the model information whether the first energy meter currently being verified is the same energy meter as the second energy meter currently required to be verified, so as to achieve the purpose of accurate verification. Avoid false inspections and missed inspections, and arrange the verification itinerary reasonably and efficiently.

[0105] In one embodiment, the processing component 601 is also used to obtain verification data of the second electric energy meter, perform error verification on the verification data, generate a verification report according to the error verification result, and send the verification report to the background server through the communication component.

[0106] The processing component obtains the error verification result of the second electric energy meter by obtaining the verification data of the second electric energy meter and performing error verification. At the same time, the verification personnel information can be determined according to the target account. The time information of the error verification result is automatically generated by the processing component after the error verification of each electric energy meter is completed. And a verification report is generated based on the error verification result, the verification personnel information, and the time information of obtaining the error verification result. In the case of network connection, the processing component sends the verification report to the background server through the communication component, realizes full record of on-site work, and strictly manages the verification data, so that the entire verification process can be traced back according to the verification report later.

[0107] Optionally, the electric energy meter calibration device 600 may further include a signal processing component, which specifically includes a signal sampling module, a signal conditioning module, a synchronous sampling module and a power / frequency conversion module.

[0108] The signal sampling module is used to obtain the calibration data of the calibrated electric energy meter. Optionally, the calibration data includes voltage signals and current signals. If the electric energy meter calibration equipment has a range requirement for calibration data measurement, the signal sampling module can be combined with an external voltage transformer and relay control circuit to realize the selection and switching between voltage ranges. The voltage transformer has a primary loop current to secondary loop current ratio of 1:1. In order to ensure the overall accuracy of the system, a high-precision precision transformer with small linearity and high accuracy can be used.

[0109] The signal conditioning module is used to remove the noise interference in the verification data obtained by the signal sampling module, filter out the out-of-band noise, and amplify the in-band signal.

[0110] The synchronous sampling module includes a phase-locked loop frequency multiplication module and an A / D conversion module. Specifically, since the collected voltage signal and current signal are not fixed at 50Hz, but fluctuate around 50Hz, synchronous sampling cannot be achieved, resulting in large measurement errors. Therefore, the sampling frequency is tracked in real time by the phase-locked loop frequency multiplication circuit to achieve full-cycle synchronous sampling. The collected voltage signal or current signal is converted into a digital signal by the A / D conversion module.

[0111] The power / frequency conversion module is used to perform power / frequency conversion on the digital signal, convert the electrical energy into high-frequency pulses proportional to the electrical energy, and output the high-frequency pulse signal to the processing component for error checking. The processing component performs error checking on the high-frequency pulse signal.

[0112] At the same time, the electric energy meter calibration device also includes a switching power supply component for supplying power to other components, and it also has protection functions such as overcurrent, overheating, and short circuit.

[0113] In one embodiment, the electric energy meter calibration device also includes an alarm component; the processing component 601 is specifically used to determine the error calibration result of the calibration data using an early warning algorithm, and to send an alarm instruction to the alarm component when the error calibration result does not meet the target error range; the alarm component is used to issue an alarm after receiving the alarm instruction.

[0114] Among them, the processing component performs error checking on the verification data through the early warning algorithm and obtains the error checking result. Specifically, the electric energy meter verification device and the electric energy meter are connected through the junction box, and the processing component 601 in the electric energy meter verification device can obtain the verification data of the second electric energy meter. The verification data at least includes the measured voltage and measured current of the electric energy meter. And, the measured voltage and measured current are error checked by the early warning algorithm. The early warning algorithm can be expressed by the following mathematical expression:

[0115]

[0116] In the above formula, A is the verification data, B is the calibration data, and C is the target error range. The value of B is pre-set. If the verification data A is the measured voltage, then B is the rated voltage value of the electric energy meter; if the verification data A is the measured current, then B is the calibrated current value of the electric energy meter.

[0117] Usually, commonly used electric energy meters have three accuracy levels: 0.5, 1.0, and 2.0. The allowable error range of a 0.5-level electric energy meter is within ±0.5%; the allowable error range of a 1.0-level electric energy meter is within ±1.0%; the allowable error range of a 2.0-level electric energy meter is within ±2.0%. Therefore, the value of C is 0.5%, 1.0%, or 2.0% according to the accuracy type of the electric energy meter. The processing component can obtain the accuracy level of the electric energy meter to be calibrated in advance, and determine the value of the target range error C according to its corresponding accuracy level, so as to further perform error calibration on the calibration data through the above-mentioned early warning algorithm.

[0118] If the error check result satisfies the above mathematical expression, that is, the error check result satisfies the target error range. If the error check result does not satisfy the above mathematical expression, that is, the error check result does not satisfy the target error range, at this time, the processing component can send an alarm instruction to the alarm component; the alarm component is used to alarm after receiving the alarm instruction, so as to achieve the purpose of prompting the calibration personnel to inspect the electric energy meter.

[0119] Optionally, the display component has a mixed display function of drawing and text images, and can display the verification data sent by the processing component in real time and display the verification data.

[0120] Optionally, the alarm component may be composed of a buzzer. At the same time, during the verification process, when the processing component detects that the amplitude or parameter deviation of the connecting piece of the junction box turned by the verification personnel is large, an alarm instruction will be sent to the alarm component, so that the alarm component will alarm according to the alarm instruction, reminding the operator to pay attention to the safety of operation, and at the same time achieving an efficient human-machine collaborative operation mode.

[0121] In one embodiment, the electric energy meter calibration device further includes a multi-protocol conversion component; the multi-protocol conversion component is used to communicate with a background server when the communication component is disconnected and the multi-protocol conversion component is connected.

[0122] Among them, the multi-protocol conversion component includes a serial port to WIFI module and a serial port to Ethernet module; the serial port to WIFI module is used to send serial port data to the background server in the form of WIFI signal; the serial port to Ethernet module is used to encapsulate serial port data into network port data and send it to the background server.

[0123] Specifically, the electric energy meter calibration device also includes a multi-protocol conversion component. When the communication component cannot be connected to the external device or the background server, that is, the communication component is not connected, the multi-protocol conversion component communicates with the background server and the external device. For example, when the communication component is not connected and the multi-protocol conversion component is connected, the multi-protocol conversion component sends the calibration report to the background server. In the embodiment of the present application, by adding a serial port conversion module, two communication modes of serial port to WIFI and serial port to Ethernet can be realized to ensure the effectiveness of communication.

[0124] like Figure 7As shown, it shows a schematic diagram of the structure of the second electric energy meter calibration device provided in the embodiment of the present application. It includes a switching power supply component, a signal processing component, a processing component, a display component, a display component, a communication component, an alarm component, a positioning component, a multi-protocol conversion component and an interactive button. Specifically, the signal processing component includes a signal sampling module, a signal conditioning module, a synchronous sampling module and a power / frequency conversion module. The synchronous sampling module includes a phase-locked loop frequency multiplication module and an A / D conversion module. The communication component includes a Bluetooth communication interface, a WiFi communication interface, a 4G communication interface, a 5G communication interface, an RS485 bus communication interface, an RS232 bus communication interface, a LORA communication interface and a NB-IOT communication interface, and each interface is implemented in software or hardware form. The multi-protocol conversion component includes a serial port to WIFI module and a serial port to Ethernet module. The positioning component includes a pin-type positioning module and a low-power positioning module. The LORA communication interface includes a LORA protocol module and a LORA radio frequency module. The LORA protocol module includes a LORA module module, a LORA point-to-point module and a LORA star module. LoRa RF modules include high-power LoRa modules and low-cost LoRa modules. Serial-to-WIFI modules include industrial-grade serial-to-WIFI modules, low-cost serial-to-WIFI modules, and high-performance serial-to-WIFI modules. Among them, low-cost serial-to-WIFI modules include ultra-small size WIFI modules, low-power WIFI modules, low-power patch-type WIFI modules, and embedded WIFI modules. High-performance serial-to-WIFI modules include built-in embedded industrial-grade WIFI modules and external embedded industrial-grade WIFI modules. Serial-to-Ethernet modules include industrial-grade serial-to-Ethernet modules, low-cost serial-to-Ethernet modules, and super network port modules. Among them, industrial-grade serial-to-Ethernet modules include three-serial-port Ethernet modules and dual-serial-port Ethernet modules. Low-cost serial-to-Ethernet modules include pin-type Ethernet modules and patch-type Ethernet modules. Super network port modules include industrial-grade super network port modules and low-cost super network port modules.

[0125] For the specific limitations in the above-mentioned electric energy meter calibration device embodiment, reference may be made to the above-mentioned limitations on the electric energy meter calibration method.

[0126] In one embodiment, a computer-readable storage medium is provided, on which a computer program is stored. When the computer program is executed by a processor, the steps in the above-mentioned method embodiments are implemented.

[0127] In one embodiment, a computer program product is provided, including a computer program, which implements the steps in the above method embodiments when executed by a processor.

[0128] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to the memory, database or other medium used in the embodiments provided in the present application can include at least one of non-volatile and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetoresistive random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory can include random access memory (RAM) or external cache memory, etc. As an illustration and not limitation, RAM can be in various forms, such as static random access memory (SRAM) or dynamic random access memory (DRAM). The database involved in each embodiment provided in this application may include at least one of a relational database and a non-relational database. Non-relational databases may include distributed databases based on blockchains, etc., but are not limited to this. The processor involved in each embodiment provided in this application may be a general-purpose processor, a central processing unit, a graphics processor, a digital signal processor, a programmable logic device, a data processing logic device based on quantum computing, etc., but are not limited to this.

[0129] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0130] The above-described embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the present application. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the present application shall be subject to the attached claims.

Claims

1. A method for calibrating an electric energy meter, used in an electric energy meter calibration device, characterized in that: The method comprises: Acquire an electric energy meter verification route, wherein the electric energy meter verification route includes a plurality of electric energy meter identifiers arranged in sequence and a geographical location corresponding to each of the electric energy meter identifiers, and the electric energy meter verification route is determined according to the geographical locations of the plurality of electric energy meters to be verified; Obtain model information and verification step information of multiple electric energy meters to be verified; Generate a target task according to the electric energy meter verification route, the model information of each of the electric energy meters, and the verification step information of each of the electric energy meters; Sending the target task to a target account, wherein the target task is used to instruct a verification personnel corresponding to the target account to verify each of the electric energy meters according to the target task; Acquire a first geographical location of a first electric energy meter that is currently actually being calibrated, and acquire a second geographical location of a second electric energy meter that is currently planned to be calibrated according to the electric energy meter calibration route; If the first geographical location is consistent with the second geographical location, displaying the model information of the second electric energy meter; After receiving the model consistency instruction, the verification step information corresponding to the second electric energy meter is displayed, and the verification step information is used to instruct the verification personnel to verify the first electric energy meter according to the verification step information. The model consistency instruction is used to indicate that the model of the second electric energy meter is consistent with the model of the first electric energy meter.

2. The method according to claim 1, characterized in that The method of obtaining the electric energy meter verification route includes: Obtain multiple electric energy meter identifiers and geographical locations corresponding to the electric energy meter identifiers sent by a backend server; According to the geographical locations corresponding to the electric energy meter identifications, the electric energy meter identifications are arranged in order to obtain the electric energy meter verification route.

3. The method according to claim 1, characterized in that The displaying of the verification step information corresponding to the second electric energy meter includes: The verification step information corresponding to the second electric energy meter is played by using the voice component in the electric energy meter verification device.

4. The method according to claim 1, characterized in that The method further comprises: The verification data of the second electric energy meter is obtained, and an error check is performed on the verification data, and a verification report is generated according to the error check result.

5. The method according to claim 4, characterized in that The performing error checking on the check data and generating a check report according to the error checking result includes: Determine the error check result of the verification data by using an early warning algorithm, and if the error check result does not meet the target error range, issue an alarm through an alarm component in the electric energy meter verification device; The verification report is generated according to the error verification result, verification personnel information, and time information of obtaining the error verification result.

6. An electric energy meter calibration device, characterized in that: The device comprises: A first acquisition module is used to acquire an electric energy meter verification route, wherein the electric energy meter verification route includes a plurality of electric energy meter identifiers arranged in sequence and a geographical location corresponding to each of the electric energy meter identifiers, and the electric energy meter verification route is determined according to the geographical locations of the plurality of electric energy meters to be verified; A third acquisition module is used to obtain model information and verification step information of multiple electric energy meters to be verified; A first generating module, configured to generate a target task according to the electric energy meter verification route, the model information of each of the electric energy meters, and the verification step information of each of the electric energy meters; A first sending module, used to send the target task to a target account, wherein the target task is used to instruct a verification personnel corresponding to the target account to verify each electric energy meter according to the target task; A second acquisition module is used to acquire a first geographical location of a first electric energy meter that is currently being actually calibrated, and acquire a second geographical location of a second electric energy meter that is currently being planned to be calibrated according to the electric energy meter calibration route; a first display module, configured to display model information of the second electric energy meter if the first geographical location is consistent with the second geographical location; The first display module is used to display the verification step information corresponding to the second electric energy meter after receiving the model consistency instruction, the verification step information is used to instruct the verification personnel to verify the first electric energy meter according to the verification step information, and the model consistency instruction is used to indicate that the model of the second electric energy meter is consistent with the model of the first electric energy meter.

7. An electric energy meter calibration device, characterized in that: The electric energy meter calibration device includes a processing component, a positioning component, a display component and a presentation component; the electric energy meter calibration device also includes a communication component; The processing component is used to obtain an electric energy meter verification route, wherein the electric energy meter verification route includes a plurality of electric energy meter identifiers arranged in sequence and a geographical location corresponding to each of the electric energy meter identifiers, and the electric energy meter verification route is determined according to the geographical locations of the plurality of electric energy meters to be verified; The processing component is further used to obtain model information and verification step information of multiple electric energy meters to be verified, generate a target task according to the electric energy meter verification route, the model information of each electric energy meter and the verification step information of each electric energy meter, and send the target task to the target account through the communication component, and the target task is used to instruct the verification personnel corresponding to the target account to verify each electric energy meter according to the target task; The positioning component is used to obtain a first geographical location of a first electric energy meter that is currently being actually verified, and send the first geographical location to the processing component; The processing component is further configured to obtain a second geographical location of a second electric energy meter that needs to be calibrated in the current plan according to the electric energy meter calibration route, and compare the first geographical location with the second geographical location, and if the first geographical location is consistent with the second geographical location, send a display instruction and model information of the second electric energy meter to the display component; The display component is used to display the model information of the second electric energy meter after receiving the display instruction; The processing component is further used to receive a model consistency instruction, and after receiving the model consistency instruction, send verification step information corresponding to the second electric energy meter to the display component; the verification step information is used to instruct the verification personnel to verify the first electric energy meter according to the verification step information, and the model consistency instruction is used to indicate that the model of the second electric energy meter is consistent with the model of the first electric energy meter; The display component is used to display the verification step information corresponding to the second electric energy meter after receiving the model consistency instruction.

8. The electric energy meter calibration equipment according to claim 7, characterized in that: The communication component is used to obtain multiple electric energy meter identifiers and geographical locations corresponding to the electric energy meter identifiers sent by the background server, and send the electric energy meter identifiers and geographical locations corresponding to the electric energy meter identifiers to the processing component; The processing component is used to arrange the electric energy meter identifiers in order according to the geographical locations corresponding to the electric energy meter identifiers to obtain the electric energy meter verification route; Among them, the communication mode of the communication component includes at least one of Bluetooth communication, WiFi communication, 4G communication, 5G communication, RS485 bus communication, RS232 bus communication, LORA communication and NB-IOT communication.

9. The electric energy meter calibration equipment according to claim 8, characterized in that: The processing component is also used to obtain the verification data of the second electric energy meter, perform error verification on the verification data, generate a verification report according to the error verification result, and send the verification report to the background server through the communication component.

10. The electric energy meter calibration equipment according to claim 9, characterized in that: The electric energy meter verification device also includes an alarm component; The processing component is specifically used to determine the error verification result of the verification data by using an early warning algorithm, and send an alarm instruction to the alarm component when the error verification result does not meet the target error range; The alarm component is used to issue an alarm after receiving the alarm instruction.

11. The electric energy meter calibration equipment according to claim 9, characterized in that: The electric energy meter verification device also includes a multi-protocol conversion component; The multi-protocol conversion component is used to communicate with the background server when the communication component is not connected and the multi-protocol conversion component is connected.

12. The electric energy meter calibration equipment according to claim 11, characterized in that: The multi-protocol conversion component includes a serial port to WIFI module and a serial port to Ethernet module; The serial port to WIFI module is used to send the serial port data to the background server in the form of WIFI signals; The serial port to Ethernet module is used to encapsulate serial port data into network port data and send it to the background server.

13. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 5 are implemented.

14. A computer program product comprising a computer program, characterized in that When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 5 are implemented.

Citation Information

Patent Citations

  • Mobile intelligent secondary circuit calibration system

    CN103699586A

  • Drawing and data processing method and device, computer equipment and storage medium

    CN113900988A

  • Data transmission method and apparatus, computer device, and storage medium

    WO2019075978A1