A power transmission and transformation project evaluation system and method based on three-dimensional design

Through the three-dimensional design-based power transmission and transformation engineering evaluation system, the collaborative sharing and compatibility problems of power transmission and transformation engineering design are solved, and a more efficient design process and more suitable basic model selection are achieved.

CN114818271BActive Publication Date: 2025-03-14杭州市电力设计院有限公司
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202210330689.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-03-31
Publication Date
2025-03-14
Estimated Expiration
2042-03-31

AI Technical Summary

Technical Problem

The existing technology cannot realize the collaborative sharing function of power transmission and transformation engineering design, resulting in inefficient design and compatibility problems in some designs, making it difficult to choose a suitable model as the basic model of other engineering designs.

Method used

It provides a power transmission and transformation engineering evaluation system based on three-dimensional design, including engineering information acquisition module, database, engineering data analysis module, engineering evaluation module and engineering application testing module. Through these modules, the system can collect and analyze engineering data, generate and modify the impact path, predict the workload, and establish evaluation functions to select the most suitable three-dimensional model as the basic model.

Benefits of technology

Through this system, users can effectively reduce the modeling time and modeling costs required for design, improve engineering design efficiency, and select the most suitable basic model to reduce modification workload and improve compatibility.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114818271B_ABST
    Figure CN114818271B_ABST
Patent Text Reader

Abstract

The invention discloses a power transmission and transformation project evaluation system and method based on three-dimensional design, comprising: an engineering information collection module, a database, an engineering data analysis module, an engineering evaluation module and an engineering application test module, wherein the engineering information collection module is used to collect the power transmission and transformation project data currently available and designed by users, and the database is used to store all the collected data, and the engineering data analysis module is used to analyze the compatibility of the power transmission and transformation project and generate the modification impact path of the power transmission and transformation project model, and predict the workload required for modifying the power transmission and transformation project, and the engineering evaluation module is used to establish an engineering evaluation function according to the analysis result, substitute the user demand data, and evaluate the applicability of the power transmission and transformation project as a basic model to the user, and the engineering application test module is used to update the user demand data, and the most suitable three-dimensional model of the power transmission and transformation project is selected as the basic model, thereby reducing the modeling times and costs of the power transmission and transformation project and improving the efficiency of the three-dimensional design of the power transmission and transformation project.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of engineering evaluation, and in particular to a power transmission and transformation engineering evaluation system and method based on three-dimensional design. Background Art

[0002] Power transmission and transformation projects refer to the construction of power transmission lines and transformer installation projects. In recent years, 3D design has been widely used in power transmission and transformation projects, which has greatly improved the efficiency and quality of power transmission and transformation projects. The use of 3D design can effectively improve the scientificity and rationality of engineering design. With the continuous acceleration of social and economic development, the demand for electricity in various industries has continued to increase, which has enabled the construction of power transmission and transformation stations to achieve leapfrog development. Relevant units have increased the cost of using 3D design when carrying out power transmission and transformation projects.

[0003] However, the use of three-dimensional design for power transmission and transformation projects is not yet mature and there are some problems: First, although power transmission and transformation projects have transitioned from two-dimensional design to three-dimensional design, they still need to be designed on a blank platform. The existing technology cannot realize the collaborative sharing function of power transmission and transformation project design. When users need to complete the project within a certain period of time, the design efficiency cannot be improved; secondly, some power transmission and transformation project designs have compatible properties, and it is impossible to select appropriate power transmission and transformation project models through evaluation projects as the basic models for other engineering designs to effectively reduce modeling time and modeling costs during design.

[0004] Therefore, people need a power transmission and transformation project evaluation system and method based on three-dimensional design to solve the above problems. Summary of the invention

[0005] The purpose of the present invention is to provide a power transmission and transformation project evaluation system and method based on three-dimensional design to solve the problems raised in the above-mentioned background technology.

[0006] In order to solve the above technical problems, the present invention provides the following technical solutions: a power transmission and transformation project evaluation system based on three-dimensional design, characterized in that: the system comprises: an engineering information acquisition module, a database, an engineering data analysis module, an engineering evaluation module and an engineering application test module;

[0007] The engineering information collection module collects the current power transmission and transformation engineering data and the power transmission and transformation engineering data that the user needs to design;

[0008] Storing all collected data through the database;

[0009] Analyzing the compatibility of the power transmission and transformation project through the engineering data analysis module and generating a modification impact path of the power transmission and transformation project model, and predicting the workload required to modify the power transmission and transformation project;

[0010] The engineering evaluation module establishes an engineering evaluation function based on the analysis results, substitutes the user demand data, and evaluates the applicability of the power transmission and transformation project as a basic model to the user;

[0011] The user demand data is updated through the engineering application test module, the project is evaluated after being substituted into the evaluation function, and the most suitable three-dimensional model of the power transmission and transformation project is selected as the basic model for engineering design.

[0012] Furthermore, the engineering information collection module includes a demand data collection unit and a design data collection unit. The demand data collection unit is used to collect the power transmission and transformation engineering data that the user needs to design and the completion time data of the power transmission and transformation engineering; the design data collection unit is used to collect the design drawing data of the currently existing power transmission and transformation engineering, and all the collected data is stored in the database.

[0013] Furthermore, the engineering data analysis module includes a compatible data analysis unit and a modification prediction unit, and the compatible data analysis unit is used to analyze the compatibility of the power transmission and transformation project with respect to other engineering designs; the modification prediction unit is used to analyze the differences between the power transmission and transformation projects, and after designing a random power transmission and transformation project on a three-dimensional design platform and generating a three-dimensional engineering model, it is confirmed that the points that need to be modified in conjunction with the modification of the random difference point are connected, and a joint modification path is generated, and the total workload required for modifying the corresponding points in the model is predicted based on the joint modification path.

[0014] Furthermore, the engineering evaluation module includes an evaluation model generation unit and an engineering applicability evaluation unit. The evaluation model generation unit is used to establish an evaluation function for a power transmission and transformation project based on three-dimensional design in combination with the modification workload and the degree of compatibility. The engineering applicability evaluation unit is used to substitute different user demand data into the evaluation function, and the applicability of the power transmission and transformation project as a basic model for the corresponding user to design other power transmission and transformation projects is evaluated. The most suitable basic model for the power transmission and transformation project is selected for the user, and the user designs the power transmission and transformation project by modifying the selected basic model.

[0015] Furthermore, the engineering application test module includes a demand data updating unit and an evaluation model training unit; the user demand data is updated by the demand data updating unit; the updated data is substituted into the evaluation function by the evaluation model training unit, the designed power transmission and transformation project is re-evaluated, and the power transmission and transformation project model with the highest evaluation is selected as the basic model for designing all power transmission and transformation projects.

[0016] A power transmission and transformation project evaluation method based on three-dimensional design, characterized in that it includes the following steps:

[0017] S01: Collect user demand data and design data of power transmission and transformation projects on the 3D design platform;

[0018] S02: After generating the 3D engineering model, generate a joint modification path and predict the workload required for modifying the corresponding points of the model;

[0019] S03: Analyze the compatibility of the designed power transmission and transformation projects;

[0020] S04: Establish an evaluation function for power transmission and transformation engineering, substitute user demand data, and evaluate the applicability of the power transmission and transformation engineering model as a basic model;

[0021] S05: Update and substitute demand data in real time to evaluate the project.

[0022] Further, in step S01-S02: the set of power transmission and transformation project design completion time required by the user is collected as ,in, represents the number of power transmission and transformation projects, collects the design difference points of two random power transmission and transformation projects, and the influence coefficient set of the difference points on the project construction is ,in, represents the number of design differences between two power transmission and transformation projects. If a random difference point is modified in one of the power transmission and transformation projects, the points that need to be modified in sequence are obtained. The time required to modify the points that need to be modified in sequence is collected as follows: , the influence coefficient set of the joint modification point on the engineering construction is , establish a two-dimensional coordinate system, and generate the set of point coordinates that need to be modified: ,in, Indicates the number of points that need to be modified when modifying a random difference point. Connect the modification points in order of duration from small to large to generate a modification path. Calculate the workload of modifying a random difference point according to the following formula :

[0023] ;

[0024] in, and They respectively represent the time required to modify two adjacent modification points of random connections. and They represent the influence coefficients of the corresponding connected modification points on the engineering construction, and the total workload of modifying the difference points in one of the transmission and transformation projects is obtained as follows: ,The modification of engineering design will bring about a series of related modifications. Often, a modification in one place will affect the design of other places. By comparing the difference points of the power transmission and transformation engineering design two by two, the point data that needs to be modified synchronously due to the modification of the difference points is analyzed. The degree of influence of the modification points on the entire engineering design is added based on the time required for the modification, and the coordinates of the modification points are generated. The purpose of analyzing the workload by calculating the area formed by the modification path and the coordinate system is to predict the comprehensive impact of the modification of the corresponding power transmission and transformation engineering model. The greater the modification workload, the less suitable it is as a basic engineering model for users to modify the design.

[0025] Further, in step S03: two random images of power transmission and transformation engineering drawings are collected, and the means of the two images are calculated using the Gaussian function to be: A1 and A2, the variances are B1 and B2, and the covariance is C 12 , calculate the compatibility degree Si of one power transmission and transformation project relative to the design of another power transmission and transformation project according to the following formula:

[0026] ;

[0027] Among them, D1 and D2 represent the engineering structure stability coefficients, D1 and D2 are constants, and the comprehensive compatibility degree of the corresponding power transmission and transformation project with the other power transmission and transformation project designs is obtained as follows: , the comprehensive compatibility set of all power transmission and transformation projects is ,Analyzing existing engineering drawings, the purpose of analyzing the engineering structure similarity through image analysis is to judge the compatibility between the power transmission and transformation project and other projects. The higher the compatibility degree, the more suitable the corresponding engineering model is as the basic model, which is helpful to reduce the user’s modification work on the model and save engineering design time.

[0028] Furthermore, in steps S04-S05: establish a power transmission and transformation project evaluation function: , where Q represents the total workload of modifying the difference points in the power transmission and transformation project, and X represents the time variable: the time required by the user to complete the power transmission and transformation project design. Indicates the comprehensive compatibility of power transmission and transformation projects, and the design completion time of a random power transmission and transformation project required by a user Substitute the evaluation function to obtain the evaluation score of a random power transmission and transformation project as a design model : , the evaluation score set of the power transmission and transformation project as a design model is obtained as , compare the evaluation scores, select the power transmission and transformation project with the highest evaluation score as the basic model for three-dimensional design, the highest evaluation score is Ymax, the user modifies the design according to the corresponding basic model, updates the time data required by the user in real time, substitutes the time data into the evaluation function, evaluates the project, and selects the project model with the highest evaluation for the user as the model for designing all power transmission and transformation projects. Combined with the project compatibility and modification workload, the power transmission and transformation project evaluation function is established, and the project design time is used as the dependent variable. The user substitutes different required design times to obtain the evaluation scores of different power transmission and transformation projects. The higher the evaluation score, the more the corresponding power transmission and transformation project model is selected as the basic model for the user to use. The shorter the time it takes for the user to complete the project design, which improves the efficiency of the user in designing power transmission and transformation projects.

[0029] Compared with the prior art, the beneficial effects achieved by the present invention are:

[0030] The present invention compares the difference points of power transmission and transformation engineering designs in pairs, analyzes the point data that are affected by the modification of the difference points and need to be modified synchronously, adds the degree of influence of the modification points on the entire engineering design based on the time required for the modification, generates a modification path, and predicts the comprehensive influence of the modification of the corresponding power transmission and transformation engineering model by calculating the area analysis workload formed by the modification path and the coordinate system. The greater the modification workload, the less suitable it is as a basic engineering model for users to modify the design. An evaluation function is set in combination with the engineering modification amount and the compatibility degree to evaluate the project, and the most suitable engineering model is selected as the basic model. By modifying the basic model, the user effectively reduces the modeling time and modeling cost required for the design, thereby improving the efficiency of engineering design. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:

[0032] Figure 1 It is a structural diagram of a power transmission and transformation engineering evaluation system based on three-dimensional design according to the present invention;

[0033] Figure 2 It is a step diagram of a power transmission and transformation project evaluation method based on three-dimensional design according to the present invention. DETAILED DESCRIPTION

[0034] The preferred embodiments of the present invention are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present invention, and are not used to limit the present invention.

[0035] See also Figure 1-Figure 2,The present invention provides a technical solution: a power transmission and transformation engineering evaluation system based on three-dimensional design, characterized in that: the system includes: an engineering information acquisition module, a database, an engineering data analysis module, an engineering evaluation module and an engineering application test module;

[0036] The engineering information collection module collects the existing power transmission and transformation engineering data and the data that users need to design;

[0037] All collected data is stored in the database;

[0038] The engineering data analysis module is used to analyze the compatibility of power transmission and transformation projects and generate the modification impact path of the power transmission and transformation project model, and to predict the workload required to modify the power transmission and transformation project;

[0039] Through the engineering evaluation module, the engineering evaluation function is established based on the analysis results, and the user demand data is substituted to evaluate the applicability of the power transmission and transformation project as a basic model to the user;

[0040] The user demand data is updated through the engineering application test module, the project is evaluated after being substituted into the evaluation function, and the most suitable three-dimensional model of the power transmission and transformation project is selected as the basic model for engineering design.

[0041] The engineering information collection module includes a demand data collection unit and a design data collection unit. The demand data collection unit is used to collect the power transmission and transformation engineering data that the user needs to design and the completion time data of the power transmission and transformation engineering; the design data collection unit is used to collect the design drawing data of the current power transmission and transformation engineering, and all the collected data is stored in the database.

[0042] The engineering data analysis module includes a compatible data analysis unit and a modification prediction unit. The compatible data analysis unit is used to analyze the compatibility of the power transmission and transformation project with respect to other engineering designs. The modification prediction unit is used to analyze the differences between the power transmission and transformation projects. After a random power transmission and transformation project is designed on a three-dimensional design platform and a three-dimensional engineering model is generated, the points that need to be modified in conjunction with the modification of a random difference point are confirmed, the points that need to be modified in conjunction are connected, a joint modification path is generated, and the total workload required for modifying the corresponding points in the model is predicted based on the joint modification path.

[0043] The engineering evaluation module includes an evaluation model generation unit and an engineering applicability evaluation unit. The evaluation model generation unit is used to establish an evaluation function for a power transmission and transformation project based on three-dimensional design in combination with the modification workload and the degree of compatibility. The engineering applicability evaluation unit is used to substitute different user demand data into the evaluation function, and the applicability of the power transmission and transformation project as a basic model for the corresponding user to design other power transmission and transformation projects is evaluated. The most suitable basic model for the power transmission and transformation project is selected for the user, and the user designs the power transmission and transformation project by modifying the selected basic model.

[0044] The engineering application test module includes a demand data updating unit and an evaluation model training unit; the user demand data is updated through the demand data updating unit; the updated data is substituted into the evaluation function through the evaluation model training unit, the designed power transmission and transformation project is re-evaluated, and the power transmission and transformation project model with the highest evaluation is selected as the basic model for designing all power transmission and transformation projects.

[0045] A power transmission and transformation project evaluation method based on three-dimensional design, characterized in that it includes the following steps:

[0046] S01: Collect user demand data and design data of power transmission and transformation projects on a 3D design platform;

[0047] S02: After generating the 3D engineering model, generate a joint modification path and predict the workload required for modifying the corresponding points of the model;

[0048] S03: Analyze the compatibility of the designed power transmission and transformation projects;

[0049] S04: Establish an evaluation function for power transmission and transformation engineering, substitute user demand data, and evaluate the applicability of the power transmission and transformation engineering model as a basic model;

[0050] S05: Update and substitute demand data in real time to evaluate the project.

[0051] In step S01-S02: the set of power transmission and transformation project design completion time required by the user is collected as ,in, represents the number of power transmission and transformation projects, collects the design difference points of two random power transmission and transformation projects, and the influence coefficient set of the difference points on the project construction is ,in, represents the number of design differences between two power transmission and transformation projects. If a random difference point is modified in one of the power transmission and transformation projects, the points that need to be modified in sequence are obtained. The time required to modify the points that need to be modified in sequence is collected as follows: , the influence coefficient set of the joint modification point on the engineering construction is , establish a two-dimensional coordinate system, and generate the set of point coordinates that need to be modified: ,in, Indicates the number of points that need to be modified when modifying a random difference point. Connect the modification points in order of duration from small to large to generate a modification path. Calculate the workload of modifying a random difference point according to the following formula :

[0052] ;

[0053] in, and They respectively represent the time required to modify two adjacent modification points of random connections. and They represent the influence coefficients of the corresponding connected modification points on the engineering construction, and the total workload of modifying the difference points in one of the transmission and transformation projects is obtained as follows: .

[0054] In step S03: two random images of power transmission and transformation engineering drawings are collected, and the means of the two images are calculated using the Gaussian function: A1 and A2, the variances are B1 and B2, and the covariance is C 12 , calculate the compatibility degree Si of one power transmission and transformation project relative to the design of another power transmission and transformation project according to the following formula:

[0055] ;

[0056] Among them, D1 and D2 represent the engineering structure stability coefficients, D1 and D2 are constants, and the comprehensive compatibility degree of the corresponding power transmission and transformation project with the other power transmission and transformation project designs is obtained as follows: , the comprehensive compatibility set of all power transmission and transformation projects is , reducing the user's modification work on the model and saving engineering design time.

[0057] In steps S04-S05: establish a power transmission and transformation project evaluation function: ,in, It represents the total workload of modifying the difference points in the power transmission and transformation project. Represents the time variable: the time required by the user to complete the power transmission and transformation project design, Indicates the comprehensive compatibility of power transmission and transformation projects, and the design completion time of a random power transmission and transformation project required by a user Substitute the evaluation function to obtain the evaluation score of a random power transmission and transformation project as a design model : , the evaluation score set of the power transmission and transformation project as a design model is obtained as , compare the evaluation scores, and select the power transmission and transformation project with the highest evaluation score as the basic model for 3D design. The user modifies the design according to the corresponding basic model, updates the duration data required by the user in real time, substitutes the duration data into the evaluation function, evaluates the project, and selects the project model with the highest evaluation for the user as the model for designing all power transmission and transformation projects, effectively reducing the modeling time and modeling cost required for the design and improving the efficiency of engineering design.

[0058] Example 1: Collect the design difference points of two random power transmission and transformation projects, and the influence coefficient set of the difference points on the project construction is , if a random difference point is modified in one of the power transmission and transformation projects, the points that need to be modified in sequence are obtained, and the time required for the corresponding points that need to be modified in sequence is collected as , the influence coefficient set of the joint modification point on the engineering construction is , establish a two-dimensional coordinate system, and generate the set of point coordinates that need to be modified as follows: , connect the joint modification points in order of duration from small to large, generate the joint modification path, according to the formula The workload set for calculating and modifying random difference points is , the total workload of modifying the difference points in one of the power transmission and transformation projects is , we collected two random images of power transmission and transformation engineering drawings, and used the Gaussian function to calculate the means of the two images: A1=2, A2=1, the variances are B1=5, B2=4, and the covariance is C 12 =6, according to the formula Calculate the compatibility of one power transmission and transformation project with another power transmission and transformation project design Si=0.19, and get the comprehensive compatibility of the corresponding power transmission and transformation project with the remaining power transmission and transformation project designs: , establish the evaluation function of power transmission and transformation project: , the time required to complete the design of a random power transmission and transformation project required by a user , substitute into the evaluation function, and get the evaluation score of a random power transmission and transformation project as a design model : , the evaluation score set of the power transmission and transformation project as a design model is obtained as , compare the evaluation scores, and select the power transmission and transformation project with the highest evaluation score as the basic model for 3D design. , the user modifies the design project according to the corresponding basic model.

[0059] Finally, it should be noted that the above description is only a preferred example of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A power transmission and transformation project evaluation system based on three-dimensional design, characterized by: The system includes: an engineering information collection module, a database, an engineering data analysis module, an engineering evaluation module and an engineering application test module; The engineering information collection module collects the current power transmission and transformation engineering data and the power transmission and transformation engineering data that the user needs to design; Storing all collected data through the database; Analyzing the compatibility of the power transmission and transformation project through the engineering data analysis module and generating a modification impact path of the power transmission and transformation project model, and predicting the workload required to modify the power transmission and transformation project; The engineering evaluation module establishes an engineering evaluation function based on the analysis results, substitutes the user demand data, and evaluates the applicability of the power transmission and transformation project as a basic model to the user; Establish the evaluation function of power transmission and transformation project: , where Q represents the total workload of modifying the difference points in the power transmission and transformation project, X represents the time variable: the time required by the user to complete the power transmission and transformation project design, S ’ Indicates the comprehensive compatibility of power transmission and transformation projects; The user demand data is updated through the engineering application test module, the project is evaluated after being substituted into the evaluation function, and the most suitable three-dimensional model of the power transmission and transformation project is selected as the basic model for engineering design.

2. The power transmission and transformation project evaluation system based on three-dimensional design according to claim 1, characterized in that: The engineering information collection module includes a demand data collection unit and a design data collection unit, and the demand data collection unit collects the power transmission and transformation engineering data and the completion time data of the power transmission and transformation engineering that the user needs to design; The design data collection unit collects the design drawing data of the current power transmission and transformation project, and stores all the collected data in the database.

3. The power transmission and transformation project evaluation system based on three-dimensional design according to claim 1 is characterized by: The engineering data analysis module includes a compatible data analysis unit and a modification prediction unit, and the compatible data analysis unit is used to analyze the compatibility of the power transmission and transformation project with respect to other engineering designs; The modification prediction unit analyzes the differences between the power transmission and transformation projects, designs a random power transmission and transformation project on the three-dimensional design platform and generates a three-dimensional engineering model, confirms the points that need to be modified in conjunction with the modification of the random difference point, connects the points that need to be modified in conjunction, generates a joint modification path, and predicts the total workload required for modifying the corresponding points in the model based on the joint modification path.

4. The power transmission and transformation project evaluation system based on three-dimensional design according to claim 1 is characterized by: The engineering evaluation module includes an evaluation model generation unit and an engineering applicability evaluation unit. The evaluation model generation unit is used to establish an evaluation function for a power transmission and transformation project based on a three-dimensional design in combination with the modification workload and the degree of compatibility. The engineering applicability evaluation unit is used to substitute different user demand data into the evaluation function, evaluate the applicability of the power transmission and transformation project as a basic model for the corresponding user to design other power transmission and transformation projects, select the most suitable basic model for the power transmission and transformation project for the user, and the user designs the power transmission and transformation project by modifying the selected basic model.

5. The power transmission and transformation project evaluation system based on three-dimensional design according to claim 1 is characterized by: The engineering application test module includes a demand data updating unit and an evaluation model training unit; the demand data updating unit is used to update user demand data; the evaluation model training unit is used to substitute the updated data into the evaluation function, and the designed power transmission and transformation project is re-evaluated, and the power transmission and transformation project model with the highest evaluation is selected as the basic model for designing all power transmission and transformation projects.

6. A power transmission and transformation project evaluation method based on three-dimensional design, characterized by: The following steps are involved: S01: Collect user demand data and design data of power transmission and transformation projects on a 3D design platform; S02: After generating the 3D engineering model, generate a joint modification path and predict the workload required for modifying the corresponding points of the model; S03: Analyze the compatibility of the designed power transmission and transformation projects; S04: Establish an evaluation function for power transmission and transformation engineering, substitute user demand data, and evaluate the applicability of the power transmission and transformation engineering model as a basic model; S05: Update and substitute demand data in real time to evaluate the project; In steps S04-S05: establish a power transmission and transformation project evaluation function: , where Q represents the total workload of modifying the difference points in the power transmission and transformation project, X represents the time variable: the time required by the user to complete the power transmission and transformation project design, S ’ Indicates the comprehensive compatibility level of power transmission and transformation projects.

7. The power transmission and transformation project evaluation method based on three-dimensional design according to claim 6 is characterized by: In step S01-S02: the set of completion time of power transmission and transformation project design required by the user is collected as T={T1, T2, ..., T n }, where n represents the number of power transmission and transformation projects. The design difference points of two random power transmission and transformation projects are collected, and the influence coefficient set of the difference points on the project construction is w={w1, w2, ..., w m }, where m represents the number of design differences between the two power transmission and transformation projects. If a random difference point is modified in one of the power transmission and transformation projects, the points that need to be modified in sequence are obtained, and the time required to modify the points that need to be modified in sequence is t ’ ={t1 ’ , t2 ’ , ..., t p ’ }, the influence coefficient set of the joint modification point on the engineering construction is {w1 ’ , w2 ’ , ..., w p ’ }, establish a two-dimensional coordinate system, and generate the set of point coordinates that need to be modified as {(t1 ’ , w1 ’ ), (t2 ’ , w2 ’ ),...,(t p ’ , w p ’ )}, where p represents the number of points that need to be modified when modifying a random difference point. The joint modification points are connected in order of duration from small to large to generate a joint modification path. The workload Qi for modifying a random difference point is calculated according to the following formula: ; Among them, t j+1 ’ and t j ’ They represent the time required to modify two adjacent modification points of random connections, w j+1 ’ and w j ’ They represent the influence coefficients of the corresponding connected modification points on the engineering construction, and the total workload of modifying the difference points in one of the transmission and transformation projects is obtained as follows: .

8. The power transmission and transformation project evaluation method based on three-dimensional design according to claim 6 is characterized by: In step S03: two random images of power transmission and transformation engineering drawings are collected, and the means of the two images are calculated using the Gaussian function: A1 and A2, the variances are B1 and B2, and the covariance is C 12 , calculate the compatibility degree Si of one power transmission and transformation project relative to the design of another power transmission and transformation project according to the following formula: ; Among them, D1 and D2 represent the engineering structure stability coefficients, D1 and D2 are constants, and the comprehensive compatibility degree of the corresponding power transmission and transformation project with the other power transmission and transformation project designs is obtained as follows: , the comprehensive compatibility set of all power transmission and transformation projects is obtained as S ’ ={S1 ’ , S2 ’ , ..., Sn ’ }.

9. The power transmission and transformation project evaluation method based on three-dimensional design according to claim 6 is characterized by: In steps S04-S05: the design completion time Ti of a random power transmission and transformation project required by a user is substituted into the evaluation function to obtain the evaluation score Yj of the random power transmission and transformation project as a design model: , the evaluation score set of the power transmission and transformation project as a design model is obtained as Y={Y1, Y2, ..., Yn}, the evaluation scores are compared, and the power transmission and transformation project with the highest evaluation score is selected as the basic model for three-dimensional design. The highest evaluation score is Ymax. The user modifies the design according to the corresponding basic model, updates the duration data required by the user in real time, substitutes the duration data into the evaluation function, evaluates the project, and selects the project model with the highest evaluation for the user as the model for designing all power transmission and transformation projects.

Citation Information

Patent Citations

  • System and method for power transmission and transformation project three-dimensional-aided preliminary design

    CN103093008A

  • Power transmission and transformation project intelligent autonomous design platform and working method thereof

    CN110569557A